CN110344602A - Grouting device and grouting method suitable for slip casting armored concrete pull-out test - Google Patents

Grouting device and grouting method suitable for slip casting armored concrete pull-out test Download PDF

Info

Publication number
CN110344602A
CN110344602A CN201910514253.3A CN201910514253A CN110344602A CN 110344602 A CN110344602 A CN 110344602A CN 201910514253 A CN201910514253 A CN 201910514253A CN 110344602 A CN110344602 A CN 110344602A
Authority
CN
China
Prior art keywords
grouting
slip casting
taper support
bar
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910514253.3A
Other languages
Chinese (zh)
Inventor
周继凯
盛慧敏
邰雅婷
冯江江
李友军
叶能君
林成欢
张艳江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruifeng Energy (wuhan) Engineering Technology Co Ltd
Hohai University HHU
Original Assignee
Ruifeng Energy (wuhan) Engineering Technology Co Ltd
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruifeng Energy (wuhan) Engineering Technology Co Ltd, Hohai University HHU filed Critical Ruifeng Energy (wuhan) Engineering Technology Co Ltd
Priority to CN201910514253.3A priority Critical patent/CN110344602A/en
Publication of CN110344602A publication Critical patent/CN110344602A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention discloses a kind of grouting device suitable for slip casting armored concrete pull-out test, including cross brace, taper support and slurry casting machine, wherein, cross brace includes cross bar, and the vertical bar through cross bar, vertical bar are hollow structure, are set in reinforcing bar top, cross bar is located at concrete top, for fixing vertical bar;Taper support is installed on reinforcing bar lower part, and the bottom surface of taper support is contacted with the bottom surface of concrete;The side wall of the taper support opens up grouting port, is inserted into for the Grouting Pipe of slurry casting machine.Such grouting device is simple and reliable for structure, and soap-free emulsion polymeization section is not interfered by slip casting, and slip casting pipe diameter can not change because ring shake thickness changes, convenient and efficient.Invention additionally discloses a kind of grouting methods suitable for slip casting armored concrete pull-out test.

Description

Grouting device and grouting method suitable for slip casting armored concrete pull-out test
Technical field
The present invention relates to a kind of grouting devices and grouting method suitable for slip casting armored concrete pull-out test, specifically Saying is, the device and method of slip casting is carried out using the ring shake between reinforcing bar and concrete through hole.
Background technique
Under blower foundation is the long-term wind load the effects of, localized accumulated is damaged between foundation ring and base concrete, is caused There is visible disengagement crack to the fastening invalidation of foundation ring in concrete between foundation ring and concrete, foundation ring bottom flange is mixed There is cavity, soil rigidity decline in solidifying soil, and pylon frequency reduces, and may influence blower normal operation.Slip casing by pressure is exactly to utilize Air pressure or it is hydraulic curable slurries are injected into crack or hole, slurries are driven away and are split in a manner of filling, permeate and is compacted etc. Its position is filled after seam or air and moisture in hole, reinforcing, antiseepage are achieved the purpose that after grout curing.
Research for blower foundation grouting consolidation effect needs to consider the influence of the factors such as slit width, temperature, humidity, and Field test is at high cost, is not easy to carry out.To solve the above-mentioned problems, propose use plain bar analog basis ring, plain bar with After staying seam slip casting between concrete block, carries out pull-out test and analyze test result.And existing grouting device is mostly directed to ground Lower engineering, is unable to satisfy the research to foundation ring and concrete and slurry interface bond effect, can not solve steel in pull-out test Muscle positioning is placed in the middle, the problems such as soap-free emulsion polymeization section is arranged.
Blower foundation grouting and reinforcing engineering commonly uses top-down grouting method, in slip casting reinforcing bar pull-out test, due to It needs to be arranged soap-free emulsion polymeization section, when using grouting method from top to bottom, first is that slurries can be made by soap-free emulsion polymeization section, is unable to control viscous The interface of section and soap-free emulsion polymeization section is tied in designated position, second is that test crack is annular, when slit width is grade, conventional slip casting Pipe can not be inserted into carry out slip casting.
Based on the above analysis, in order to overcome the defect of existing grouting mode, thus this case is generated.
Summary of the invention
The purpose of the present invention is to provide a kind of grouting device suitable for slip casting armored concrete pull-out test and side Method, simple and reliable for structure, soap-free emulsion polymeization section is not interfered by slip casting, and slip casting pipe diameter can not change because ring shake thickness changes Become, it is convenient and efficient.
In order to achieve the above objectives, solution of the invention is:
A kind of grouting device suitable for slip casting armored concrete pull-out test, including cross brace, taper support and note Starch device, wherein cross brace includes cross bar, and through the vertical bar of cross bar, vertical bar is hollow structure, is set in reinforcing bar top, Cross bar is located at concrete top, for fixing vertical bar;Taper support is installed on reinforcing bar lower part, and the bottom surface of taper support and coagulation The bottom surface contact of soil;The side wall of the taper support opens up grouting port, is inserted into for the Grouting Pipe of slurry casting machine.
5 times for being overlapped length and being bar diameter of above-mentioned vertical bar and reinforcing bar.
The contact position of above-mentioned taper support and reinforcing bar is provided with rubber ring.
Gap magnesium carbonate cement seal between above-mentioned taper support and concrete.
Based on the grouting method of the foregoing grouting device suitable for slip casting armored concrete pull-out test, including such as Lower step:
Step 1, the vertical bar of cross brace is set in reinforcing bar top, taper support is installed on reinforcing bar lower part, and will note Starch the grouting port of the Grouting Pipe insertion taper support side wall of device;
Step 2, slurries are injected into Grouting Pipe with slurry casting machine, from bottom to top slip casting, and make Grouting Pipe no more than slip casting Liquid level slowly extracts Grouting Pipe when slurries can not continue injection, closes grouting port with rubber stopper;After certain interval of time, Same position opens grouting port, and insertion Grouting Pipe repeats slip casting, so that slurries are full of crack;
Step 3, by whole inversion, until slurries is in semi-cured state, taper support is taken out, extra slurries are cleared up, The ring shake that taper support is formed is sealed with medical proof fabric, and brushing magnesium carbonate cement seal crack;
Step 4, maintenance to grout curing rear taking-up cross brace and removes surface residue.
In above-mentioned steps 1, with the gap between seal with elastometic washer taper support and reinforcing bar, with magnesium carbonate cement seal taper Gap between support and concrete.
In above-mentioned steps 2, before injecting slurries, first at magnesium carbonate cement seal smear suds, with slurry casting machine to Air is injected in Grouting Pipe, and whether there is or not gas leak phenomenons for observation, if gas leakage, are filled up with magnesium carbonate cement, until no longer gas leakage.
After adopting the above scheme, the present invention compared to the prior art, the advantage is that:
(1) compared to traditional grouting device, present invention is generally directed to the simulation test of blower foundation grouting consolidation effect, That is slip casting armored concrete pull-out test.Taper support and cross brace are capable of fixing reinforcing bar, are located in reinforcing bar in concrete The heart improves test accuracy, facilitates grouting operation;
(2) present invention uses slip casting from bottom to top, and cross brace closes the reinforcing bar upper half, and slurries when slip casting is avoided to pass through nothing Adhesive section is conducive to soap-free emulsion polymeization section needed for pull-out test accurately is arranged, and is also beneficial to reduce the bubble generated during slip casting, Improve grouting quality;
(3) grouting port is arranged using in taper support side wall in the present invention, and slip casting pipe diameter is not influenced by slit width, can be to milli Meter level ring shake slip casting, thus short form test equipment.
Detailed description of the invention
Fig. 1 is the sectional view of grouting device of the present invention;
Fig. 2, Fig. 3 are the floor map of grouting device of the present invention.
Specific embodiment
Below with reference to attached drawing, technical solution of the present invention and beneficial effect are described in detail.
As shown in Figure 1 to Figure 3, the present invention provides a kind of grouting device suitable for slip casting armored concrete pull-out test, Seam slip casting, including cross brace 2, taper support 4, slurry casting machine and rubber ring 6 are stayed for realizing between reinforcing bar 1 and concrete 3, Wherein, reinforcing bar 1, concrete 3 are test specimen main body, and reinforcing bar 1 is inserted into the through hole center of concrete 3, and in reinforcing bar 1 and concrete 3 There are ring shakes between through hole.
Cross brace 2 is set in 1 top of reinforcing bar, the cross comprising being used to form the vertical bar of soap-free emulsion polymeization section and for fixing vertical bar Bar, wherein vertical bar is hollow structure, is inserted into for reinforcing bar, to play positioning action, and vertical bar runs through cross bar, vertical bar and reinforcing bar Coincidence length (namely length of soap-free emulsion polymeization section) be 5 times of bar diameter;By cooperating cross brace 2 and reinforcing bar 1, play Fixed steel bars 1, setting soap-free emulsion polymeization section and the effect for sealing slip casting channel top, and taken out after the completion of slip casting.
Taper support 4 is installed on 1 lower part of reinforcing bar, plays the role of support positioning, reinforcing bar 1 is fixed on concrete 3 and is penetrated through Hole center, and taper support 4 and 1 contact position of reinforcing bar are provided with rubber ring 6, the gap between taper support 4 and concrete 3 is then used Magnesium carbonate cement seal plays the role of closing slip casting environment.
The side wall of the taper support 4 opens up grouting port, is inserted into for the Grouting Pipe 5 of slurry casting machine, realizes slip casting from bottom to top, And notice that slip casting nozzle is no more than slurries liquid level during slip casting, to reduce the generation of bubble, improve grouting quality.
In the present embodiment, the cube block side length that concrete is presented is 10 times of bar diameter, and soap-free emulsion polymeization segment length is 5 times of bar diameter, reinforcing bar upper surface and concrete cube upper surface distance are not less than 300mm, reinforcing bar lower surface and coagulation The distance of native cube block lower surface is not less than 50mm.
The present invention also provides a kind of grouting methods suitable for slip casting armored concrete pull-out test, include the following steps:
Step 1, the dust on reinforcing bar 1 and 3 surface of concrete and residue etc. are cleaned out with hair dryer, assembles and seals note Sizing device specifically includes and seals gap between taper support 4 and reinforcing bar 1 with rubber ring 6, with magnesium carbonate cement seal taper branch Gap between support 4 and concrete 3;
Step 2, suds are smeared at magnesium carbonate cement seal, air are injected into Grouting Pipe 5 with slurry casting machine, and observe Whether there is or not gas leak phenomenons, if gas leakage, are filled up with magnesium carbonate cement, until no longer gas leakage;
Step 3, slurries are injected into Grouting Pipe 5 with slurry casting machine, from bottom to top slip casting, Grouting Pipe 5 is no more than injection slurry Grouting Pipe is slowly extracted when slurries can not continue injection in face, closes grouting port with rubber stopper;After being spaced a few minutes, same Grouting port is opened in position, and insertion Grouting Pipe repeats slip casting, so that slurries are full of crack;
Step 4, component is inverted, until slurries are in semi-cured state, taper support 4 is taken out, extra slurry is cleared up Liquid, ring shake are sealed with medical proof fabric, and brushing magnesium carbonate cement seal crack;
Step 5, maintenance to grout curing rear taking-up cross brace 2 and removes surface residue.
The above examples only illustrate the technical idea of the present invention, and this does not limit the scope of protection of the present invention, all According to the technical idea provided by the invention, any changes made on the basis of the technical scheme each falls within the scope of the present invention Within.

Claims (7)

1. a kind of grouting device suitable for slip casting armored concrete pull-out test, it is characterised in that: including cross brace, taper Support and slurry casting machine, wherein cross brace includes cross bar, and through the vertical bar of cross bar, vertical bar is hollow structure, is set in steel Muscle top, cross bar is located at concrete top, for fixing vertical bar;Taper support is installed on reinforcing bar lower part, and the bottom of taper support Face is contacted with the bottom surface of concrete;The side wall of the taper support opens up grouting port, is inserted into for the Grouting Pipe of slurry casting machine.
2. being suitable for the grouting device of slip casting armored concrete pull-out test as described in claim 1, it is characterised in that: described 5 times for being overlapped length and being bar diameter of vertical bar and reinforcing bar.
3. being suitable for the grouting device of slip casting armored concrete pull-out test as described in claim 1, it is characterised in that: described The contact position of taper support and reinforcing bar is provided with rubber ring.
4. being suitable for the grouting device of slip casting armored concrete pull-out test as described in claim 1, it is characterised in that: described Gap magnesium carbonate cement seal between taper support and concrete.
5. based on the grouting method of the grouting device as described in claim 1 suitable for slip casting armored concrete pull-out test, It is characterized by comprising following steps:
Step 1, the vertical bar of cross brace is set in reinforcing bar top, taper support is installed on reinforcing bar lower part, and by slurry casting machine Grouting Pipe insertion taper support side wall grouting port;
Step 2, slurries are injected into Grouting Pipe with slurry casting machine, from bottom to top slip casting, and make Grouting Pipe no more than slip casting liquid level, When slurries can not continue injection, Grouting Pipe is slowly extracted, closes grouting port with rubber stopper;After certain interval of time, same Grouting port is opened in position, and insertion Grouting Pipe repeats slip casting, so that slurries are full of crack;
Step 3, by whole inversion, until slurries are in semi-cured state, taper support is taken out, extra slurries, taper are cleared up The ring shake that support is formed is sealed with medical proof fabric, and brushing magnesium carbonate cement seal crack;
Step 4, maintenance to grout curing rear taking-up cross brace and removes surface residue.
6. grouting method as claimed in claim 5, it is characterised in that: in the step 1, with seal with elastometic washer taper support with Gap between reinforcing bar, with the gap between magnesium carbonate cement seal taper support and concrete.
7. grouting method as claimed in claim 6, it is characterised in that: in the step 2, before injecting slurries, first in carbon Suds are smeared at sour magnesium cement seal, air are injected into Grouting Pipe with slurry casting machine, and observe whether there is or not gas leak phenomenon, if leakage Gas is then filled up with magnesium carbonate cement, until no longer gas leakage.
CN201910514253.3A 2019-06-14 2019-06-14 Grouting device and grouting method suitable for slip casting armored concrete pull-out test Pending CN110344602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910514253.3A CN110344602A (en) 2019-06-14 2019-06-14 Grouting device and grouting method suitable for slip casting armored concrete pull-out test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910514253.3A CN110344602A (en) 2019-06-14 2019-06-14 Grouting device and grouting method suitable for slip casting armored concrete pull-out test

Publications (1)

Publication Number Publication Date
CN110344602A true CN110344602A (en) 2019-10-18

Family

ID=68182054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910514253.3A Pending CN110344602A (en) 2019-06-14 2019-06-14 Grouting device and grouting method suitable for slip casting armored concrete pull-out test

Country Status (1)

Country Link
CN (1) CN110344602A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206565A (en) * 2020-03-06 2020-05-29 中冶建工集团有限公司 Local terrace concrete sedimentation treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011017208A (en) * 2009-07-10 2011-01-27 Takenaka Komuten Co Ltd Method of manufacturing precast concrete member, precast concrete member, and form for guide surface molding
CN202401766U (en) * 2011-12-07 2012-08-29 中国铁道科学研究院铁道建筑研究所 Novel slurry filling assembly for cracks
CN103016034A (en) * 2012-11-03 2013-04-03 孟钧 Mining hollow grouting anchor cable
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN205839602U (en) * 2016-06-30 2016-12-28 北京城建七建设工程有限公司 A kind of deformed bar pipeline grouting device
CN210828420U (en) * 2019-06-14 2020-06-23 河海大学 Grouting device suitable for grouting reinforced concrete drawing test

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011017208A (en) * 2009-07-10 2011-01-27 Takenaka Komuten Co Ltd Method of manufacturing precast concrete member, precast concrete member, and form for guide surface molding
CN202401766U (en) * 2011-12-07 2012-08-29 中国铁道科学研究院铁道建筑研究所 Novel slurry filling assembly for cracks
CN103016034A (en) * 2012-11-03 2013-04-03 孟钧 Mining hollow grouting anchor cable
CN205839602U (en) * 2016-06-30 2016-12-28 北京城建七建设工程有限公司 A kind of deformed bar pipeline grouting device
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN210828420U (en) * 2019-06-14 2020-06-23 河海大学 Grouting device suitable for grouting reinforced concrete drawing test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206565A (en) * 2020-03-06 2020-05-29 中冶建工集团有限公司 Local terrace concrete sedimentation treatment method

Similar Documents

Publication Publication Date Title
CN106088364B (en) A kind of basement antiseep connection structure and its construction method
CN105442862B (en) A kind of distress in concrete infiltration water collision reinforcement and repair method
CN103837385B (en) Coarse-grained soil high polymer grouting triaxial test sample preparation device and using method thereof
CN110082218A (en) A kind of tunnel lining structural model test device and test method
CN109162152A (en) The regulation method of the ballastless track bed disease of rising soil of high-speed rail
CN104215484B (en) A kind of preparation method of saturated soil sample in geotechnique's dynamic centrifuge model test
CN103015538A (en) Leakage prevention device and leakage treatment method for concrete structure deformation joint
CN207231732U (en) A kind of assembled piping lane joint waterproofing test device
CN106568698A (en) Method for repairing concrete cracks by using microorganisms and conducting permeability test
CN201883435U (en) Preburied pipe pile grouting device
CN206618664U (en) A kind of concrete sealing material anti-permeability performance evaluation experimental device
CN105464194A (en) Water proofing and leak repairing construction method for sewage pipe network below underground water level
CN105181463A (en) Water-containing gangue compression testing device and testing method thereof
CN205576888U (en) Booster -type vacuum preloading consolidates soft soil foundation structure
CN110344602A (en) Grouting device and grouting method suitable for slip casting armored concrete pull-out test
CN110593808B (en) Grout stopping plugging device and grouting anchor cable hole sealing grout stopping method
CN116047024A (en) Grouting lifting three-dimensional model test device and test method
CN105651674A (en) Method for detecting water breakthrough performance of waterproof coiled material
CN102927364B (en) Reinforced concrete pipe installation method and clamp special for reinforced concrete pipe
CN207143920U (en) Water-stopping system between novel pile under a kind of complicated circumstance of flowing water
CN105604163A (en) Sewage pipeline internal plugging and external grouting construction method
CN106644835B (en) The measurement device and method of chloride ion vertical proliferation coefficient under different hydraulic gradients
CN209742911U (en) simulation test device for slurry loss amount in shield synchronous grouting
CN111472568A (en) Concrete crack repairing device and method
CN204301779U (en) A kind of indoor deep hole grouting multi-parameter combined measuring instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination