CN110359189A - A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping - Google Patents

A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping Download PDF

Info

Publication number
CN110359189A
CN110359189A CN201910661117.7A CN201910661117A CN110359189A CN 110359189 A CN110359189 A CN 110359189A CN 201910661117 A CN201910661117 A CN 201910661117A CN 110359189 A CN110359189 A CN 110359189A
Authority
CN
China
Prior art keywords
baseline
sewing machine
sewing
controller
peg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910661117.7A
Other languages
Chinese (zh)
Inventor
潘建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jack Technology Co Ltd
Original Assignee
Jack Sewing Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jack Sewing Machine Co Ltd filed Critical Jack Sewing Machine Co Ltd
Priority to CN201910661117.7A priority Critical patent/CN110359189A/en
Publication of CN110359189A publication Critical patent/CN110359189A/en
Pending legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D05SEWING; EMBROIDERING; TUFTING
    • D05BSEWING
    • D05B59/00Applications of bobbin-winding or -changing devices; Indicating or control devices associated therewith
    • D05B59/02Devices for determining or indicating the length of thread still on the bobbin

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Sewing Machines And Sewing (AREA)

Abstract

The present invention provides a kind of bobbin thread for sewing machine overmeasure computation method, comprising the following steps: baseline winding length A is obtained when to shuttle peg winding;The baseline beginning that the controller of sewing machine obtains baseline on peg or spindle measures L: baseline beginning amount L is baseline winding length A or is the baseline surplus after last time sewing;Seam is started;After sewing, the controller of sewing machine obtains the baseline that sewing needle number M and every needle needle gage use and uses length B, and the controller of sewing machine calculates baseline surplus Y:Y=f (L automatically, M, B), the f (L, M, B) it is pre-stored in the controller of sewing machine.The application can effectively calculate the baseline surplus Y on peg or spindle, to effectively be monitored to baseline surplus;Particularly, the application can avoid being transformed the structure of peg or spindle, and the application can be realized using common peg or spindle, cancels the specificity of peg or spindle, so that peg or spindle is general, and reduces the difficulty of processing of peg or spindle.

Description

A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping
Technical field
The present invention relates to sewing machine fields, stop more particularly to a kind of bobbin thread for sewing machine overmeasure computation method and sewing machine Vehicle control method.
Background technique
When sewing sewing, the rotating shuttle and eedle of sewing machine cooperate so that baseline and upper thread are interleaved with each other company sewing machine Eyelet is threaded on sewing, to form stitching.Upper thread is threaded through in the pinprick of eedle, and eedle does up and down campaign;Rotating shuttle by Bobbin case and peg or spindle are constituted, and peg or spindle is housed in bobbin case, and baseline is wrapped on peg or spindle.Upper thread is generally longer, there is 3000m- 4000m, and user can observe the number of upper thread line amount at any time in sewing process, therefore upper thread can be replaced in time.But due to seam It threads the limitation of machine space and mechanism principle, baseline is generally shorter, only 20m-50m, therefore needs to be replaced as frequently as peg or spindle.
Currently, worker can not be by eyes direct viewing peg or spindle for the sewing machine of no baseline surplus detection function Whether baseline surplus is enough, therefore can not find in time after baseline is finished, and causes to sew in vain, so that sewing be caused to scrap or tear open Line is done over again.For there is the sewing machine of baseline surplus detection function, most of them are realized by sensor baseline surplus detection, Such as: a kind of bobbin thread for sewing machine excess detection method disclosed in the Chinese invention patent application No. is 201610388889.4, It uses sensor alignment peg or spindle, peg or spindle have the function of can reflected sensor signal, therefore peg or spindle is dedicated peg or spindle, with current Common peg or spindle in the market can not be general, and this dedicated peg or spindle, other than poor universality, difficulty of processing is also high.
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide a kind of calculating of bobbin thread for sewing machine surplus Method uses common peg or spindle can be realized.
To achieve the above object, the present invention provides a kind of bobbin thread for sewing machine overmeasure computation method, comprising the following steps:
1) baseline winding length A, is obtained when to shuttle peg winding;
2), the baseline beginning that the controller of sewing machine obtains baseline on peg or spindle measures L: head after this time sewing is replaces peg or spindle When secondary sewing, the baseline beginning amount L is baseline winding length A;When this time sewing for replacement peg or spindle after it is non-sew for the first time when, institute Stating baseline beginning amount L is the baseline surplus after last time sewing;
3) seam, has been started;
4) after, sewing, the controller of sewing machine obtains the sewing needle number M of the secondary sewing and every needle needle gage uses Baseline use length B, the controller of sewing machine calculates baseline surplus Y:Y=f (L, M, B) automatically, and the f (L, M, B) prestores In the controller of sewing machine.
Further, in the step 4), f (L, M, B)=L-M*B.
Further, in the step 4), the controller of the sewing machine obtains the baseline that every needle needle gage uses and uses length Spend the mode of B are as follows:
S1, the compensation variable N that every needle needle gage uses line length is previously provided in the controller of sewing machine;
S2, started after stitching, the controller of sewing machine obtains the needle gage P of the secondary sewing;
S3, sewing machine controller calculate the baseline that every needle needle gage in the secondary sewing process uses automatically and use length B: B=f (N, P), the f (N, P) are pre-stored in the controller of sewing machine.
Further, the compensation variable N is that the baseline that every needle needle gage uses uses length B to consume relative to needle gage P more Baseline amount;In the step S3, f (N, P)=P+N.
Further, the compensation variable N is that the baseline that every needle needle gage uses uses length B relative to the multiple of needle gage P; In the step S3, f (N, P)=P*N.
Further, the compensation variable N is constant.
Further, in the step 1), baseline is wrapped on peg or spindle using bobbin winder device, is pacified in the bobbin winder device Electronic device equipped with measurement winding length.
The application also provides a kind of sewing machine control method for stopping, and the sewing machine control method for stopping uses as described above Bobbin thread for sewing machine overmeasure computation method calculate every time sewing after baseline surplus Y, the controller and seam of the sewing machine Thread machine main motor be connected;Parking condition is provided in the controller of the sewing machine, the Parking condition is lower road sewer Baseline amount needed for sequence allows surplus for baseline, and the controller of the sewing machine controls the main electricity of sewing machine according to Parking condition Machine stops operating.
As described above, bobbin thread for sewing machine overmeasure computation method of the present invention and sewing machine control method for stopping, have Below the utility model has the advantages that
The application is kept away in the baseline surplus Y that can effectively calculate on peg or spindle to effectively be monitored to baseline surplus Exempt to generate invalid sewing, guarantees sewing quality;Particularly, the application is that L, sewing needle number M and every needle needle are measured by the baseline beginning Length B is used away from the baseline used to obtain the accurate baseline surplus Y of remaining baseline on peg or spindle, rather than is used in the prior art The cooperation of sensor and peg or spindle is realized, therefore the application avoids being transformed the structure of peg or spindle, and the application is using common Peg or spindle can be realized, and cancel the specificity of peg or spindle, so that peg or spindle is general, and reduce the difficulty of processing of peg or spindle.
Detailed description of the invention
Fig. 1 is to connect to close between the controller of sewing machine, the main motor of sewing machine and bobbin winder device three in the application It is the schematic diagram of embodiment one.
Fig. 2 is to connect to close between the controller of sewing machine, the main motor of sewing machine and bobbin winder device three in the application It is the schematic diagram of embodiment two.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
It should be clear that structure, ratio, size etc. that this specification attached drawing is drawn, only to cooperate specification revealed interior Hold, so that those skilled in the art understands and reads, is not intended to limit the invention enforceable qualifications, therefore does not have skill Essential meaning in art, the modification of any structure, the change of proportionate relationship or the adjustment of size can be produced not influencing the present invention Under raw effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents can cover.Together When, cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term, be merely convenient to chat It states clearly, rather than to limit the scope of the invention, relativeness is altered or modified, and is changing technology without essence It inside holds, when being also considered as the enforceable scope of the present invention.
The application provides a kind of bobbin thread for sewing machine overmeasure computation method, comprising the following steps:
1) baseline winding length A, is obtained when to shuttle peg winding, which is that peg or spindle is fitted into sewing machine The baseline amount of baseline when sewing for the first time afterwards.
2) before, starting sewing, the baseline beginning that the controller of sewing machine obtains baseline on peg or spindle measures L: when the secondary sewing is When sewing for the first time after replacing peg or spindle, baseline beginning amount L be the peg or spindle around baseline when baseline winding length A;When the secondary seam When non-after threading as replacement peg or spindle is sewed for the first time, baseline beginning amount L is the baseline surplus after last time sewing, baseline surplus The base line length of remaining baseline as on peg or spindle.
3) seam, has been started.
4) after, sewing, the controller acquisition of sewing machine is stitched to sewing from the outset to be terminated in this section of sewing process The baseline that sewing needle number M and every needle needle gage use uses length B, and the controller of sewing machine calculates baseline surplus Y:Y=automatically F (L, M, B), the f (L, M, B) are pre-stored in the controller of sewing machine.Preferably, Y=f (L, M, B)=L-M*B.
Therefore, the application can effectively calculate the baseline surplus Y on peg or spindle, to carry out to baseline surplus effective real When monitor, avoid generating invalid sewing, guarantee sewing quality.Particularly, the application be by the baseline beginning measure L, sewing needle number M, And the baseline that every needle needle gage uses uses length B to obtain the accurate baseline surplus Y of remaining baseline on peg or spindle, rather than use The cooperation of sensor and peg or spindle in the prior art is realized, therefore the application avoids being transformed the structure of peg or spindle, the application It can be realized using common peg or spindle, cancel the specificity of peg or spindle, so that peg or spindle is general, and reduce the difficulty of processing of peg or spindle.
Further, the application also provides a kind of sewing machine control method for stopping, and the sewing machine control method for stopping is above-mentioned Bobbin thread for sewing machine overmeasure computation method calculates the baseline surplus Y after sewing every time;In addition, as shown in Figure 1 or 2, sewing The controller of machine is connected with the main motor of sewing machine, the rotation for controlling main motor and stops operating, to control sewing machine Operating or shutdown;Through the above steps 1) to more than the baseline that 4) can be accurately calculated on peg or spindle after each sewing Y is measured, baseline surplus Y is stored in the controller of sewing machine and covers last data, and the controller of sewing machine is the bottom of further according to The sewing of line surplus Y and lower road sewing process requires the operating condition of control sewing machine.Specific control mode are as follows: the control of sewing machine Parking condition is provided in device processed, Parking condition is baseline amount needed for lower road sewing process or is that baseline allows surplus, sewing The controller of machine stops operating according to the main motor that Parking condition controls sewing machine namely the controller of sewing machine is according to parking item Part judges accurate down time.
Such as: lower road sewing process is the technique for not allowing wiring to continue sewing, that is, the garment sewing technique being directed to does not permit Perhaps the wiring sewing technology then sewed at this again after baseline is finished, next time, then Parking condition is lower road seam Baseline amount needed for process of threading, electronic control module judge whether the baseline surplus Y being calculated after last time sewing meets lower road The sewing of pattern template in process of sewing, if being able to satisfy, this road is completed in the controller control sewing machine host operating of sewing machine The sewing of pattern template;If not being able to satisfy, the controller of sewing machine triggers the alarm module in sewing machine, prompts user's replacement New peg or spindle.Pattern template can be the CAD domain being stored in sewing machine control, and the controller of sewing machine reads CAD editions The sewing needle number of pattern template in lower road sewing process can be obtained after figure, the controller of sewing machine is in process of sewing by lower road Baseline that the sewing needle number and every needle needle gage of pattern template use uses length B to be calculated after judging last time sewing Whether baseline surplus Y meets the sewing of pattern template in lower road sewing process, avoids sewing in vain or fabric is scrapped or torn open Line is done over again linearly.
For another example: lower road sewing process is the technique for allowing wiring to continue sewing, that is, the garment sewing technique being directed to allows After baseline is finished, next time the wiring sewing technology then sewed at this again, then Parking condition is baseline permission The controller of surplus, sewing machine uses length B and baseline surplus Y according to the baseline that baseline allows surplus, every needle needle gage to use Allow to sew needle number X obtain lower road sewing process automatically, the main motor movement of the controller driving sewing machine of sewing machine, to Stitching sewing machine is complete to be allowed to sew the main motor of the controller driving sewing machine of sewing machine after needle number X and shuts down, and triggers seam The alarm module threaded in machine, the peg or spindle for prompting user more to renew, avoids sewing in vain.Therefore, wiring is being allowed to continue to stitch Under the sewing environment for the technique threaded, the application may be implemented in line more than baseline it is short enough when, sewing machine is sentenced automatically according to setting Break parking when baseline reserves certain length, avoids causing after no baseline sewing in vain or fabric is scrapped.
Further, the baseline that the controller of sewing machine obtains that every needle needle gage uses uses length B can be and measures in advance It is manually entered into the controller of sewing machine, can also can also be mended by sensor signal automatic identification by user afterwards Repay calculating.In the present embodiment, baseline uses compensation calculation mode using length B, preferably includes following steps: S1, in sewing machine Controller in be previously provided with every needle needle gage use line length compensation variable N;S2, started after stitching, the control of sewing machine Device obtains the needle gage P of the secondary sewing;S3, sewing machine controller calculate what every needle needle gage in the secondary sewing process used automatically Baseline uses length B:B=f (N, P), and the f (N, P) is pre-stored in the controller of sewing machine.Compensation variable N is based on sewing What the factor that thickness, the bad, line tension of baseline stitching etc. have an impact baseline loss determined, it is compensated and is counted by compensation variable N Base line length needed for calculating every needle needle gage, baseline caused by the factors such as compensating approach sewing thickness, the bad, line tension of baseline stitching The calculating error of waste reduces the calculating error that every needle needle gage baseline uses length, to improve the bottom that every needle needle gage uses Line uses the calculating precision of length B, and then improves the calculating precision of baseline surplus Y.
The determination method of compensation variable N is preferred are as follows: by causing the loss of baseline to be studied sewing thickness, obtain because Baseline loss value Q1 caused by sewing thickness;By causing the loss of baseline to be studied the bad stitching of baseline, obtain the bottom of because of Baseline loss value Q2 caused by the bad stitching of line;By causing the loss of baseline to be studied line tension, obtain because of line tension Caused by baseline loss value Q3.Empirical value can be used in Q1, Q2 and Q3, and thus calculating resulting compensation variable N is constant.Work as benefit It repays variable N and uses length B relative to the baseline amount of needle gage P mostly consumption come when indicating, compensation becomes with the baseline that every needle needle gage uses Measure the calculation method of N are as follows: N=Q1+Q2+Q3 or N=Q1+Q2-Q3.In addition, if there is also other cause baseline be lost because These factors can be included in and calculate compensation variable N, it may be assumed that N=Q1+Q2+Q3+ ... or N=Q1+Q2-Q3+ ... by element.Based on this, bottom Line uses length B=f (N, P)=P+N.When compensation variable N uses length B relative to needle gage P with the baseline that every needle needle gage uses Multiple come when indicating, the calculation method of compensation variable N are as follows: N=(P+Q1+Q2+Q3)/P or (P+Q1+Q2-Q3)/P.In addition, If these factors can be included in and calculate compensation variable N, it may be assumed that N=(P+Q1+Q2+ there is also the factor that other cause baseline to be lost Q3+ ...)/P or N=(P+Q1+Q2-Q3+ ...)/P.Based on this, in the step 3), baseline uses length B=f (N, P)=P* N。
Further, in the step 1), baseline is wrapped on peg or spindle using bobbin winder device, is equipped in bobbin winder device The electronic device of winding length is measured, therefore baseline winding length A is accurately recorded by bobbin winder device.As shown in Figure 1, bobbin winder device Be not connected between the controller of sewing machine, between the two without Direct Communication, at this point, baseline winding length A can by with Family is manually entered into the controller of sewing machine through the operation panel on sewing machine.Alternatively, as shown in Fig. 2, bobbin winder device and seam Thread machine controller by signal wire be connected, at this point, baseline winding length A is automatically fed to the control of sewing machine by bobbin winder device Device.
In conclusion the application can accurately judge baseline surplus, to keep away under the premise of using traditional peg or spindle Exempt from sewing, fabric in vain to scrap, dismantle the problems such as linear of doing over again, enables peg or spindle and currently used peg or spindle general, reduce The difficulty of processing of peg or spindle, so that client is acceptant.Particularly, the application stitches before each sewing starts according to the last time The baseline surplus Y that is calculated after threading and the Parking condition of setting judge accurately down time: for not permitting Perhaps wiring continues the technique of sewing, and the sewing institute of pattern template in lower road sewing process whether is met by matching baseline surplus Y Needle number is needed, if judgement is unable to satisfy needle number needed for the sewing of pattern template, sewing machine automatic stopping in lower road sewing process;It is right In the technique for allowing wiring to continue sewing, sewing machine judges parking when baseline reserves certain length automatically according to setting.
So the present invention effectively overcomes various shortcoming in the prior art and has high industrial utilization value.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (8)

1. a kind of bobbin thread for sewing machine overmeasure computation method, it is characterised in that: the following steps are included:
1) baseline winding length A, is obtained when to shuttle peg winding;
2), the baseline beginning that the controller of sewing machine obtains baseline on peg or spindle measures L: the seam for the first time after this time sewing is replaces peg or spindle When threading, the baseline beginning amount L is baseline winding length A;When this time sewing for replacement peg or spindle after it is non-sew for the first time when, the bottom It is the baseline surplus after last time sewing that the line beginning, which measures L,;
3) seam, has been started;
4) after, sewing, the controller of sewing machine obtains the sewing needle number M of the secondary sewing and every needle needle gage uses bottom Line uses length B, and the controller of sewing machine calculates baseline surplus Y:Y=f (L, M, B) automatically, and the f (L, M, B) is pre-stored in seam It threads in the controller of machine.
2. bobbin thread for sewing machine overmeasure computation method according to claim 1, it is characterised in that: in the step 4), f (L, M, B)=L-M*B.
3. bobbin thread for sewing machine overmeasure computation method according to claim 1, it is characterised in that: described in the step 4) The controller of sewing machine obtains the mode that the baseline that every needle needle gage uses uses length B are as follows:
S1, the compensation variable N that every needle needle gage uses line length is previously provided in the controller of sewing machine;
S2, started after stitching, the controller of sewing machine obtains the needle gage P of the secondary sewing;
S3, sewing machine controller calculate the baseline that every needle needle gage in the secondary sewing process uses automatically and use length B:B=f (N, P), the f (N, P) are pre-stored in the controller of sewing machine.
4. bobbin thread for sewing machine overmeasure computation method according to claim 3, it is characterised in that: the compensation variable N is every The baseline amount that the baseline that needle needle gage uses uses length B to consume relative to needle gage P more;In the step S3, f (N, P)=P+N.
5. bobbin thread for sewing machine overmeasure computation method according to claim 3, it is characterised in that: the compensation variable N is every The baseline that needle needle gage uses uses length B relative to the multiple of needle gage P;In the step S3, f (N, P)=P*N.
6. according to the described in any item bobbin thread for sewing machine overmeasure computation methods of claim 3-5, it is characterised in that: the compensation becomes Amount N is constant.
7. bobbin thread for sewing machine overmeasure computation method according to claim 1, it is characterised in that: in the step 1), use Baseline is wrapped on peg or spindle by bobbin winder device, and the electronic device of measurement winding length is equipped in the bobbin winder device.
8. a kind of sewing machine control method for stopping, it is characterised in that: the sewing machine control method for stopping uses claim 1-7 Described in any item bobbin thread for sewing machine overmeasure computation methods calculate the baseline surplus Y after sewing every time, the sewing machine Controller is connected with the main motor of sewing machine;Parking condition is provided in the controller of the sewing machine, the Parking condition is Baseline amount needed for lower road sewing process allows surplus for baseline, and the controller of the sewing machine is controlled according to Parking condition to be stitched The main motor of machine of threading stops operating.
CN201910661117.7A 2019-07-22 2019-07-22 A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping Pending CN110359189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910661117.7A CN110359189A (en) 2019-07-22 2019-07-22 A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910661117.7A CN110359189A (en) 2019-07-22 2019-07-22 A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping

Publications (1)

Publication Number Publication Date
CN110359189A true CN110359189A (en) 2019-10-22

Family

ID=68220543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910661117.7A Pending CN110359189A (en) 2019-07-22 2019-07-22 A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping

Country Status (1)

Country Link
CN (1) CN110359189A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005165A (en) * 2019-12-16 2020-04-14 拓卡奔马机电科技有限公司 Keyhole bottom thread consumption calculation method and shuttle peg remaining thread amount control method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4210477A1 (en) * 1992-03-31 1992-10-01 Baeckmann Reinhard METHOD AND DEVICE ON A DOUBLE LOCKSTITCH SEWING MACHINE FOR MONITORING THE BOBBIN CONTENT
JPH07171286A (en) * 1993-12-21 1995-07-11 Juki Corp Bobbin thread detector of sewing machine
US20060021556A1 (en) * 2004-07-28 2006-02-02 Brother Kogyo Kabushiki Kaisha Control device for sewing machines
CN1966800A (en) * 2005-11-17 2007-05-23 大和缝纫机制造株式会社 Thread supplying device of sewing machine
CN103741393A (en) * 2013-12-27 2014-04-23 蔡金财 Base line allowance detection device for lock stitch sewing machine and detection method thereof
CN105420946A (en) * 2015-12-23 2016-03-23 拓卡奔马机电科技有限公司 Method used for detecting remaining quantity of cop latch base lines of sewing machine
CN106245247A (en) * 2016-10-19 2016-12-21 杰克缝纫机股份有限公司 A kind of bobbin thread for sewing machine allowance detector
CN106319785A (en) * 2015-06-19 2017-01-11 北京大豪科技股份有限公司 Bottom line monitoring method and system of template machine and template machine
CN206828773U (en) * 2017-01-24 2018-01-02 深圳市梵思诺时尚服饰有限公司 Sewing device
CN109706646A (en) * 2018-12-27 2019-05-03 拓卡奔马机电科技有限公司 The monitoring method and device of bobbin thread for sewing machine surplus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4210477A1 (en) * 1992-03-31 1992-10-01 Baeckmann Reinhard METHOD AND DEVICE ON A DOUBLE LOCKSTITCH SEWING MACHINE FOR MONITORING THE BOBBIN CONTENT
JPH07171286A (en) * 1993-12-21 1995-07-11 Juki Corp Bobbin thread detector of sewing machine
US20060021556A1 (en) * 2004-07-28 2006-02-02 Brother Kogyo Kabushiki Kaisha Control device for sewing machines
CN1966800A (en) * 2005-11-17 2007-05-23 大和缝纫机制造株式会社 Thread supplying device of sewing machine
CN103741393A (en) * 2013-12-27 2014-04-23 蔡金财 Base line allowance detection device for lock stitch sewing machine and detection method thereof
CN106319785A (en) * 2015-06-19 2017-01-11 北京大豪科技股份有限公司 Bottom line monitoring method and system of template machine and template machine
CN105420946A (en) * 2015-12-23 2016-03-23 拓卡奔马机电科技有限公司 Method used for detecting remaining quantity of cop latch base lines of sewing machine
CN106245247A (en) * 2016-10-19 2016-12-21 杰克缝纫机股份有限公司 A kind of bobbin thread for sewing machine allowance detector
CN206828773U (en) * 2017-01-24 2018-01-02 深圳市梵思诺时尚服饰有限公司 Sewing device
CN109706646A (en) * 2018-12-27 2019-05-03 拓卡奔马机电科技有限公司 The monitoring method and device of bobbin thread for sewing machine surplus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005165A (en) * 2019-12-16 2020-04-14 拓卡奔马机电科技有限公司 Keyhole bottom thread consumption calculation method and shuttle peg remaining thread amount control method
CN111005165B (en) * 2019-12-16 2021-07-30 拓卡奔马机电科技有限公司 Keyhole bottom thread consumption calculation method and shuttle peg remaining thread amount control method

Similar Documents

Publication Publication Date Title
US7949421B2 (en) Multi-needle type embroidery sewing machine and computer-readable storage medium including a computer control program for the multi-needle type embroidery sewing machine
US20090205549A1 (en) Sewing machine and computer readable medium storing sewing machine control program
JPH062250A (en) Method for controlling yarn processing position of weft knitting machine and device therefor
CN110359189A (en) A kind of bobbin thread for sewing machine overmeasure computation method and sewing machine control method for stopping
JPS6185985A (en) Automatic tension sewing machine
CN109706649A (en) Sewing machine control method and sewing-machine control systems
CN103614866B (en) A kind of method controlling electro-pattern-sewing machine and adapt to the sewing of different-thickness sewing
CN107099951A (en) A kind of sewing machine and its bouncing pilotage detection means and detection method
CN206828773U (en) Sewing device
JP5702091B2 (en) sewing machine
JPH04354972A (en) Sewing machine with stitch-back function
CN110359190A (en) A kind of bobbin thread for sewing machine consumption amount estimating method
CN108625051A (en) Bind
CN105908401A (en) Pressure sensing type line breakage detection mechanism and sewing machine
CN111005165B (en) Keyhole bottom thread consumption calculation method and shuttle peg remaining thread amount control method
Wesley D et al. A simple system for the online detection of skip/loop stitches in single needle lockstitch sewing machines
CN104372539A (en) Bottom line detection correlation type photoelectric control system for sewing machine and control method
KR20160133205A (en) Detector for checking rest of under-thread sewing yarn of sewing machine
CN110359191A (en) A kind of baseline based on error compensation uses length calculation method
CN110396776B (en) Control method and system for bottom line allowance of long sewing line
JP2013252162A (en) Sewing machine
CN110424109B (en) Simplified control method and system for bottom line allowance of long sewing line
CN204237984U (en) Use in sewing machine bottom line detects correlation optoelectronic induction control system
CN113337970B (en) Thread breakage and tension detection device and detection method for sewing machine
CN215800363U (en) Contactless bottom line monitoring mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191022

RJ01 Rejection of invention patent application after publication