CN110348607A - The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system - Google Patents
The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system Download PDFInfo
- Publication number
- CN110348607A CN110348607A CN201910524481.9A CN201910524481A CN110348607A CN 110348607 A CN110348607 A CN 110348607A CN 201910524481 A CN201910524481 A CN 201910524481A CN 110348607 A CN110348607 A CN 110348607A
- Authority
- CN
- China
- Prior art keywords
- link
- industry
- business
- whole process
- opens
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Educational Administration (AREA)
- Computational Linguistics (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Expand overall process one this application involves the industry of more power business system datas fusion and open figure monitoring method and system, monitoring method is comprising steps of setting class of service;The business datum of each link of acquisition business whole process;Business datum is analyzed, generates the whole process monitoring interface that there is data link relation path to show for each link;Risk then provides early warning if it exists;Time-out then provides overtime prompt if it exists.Electricity consumption counseling services, high pressure industry are expanded, low pressure industry extends to industry and expands the business overall process for being related to multiple departments' collaborative works such as mating in an interface display, avoid the presence of information island, and effective early warning can be provided for risk and time-out and supervise and manage mechanism, be conducive to that potential risk directly is presented, it is also beneficial to take treatment measures in time, on the one hand business processing working efficiency is improved, on the other hand trans-departmental collaborative work efficiency is improved, another further aspect improves vocational work quality, may advantageously facilitate business fining monitoring and cycle development.
Description
Technical field
This application involves more power business system globe areas fields, more particularly to the industry of more power business system datas fusion
Expand overall process one and opens figure monitoring method and system.
Background technique
Electric system has a large amount of business department, and tradition monitoring method is mainly real in a certain department or part process at present
It is existing, such as in the application system independent operating of each department, there are information islands, do not form effective early warning supervisor mechanism, stop
Stay in monitoring level.
Summary of the invention
Based on this, it is necessary to which the industry for providing a kind of more power business system data fusions expands overall process one and opens figure monitoring method
And system.
A kind of industry of more power business system datas fusion expands overall process one and opens figure monitoring method comprising following steps:
Be arranged class of service, the class of service include electricity consumption counseling services, high pressure industry expand, low pressure industry extend to industry expand it is mating;Obtain industry
The business datum for each link of whole process of being engaged in;The business datum is analyzed, generates whole process monitoring interface for each link;Wherein, institute
Whole process monitoring interface is stated to show with the data link relation path between each link;Risk is then in the whole process if it exists
Monitoring interface provides early warning;Time-out then provides overtime prompt in the whole process monitoring interface if it exists.
Above-mentioned industry expands overall process one and opens figure monitoring method, is shown by the data link relation path of ingehious design, more
Power business system data is fused to a whole process monitoring interface, so that electricity consumption counseling services, high pressure industry are expanded, low pressure industry extends to
Industry, which expands the business overall process for being related to multiple departments' collaborative works such as mating, to be shown at an interface, and information orphan is avoided
The presence on island, and effective early warning can be provided for risk and time-out and supervise and manage mechanism, be conducive to that potential risk directly is presented,
Be conducive to take treatment measures in time, on the one hand improve business processing working efficiency, on the other hand improves trans-departmental collaboration
Working efficiency, another further aspect improve vocational work quality, may advantageously facilitate business fining monitoring and cycle development.
It is each for business whole process in the business datum for obtaining each link of business whole process in one of the embodiments,
Link carries out the integration setting of key business stage, forms at least key business stage including several links;It is raw for each link
It helps in flow monitoring interface, the data link relation path for generating critical stage for each key business stage is shown.
In one of the embodiments, the industry expand overall process one open figure monitoring method further comprise the steps of: individually display or
The data link relation path for sending the critical stage is shown.
The business datum is analyzed in one of the embodiments, is generated in whole process monitoring interface for each link, analysis
The potential risk of current link or follow-up link determines the execution time and delay time at stop of each link.
The industry expansion overall process one is opened figure monitoring method and is further comprised the steps of: in a screen in one of the embodiments,
It is upper all to show the whole process monitoring interface.
It is generated in whole process monitoring interface for each link in one of the embodiments, it is complete to generate high-low pressure for each link
Flow monitoring interface;Alternatively, count each link average treatment duration, and according to the management time limit, to by time-out and having timed out
Link carries out the outer bright displaying of collimation mark, and shows that average treatment duration will be more than the early warning value work order number that management requires the time limit, and/
Or average treatment duration alreadys exceed management and requires time limit work order number.
The industry expansion overall process one is opened figure monitoring method and is further comprised the steps of: by query elements in one of the embodiments,
It carries out inquiry and shows query result in the whole process monitoring interface;Wherein, the query elements include power supply unit, business
Classification formally accepts date and work order number.
It is inquired in one of the embodiments, according to work order number, shows the work in the whole process monitoring interface
The how corresponding work order essential information of odd numbers, stage introduction time, outflow time in stage and stage handle duration;Wherein, the work
Odd numbers includes that industry expands work order number, consulting work order number and industry expansion supporting project number.
When providing early warning in one of the embodiments, business datum corresponding to the link of risk also will be present
It is sent to associate people;When providing time-out prompt, business datum corresponding to the link of time-out also will be present and be sent to affiliated person
Member.
A kind of industry of more power business system datas fusion expands overall process one and opens figure monitoring system comprising resource devices,
Access device, storage device, permanent means, analytical equipment, logic device and display device;
The business datum of each link of resource devices convergence service whole process enters access device;
Access device capturing service data enter storage device;
Storage device storage service classification and business datum;
Analytical equipment obtains class of service and business datum in storage device by permanent means, analyzes business datum,
Cooperating logic device is that each link generates whole process monitoring interface;
Display device shows the whole process monitoring interface shown with the data link relation path between each link.
Detailed description of the invention
Fig. 1 is that the industry expansion overall process one of one embodiment of the application opens figure monitoring method whole process monitoring interface schematic diagram.
Fig. 2 is that the industry expansion overall process one of another embodiment of the application opens figure monitoring method realization schematic diagram.
Fig. 3 is that the industry expansion overall process one of the another embodiment of the application opens figure monitoring method flow diagram.
Specific embodiment
In order to make the above objects, features, and advantages of the present application more apparent, with reference to the accompanying drawing to the application
Specific embodiment be described in detail.Many details are explained in the following description in order to fully understand this Shen
Please.But the application can be implemented with being much different from other way described herein, those skilled in the art can be not
Similar improvement is done in the case where violating the application intension, therefore the application is not limited by the specific embodiments disclosed below.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element
On one element or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be with
It is directly to another element or may be simultaneously present centering elements.Term as used herein " vertically ", " level
", "left", "right" and similar statement for illustrative purposes only, be not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and the technical field for belonging to the application
The normally understood meaning of technical staff is identical.The term used in the description of the present application is intended merely to description tool herein
The purpose of the embodiment of body, it is not intended that in limitation the application.Term " and or " used herein includes one or more
Any and all combinations of relevant listed item.
In the application one embodiment, as shown in figure 3, a kind of industry of more power business system data fusions expands overall process
One figure monitoring method comprising following steps: setting class of service, the class of service includes electricity consumption counseling services, high pressure
It is mating that industry expands, low pressure industry extends to industry expansion;The business datum of each link of acquisition business whole process;The business datum is analyzed, is each
Link generates whole process monitoring interface;Wherein, the whole process monitoring interface has the data link relationship road between each link
Diameter is shown;Risk then provides early warning in the whole process monitoring interface if it exists;Time-out is then in the whole process if it exists
Monitoring interface provides overtime prompt.Above-mentioned industry expands overall process one and opens figure monitoring method, passes through the data link relationship of ingehious design
Path is shown, more power business system datas are fused to a whole process monitoring interface, so that electricity consumption counseling services, high pressure industry
Expansion, low pressure industry, which extend to industry, which expands the business overall process for being related to multiple departments' collaborative works such as mating, to be shown at an interface
Show, avoids the presence of information island, and effective early warning can be provided for risk and time-out and supervise and manage mechanism, be conducive to directly
Potential risk is presented, is also beneficial to take treatment measures in time, on the one hand improves business processing working efficiency, on the other hand mention
Risen trans-departmental collaborative work efficiency, another further aspect improves vocational work quality, may advantageously facilitate business fining monitoring and
Cycle development.
In the application one embodiment, a kind of industry of more power business system datas fusion expands overall process one and opens figure monitoring
Method comprising the part steps or Overall Steps of following embodiment;That is, the industry of more power business system data fusions expands
It includes some technical characteristics or all technical features below that overall process one, which opens figure monitoring method,.
Class of service is set, and the class of service includes electricity consumption counseling services, high pressure industry expands, low pressure industry extends to industry expansion and matches
Set;Electricity consumption counseling services, high pressure industry, which are expanded, low pressure industry extends to industry to expand mating to include more specific detailed design, according to reality
The demand setting of border work, does not limit additionally herein, is shown by the data link relation path of ingehious design, more
Power business system data is fused to a whole process monitoring interface, so that electricity consumption counseling services, high pressure industry are expanded, low pressure industry extends to
Industry, which expands the business overall process for being related to multiple departments' collaborative works such as mating, to be shown at an interface, and information orphan is avoided
The presence on island.
The business datum of each link of acquisition business whole process;Each ring of business whole process is obtained in one of the embodiments,
In the business datum of section, link each for business whole process carries out the integration setting of key business stage, and being formed includes several links
An at least key business stage;That is, certain important interrelated links are carried out integration and are arranged to form key
Service Period, each key business stage include several links.Further, each crucial industry in one of the embodiments,
The business stage is arranged including sequence and several links that are mutually related.Further, the industry is analyzed in one of the embodiments,
Business data generate whole process monitoring interface for each link;Wherein, the whole process monitoring interface has the data between each link
Link relation path is shown;The business datum is analyzed in one of the embodiments, is generated whole process for each link and is monitored boundary
In face, the potential risk of current link or follow-up link is analyzed, determines the execution time and delay time at stop of each link.Wherein one
In a embodiment, in the business datum of acquisition each link of business whole process, link each for business whole process carries out key business
Stage integration setting, forms at least key business stage including several links;Whole process monitoring interface is generated for each link
In, the data link relation path for generating critical stage for each key business stage is shown;And analysis current link or after
The potential risk of continuous link, determines the execution time and delay time at stop of each link.Such design, each link of business whole process
Business datum all put together, integrated, analyzed and handled, so as to cooperate subsequent step realize current link or after
The potential risk analysis and time-out judgement of continuous link.
Further, it is generated in whole process monitoring interface for each link in one of the embodiments, is each key
The data link relation path that Service Period generates critical stage is shown.Business whole process is obtained in one of the embodiments,
In the business datum of each link, link each for business whole process carries out the integration setting of key business stage, and it includes several for being formed
An at least key business stage for link;It is generated in whole process monitoring interface for each link, it is raw for each key business stage
It is shown at the data link relation path of critical stage.Further, the industry expands overall process one in one of the embodiments,
It opens figure monitoring method and further comprises the steps of: a setting at least key business stage, each key business stage includes several links;?
In one embodiment, each key business stage includes that sequence is implemented and several links that are mutually related;Such design,
Can be realized whole process supervision perforation each department's business application system, integrated overall process is related to each department's application system data flow,
One figure embodies overall process critical stage and loopful section timeliness, solves problem of detached island of information, promotes trans-departmental collaborative work effect
Rate, on the one hand improves business processing working efficiency, on the other hand improves trans-departmental collaborative work efficiency, and another further aspect is promoted
Vocational work quality may advantageously facilitate business fining monitoring and cycle development.
Risk then provides early warning in the whole process monitoring interface if it exists;Further, an implementation wherein
In example, early warning is provided in the whole process monitoring interface using word processing, is such as arranged using color identifier or overstriking
Or underscore setting etc. provides early warning in the whole process monitoring interface.Sound is used in one of the embodiments,
Processing provides early warning in the whole process monitoring interface, such as provides prompt tone using voice broadcast or when clicking.
Such design, can be convenient, in time and accurately provide early warning, be truly realized the different operating personnel of different regions
All in the technical effect of a figure job, the presence of information island is avoided.
Time-out then provides overtime prompt in the whole process monitoring interface if it exists.Further, an implementation wherein
In example, overtime prompt is provided in the whole process monitoring interface using word processing, is such as arranged using color identifier or overstriking
Or underscore setting etc. provides overtime prompt in the whole process monitoring interface.Sound is used in one of the embodiments,
Processing provides overtime prompt in the whole process monitoring interface, such as provides prompt tone using voice broadcast or when clicking.
Such design, can be convenient, in time and accurately provide overtime prompt, but also the different operating personnel of different regions can
In a figure job, and effective early warning can be provided for risk and time-out and supervise and manage mechanism, be conducive to that potential wind is directly presented
Danger, is also beneficial to take treatment measures in time, so as to prevent trouble before it happens, associated each department mutually coordinated can be closed
Make, has been avoided as much as the generation of time-out time.
In one of the embodiments, the industry expand overall process one open figure monitoring method further comprise the steps of: individually display or
The data link relation path for sending the critical stage is shown.That is, individually showing the data link relationship of the critical stage
The data link relation path that path individually carries out stating critical stage is shown, or sends the data link of the critical stage
Relation path shows that the data link relation path for sending the critical stage is shown.Also that is, a kind of more power businesses
The industry of system data fusion expands overall process one and opens figure monitoring method comprising following steps: setting class of service, the service class
Not Bao Kuo electricity consumption counseling services, high pressure industry expand, low pressure industry extend to industry expand it is mating;The business number of each link of acquisition business whole process
According to;The business datum is analyzed, generates whole process monitoring interface for each link;Wherein, the whole process monitoring interface has each
Data link relation path between link is shown;Risk then provides early warning in the whole process monitoring interface if it exists;
Time-out then provides overtime prompt in the whole process monitoring interface if it exists;Individually show or send the data of the critical stage
Link relation path is shown.A kind of industry of more power business system data fusions expands overall process one in one of the embodiments,
Open figure monitoring method comprising following steps: setting class of service, the class of service includes electricity consumption counseling services, high pressure industry
It is mating that expansion, low pressure industry extend to industry expansion;The business datum of each link of acquisition business whole process, wherein ring each for business whole process
Section, carries out the integration setting of key business stage, and formation includes an at least key business stage for several links;Analyze the business
Data generate whole process monitoring interface for each link;Wherein, the whole process monitoring interface has the data-link between each link
Road relation path is shown, and is shown for the data link relation path that each key business stage generates critical stage;If depositing
Early warning then is provided in the whole process monitoring interface in risk;Time-out is then provided in the whole process monitoring interface if it exists
Time-out prompt;The data link relation path for individually showing or sending the critical stage is shown.Remaining embodiment and so on.
Such design directly can individually be shown, be also sent to for the data link relation path of critical stage
Target terminal is shown, is especially suitable for the data link relation path of prominent critical stage, is shown, to realize standard
The really effect of monitoring critical stage, cooperates multiple ranks such as level Four, and whole process supervision may be implemented and carry out level Four supervisor's mechanism,
On the basis of business whole process supervision, early warning and overtime threshold are set, find potential risk and by information-based means to dry
It is that people reminds supervisor, promotes vocational work quality and efficiency, promote business fine-grained management and cycle development.
The industry expansion overall process one is opened figure monitoring method and is further comprised the steps of: in a screen in one of the embodiments,
It is upper all to show the whole process monitoring interface.Described in all being shown on a mobile phone screen in one of the embodiments,
Whole process monitoring interface.The whole process monitoring interface is all shown on a PC screen in one of the embodiments,.?
In one embodiment, the whole process monitoring interface is all shown on a large screen.It is understood that at one
The whole process monitoring interface is all shown on screen, including the whole process monitoring interface is all shown in a screen
On, this screen is either one or more.The whole process monitoring interface is all aobvious in one of the embodiments,
Show on the screen of multiple terminals.Such design may be implemented to have seen on monitoring large screen and/or administrative staff's mobile phone
Whole whole process monitoring interface.
It is generated in whole process monitoring interface for each link in one of the embodiments, it is complete to generate high-low pressure for each link
Flow monitoring interface;Further, high-low pressure whole process monitoring interface includes separately positioned height in one of the embodiments,
Laminate section and low-pressure section further include the high-low pressure intergrant for merging setting.Such design is in order to enable different risk works
It is obviously distinguished, the job security of lifting construction personnel.Alternatively, counting each link in one of the embodiments,
Average treatment duration, and according to the management time limit to by time-out and having timed out link and carry out the outer bright displaying of collimation mark, and is shown averagely
Handling duration will require the early warning value work order number in time limit or average treatment duration to already exceed management and require the time limit more than management
Work order number.Further, each link average treatment duration is counted in one of the embodiments, and according to the management time limit, it is right
It by time-out and has timed out link and carries out the outer bright displaying of collimation mark, and show that average treatment duration will be more than to manage require the time limit
Early warning value work order number and average treatment duration already exceed management and require time limit work order number.Further, a reality wherein
It applies in example, each link average treatment duration is arranged according to current service data and history service data;Alternatively, each link
Average treatment duration is arranged according to the mean value of the history service data of corresponding link;Alternatively, each link average treatment duration
It is arranged according to the mean value of the target call of corresponding link and history service data.Such design is conducive in the full stream
Range monitoring interface provides prompt effect obvious and with reference significance.Further, statistics is closed in one of the embodiments,
Each link average treatment duration in the key stage, and according to management the time limit, to i.e. by time-out and have timed out link carry out outline border
When marking bright displaying, and generating the data link relation path display of critical stage, display average treatment duration will be more than management
It is required that the early warning value work order number and average treatment duration in time limit, which already exceed management, requires time limit work order number.Such design,
Whole process supervision is not limited only to the monitoring of business whole process link, and further refining the key business stage is monitored, and provides simultaneously
The monitoring of second level figure layer loopful section, the potential risk that will be present excavate presentation step by step, provide foundation for company management aid decision
While, promote business processing person works efficiency.
The industry expansion overall process one is opened figure monitoring method and is further comprised the steps of: by query elements in one of the embodiments,
It carries out inquiry and shows query result in the whole process monitoring interface;Wherein, the query elements include power supply unit, business
Classification formally accepts date and work order number.It is inquired in one of the embodiments, according to work order number, in the whole process
Monitoring interface shows that the how corresponding work order essential information of the work order number, stage introduction time, outflow time in stage and stage do
Manage duration;Wherein, the work order number includes that industry expands work order number, consulting work order number and industry expansion supporting project number.Such design,
It is advantageously implemented query function, the personnel of different departments is facilitated accurately and effectively to retrieve oneself relevant working portion.
When providing early warning in one of the embodiments, business datum corresponding to the link of risk also will be present
It is sent to associate people;When providing time-out prompt, business datum corresponding to the link of time-out also will be present and be sent to affiliated person
Member.A kind of industry expansion overall process one of more power business system data fusions opens figure monitoring method in one of the embodiments,
The following steps are included: setting class of service, the class of service includes electricity consumption counseling services, high pressure industry expands, low pressure industry extends to industry
Expand mating;The business datum of each link of acquisition business whole process;The business datum is analyzed, generates whole process monitoring for each link
Interface;Wherein, there is the whole process monitoring interface data link relation path between each link to show;Risk is then if it exists
Early warning is provided in the whole process monitoring interface, business datum corresponding to the link of risk also will be present and be sent to association
Personnel;Time-out then provides overtime prompt in the whole process monitoring interface if it exists, corresponding to the link that time-out also will be present
Business datum is sent to associate people.Remaining embodiment and so on.Such design can when something goes wrong or will go out
When existing problem, realization is sent directly to associate people, timely and effectively carries out targetedly processing work, improves business work
Make quality, may advantageously facilitate business fining monitoring and cycle development.
In the embodiment of a concrete application, it is arranged before class of service, the industry expands overall process one and opens figure monitoring side
Method further comprises the steps of: the formal rule of uniform service data, formulates the generation standard of whole process monitoring interface;It is each by visiting
Business department understands respective demand, unified to arrange, and formulates complete index specification, expands process for optimization industry and provides data base
Plinth provides foundation for later period standardized management.The business datum of each link of abundant conformity of business operation whole process, optimizes business whole process
The resource of each link;By the advantage using information system management, the systems such as marketing, plan, capital construction and goods and materials are got through, pass through one
Figure shows each data among systems link relationship comprehensively, realizes the linkage of data, reduces the communication cost of each department.It is counted
According to real-time exhibition and adjustment;After operation system generates data, data circulate in real time, after data mart modeling, utilize visualization
Technology quickly shows, and convenient for follow-up in time, understanding business, a situation arises, analyzes potential risk in advance.
The whole process monitoring interface is as shown in Figure 1, it is respectively provided with electricity consumption consultative department in one of the embodiments,
Divide, industry expands flow elements and industry expands mating portions;Clearly tagged traffic whole process whole link and/or highlights and work as front ring
Save and/or provide early warning and/or provide time-out prompt etc.;Label in figure can also be using intensification label, overstriking label
Or color mark etc..
In the embodiment of a concrete application, respectively represented with blue, green, orange, red four colors circle and font: place rank
The work order quantity of the different conditions of section: blue: in non-early warning number on the way;Orange: number is not being warned on the way;Green: filing has not timed out number;It is red: filing
Overtime number.Numerical value on the click stage can enter corresponding work order list interface, can be shown to work order in list interface, right
The work order business for comparing care can pay close attention to collection operation.Each stage upper right corner counts stage average treatment duration.And according to
The time limit is managed, to by time-out and having timed out the stage and carry out the outer bright displaying of collimation mark: purple represents stage average treatment duration will
More than the early warning value work order number that management requires the time limit;Red, which represents stage average treatment duration and alreadys exceed management, requires time limit work
Odd number.When clicking each stage upper right corner stage average treatment when long pointer, a suspended window is popped up, shows that stage filing is flat
The composition information of equal duration, including number, overtime number (digital red font) is completed and constantly completes number (number green
Font) etc..The figure upper right corner is opened in whole process one, input work order number clicks inquiry, jumps to work order whole process one and open figure interface, boundary
Face data item has work order essential information, stage introduction time, outflow time in stage, stage to handle duration.
A kind of industry expansion overall process one of more power business system data fusions opens figure monitoring system in one of the embodiments,
System comprising resource devices, access device, storage device, permanent means, analytical equipment, logic device and display device;Resource
The business datum of each link of device convergence service whole process enters access device;Access device capturing service data enter storage dress
It sets;Storage device storage service classification and business datum;Analytical equipment obtains the service class in storage device by permanent means
Not and business datum, analysis business datum, cooperation logic device are that each link generates whole process monitoring interface;Display device shows
The whole process monitoring interface shown with the data link relation path between each link.Above-mentioned each device, including resource
Device, access device, storage device, permanent means, analytical equipment, logic device and display device, also referred to as module.At it
In middle one embodiment, a kind of industry of more power business system datas fusion expands overall process one and opens figure monitoring system, uses
It states the expansion of industry described in any embodiment overall process one and opens the realization of figure monitoring method.The industry expands full mistake in one of the embodiments,
It includes executing industry described in any of the above-described embodiment to expand overall process one to open each step institute of figure monitoring method right that journey one, which opens figure monitoring system,
The functional module answered.It includes setup module that the industry, which expands overall process one to open figure monitoring system, in one of the embodiments, described
Setup module is for being arranged class of service, and the class of service includes electricity consumption counseling services, high pressure industry expands, low pressure industry extends to industry expansion
It is mating.Remaining embodiment and so on.
The business datum of each link of business whole process is obtained in one of the embodiments, and forms data source.Wherein
In one embodiment, show device for realizing human-computer interaction and data visual presentation, functional module include MUI,
Bootstrap, ECHARTS and Angularjs etc..Logic device is in one of the embodiments, for realizing service logic control
System, functional module includes SpringMVC, SpringWeb, SpringAOP, Velocity mould plate technique etc..One wherein
In embodiment, for analytical equipment for realizing the analysis of business datum, functional module includes data prediction, analysis model, number
According to service and model running environment etc..Permanent means are in one of the embodiments, for realizing to storage device data
Access, functional module includes JdbcTemplate, SpringORM, MyBatis, JDBC.It deposits in one of the embodiments,
Storage device is used to store data, analytic process data and the analysis result data of access;Its functional module include Oracle,
Greenplum.For access device for realizing the access of external data, functional module includes net in one of the embodiments,
Network crawler, ETL tool, data-interface and Quartz task schedule.Resource devices are in one of the embodiments, for realizing remittance
The business datum of poly- each link of business whole process, functional module include operation system database, external social public data etc..
In the embodiment of a concrete application, when business occurs in resource devices, after generating data, into crossing access dress
The acquisition effect set enters storage device, and after data reach storage device, analytical equipment accesses data by permanent means, goes forward side by side
Row analysis will analyze result write storage device, and application program is by showing that device and logic device by data visualization, are shown
At all kinds of reports and chart;According to the different rights of personnel, the access profile of data is set.Such design can be realized prison
All worksheet progress situations of Business Process System related service are controlled, the class of service of monitoring includes electricity consumption counseling services, high pressure
Industry expands (high pressure new clothes), low pressure industry expands (the single-phase new clothes of low pressure/three-phase new clothes, scattered resident's new clothes), industry expands mating 4 class.Work order
Processing progress carries out in such a way that the stage summarizes, and can work order be paid close attention to and be pressed.Whole process one opens figure monitoring interface
It supports high-low pressure switching, supports according to power supply unit, class of service, formally accepts the date and inquired.Meanwhile supporting input work
The whole process that odd numbers such as industry expansion work order number, consulting work order number, industry expansion supporting project number etc. inquire single work order is handled
Situation.
In the embodiment of a concrete application, the mode separated with front and back end, front end page cloth are laid out using response type
Office designs using response type, a layout pattern is had below each screen resolution, it can be ensured that a page is in institute
Satisfactory effect can be shown by having in terminal, can perfectly adapt to PC and mobile terminal.Front end graph tool utilizes
Echarts and SVG technology smooth can operate on PC and mobile device, and compatible current most browsers provide beauty
See, interaction is abundant, can height personalized customization data visualization chart, realize the separation of data and pattern.Data mining
Tool uses database of the oracle as mainstream, utilizes it as developing instrument, and program is stable, and code is easy to maintain,
Easily the later period can be supported to extend.Data acquisition and scheduling can be realized a large amount of transaction using OGG as metadata acquisition tool
The real-time capture of data, transformation and delivery realize that source database is synchronous with the data of target database, keep the number of minimum 10ms
According to delay, basis is provided for analysis in real time.Informatica enterprise data integration solution provider, provides expert data
Integrated software and service, to solve the problems, such as that the fragmentation of data between system, quality of data software, can be outstanding by unified platform
Completion different demands scheduling.Level Four short message warning supervisor's rule base is further established, management time limit configuration feature is provided, is pressed
Whole process and key link configuration management threshold values, level Four early warning threshold values, short message supervisor, generate according to management threshold values and early warning threshold values
Early warning short message.In one of the embodiments, as shown in Fig. 2, realizing each system/each center number by modes such as DSG/OGG
According to convergence is collected, the data file of data center is transferred to monitoring system by FTP mode, finally in mobile terminal, PC terminal
And/or it is shown at large screen.
It should be noted that the other embodiments of the application further include, the mutually group of the technical characteristic in the various embodiments described above
Close be formed by, the industry of the more power business system datas that can implement fusion expands overall process one and opens figure monitoring method and system;
In each embodiment, the industry expansion overall process one of more power business system data fusions opens figure monitoring method and is also referred to as based on more electric power
The industry of operation system data fusion expands overall process one and opens figure monitoring method, the monitoring side based on the fusion of more power business system datas
Method, industry expand overall process one and open figure monitoring method or the monitoring method of more power business system datas fusion etc.;It is more in each embodiment
The industry expansion overall process one of power business system data fusion opens figure monitoring system and is also referred to as based on more power business system datas
The industry of fusion expands overall process one and opens figure monitoring system, the monitoring system based on the fusion of more power business system datas, the full mistake of industry expansion
Journey one opens the monitoring system etc. of figure monitoring system or the fusion of more power business system datas.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
The limitation to claim therefore cannot be interpreted as.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application
Range.Therefore, the scope of patent protection of the application should be determined by the appended claims.
Claims (10)
1. a kind of industry of more power business system datas fusion expands overall process one and opens figure monitoring method, which is characterized in that including with
Lower step:
Be arranged class of service, the class of service include electricity consumption counseling services, high pressure industry expand, low pressure industry extend to industry expand it is mating;
The business datum of each link of acquisition business whole process;
The business datum is analyzed, generates whole process monitoring interface for each link;Wherein, the whole process monitoring interface has each
Data link relation path between link is shown;
Risk then provides early warning in the whole process monitoring interface if it exists;
Time-out then provides overtime prompt in the whole process monitoring interface if it exists.
2. industry expansion overall process one opens figure monitoring method according to claim 1, which is characterized in that
In the business datum of each link of acquisition business whole process, it is whole to carry out the key business stage for link each for business whole process
Setting is closed, at least key business stage including several links is formed;
It is generated in whole process monitoring interface for each link, the data link for generating critical stage for each key business stage is closed
It is that path is shown.
3. industry expansion overall process one opens figure monitoring method according to claim 2, which is characterized in that further comprise the steps of: individually aobvious
The data link relation path for showing or sending the critical stage is shown.
4. industry expansion overall process one opens figure monitoring method according to claim 2, which is characterized in that the business datum is analyzed,
It is generated in whole process monitoring interface for each link, analyzes the potential risk of current link or follow-up link, determine holding for each link
Row time and delay time at stop.
5. industry expansion overall process one opens figure monitoring method according to claim 1, which is characterized in that further comprise the steps of: at one
The whole process monitoring interface is all shown on screen.
6. industry expansion overall process one opens figure monitoring method according to claim 5, which is characterized in that generate whole process for each link
In monitoring interface, high-low pressure whole process monitoring interface is generated for each link;Alternatively, each link average treatment duration is counted, and
According to the management time limit, to by time-out and having timed out link and carry out the outer bright displaying of collimation mark, and display average treatment duration will surpass
Management is crossed to require the early warning value work order number in time limit and/or average treatment duration to already exceed management to require time limit work order number.
7. industry expansion overall process one opens figure monitoring method according to claim 5, which is characterized in that further comprise the steps of: by inquiry
Element carries out inquiry and shows query result in the whole process monitoring interface;Wherein, the query elements include power supply unit,
Class of service formally accepts date and work order number.
8. industry expansion overall process one opens figure monitoring method according to claim 7, which is characterized in that looked into according to work order number
It askes, shows that the how corresponding work order essential information of the work order number, stage introduction time, stage pass in the whole process monitoring interface
Time and stage handle duration out;Wherein, the work order number includes that industry expands work order number, consulting work order number and industry expansion supporting project volume
Number.
9. expanding overall process one to industry described in any one of 8 according to claim 1 opens figure monitoring method, which is characterized in that provide pre-
When alert prompt, business datum corresponding to the link of risk also will be present and be sent to associate people;
When providing time-out prompt, business datum corresponding to the link of time-out also will be present and be sent to associate people.
10. a kind of industry of more power business system data fusions expands overall process one and opens figure monitoring system, which is characterized in that including money
Source device, access device, storage device, permanent means, analytical equipment, logic device and display device;
The business datum of each link of resource devices convergence service whole process enters access device;
Access device capturing service data enter storage device;
Storage device storage service classification and business datum;
Analytical equipment obtains class of service and business datum in storage device by permanent means, analyzes business datum, cooperation
Logic device is that each link generates whole process monitoring interface;
Display device shows the whole process monitoring interface shown with the data link relation path between each link.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910524481.9A CN110348607A (en) | 2019-06-18 | 2019-06-18 | The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910524481.9A CN110348607A (en) | 2019-06-18 | 2019-06-18 | The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110348607A true CN110348607A (en) | 2019-10-18 |
Family
ID=68182237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910524481.9A Pending CN110348607A (en) | 2019-06-18 | 2019-06-18 | The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110348607A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110956441A (en) * | 2019-11-12 | 2020-04-03 | 广州供电局有限公司 | Business expansion customer service system and method |
CN115471140A (en) * | 2022-11-02 | 2022-12-13 | 广东电网有限责任公司中山供电局 | Method and system for monitoring power failure service of power system client |
CN116582462A (en) * | 2023-07-14 | 2023-08-11 | 浪潮通信信息***有限公司 | Converged service monitoring method and device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104240043A (en) * | 2014-10-10 | 2014-12-24 | 国家电网公司 | Full-service centralized management service platform for electric power customer service based on number 95598 |
CN106096865A (en) * | 2016-06-29 | 2016-11-09 | 国网浙江省电力公司 | A kind of power marketing industry expands whole process information disclosure and implements managing and control system integrated approach |
CN106203782A (en) * | 2016-06-29 | 2016-12-07 | 国网浙江省电力公司 | A kind of power marketing industry expands whole process process management and control real-time exhibition method |
-
2019
- 2019-06-18 CN CN201910524481.9A patent/CN110348607A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104240043A (en) * | 2014-10-10 | 2014-12-24 | 国家电网公司 | Full-service centralized management service platform for electric power customer service based on number 95598 |
CN106096865A (en) * | 2016-06-29 | 2016-11-09 | 国网浙江省电力公司 | A kind of power marketing industry expands whole process information disclosure and implements managing and control system integrated approach |
CN106203782A (en) * | 2016-06-29 | 2016-12-07 | 国网浙江省电力公司 | A kind of power marketing industry expands whole process process management and control real-time exhibition method |
Non-Patent Citations (1)
Title |
---|
张磐等: "配电网全过程管理技术在天津的应用", 《供用电》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110956441A (en) * | 2019-11-12 | 2020-04-03 | 广州供电局有限公司 | Business expansion customer service system and method |
CN115471140A (en) * | 2022-11-02 | 2022-12-13 | 广东电网有限责任公司中山供电局 | Method and system for monitoring power failure service of power system client |
CN116582462A (en) * | 2023-07-14 | 2023-08-11 | 浪潮通信信息***有限公司 | Converged service monitoring method and device |
CN116582462B (en) * | 2023-07-14 | 2023-09-22 | 浪潮通信信息***有限公司 | Converged service monitoring method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110348607A (en) | The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system | |
CN102867219B (en) | A kind of business automatic arrangement program system and method | |
CN105469246A (en) | Colleague circle system and management method thereof | |
CN103886398A (en) | Service monitoring method and system in cross-system heterogeneous environment | |
CN106600103A (en) | Statistic data model building method facing programs, plans, and decisions | |
CN103840955A (en) | Operation maintenance system of distributed IT system, and operation maintenance management method thereof | |
CN115879728A (en) | Based on capital construction overall process platform system | |
CN102354387A (en) | Multi-dimensional platform data mining method and system of power grid dispersed power supply information | |
CN109919453A (en) | A kind of city grid management system | |
CN113642299A (en) | One-key generation method based on power grid statistical form | |
CN112200494A (en) | High-efficient emergency treatment platform of highway | |
CN109544423A (en) | Assets management method, device and computer readable storage medium | |
Kang et al. | The organizational structure and operational logic of an urban smart governance information platform: Discussion on the background of urban governance transformation in China | |
CN107122151A (en) | A kind of Dynamic Distribution method and system of Urban Operation center large-size screen monitors | |
CN106227826A (en) | A kind of Party building big data system reference model | |
CN114115837A (en) | MIS self-adaptive generator based on object information and use method | |
CN110321121A (en) | Several systems | |
CN111190953A (en) | Land resource information management system based on Internet of things | |
CN102799971A (en) | Tobacco supply-by-order process control system | |
CN102509195A (en) | Digitalized management platform for call center | |
CN110110972A (en) | Workflow information service system | |
CN114066172A (en) | Banking data studying, judging and analyzing system based on big data technology | |
CN112183991A (en) | Power plant data management method and system, electronic equipment and storage medium | |
CN111625616A (en) | Enterprise-level data management system capable of realizing mass storage | |
Huang et al. | Design and implementation of customized workflow configuration platform for electric power company |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201021 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191018 |