CN110347686A - Record the method and system of engineering drawing modification information - Google Patents

Record the method and system of engineering drawing modification information Download PDF

Info

Publication number
CN110347686A
CN110347686A CN201910587960.5A CN201910587960A CN110347686A CN 110347686 A CN110347686 A CN 110347686A CN 201910587960 A CN201910587960 A CN 201910587960A CN 110347686 A CN110347686 A CN 110347686A
Authority
CN
China
Prior art keywords
modification
information
resume
engineering drawing
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910587960.5A
Other languages
Chinese (zh)
Inventor
陈茂勇
靳盼盼
蒋伟
陈龙
李轶兵
张玉莹
赵薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201910587960.5A priority Critical patent/CN110347686A/en
Publication of CN110347686A publication Critical patent/CN110347686A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2282Tablespace storage structures; Management thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • G06F16/2358Change logging, detection, and notification

Abstract

The invention discloses a kind of method and systems for recording engineering drawing modification information, and wherein for method the following steps are included: obtaining the attribute information of the modification cloud line of engineering drawing, attribute information includes modification resume information;A modification resume is generated according to the quantity of modification resume information, modification resume includes several information bars, so that each modification resume information is corresponding with an information bar, information bar includes project column corresponding with the modification classification of resume information;Modification resume information is corresponded to and is saved into project column.The present invention automatically generates corresponding modification resume by obtaining modification resume information automatically, automatically saves modification resume information to modification resume, improves the efficiency of record engineering drawing modification information, provide convenience for user.

Description

Record the method and system of engineering drawing modification information
Technical field
The invention belongs to engineering drawing technique field more particularly to a kind of method for recording engineering drawing modification information and it is System.
Background technique
By taking ship charts as an example, with the propulsion of design object, due to the change of design scheme, equipment data it is continuous complete Equilibrium iteration between kind, shipowner and the proposition and each design specialist of classification society's opinion, relevant design drawing also will be repaired constantly Change update.To make knowledge figure personnel clearly grasp the modifying point of every domain paper, and make that each modifying point of drawing is evidence-based, has mark It can look into, perfect modification record is essential.
In the mapping software of current mainstream, need to count modification information in a manner of editing one by one by hand.That is: work as engineering When figure modification, user needs to be shown at modification with modification cloud coil manually.Then, user works out manually modifies resume, and The resume information of modifying point at this is filled in modification resume manually.Modification resume is worked out and fills in manually, efficiency is very low, also It is easy to produce the skimble-scamble problem of record format.Also, after engineering drawing modification, if designer, which fails to work out in time, fills in modification shoe Ephemeris, later period cause modification information to lose.
Summary of the invention
The technical problem to be solved by the present invention is in the prior art, when modifying engineering drawing, user need establishment manually and Modification resume is filled in, the defect of inefficiency provides a kind of method and system for recording engineering drawing modification information.
The present invention solves above-mentioned technical problem by the following technical programs:
The present invention provides a kind of method for recording engineering drawing modification information, comprising the following steps:
S1, the attribute information for modifying cloud line for obtaining engineering drawing, attribute information include modification resume information;
S2, a modification resume being generated according to the quantity of modification resume information, modification resume includes several information bars, with So that each modification resume information is corresponding with an information bar, information bar includes corresponding with the modification classification of resume information Project column;
S3, modification resume information is corresponded into preservation into project column.
Preferably, modification resume information includes modification content information, presenter's information, modification basis information, modification label Information and modification date information;
Each information bar includes modification content item column, presenter's project column, modification basis project column, modification tagging items Column and modification date of making available column, modification content item column are mentioned for saving modification content information, presenter's project column for saving Information out, modification basis project column is for saving modification basis information, and modification tagging items column is for saving modification label letter Breath, modification date of making available column is for saving modification date information.
Preferably, method is further comprising the steps of:
S4, modification resume is shown on engineering drawing, and build between information bar and modification cloud line corresponding with information bar Vertical modification lead,
And/or modification resume is shown on engineering drawing, and modification mark is shown in the preset range of distance modification cloud line Note, the modification label includes the modification mark information.
Preferably, step S2 further include: the quantity of statistics modification resume information, if a plurality of modification resume information is identical, Then counted using a plurality of modification resume information as one;Modification resume is generated according to the quantity of modification resume information, is repaired The quantity for changing the information bar of resume is equal with the modification quantity of resume information;
Then step S3 further include: if a plurality of modification resume information is identical, the modification that wherein one is modified cloud line is carried out Information preservation is gone through to corresponding information bar;
Then step S4 further include: between each modification cloud line in information bar and corresponding a plurality of modification cloud line respectively Establish modification lead.
Preferably, method is further comprising the steps of before step S1:
S0, judge modification cloud line whether is generated in engineering drawing, if so, generating a prompt information, prompt information is for mentioning Show that user inputs modification resume information;After receiving modification resume information, step S1 is executed.
Preferably, modification cloud line includes that can recognize modification cloud line and not can recognize modification cloud line, then step S1 includes:
Obtain the attribute information that can recognize modification cloud line.
The present invention also provides a kind of systems for recording engineering drawing modification information, including information acquisition unit, resume to generate Unit, resume writing unit;
Information acquisition unit is used to obtain the attribute information of the modification cloud line of engineering drawing, and attribute information includes modification resume letter Breath;
Resume generation unit is used to generate a modification resume according to the quantity of modification resume information, modifies resume packet Several information bars are included, so that each modification resume information is corresponding with an information bar, information bar includes and modification resume The corresponding project column of the classification of information;
For that will modify, resume information is corresponding to be saved into project column resume writing unit.
Preferably, modification resume information includes modification content information, presenter's information, modification basis information, modification label Information and modification date information;
Each information bar includes modification content item column, presenter's project column, modification basis project column, modification tagging items Column and modification date of making available column, modification content item column are mentioned for saving modification content information, presenter's project column for saving Information out, modification basis project column is for saving modification basis information, and modification tagging items column is for saving modification label letter Breath, modification date of making available column is for saving modification date information.
Preferably, system further includes that lead establishes unit and/or flag setting unit;
Lead establishes unit and modifies resume for show on engineering drawing, and in information bar and corresponding with information bar repairs Change and establishes modification lead between cloud line;
Flag setting unit modifies resume for showing on engineering drawing, and in the preset range of distance modification cloud line Display modification label, the modification label includes the modification mark information.
Preferably, system further includes statistic unit;
The quantity that statistic unit is used to count modification resume information will be a plurality of if a plurality of modification resume information is identical Modification resume information is counted as one;
Then resume generation unit is used to generate modification resume according to the quantity of modification resume information, modifies resume The quantity of information bar is equal with the modification quantity of resume information;
If a plurality of modification resume information is identical, resume writing unit is used to modify wherein one the modification of cloud line Resume information is saved to corresponding information bar;
Then lead establishes unit between each modification cloud line in information bar and corresponding a plurality of modification cloud line Modification lead is established respectively.
Preferably, system further includes judging unit, prompt unit;
Judging unit is for judging whether generate modification cloud line in engineering drawing, if so, prompt unit is mentioned for generating one Show information, prompt information is for prompting user to input modification resume information;Then information acquisition unit is used to receive modification shoe Attribute information is obtained after going through information.
Preferably, modification cloud line includes that can recognize modification cloud line and not can recognize modification cloud line, then information acquisition unit is used It can recognize the attribute information for modifying cloud line in obtaining.
The positive effect of the present invention is that: the present invention is automatically generated pair by obtaining modification resume information automatically The modification resume answered automatically saves modification resume information to modification resume, improves record engineering drawing modification information Efficiency is provided convenience for user.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the system of the record engineering drawing modification information of a preferred embodiment of the invention.
Fig. 2 is the modification resume that the system of the record engineering drawing modification information of a preferred embodiment of the invention generates Schematic diagram.
Fig. 3 is showing for the modification lead that the system of the record engineering drawing modification information of a preferred embodiment of the invention generates It is intended to.
Fig. 4 is showing for the modification label that the system of the record engineering drawing modification information of a preferred embodiment of the invention generates It is intended to.
Fig. 5 is the flow chart of the method for the record engineering drawing modification information of a preferred embodiment of the invention.
Specific embodiment
The present invention is further illustrated below by the mode of a preferred embodiment, but does not therefore limit the present invention to institute Among the scope of embodiments stated.
The present embodiment provides a kind of systems for recording engineering drawing modification information, and referring to Fig.1, which includes acquisition of information list First 101, resume generation unit 102, resume writing unit 103.Information acquisition unit 101 is used to obtain the modification of engineering drawing The attribute information of cloud line, attribute information include modification resume information.Resume generation unit 102 is used for according to modification resume information Quantity generate a modification resume, modification resume includes several information bars, so that each modification resume information is with one A information bar is corresponding, and information bar includes project column corresponding with the modification classification of resume information.Resume writing unit 103 For that will modify, resume information is corresponding to be saved into project column.
The system of the record engineering drawing modification information of the present embodiment further includes judging unit 104, prompt unit 105.Judgement Unit 104 is for judging whether generate modification cloud line in engineering drawing, if so, prompt unit 105 is used to generate a prompt information, Prompt information is for prompting user to input modification resume information.Information acquisition unit 101 is for receiving modification resume information After obtain attribute information.
It modifies on interface to engineering drawing when user modifies in engineering drawing, is shown at modification with modification cloud coil, then sentenced Disconnected unit 104 judges to generate modification cloud line in engineering drawing according to the variation of the data information of engineering drawing.Then, prompt unit 105 A prompting frame is shown on engineering drawing modification interface, and prompting frame display reminding information prompts user to input the category of the modification cloud line Property information.Attribute information includes modification content information, presenter's information, modification basis information, modification mark information and modification day Phase information.Prompting frame shows " modification content information ", " presenter's information ", " modification basis information ", " modification mark information " word Sample and corresponding blank column prompt user to fill in the content of corresponding information in corresponding blank column.After the completion of user fills in, " preservation " button that prompting frame is shown is clicked, can complete to save.When user clicks save button, information acquisition unit 101 is obtained It takes current system time and saves as modification date information.Modification content information, modification basis information, is repaired at presenter's information Changing mark information and modification date information will save as modification resume information.Modifying cloud line includes that can recognize modification cloud line Modification cloud line is not can recognize.Modification cloud line can be set as can recognize modifying cloud line or not can recognize and repaired by user according to demand Change cloud line.When user clicks save button, information acquisition unit 101 obtains user for the modification that can recognize that modification cloud line is filled in Content information, presenter's information, modification basis information, modification mark information.
The system of the record engineering drawing modification information of the present embodiment further includes statistic unit 106.Statistic unit 106 is for uniting Meter modification resume information quantity, if a plurality of modification resume information is identical, using a plurality of modification resume information as one into Row statistics.
After the completion of statistic unit 106 counts, resume generation unit 102 is repaired according to the quantity generation of modification resume information Change resume, the quantity for modifying the information bar of resume is equal with the modification quantity of resume information.As shown in Fig. 2, what is generated repairs Change in resume, information bar is the form (in other optional embodiments, information bar is the form of column) of row, modifies resume The quantity of information is 3, and the line number for modifying the information bar of resume is 3.Each information bar includes modification content item column, presenter Project column, modification basis project column, modification tagging items column and modification date of making available column, modification content item column are repaired for saving Changing content information, presenter's project column is used to save modification basis information for saving presenter's information, modification basis project column, Tagging items column is modified for saving modification mark information, modification date of making available column is for saving modification date information.
Next, resume writing unit 103 will be modified, resume information is corresponding to be saved into project column.If a plurality of modification Resume information is identical, then resume writing unit 103 saves the modification resume information that wherein one is modified cloud line to corresponding Information bar.That is, only saving a modification resume information in modification resume if a plurality of modification resume information is identical.
As a kind of preferred embodiment, the system of the record engineering drawing modification information of the present embodiment further includes that lead is established Unit 107.As shown in figure 3, lead establishes unit 107 shows modification resume on engineering drawing, and in information bar and and information Modification lead is established between the corresponding modification cloud line of item.In the case of identical for a plurality of modification resume information, lead establishes unit 107 establish modification lead between each modification cloud line in information bar and corresponding a plurality of modification cloud line respectively.Such as Fig. 3 institute Show, the first modification cloud line 121 is identical with modification resume information corresponding to the second modification cloud line 122, and modification resume information is equal It is stored in the first row of modification resume.Lead establishes unit 107 in the first row and the first modification cloud line 121 of modification resume Between establish the first modification lead 131, modification resume the first row and second modification cloud line 122 between establish the second modification Lead 132.By modifying lead, user can be understood that the corresponding situation of modification cloud line with modification resume information.In order to Convenient for it will be appreciated by those skilled in the art that data, symbol and the lines marked in the engineering drawing that Fig. 3 is remained, these information are works Routine information in journey figure is that those skilled in the art clearly understood that according to the knowledge of this field grasped, herein No longer illustrate.
In other optional embodiments, the system of record engineering drawing modification information further includes flag setting unit.? After resume writing unit 103 will modify the corresponding preservation to project column of resume information, as shown in figure 4, flag setting unit exists Modification resume is shown on engineering drawing, and modification label is shown in the preset range of distance modification cloud line.Wherein, the first modification Cloud line 121 is identical with modification resume information corresponding to the second modification cloud line 122, and modification resume information is stored in modification and carries out The first row of ephemeris.Flag setting unit is that the first modification cloud line 121 is set according to the modification mark information in modification resume information The first modification label 141 is set, and is second modification cloud line 122 setting the second modification label 142.Modification label uses an English Letter, the frame composition of an additional polygon.The modification in English alphabet and modification resume information in modification label, which marks, to be believed Breath is consistent.The English alphabet can be defined according to demand.In order to facilitate the understanding of those skilled in the art, what Fig. 4 was remained Data, symbol and the lines marked in engineering drawing, these information are those skilled in the art's knowing according to this field grasped What knowledge clearly understood that, details are not described herein again.In Fig. 4, the polygon in modification label is triangle.It is optional real at other It applies in mode, according to the difference that industry or designer are accustomed to, modification label can be not limited to shown in Fig. 4 there are many pattern. In another optional embodiment, the system of record engineering drawing modification information includes that flag setting unit and lead establish list Member.
The system of the record engineering drawing modification information of the present embodiment is after user adds modification cloud line in engineering drawing, automatically Modification resume information is obtained, and automatically generates corresponding modification resume, automatically saves modification resume information to modification resume Table improves the efficiency of record engineering drawing modification information, provides convenience for user.
The present embodiment provides a kind of method for recording engineering drawing modification information, the method for the record engineering drawing modification information is adopted It is realized with the system of the record engineering drawing modification information of the present embodiment.Referring to Fig. 5, method includes the following steps:
Step S200, judge modification cloud line whether is generated in engineering drawing, if so, thening follow the steps S201.
Step S201, a prompt information is generated.Prompt information is for prompting user to input modification resume information.It is receiving After modifying resume information, step S202 is executed.
Step S202, the attribute information of the modification cloud line of engineering drawing is obtained.Attribute information includes modification resume information.
Step S203, a modification resume is generated according to the quantity of modification resume information.Modifying resume includes several letters Item is ceased, so that each modification resume information is corresponding with an information bar, information bar includes the class with modification resume information Not corresponding project column.
Step S204, modification resume information is corresponded to and is saved into project column.
Step S205, modification resume is shown on engineering drawing, and in information bar and modification cloud line corresponding with information bar Between establish modification lead.
It modifies on interface to engineering drawing when user modifies in engineering drawing, is shown at modification with modification cloud coil, then existed In step S200, judging unit 104 judges to generate modification cloud line in engineering drawing according to the variation of the data information of engineering drawing.So Afterwards, in step s 201, prompt unit 105 is modified in engineering drawing and shows a prompting frame on interface, prompting frame display reminding information, Prompt user inputs the attribute information of the modification cloud line.Attribute information includes modification content information, presenter's information, modification basis Information, modification mark information and modification date information.Prompting frame show " modification content information ", " presenter's information ", " modification according to It is believed that breath ", " modification mark information " printed words and corresponding blank column, prompt user to fill in corresponding letter in corresponding blank column The content of breath.After the completion of user fills in, " preservation " button that prompting frame is shown is clicked, can complete to save.User, which clicks, to be saved When button, information acquisition unit 101 obtains current system time and saves as modification date information.Modification content information mentions Information, modification basis information, modification mark information and modification date information will be saved as modification resume information out.It repairs Changing cloud line includes that can recognize modification cloud line and not can recognize to modify cloud line.User can according to demand set modification cloud line to can Identification modification cloud line not can recognize modification cloud line.After user clicks save button, in step S202, information acquisition unit 101 acquisition users modify modification content information, the presenter's information, modification basis information, modification that cloud line is filled in for recognizable Mark information.
In step S202, the quantity of the statistics modification resume information of statistic unit 106, if a plurality of modification resume information phase Together, then it is counted using a plurality of modification resume information as one.
After the completion of statistic unit 106 counts, in step S203, resume generation unit 102 is believed according to modification resume The quantity of breath generates modification resume, and the quantity for modifying the information bar of resume is equal with the modification quantity of resume information.Such as Fig. 2 Shown, in the modification resume of generation, the quantity for modifying resume information is 3, and the line number for modifying the information bar of resume is 3.Often One information bar includes modification content item column, presenter's project column, modification basis project column, modification tagging items column and modification day Phase project column, modification content item column are repaired for saving modification content information, presenter's project column for saving presenter's information Change and modifies the date for saving modification mark information for saving modification basis information, modification tagging items column according to project column Project column is for saving modification date information.
Next, resume writing unit 103 will modify the corresponding preservation of resume information to project column in step S204 In.If a plurality of modification resume information is identical, resume writing unit 103 believes the modification resume that wherein one is modified cloud line Breath is saved to corresponding information bar.That is, only saving one if a plurality of modification resume information is identical in modification resume and repairing Change resume information.
As a kind of preferred embodiment, as shown in figure 3, lead establishes unit 107 on engineering drawing in step S205 Display modification resume, and modification lead is established between information bar and modification cloud line corresponding with information bar.It is repaired for a plurality of Change the identical situation of resume information, lead is established each of the unit 107 in information bar and corresponding a plurality of modification cloud line and repaired Change and establishes modification lead between cloud line respectively.As shown in figure 3, corresponding to the first modification cloud line 121 and the second modification cloud line 122 Modification resume information is identical, and modification resume information is stored in the first row of modification resume.Lead is established unit 107 and is being repaired Change and establish the first modification lead 131 between the first row of resume and the first modification cloud line 121, in the first row of modification resume The second modification lead 132 is established between the second modification cloud line 122.By modifying lead, user can be understood that modification The corresponding situation of cloud line and modification resume information.In order to facilitate the understanding of those skilled in the art, the engineering drawing acceptance of the bid that Fig. 3 is remained Data, symbol and the lines of note, these information are that those skilled in the art can understand according to the knowledge of this field grasped Understand, details are not described herein again.
In other optional embodiments, after step s 204, as shown in figure 4, flag setting unit is in engineering drawing Resume is modified in upper display, and modification label is shown in the preset range of distance modification cloud line.Wherein, the first modification cloud line 121 is identical with modification resume information corresponding to the second modification cloud line 122, and modification resume information is stored in modification resume The first row.Flag setting unit is the first modification cloud line 121 setting the according to the modification mark information in modification resume information One modification label 141, and be second modification cloud line 122 setting the second modification label 142.Modification label uses an English words Mother, the frame composition of an additional polygon.The modification mark information in English alphabet and modification resume information in modification label Unanimously.The English alphabet can be defined according to demand.In order to facilitate the understanding of those skilled in the art, the work that Fig. 4 is remained Data, symbol and the lines marked in journey figure, these information are knowledge of the those skilled in the art according to this field grasped It clearly understood that, details are not described herein again.In Fig. 4, the polygon in modification label is triangle.In other optional implementations In mode, according to the difference that industry or designer are accustomed to, modification label can be not limited to shown in Fig. 4 there are many pattern.
The method of the record engineering drawing modification information of the present embodiment is a kind of preferable implementation.Record work of the invention The method of journey figure modification information is not limited to realize using the system of the record engineering drawing modification information of the present embodiment.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that these It is merely illustrative of, protection scope of the present invention is defined by the appended claims.Those skilled in the art is not carrying on the back Under the premise of from the principle and substance of the present invention, many changes and modifications may be made, but these are changed Protection scope of the present invention is each fallen with modification.

Claims (12)

1. a kind of method for recording engineering drawing modification information, which comprises the following steps:
S1, the attribute information for modifying cloud line for obtaining the engineering drawing, the attribute information include modification resume information;
S2, a modification resume is generated according to the quantity of the modification resume information, the modification resume includes several information Item, so that each described modification resume information is corresponding with an information bar, the information bar includes repairing with described Change the corresponding project column of classification of resume information;
S3, the modification resume information is corresponded into preservation into the project column.
2. the method for record engineering drawing modification information as described in claim 1, which is characterized in that
The modification resume information includes modification content information, presenter's information, modification basis information, modification mark information and repairs Change date information;
Each information bar includes modification content item column, presenter's project column, modification basis project column, modification tagging items Column and modification date of making available column, the modification content item column is for saving the modification content information, presenter's project Column is for saving presenter's information, and modification basis project column is for saving the modification basis information, the modification Tagging items column is for saving the modification mark information, and the modification date of making available column is for saving the modification date letter Breath.
3. the method for record engineering drawing modification information as claimed in claim 2, which is characterized in that the method also includes following Step:
S4, the modification resume is shown on the engineering drawing, in the information bar and corresponding with the information bar described It modifies and establishes modification lead between cloud line,
And/or the modification resume is shown on the engineering drawing, it is shown in the preset range apart from the modification cloud line Modification label, the modification label includes the modification mark information.
4. the method for record engineering drawing modification information as claimed in claim 3, which is characterized in that step S2 further include: statistics The quantity of the modification resume information, if a plurality of modification resume information is identical, by a plurality of modification resume information It is counted as one;The modification resume, the modification resume are generated according to the quantity of the modification resume information Information bar quantity it is equal with the modification quantity of resume information;
Then step S3 further include: if a plurality of modification resume information is identical, by the institute of the wherein one modification cloud line Modification resume information is stated to save to the corresponding information bar;
Then step S4 further include: modification cloud line described in each in the information bar and the corresponding a plurality of modification cloud line Between respectively establish modification lead.
5. the method for record engineering drawing modification information as described in claim 1, which is characterized in that described before step S1 Method is further comprising the steps of:
S0, judge the modification cloud line whether is generated in the engineering drawing, if so, a prompt information is generated, the prompt letter Breath is for prompting user to input the modification resume information;After receiving the modification resume information, step S1 is executed.
6. the method for record engineering drawing modification information as described in claim 1, which is characterized in that the modification cloud line includes can Identification modifies cloud line and not can recognize modification cloud line, then step S1 includes:
Obtain the attribute information of the recognizable modification cloud line.
7. a kind of system for recording engineering drawing modification information, which is characterized in that generated including information acquisition unit, resume single Member, resume writing unit;
The information acquisition unit is used to obtain the attribute information of the modification cloud line of the engineering drawing, and the attribute information includes repairing Change resume information;
The resume generation unit is used to generate a modification resume, the modification according to the quantity of the modification resume information Resume includes several information bars, so that each described modification resume information is corresponding with an information bar, it is described Information bar includes project column corresponding with the modification classification of resume information;
The resume writing unit is used for the corresponding preservation of the modification resume information into the project column.
8. the system of record engineering drawing modification information as claimed in claim 7, which is characterized in that
The modification resume information includes modification content information, presenter's information, modification basis information, modification mark information and repairs Change date information;
Each information bar includes modification content item column, presenter's project column, modification basis project column, modification tagging items Column and modification date of making available column, the modification content item column is for saving the modification content information, presenter's project Column is for saving presenter's information, and modification basis project column is for saving the modification basis information, the modification Tagging items column is for saving the modification mark information, and the modification date of making available column is for saving the modification date letter Breath.
9. the system of record engineering drawing modification information as claimed in claim 8, which is characterized in that the system also includes leads Establish unit and/or flag setting unit;
The lead establishes unit for showing the modification resume on the engineering drawing, and the information bar and with institute It states and establishes modification lead between the corresponding modification cloud line of information bar;
The flag setting unit on the engineering drawing for showing the modification resume, and apart from the modification cloud line Preset range in display modification label, modification label includes the modification mark information.
10. the system of record engineering drawing modification information as claimed in claim 9, which is characterized in that the system also includes systems Count unit;
The statistic unit is used to count the quantity of the modification resume information, if a plurality of modification resume information is identical, Then counted using a plurality of modification resume information as one;
Then the resume generation unit is used to generate the modification resume according to the quantity of the modification resume information, described The quantity for modifying the information bar of resume is equal with the modification quantity of resume information;
If a plurality of modification resume information is identical, the resume writing unit is for will a wherein modification cloud The modification resume information of line is saved to the corresponding information bar;
Then the lead establish unit for the information bar and it is corresponding it is a plurality of it is described modification cloud line in each described in It modifies and establishes modification lead between cloud line respectively.
11. the system of record engineering drawing modification information as claimed in claim 7, which is characterized in that the system also includes sentence Disconnected unit, prompt unit;
The judging unit is for judging whether generate the modification cloud line in the engineering drawing, if so, the prompt unit For generating a prompt information, the prompt information is for prompting user to input the modification resume information;Then the information obtains Take unit for obtaining the attribute information after receiving the modification resume information.
12. the system of record engineering drawing modification information as claimed in claim 7, which is characterized in that the modification cloud line includes It can recognize modification cloud line and not can recognize modification cloud line, then the information acquisition unit is for obtaining the recognizable modification cloud line Attribute information.
CN201910587960.5A 2019-07-02 2019-07-02 Record the method and system of engineering drawing modification information Pending CN110347686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910587960.5A CN110347686A (en) 2019-07-02 2019-07-02 Record the method and system of engineering drawing modification information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910587960.5A CN110347686A (en) 2019-07-02 2019-07-02 Record the method and system of engineering drawing modification information

Publications (1)

Publication Number Publication Date
CN110347686A true CN110347686A (en) 2019-10-18

Family

ID=68178112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910587960.5A Pending CN110347686A (en) 2019-07-02 2019-07-02 Record the method and system of engineering drawing modification information

Country Status (1)

Country Link
CN (1) CN110347686A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111325826A (en) * 2020-01-10 2020-06-23 郑州航空工业管理学院 Engineering drawing model projection system and method
CN111782665A (en) * 2020-06-19 2020-10-16 北京思特奇信息技术股份有限公司 Method and system for monitoring life cycle management of product and commodity

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7086028B1 (en) * 2003-04-09 2006-08-01 Autodesk, Inc. Simplified generation of design change information on a drawing in a computer aided design (CAD) environment
CN1993020A (en) * 2005-12-30 2007-07-04 英业达股份有限公司 Circuit layout system and method for automatic presenting project for modification
CN104036059A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Primitive-based engineering collaborative design method and system
CN104036060A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Online auditing method and system for engineering drawing
CN104392028A (en) * 2014-11-11 2015-03-04 国家电网公司 Management system for power distribution network engineering design
CN104598622A (en) * 2015-02-02 2015-05-06 浪潮软件股份有限公司 Method and system for implementing data modification log as well as application server
US20160125014A1 (en) * 2014-10-31 2016-05-05 Red Hat, Inc. Registering data modification listener in a data-grid
CN109697297A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 Management method, system, memory and the electronic equipment of engineering drawing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7086028B1 (en) * 2003-04-09 2006-08-01 Autodesk, Inc. Simplified generation of design change information on a drawing in a computer aided design (CAD) environment
CN1993020A (en) * 2005-12-30 2007-07-04 英业达股份有限公司 Circuit layout system and method for automatic presenting project for modification
CN104036059A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Primitive-based engineering collaborative design method and system
CN104036060A (en) * 2013-03-07 2014-09-10 纬衡浩建科技(深圳)有限公司 Online auditing method and system for engineering drawing
US20160125014A1 (en) * 2014-10-31 2016-05-05 Red Hat, Inc. Registering data modification listener in a data-grid
CN104392028A (en) * 2014-11-11 2015-03-04 国家电网公司 Management system for power distribution network engineering design
CN104598622A (en) * 2015-02-02 2015-05-06 浪潮软件股份有限公司 Method and system for implementing data modification log as well as application server
CN109697297A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 Management method, system, memory and the electronic equipment of engineering drawing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111325826A (en) * 2020-01-10 2020-06-23 郑州航空工业管理学院 Engineering drawing model projection system and method
CN111782665A (en) * 2020-06-19 2020-10-16 北京思特奇信息技术股份有限公司 Method and system for monitoring life cycle management of product and commodity

Similar Documents

Publication Publication Date Title
CN105574133A (en) Multi-mode intelligent question answering system and method
CN106406783B (en) Label printing method and label print plug-in unit
CN101246550B (en) Image character recognition method and device
CN102646091B (en) Dependence relationship labeling method, device and system
CN110347686A (en) Record the method and system of engineering drawing modification information
CN112766655B (en) Automatic scheduling method, device, equipment and computer readable storage medium
CN107220274A (en) One kind visualization data-interface fairground implementation method
CN107331225B (en) A kind of answer method of the interaction generation method based on graph image
CN101976394B (en) Data acquiring and counting system and method
CN110244921A (en) Label printing method, device, electronic equipment and system
CN108984208A (en) A kind of function document generating method, apparatus and system
CN110795917A (en) Personalized handout generation method and system, electronic equipment and storage medium
CN107748744A (en) A kind of method for building up and device for sketching the contours frame knowledge base
JP2021103552A (en) Method for labelling structured document information, device for labelling structured document information, electronic apparatus, computer readable storage medium, and computer program
CN110738050B (en) Text reorganization method, device and medium based on word segmentation and named entity recognition
CN107644090B (en) A kind of modification information processing method and processing device
CN112463986A (en) Information storage method and device
CN116245177A (en) Geographic environment knowledge graph automatic construction method and system and readable storage medium
CN111859854A (en) Data annotation method, device and equipment and computer readable storage medium
CN116311300A (en) Table generation method, apparatus, electronic device and storage medium
CN106021206A (en) Patent writing image-text matching system and matching method thereof
CN115828856A (en) Test paper generation method, device, equipment and storage medium
CN112507931B (en) Deep learning-based information chart sequence detection method and system
CN114724170A (en) BOM generation method and device, electronic equipment and storage medium
CN110991156B (en) Automatic report generation method based on ship numerical virtual test

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191018