CN110344545B - Adjustable screw rod for controlling thickness of pier column reinforcement protection layer - Google Patents

Adjustable screw rod for controlling thickness of pier column reinforcement protection layer Download PDF

Info

Publication number
CN110344545B
CN110344545B CN201910606932.3A CN201910606932A CN110344545B CN 110344545 B CN110344545 B CN 110344545B CN 201910606932 A CN201910606932 A CN 201910606932A CN 110344545 B CN110344545 B CN 110344545B
Authority
CN
China
Prior art keywords
screw rod
reinforcement cage
thickness
welding
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910606932.3A
Other languages
Chinese (zh)
Other versions
CN110344545A (en
Inventor
吕晓辉
尹家亮
杨波
蒋明雷
刘春�
黄飞
张建华
陈浩
廖树柏
张育锋
黄显全
张若瑜
石峰
张青春
刘志超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
First Engineering Co Ltd of CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
First Engineering Co Ltd of CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd, First Engineering Co Ltd of CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201910606932.3A priority Critical patent/CN110344545B/en
Publication of CN110344545A publication Critical patent/CN110344545A/en
Application granted granted Critical
Publication of CN110344545B publication Critical patent/CN110344545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/18Spacers of metal or substantially of metal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An adjustable screw for controlling the thickness of a pier stud reinforcement protection layer, comprising: a erect supporting rib for enclosing into the steel reinforcement cage, erect the outer circumference welding of supporting rib and wind the muscle outward, erect the interior circumference welding of supporting rib middle part and interior strengthening rib, strengthening rib top welding curved overlap joint muscle, weld the nut between overlap joint muscle and the strengthening rib, nut internal thread connection screw rod, the screw rod stretches into the welding of steel reinforcement cage end and is the short reinforcing bar head of platykurtic, the screw rod exposes the steel reinforcement cage outside end and is the cusp. After the structure is adopted for operation, the qualification rate of the reinforcement protection layer before and after the thickness is high, the construction quality is effectively ensured, and in addition, the structure is simple to operate, the cost is lower, and the popularization value is higher.

Description

Adjustable screw rod for controlling thickness of pier column reinforcement protection layer
Technical Field
The invention relates to the technical field of building pier columns, in particular to an adjustable screw for controlling the thickness of a pier column reinforcement protection layer.
Background
The traditional pier stud protective layer control method comprises the following steps: the short steel bars are welded and fixed on the steel bar cage, and in the process of installing the templates, the templates are easy to be incapable of being assembled or the steel bars are easy to bend, deform and fall, so that the thickness of the local protective layer of the pier stud steel bars is insufficient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the adjustable screw for controlling the thickness of the pier stud reinforcement protection layer, after the structure is adopted to operate, the qualification rate of the reinforcement protection layer before and after the construction is high, the construction quality is effectively ensured, in addition, the operation is simple, the cost is lower, and the popularization value is higher.
In order to achieve the aim of the invention, the invention adopts the following technical scheme:
An adjustable screw for controlling the thickness of a pier stud reinforcement protection layer, comprising: a erect supporting rib for enclosing into the steel reinforcement cage, erect the outer circumference welding of supporting rib and wind the muscle outward, erect the interior circumference welding of supporting rib middle part and interior strengthening rib, strengthening rib top welding curved overlap joint muscle, weld the nut between overlap joint muscle and the strengthening rib, nut internal thread connection screw rod, the screw rod stretches into the welding of steel reinforcement cage end and is the short reinforcing bar head of platykurtic, the screw rod exposes the steel reinforcement cage outside end and is the cusp.
Further, the screw rod is retracted into the reinforcement cage before die assembly, the die assembly can be carried out smoothly, deformation and falling caused by collision of the screw rod and the die plate are avoided, the screw rod is manually rotated to eject after die assembly, the extension length of the screw rod is adjusted to meet the thickness requirement of the inner reinforcing rib protective layer, the single section setting interval of the screw rod, namely the arc length of the lap joint rib is 110cm-120 cm, and the section interval is 290 cm-310 cm.
The beneficial effects of the invention are as follows:
The screw cap is welded on the reinforcement cage and is fixed firmly by adopting the lap joint ribs, the screw is sleeved, the short reinforcement heads are welded at the tail parts of the screw side by side and are flat, the screw is convenient to rotate, the outer sides of the screw heads are sharpened, the screw is retracted into the reinforcement cage before die assembly, the die assembly can be carried out smoothly, and deformation and falling caused by collision of the screw and the die plate are avoided; after the die is assembled, the screw rod is manually rotated to eject, and the extension length of the screw rod can be gradually adjusted, so that the requirement of the design of the thickness of the reinforcement protection layer is met. The single section of the screw is provided with the spacing of 110cm-120 cm, the arc length is uniformly distributed, and the spacing of 290 cm-310 cm can meet the requirements. After the operation structure is adopted, the qualification rate of the reinforcement protection layer before and after the thickness is high, the construction quality is effectively ensured, in addition, the operation is simple, the cost is lower, and the popularization value is higher.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged view of the structure of the present invention;
Reference numeral control table:
1-vertical supporting ribs, 2-external winding ribs, 3-internal reinforcing ribs, 4-lap joint ribs, 5-nuts, 6-screw rods, 7-reinforcement cages and 8-short reinforcement heads.
Detailed Description
Specific embodiments of the present invention will be further described below with reference to the accompanying drawings. Wherein like parts are designated by like reference numerals.
It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the drawings, and the words "inner" and "outer" refer to directions toward or away from, respectively, the geometric center of a particular component.
In order to make the contents of the present invention more clearly understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1 and 2, an adjustable screw for controlling the thickness of a pier stud reinforcement protection layer, comprising: a erect supporting rib 1 for enclosing into steel reinforcement cage 7, erect supporting rib 1 outer circumference welding and wind muscle 2 outward, erect supporting rib 1 middle part inner circumference welding internal reinforcement 3, the curved overlap joint muscle 3 of strengthening rib 3 top welding, weld nut 5 between overlap joint muscle 3 and the strengthening rib 3, nut 5 internal thread connection screw rod 6, screw rod 6 stretches into steel reinforcement cage 7 end welding and is flat short bar head 8, screw rod 6 exposes steel reinforcement cage 7 outside end and is the pointed.
The screw rod 6 is retracted into the reinforcement cage 7 before die assembly, the die assembly of the die plate can be carried out smoothly, deformation and falling caused by collision of the screw rod 6 and the die plate are avoided, the screw rod 6 is manually rotated to eject after die assembly, the extension length of the screw rod 6 is adjusted to meet the requirement of the thickness of the protective layer of the inner reinforcing rib 3, the single section setting interval of the screw rod 6, namely the arc length of the lap joint rib 3 is 110cm-120 cm, and the section interval is 290 cm-310 cm.
The screw cap is welded on the reinforcement cage and is fixed firmly by adopting the lap joint ribs, the screw is sleeved, the short reinforcement heads are welded at the tail parts of the screw side by side and are flat, the screw is convenient to rotate, the outer sides of the screw heads are sharpened, the screw is retracted into the reinforcement cage before die assembly, the die assembly can be carried out smoothly, and deformation and falling caused by collision of the screw and the die plate are avoided; after the die is assembled, the screw rod is manually rotated to eject, and the extension length of the screw rod can be gradually adjusted, so that the requirement of the design of the thickness of the reinforcement protection layer is met.
The above description is illustrative of the preferred embodiments of the present invention and is not intended to limit the scope of the present invention, but is to be accorded the full scope of the claims.

Claims (2)

1. An adjustable screw for controlling the thickness of a pier stud reinforcement protection layer, comprising: a erect brace rod (1) for enclosing into steel reinforcement cage (7), erect brace rod (1) outer circumference welding and wind muscle (2) outward, erect brace rod (1) middle part inner circumference welding and interior strengthening rib (3), interior strengthening rib (3) top welding curved overlap joint muscle (4), weld nut (5) between overlap joint muscle (4) and interior strengthening rib (3), nut (5) internal thread connection screw rod (6), screw rod (6) stretch into steel reinforcement cage (7) end welding and be flat short bar head (8), screw rod (6) expose steel reinforcement cage (7) outside end and be the cusp.
2. The adjustable screw for controlling the thickness of a pier stud reinforcement cover according to claim 1, wherein: the screw rod (6) is retracted into the reinforcement cage (7) before die assembly, the die assembly can be carried out smoothly, deformation and falling caused by collision between the screw rod (6) and the die plate are avoided, the screw rod (6) is rotated manually to eject after die assembly, the extension length of the screw rod (6) is adjusted to meet the thickness requirement of the protective layer of the inner reinforcing rib (3), the single section setting interval of the screw rod (6), namely the arc length of the lap joint rib (4), is 110cm-120cm, and the section interval is 290cm-310cm.
CN201910606932.3A 2019-07-06 2019-07-06 Adjustable screw rod for controlling thickness of pier column reinforcement protection layer Active CN110344545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910606932.3A CN110344545B (en) 2019-07-06 2019-07-06 Adjustable screw rod for controlling thickness of pier column reinforcement protection layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910606932.3A CN110344545B (en) 2019-07-06 2019-07-06 Adjustable screw rod for controlling thickness of pier column reinforcement protection layer

Publications (2)

Publication Number Publication Date
CN110344545A CN110344545A (en) 2019-10-18
CN110344545B true CN110344545B (en) 2024-04-30

Family

ID=68177893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910606932.3A Active CN110344545B (en) 2019-07-06 2019-07-06 Adjustable screw rod for controlling thickness of pier column reinforcement protection layer

Country Status (1)

Country Link
CN (1) CN110344545B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195788A (en) * 2020-09-25 2021-01-08 中国一冶集团有限公司 Bridge pier column steel bar positioning, butting and fixing device and using method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226129A (en) * 1995-02-22 1996-09-03 Raito Kogyo Co Ltd Form for reinforcement preassembly and slope frame construction method using the form
CN204662959U (en) * 2015-03-26 2015-09-23 中国建筑第六工程局有限公司 Pier stud topping adjuster
CN105908903A (en) * 2016-05-17 2016-08-31 济南城建集团有限公司 Device and method for controlling thickness of protecting layer of pier column reinforcing bar of bridge
CN207452862U (en) * 2017-10-30 2018-06-05 中国水利水电第十四工程局有限公司 A kind of adjustable height concrete coating scrapes rail bracket
CN108360754A (en) * 2018-02-02 2018-08-03 中国建筑第四工程局有限公司 A kind of method and device controlling shear wall and thickness of concrete cover
CN207919365U (en) * 2017-12-28 2018-09-28 中交二航局第四工程有限公司 A kind of adjustable pier stud cover to reinforcement control device
CN108842764A (en) * 2018-06-01 2018-11-20 中力建设集团有限公司 A kind of Stirring formula anchor tube construction method
CN208219630U (en) * 2018-04-03 2018-12-11 浙江交工国际工程有限公司 It is a kind of that reusable steel reinforcement cage support device is adjusted
CN211257568U (en) * 2019-07-06 2020-08-14 中交三公局第一工程有限公司 Adjustable screw for controlling thickness of pier stud steel bar protective layer

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226129A (en) * 1995-02-22 1996-09-03 Raito Kogyo Co Ltd Form for reinforcement preassembly and slope frame construction method using the form
CN204662959U (en) * 2015-03-26 2015-09-23 中国建筑第六工程局有限公司 Pier stud topping adjuster
CN105908903A (en) * 2016-05-17 2016-08-31 济南城建集团有限公司 Device and method for controlling thickness of protecting layer of pier column reinforcing bar of bridge
CN207452862U (en) * 2017-10-30 2018-06-05 中国水利水电第十四工程局有限公司 A kind of adjustable height concrete coating scrapes rail bracket
CN207919365U (en) * 2017-12-28 2018-09-28 中交二航局第四工程有限公司 A kind of adjustable pier stud cover to reinforcement control device
CN108360754A (en) * 2018-02-02 2018-08-03 中国建筑第四工程局有限公司 A kind of method and device controlling shear wall and thickness of concrete cover
CN208219630U (en) * 2018-04-03 2018-12-11 浙江交工国际工程有限公司 It is a kind of that reusable steel reinforcement cage support device is adjusted
CN108842764A (en) * 2018-06-01 2018-11-20 中力建设集团有限公司 A kind of Stirring formula anchor tube construction method
CN211257568U (en) * 2019-07-06 2020-08-14 中交三公局第一工程有限公司 Adjustable screw for controlling thickness of pier stud steel bar protective layer

Also Published As

Publication number Publication date
CN110344545A (en) 2019-10-18

Similar Documents

Publication Publication Date Title
CN110344545B (en) Adjustable screw rod for controlling thickness of pier column reinforcement protection layer
CN207953062U (en) Flexible cross cylinder body supporting device
CN108551125A (en) A kind of cable shield stripping-off device
CN209457425U (en) A kind of ancient architecture wall recovery support
CN211257568U (en) Adjustable screw for controlling thickness of pier stud steel bar protective layer
CN106271658B (en) A kind of fence automatic soldering device
CN215155520U (en) Interim hole/manhole passageway protection frock
CN209664168U (en) A kind of engineering header shell tinuous production
CN104550574B (en) The framework of steel reinforcement machine main muscle of stirrup case supports and adjusting apparatus
CN218597884U (en) Tower section of thick bamboo seam supports reinforcing apparatus
CN207521960U (en) A kind of rail vehicle aluminium alloy drivers' cab skin morph control device
CN208713101U (en) Automatic TIG welding machine tungsten electrode is from release
CN209157556U (en) A kind of tower processing interior welds equipment
CN203635828U (en) Serration-type reinforcing cage processing jig frame
CN113333912A (en) Front shield screw machine sleeve surfacing tool, automatic surfacing equipment and surfacing method
CN109138459B (en) Section steel post welding butt joint straightness controller that hangs down
CN206839011U (en) Mesh sheet positioning and guiding correction mechanism and steel mesh welding equipment
CN202725885U (en) Reusable wire rod reinforcing steel bar straightening guider on building construction site
CN207223164U (en) A kind of split blade type wind tower burst cutting machine
CN219074221U (en) Protection device of steel bar straightener
CN206903203U (en) Side wall plate device
CN207942043U (en) A kind of vehicle frame aluminium-alloy pipe pipe cutting machine
CN216097280U (en) Fixing support for welding automobile fender
CN217232405U (en) Intercolumnar bearing structure
CN209753706U (en) Heating pipe plastic resetting means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant