CN110333464A - Method of instructing operation and device - Google Patents
Method of instructing operation and device Download PDFInfo
- Publication number
- CN110333464A CN110333464A CN201910672875.9A CN201910672875A CN110333464A CN 110333464 A CN110333464 A CN 110333464A CN 201910672875 A CN201910672875 A CN 201910672875A CN 110333464 A CN110333464 A CN 110333464A
- Authority
- CN
- China
- Prior art keywords
- battery
- mentioned
- battery group
- capacity value
- predetermined threshold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R31/3835—Arrangements for monitoring battery or accumulator variables, e.g. SoC involving only voltage measurements
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/392—Determining battery ageing or deterioration, e.g. state of health
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/396—Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
Abstract
The invention discloses a kind of method of instructing operation and devices.Wherein, this method comprises: obtaining the voltage change of battery group during discharge;According to above-mentioned voltage change, determine whether the use duration of above-mentioned battery group reaches predetermined threshold;If judging, the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold, exports operation instruction information, and aforesaid operations instruction information is used to indicate target object and executes the operation for replacing above-mentioned battery group.The present invention solves the service life for lacking effective monitoring battery group in the prior art, leads to the technical issues of electric power system fault occur when the service life of battery group is too long.
Description
Technical field
The present invention relates to field of computer technology, in particular to a kind of method of instructing operation and device.
Background technique
In the related art, electric system battery and continuous-current plant in the process of running, due to lack to storage
The monitoring of the service life of battery pack leads to electric power system fault occur when the service life of battery group is too long, can not expire
Sufficient electric system is to device security, the requirement of reliability.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of method of instructing operation and devices, at least to solve to lack in the prior art effectively
The service life for monitoring battery group, the technology for electric power system fault occur when the service life of battery group is too long is caused to be asked
Topic.
According to an aspect of an embodiment of the present invention, a kind of method of instructing operation is provided, comprising: obtain battery group and exist
Voltage change in discharge process;According to above-mentioned voltage change, determine whether the use duration of above-mentioned battery group reaches
Predetermined threshold;If judging, the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold, exports operation instruction information, on
It states operation instruction information and is used to indicate the operation that target object executes the above-mentioned battery group of replacement.
Further, according to above-mentioned voltage change, determine whether the use duration of above-mentioned battery group reaches predetermined threshold
Value, comprising: the discharge capacity value of above-mentioned battery group is determined according to above-mentioned voltage change;More above-mentioned discharge capacity value and volume
The size of nominal value;Determine whether the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold based on comparative result.
Further, the discharge capacity value of above-mentioned battery group is determined according to above-mentioned voltage change, comprising: obtain above-mentioned
The normal voltage curve data of battery group, above-mentioned standard voltage curve data are used to indicate voltage change and discharge capacity value
Between corresponding relationship;Above-mentioned discharge capacity value corresponding with above-mentioned voltage change is determined according to above-mentioned corresponding relationship.
Further, determine whether the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold based on comparative result,
If including: that above-mentioned comparison result indicates that above-mentioned discharge capacity value is less than or equal to the rated capacity value of predetermined ratio, it is determined that on
The use duration for stating battery group reaches above-mentioned predetermined threshold;If it is above-mentioned that above-mentioned comparison result indicates that above-mentioned discharge capacity value is greater than
The rated capacity value of predetermined ratio, it is determined that the use duration of above-mentioned battery group is not up to above-mentioned predetermined threshold.
Further, before exporting operation instruction information, the above method further include: obtain and terminated in above-mentioned discharge process
The battery voltage value of every section battery in Shi Shangshu battery group;Judge whether the battery voltage value of above-mentioned every section battery is full
Sufficient predetermined voltage demand, wherein if judging, the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined voltage demand,
The step of then executing above-mentioned output operation instruction information.
Further, before exporting operation instruction information, the above method further include: obtain every section in above-mentioned battery group
The battery capacity value of battery;Judge whether the battery capacity value of above-mentioned every section battery is all satisfied predetermined load demand, wherein
If judging, the battery capacity value of any one section battery is unsatisfactory for above-mentioned predetermined load demand, executes above-mentioned output operation and refers to
The step of showing information.
According to another aspect of an embodiment of the present invention, a kind of operation instruction device is additionally provided, comprising: obtain module, use
In the voltage change of acquisition battery during discharge;Determining module, for determining above-mentioned according to above-mentioned voltage change
Whether the use duration of battery reaches predetermined threshold;Output module, if being up to when for judging the use of above-mentioned battery
To above-mentioned predetermined threshold, then operation instruction information is exported, aforesaid operations instruction information is used to indicate target object execution and replaces with
State the operation of battery.
Further, above-mentioned determining module includes: the first determining submodule, for determining according to above-mentioned voltage change
State the discharge capacity value of battery;Comparative sub-module, the size for more above-mentioned discharge capacity value and rated capacity value;Second
Submodule is determined, for determining whether the use duration of above-mentioned battery reaches above-mentioned predetermined threshold based on comparative result.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, above-mentioned storage medium includes storage
Program, wherein equipment where controlling above-mentioned storage medium in above procedure operation executes the above-mentioned operation of any one and refers to
Show method.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, above-mentioned processor is used to run program,
Wherein, any one above-mentioned method of instructing operation is executed when above procedure is run.
In embodiments of the present invention, by obtaining the voltage change of battery group during discharge;According to above-mentioned electricity
Changing value is pressed, determines whether the use duration of above-mentioned battery group reaches predetermined threshold;If judging making for above-mentioned battery group
Used time length reaches above-mentioned predetermined threshold, then exports operation instruction information, and aforesaid operations instruction information is used to indicate target object and holds
Row replaces the operation of above-mentioned battery group, has reached the service life of effective monitoring battery group, has avoided due to battery group
Occurs the purpose of electric power system fault when service life is too long, to realize the device security of enhancing electric system and reliable
Property technical effect, and then solve in the prior art lack effective monitoring battery group service life, lead to battery group
Service life it is too long when there is the technical issues of electric power system fault.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of method of instructing operation according to an embodiment of the present invention;
Fig. 2 is a kind of flow chart of optional method of instructing operation according to an embodiment of the present invention;
Fig. 3 is a kind of flow chart of optional method of instructing operation according to an embodiment of the present invention;
Fig. 4 is a kind of structural schematic diagram of operation instruction device according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work
It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to
Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product
Or other step or units that equipment is intrinsic.
Embodiment 1
According to embodiments of the present invention, a kind of embodiment of method of instructing operation is provided, it should be noted that in attached drawing
The step of process illustrates can execute in a computer system such as a set of computer executable instructions, although also,
Logical order is shown in flow chart, but in some cases, it can be to be different from shown by sequence execution herein or retouch
The step of stating.
Fig. 1 is a kind of flow chart of method of instructing operation according to an embodiment of the present invention, as shown in Figure 1, this method includes
Following steps:
Step S102 obtains the voltage change of battery group during discharge;
Step S104 determines whether the use duration of above-mentioned battery group reaches predetermined threshold according to above-mentioned voltage change
Value;
Step S106, if judging, the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold, exports operation and refers to
Show that information, aforesaid operations instruction information are used to indicate target object and execute the operation for replacing above-mentioned battery group.
In embodiments of the present invention, by obtaining the voltage change of battery group during discharge;According to above-mentioned electricity
Changing value is pressed, determines whether the use duration of above-mentioned battery group reaches predetermined threshold;If judging making for above-mentioned battery group
Used time length reaches above-mentioned predetermined threshold, then exports operation instruction information, and aforesaid operations instruction information is used to indicate target object and holds
Row replaces the operation of above-mentioned battery group, has reached the service life of effective monitoring battery group, has avoided due to battery group
Occurs the purpose of electric power system fault when service life is too long, to realize the device security of enhancing electric system and reliable
Property technical effect, and then solve in the prior art lack effective monitoring battery group service life, lead to battery group
Service life it is too long when there is the technical issues of electric power system fault.
It should be noted that can be, but not limited to execute or realize that the application is real on intelligent battery group loading tester
Apply method of instructing operation provided by example, wherein intelligent battery group loading tester is connect with battery group, to reach electric power storage
Pond group load testing and instruction target object execute the purpose of replacement battery group operation.
Optionally, above-mentioned battery can be, but not limited to for the matching used battery of solar power system, for example,
Lead-acid accumulator, cadmium-nickel accumulator.
In alternative embodiment provided herein, battery group is not exchanged as a kind of reliable power supply of independence
The influence of power supply, when any accident occurring in power plant or substation or even in the case that whole station AC power source has a power failure, still
It can guarantee that the electrical equipment in direct current system is reliable and continuously work and voltage is steady, while being also used as the accident of whole station
Mains lighting supply is to guarantee the unbroken last barrier of power supply.
Optionally, above-mentioned predetermined threshold can be, but not limited to be 3 years, 5 years, 10 years etc., in actual application, can be with
The above-mentioned predetermined threshold of the setting such as type, required standard service life according to battery group.
Optionally, above-mentioned target object can be the staff of electric system, for example, trouble hunting personnel etc..
It in the embodiment of the present application, can be by monitoring battery group voltage change during discharge, in determination
The use duration of battery group is stated, and by comparing the size for using duration and predetermined threshold, to judge whether this uses duration
Reach predetermined threshold.
In an alternative embodiment, according to above-mentioned voltage change, determine that the use duration of above-mentioned battery group is
It is no to reach predetermined threshold, comprising:
Step S202 determines the discharge capacity value of above-mentioned battery group according to above-mentioned voltage change;
Step S204, the size of more above-mentioned discharge capacity value and rated capacity value;
Step S206, determines whether the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold based on comparative result.
Optionally, above-mentioned discharge capacity value can be based on electric power in an alternative embodiment for percent value
System battery and continuous-current plant operation and maintenance technology, continuous several times (for example, 3 times), which put the execution of battery group, fills
Electricity, obtains battery group voltage change during discharge, and based on scheduled voltage change and discharge capacity value it
Between corresponding relationship, the discharge capacity value of above-mentioned battery group is determined according to above-mentioned voltage change;By comparing discharge capacity
The size of value and rated capacity value, determines whether the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold.
In an alternative embodiment, the discharge capacity value of above-mentioned battery group is determined according to above-mentioned voltage change,
Include:
Step S302, obtains the normal voltage curve data of above-mentioned battery group, and above-mentioned standard voltage curve data are used for
Corresponding relationship between instructed voltage changing value and discharge capacity value;
Step S304 determines above-mentioned discharge capacity value corresponding with above-mentioned voltage change according to above-mentioned corresponding relationship.
Optionally, above-mentioned standard voltage curve data are used to indicate the corresponding pass between voltage change and discharge capacity value
System.
After obtaining the voltage change of battery group during discharge, the standard of available above-mentioned battery group
Voltage curve data, according to the corresponding pass in the normal voltage curve data between the voltage change indicated and discharge capacity value
System determines above-mentioned discharge capacity value corresponding with above-mentioned voltage change.
In an alternative embodiment, determine whether the use duration of above-mentioned battery group reaches based on comparative result
State predetermined threshold, comprising:
Step S402, if above-mentioned comparison result indicates that above-mentioned discharge capacity value is less than or equal to the rated capacity of predetermined ratio
Value, it is determined that the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold;
Step S404, if above-mentioned comparison result indicates that above-mentioned discharge capacity value is greater than the rated capacity of above-mentioned predetermined ratio
Value, it is determined that the use duration of above-mentioned battery group is not up to above-mentioned predetermined threshold.
Optionally, the rated capacity value of above-mentioned predetermined ratio can be 80% rated capacity, or the volume higher than 80%
Constant volume, the embodiment of the present application is not specific to this to be limited, and can be selected according to the actual conditions during specific implementation.
In above-mentioned optional embodiment, if above-mentioned comparison result indicates that above-mentioned discharge capacity value is less than or equal to 80%
Rated capacity value, it is determined that the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold;If in above-mentioned comparison result instruction
State the rated capacity value that discharge capacity value is greater than 80%, it is determined that the use duration of above-mentioned battery group is not up to above-mentioned predetermined threshold
Value.
Optionally, if put charging to battery group is not achieved the 80% of rated capacity value three times, it can determine whether out the electric power storage
The service life of pond group has arrived, and exportable instruction information is to indicate that trouble hunting personnel replace the battery group.
In an alternative embodiment, before exporting operation instruction information, the above method further include:
Step S502 obtains the cell voltage of every section battery in above-mentioned battery group when above-mentioned discharge process terminates
Value;
Step S504, judges whether the battery voltage value of above-mentioned every section battery is all satisfied predetermined voltage demand, wherein if
Judge that the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined voltage demand, then executes above-mentioned output operation instruction
The step of information.
Optionally, above-mentioned predetermined voltage demand can be true in advance according to progress such as model, the practical situations of battery
Fixed, the embodiment of the present application is not specific to this to be limited, and is subject to and the embodiment of the present application may be implemented.
In above-mentioned optional embodiment, before exporting operation instruction information, it can also differentiate every in battery group
Whether section battery is all satisfied predetermined voltage demand, by obtaining when above-mentioned discharge process terminates every section in above-mentioned battery group
The battery voltage value of battery, and judging that the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined voltage demand
In the case where, the step of executing above-mentioned output operation instruction information.
In an alternative embodiment, before exporting operation instruction information, the above method further include:
Step S602 obtains the battery capacity value of every section battery in above-mentioned battery group;
Step S604, judges whether the battery capacity value of above-mentioned every section battery is all satisfied predetermined load demand, wherein if
Judge that the battery capacity value of any one section battery is unsatisfactory for above-mentioned predetermined load demand, then executes above-mentioned output operation instruction
The step of information.
Optionally, above-mentioned workload demand can carry out predetermined according to model, the practical situations etc. of battery, this
Apply for that embodiment is not specific to this to limit, is subject to and the embodiment of the present application may be implemented.
In above-mentioned optional embodiment, before exporting operation instruction information, it can also differentiate every in battery group
Whether section battery is all satisfied predetermined load demand, by obtaining the battery capacity value of every section battery in above-mentioned battery group,
And in the case where judging that the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined load demand, execute above-mentioned defeated
The step of operation instruction information out.
In an alternative embodiment, before exporting operation instruction information, or in output operation instruction information
While, it can show that aforesaid operations indicate information on the display device;Specifically, alarm can be passed through in the embodiment of the present application
The form of device or alarm exports aforesaid operations and indicates information.
Embodiment 2
According to embodiments of the present invention, it additionally provides a kind of for implementing the Installation practice of aforesaid operations indicating means, Fig. 4
It is a kind of structural schematic diagram of operation instruction device according to an embodiment of the present invention, as shown in figure 4, aforesaid operations instruction device,
It include: to obtain module 40, determining module 42 and output module 44, in which:
Module 40 is obtained, for obtaining the voltage change of battery during discharge;Determining module 42 is used for foundation
Above-mentioned voltage change, determines whether the use duration of above-mentioned battery reaches predetermined threshold;Output module 44, if for judging
The use duration of above-mentioned battery reaches above-mentioned predetermined threshold out, then exports operation instruction information, and aforesaid operations indicate that information is used
The operation for replacing above-mentioned battery is executed in instruction target object.
In an alternative embodiment, above-mentioned determining module includes: the first determining submodule, for according to above-mentioned voltage
Changing value determines the discharge capacity value of above-mentioned battery;Comparative sub-module is used for more above-mentioned discharge capacity value and rated capacity
The size of value;Second determines submodule, for determining whether the use duration of above-mentioned battery reaches above-mentioned based on comparative result
Predetermined threshold.
It should be noted that above-mentioned modules can be realized by software or hardware, for example, for the latter,
Can be accomplished by the following way: above-mentioned modules can be located in same processor;Alternatively, above-mentioned modules are with any
Combined mode is located in different processors.
Herein it should be noted that above-mentioned acquisition module 40, determining module 42 and output module 44 correspond in embodiment 1
Step S102 to step S106, above-mentioned module is identical as example and application scenarios that corresponding step is realized, but is not limited to
1 disclosure of that of above-described embodiment.It should be noted that above-mentioned module may operate in computer as a part of device
In terminal.
It should be noted that the optional or preferred embodiment of the present embodiment may refer to the associated description in embodiment 1,
Details are not described herein again.
Above-mentioned operation instruction device can also include processor and memory, above-mentioned acquisition module 40, determining module 42
It waits with output module 44 and is stored in memory as program unit, above-mentioned journey stored in memory is executed by processor
Sequence unit realizes corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel, above-mentioned kernel can be set
One or more.Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM)
And/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes at least one
Storage chip.
According to the embodiment of the present application, a kind of storage medium embodiment is additionally provided.Optionally, in the present embodiment, above-mentioned
Storage medium includes the program of storage, wherein equipment where controlling above-mentioned storage medium in above procedure operation executes above-mentioned
Any one method of instructing operation.
Optionally, in the present embodiment, above-mentioned storage medium can be located in computer network in computer terminal group
In any one terminal, or in any one mobile terminal in mobile terminal group, above-mentioned storage medium packet
Include the program of storage.
Optionally, when program is run, equipment where control storage medium executes following functions: obtaining battery group and is putting
Voltage change in electric process;According to above-mentioned voltage change, determine whether the use duration of above-mentioned battery group reaches pre-
Determine threshold value;If judging, the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold, exports operation instruction information, above-mentioned
Operation instruction information is used to indicate target object and executes the operation for replacing above-mentioned battery group.
Optionally, when program is run, equipment where control storage medium executes following functions: according to above-mentioned voltage change
Value determines the discharge capacity value of above-mentioned battery group;The size of more above-mentioned discharge capacity value and rated capacity value;Based on comparing
As a result determine whether the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold.
Optionally, when program is run, equipment where control storage medium executes following functions: obtaining above-mentioned battery group
Normal voltage curve data, above-mentioned standard voltage curve data are used to indicate pair between voltage change and discharge capacity value
It should be related to;Above-mentioned discharge capacity value corresponding with above-mentioned voltage change is determined according to above-mentioned corresponding relationship.
Optionally, when program is run, equipment where control storage medium executes following functions: if above-mentioned comparison result refers to
Show that above-mentioned discharge capacity value is less than or equal to the rated capacity value of predetermined ratio, it is determined that be up to when the use of above-mentioned battery group
To above-mentioned predetermined threshold;If above-mentioned comparison result indicates that above-mentioned discharge capacity value is greater than the rated capacity value of above-mentioned predetermined ratio,
Then determine that the use duration of above-mentioned battery group is not up to above-mentioned predetermined threshold.
Optionally, when program is run, equipment where control storage medium executes following functions: obtaining and discharged above-mentioned
The battery voltage value of journey every section battery in above-mentioned battery group when terminating;Judging the battery voltage value of above-mentioned every section battery is
It is no to be all satisfied predetermined voltage demand, wherein if judging, the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined electricity
Pressure demand, then the step of executing above-mentioned output operation instruction information.
Optionally, when program is run, equipment where control storage medium executes following functions: obtaining above-mentioned battery group
In every section battery battery capacity value;Judge whether the battery capacity value of above-mentioned every section battery is all satisfied predetermined load and needs
It asks, wherein if judging, the battery capacity value of any one section battery is unsatisfactory for above-mentioned predetermined load demand, executes above-mentioned defeated
The step of operation instruction information out.
According to the embodiment of the present application, a kind of processor embodiment is additionally provided.Optionally, in the present embodiment, above-mentioned place
Reason device is for running program, wherein above procedure executes any one of the above method of instructing operation when running.
The embodiment of the present application provides a kind of equipment, equipment include processor, memory and storage on a memory and can
The program run on a processor, processor performs the steps of when executing program obtains battery group during discharge
Voltage change;According to above-mentioned voltage change, determine whether the use duration of above-mentioned battery group reaches predetermined threshold;If sentencing
The use duration of disconnected above-mentioned battery group out reaches above-mentioned predetermined threshold, then exports operation instruction information, aforesaid operations instruction letter
Breath is used to indicate target object and executes the operation for replacing above-mentioned battery group.
Optionally, when above-mentioned processor executes program, above-mentioned battery group can also be determined according to above-mentioned voltage change
Discharge capacity value;The size of more above-mentioned discharge capacity value and rated capacity value;Above-mentioned battery is determined based on comparative result
Whether the use duration of group reaches above-mentioned predetermined threshold.
Optionally, when above-mentioned processor executes program, the normal voltage curve data of above-mentioned battery group can also be obtained,
Above-mentioned standard voltage curve data are used to indicate the corresponding relationship between voltage change and discharge capacity value;According to above-mentioned correspondence
Relationship determines above-mentioned discharge capacity value corresponding with above-mentioned voltage change.
Optionally, when above-mentioned processor executes program, if can indicate that above-mentioned discharge capacity value is small with above-mentioned comparison result
In or equal to predetermined ratio rated capacity value, it is determined that the use duration of above-mentioned battery group reaches above-mentioned predetermined threshold;If
Above-mentioned comparison result indicates that above-mentioned discharge capacity value is greater than the rated capacity value of above-mentioned predetermined ratio, it is determined that above-mentioned battery group
Use duration be not up to above-mentioned predetermined threshold.
Optionally, when above-mentioned processor executes program, the above-mentioned battery when above-mentioned discharge process terminates can also be obtained
The battery voltage value of every section battery in group;Judge whether the battery voltage value of above-mentioned every section battery is all satisfied predetermined voltage and needs
It asks, wherein if judging, the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined voltage demand, executes above-mentioned defeated
The step of operation instruction information out.
Optionally, when above-mentioned processor executes program, the battery of every section battery in above-mentioned battery group can also be obtained
Capability value;Judge whether the battery capacity value of above-mentioned every section battery is all satisfied predetermined load demand, wherein if judging any
The battery capacity value of one section battery is unsatisfactory for above-mentioned predetermined load demand, then executes the step of above-mentioned output operation instruction information
Suddenly.
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just
The program of beginningization there are as below methods step: the voltage change of battery group during discharge is obtained;Become according to above-mentioned voltage
Change value, determines whether the use duration of above-mentioned battery group reaches predetermined threshold;If judge the use of above-mentioned battery group
Length reaches above-mentioned predetermined threshold, then exports operation instruction information, and aforesaid operations instruction information is used to indicate target object and executes more
Change the operation for stating battery group.
Optionally, it when above-mentioned computer program product executes program, can also be determined according to above-mentioned voltage change above-mentioned
The discharge capacity value of battery group;The size of more above-mentioned discharge capacity value and rated capacity value;On determining based on comparative result
Whether the use duration for stating battery group reaches above-mentioned predetermined threshold.
Optionally, when above-mentioned computer program product executes program, the normal voltage of above-mentioned battery group can also be obtained
Curve data, above-mentioned standard voltage curve data are used to indicate the corresponding relationship between voltage change and discharge capacity value;According to
Above-mentioned discharge capacity value corresponding with above-mentioned voltage change is determined according to above-mentioned corresponding relationship.
Optionally, when above-mentioned computer program product executes program, if above-mentioned electric discharge can be indicated with above-mentioned comparison result
Capability value is less than or equal to the rated capacity value of predetermined ratio, it is determined that the use duration of above-mentioned battery group reaches above-mentioned predetermined
Threshold value;If above-mentioned comparison result indicates that above-mentioned discharge capacity value is greater than the rated capacity value of above-mentioned predetermined ratio, it is determined that above-mentioned
The use duration of battery group is not up to above-mentioned predetermined threshold.
Optionally, it when above-mentioned computer program product executes program, can also obtain on when above-mentioned discharge process terminates
State the battery voltage value of every section battery in battery group;It is pre- to judge whether the battery voltage value of above-mentioned every section battery is all satisfied
Constant voltage demand, wherein the battery voltage value of any one section battery is unsatisfactory for above-mentioned predetermined voltage demand if judging, holds
The step of row above-mentioned output operation instruction information.
Optionally, when above-mentioned computer program product executes program, every section electric power storage in above-mentioned battery group can also be obtained
The battery capacity value in pond;Judge whether the battery capacity value of above-mentioned every section battery is all satisfied predetermined load demand, wherein if sentencing
The battery capacity value of disconnected any one section battery out is unsatisfactory for above-mentioned predetermined load demand, then executes above-mentioned output operation instruction letter
The step of breath.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment
The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module
It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code
Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of method of instructing operation characterized by comprising
Obtain the voltage change of battery group during discharge;
According to the voltage change, determine whether the use duration of the battery group reaches predetermined threshold;
If judging, the use duration of the battery group reaches the predetermined threshold, exports operation instruction information, the behaviour
Make instruction information and is used to indicate the operation that target object executes the replacement battery group.
2. the method according to claim 1, wherein determining the battery group according to the voltage change
Use duration whether reach predetermined threshold, comprising:
The discharge capacity value of the battery group is determined according to the voltage change;
Compare the size of the discharge capacity value and rated capacity value;
Determine whether the use duration of the battery group reaches the predetermined threshold based on comparative result.
3. according to the method described in claim 2, it is characterized in that, determining the battery group according to the voltage change
Discharge capacity value, comprising:
The normal voltage curve data of the battery group is obtained, the normal voltage curve data is used to indicate voltage change
Corresponding relationship between discharge capacity value;
The discharge capacity value corresponding with the voltage change is determined according to the corresponding relationship.
4. according to the method described in claim 2, it is characterized in that, when determining the use of the battery group based on comparative result
Whether length reaches the predetermined threshold, comprising:
If the comparison result indicates that the discharge capacity value is less than or equal to the rated capacity value of predetermined ratio, it is determined that described
The use duration of battery group reaches the predetermined threshold;
If the comparison result indicates that the discharge capacity value is greater than the rated capacity value of the predetermined ratio, it is determined that the storage
The use duration of battery pack is not up to the predetermined threshold.
5. the method according to claim 1, wherein the method is also wrapped before exporting operation instruction information
It includes:
Obtain the battery voltage value of every section battery in the battery group when the discharge process terminates;
Judge whether the battery voltage value of every section battery is all satisfied predetermined voltage demand, wherein if judging any one
The step of battery voltage value of section battery is unsatisfactory for the predetermined voltage demand, then executes the output operation instruction information.
6. the method according to claim 1, wherein the method is also wrapped before exporting operation instruction information
It includes:
Obtain the battery capacity value of every section battery in the battery group;
Judge whether the battery capacity value of every section battery is all satisfied predetermined load demand, wherein if judging any one
The step of battery capacity value of section battery is unsatisfactory for the predetermined load demand, then executes the output operation instruction information.
7. a kind of operation instruction device characterized by comprising
Module is obtained, for obtaining the voltage change of battery during discharge;
Determining module, for determining whether the use duration of the battery reaches predetermined threshold according to the voltage change;
Output module, if exporting operation instruction for judging that the use duration of the battery reaches the predetermined threshold
Information, the operation instruction information are used to indicate target object and execute the operation for replacing the battery.
8. device according to claim 7, which is characterized in that the determining module includes:
First determines submodule, for determining the discharge capacity value of the battery according to the voltage change;
Comparative sub-module, the size for the discharge capacity value and rated capacity value;
Second determines submodule, for determining whether the use duration of the battery reaches the predetermined threshold based on comparative result
Value.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein run in described program
When control the storage medium where equipment perform claim require any one of 1 to 6 described in method of instructing operation.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run
Benefit require any one of 1 to 6 described in method of instructing operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672875.9A CN110333464A (en) | 2019-07-24 | 2019-07-24 | Method of instructing operation and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672875.9A CN110333464A (en) | 2019-07-24 | 2019-07-24 | Method of instructing operation and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110333464A true CN110333464A (en) | 2019-10-15 |
Family
ID=68147372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910672875.9A Pending CN110333464A (en) | 2019-07-24 | 2019-07-24 | Method of instructing operation and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110333464A (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1196796A (en) * | 1996-04-29 | 1998-10-21 | 艾利森电话股份有限公司 | Battery capacity measuring device |
CN1298106A (en) * | 1999-10-26 | 2001-06-06 | 皇家菲利浦电子有限公司 | Apparatus for measuring battery charging state |
JP2003009423A (en) * | 2001-06-22 | 2003-01-10 | Nec System Technologies Ltd | Decision method and equipment of battery life |
CN101383438A (en) * | 2007-09-07 | 2009-03-11 | 日立车辆能源株式会社 | Internal information testing method of secondary battery and apparatus |
CN201479214U (en) * | 2009-09-09 | 2010-05-19 | 康佳集团股份有限公司 | Mobile phone and battery power alarming and prompting device thereof |
CN103199318A (en) * | 2013-03-07 | 2013-07-10 | 上海电气钠硫储能技术有限公司 | Disassembling processing method of waste sodium-sulfur cells |
CN103698710A (en) * | 2013-12-12 | 2014-04-02 | 中南大学 | Prediction method for life cycle of battery |
CN104502856A (en) * | 2014-12-26 | 2015-04-08 | 骐俊通联(厦门)科技有限公司 | Method and system for detecting vehicle storage battery service life |
CN105829903A (en) * | 2013-12-17 | 2016-08-03 | 博朗有限公司 | Method and apparatus for indicating a low battery level |
CN105938183A (en) * | 2016-05-06 | 2016-09-14 | 思创数码科技股份有限公司 | Intelligent monitoring system for predicting UPS battery life |
CN106019167A (en) * | 2016-08-10 | 2016-10-12 | 国网江苏省电力公司电力科学研究院 | Intelligent electric energy meter clock battery performance testing method based on working condition simulation |
CN206893769U (en) * | 2017-06-28 | 2018-01-16 | 上海杰士鼎虎动力有限公司 | A kind of freezer forklift battery |
CN108318825A (en) * | 2018-01-31 | 2018-07-24 | 胡继业 | Reuse the residual value appraisal procedure of accumulator |
CN108802621A (en) * | 2018-05-08 | 2018-11-13 | 中国电力科学研究院有限公司 | A kind of method and system that the state of battery is assessed based on big data |
CN109031143A (en) * | 2018-07-20 | 2018-12-18 | 天津市气象探测中心 | A kind of field automatic weather station battery abnormality comprehensive judging method |
-
2019
- 2019-07-24 CN CN201910672875.9A patent/CN110333464A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1196796A (en) * | 1996-04-29 | 1998-10-21 | 艾利森电话股份有限公司 | Battery capacity measuring device |
CN1298106A (en) * | 1999-10-26 | 2001-06-06 | 皇家菲利浦电子有限公司 | Apparatus for measuring battery charging state |
JP2003009423A (en) * | 2001-06-22 | 2003-01-10 | Nec System Technologies Ltd | Decision method and equipment of battery life |
CN101383438A (en) * | 2007-09-07 | 2009-03-11 | 日立车辆能源株式会社 | Internal information testing method of secondary battery and apparatus |
CN201479214U (en) * | 2009-09-09 | 2010-05-19 | 康佳集团股份有限公司 | Mobile phone and battery power alarming and prompting device thereof |
CN103199318A (en) * | 2013-03-07 | 2013-07-10 | 上海电气钠硫储能技术有限公司 | Disassembling processing method of waste sodium-sulfur cells |
CN103698710A (en) * | 2013-12-12 | 2014-04-02 | 中南大学 | Prediction method for life cycle of battery |
CN105829903A (en) * | 2013-12-17 | 2016-08-03 | 博朗有限公司 | Method and apparatus for indicating a low battery level |
CN104502856A (en) * | 2014-12-26 | 2015-04-08 | 骐俊通联(厦门)科技有限公司 | Method and system for detecting vehicle storage battery service life |
CN105938183A (en) * | 2016-05-06 | 2016-09-14 | 思创数码科技股份有限公司 | Intelligent monitoring system for predicting UPS battery life |
CN106019167A (en) * | 2016-08-10 | 2016-10-12 | 国网江苏省电力公司电力科学研究院 | Intelligent electric energy meter clock battery performance testing method based on working condition simulation |
CN206893769U (en) * | 2017-06-28 | 2018-01-16 | 上海杰士鼎虎动力有限公司 | A kind of freezer forklift battery |
CN108318825A (en) * | 2018-01-31 | 2018-07-24 | 胡继业 | Reuse the residual value appraisal procedure of accumulator |
CN108802621A (en) * | 2018-05-08 | 2018-11-13 | 中国电力科学研究院有限公司 | A kind of method and system that the state of battery is assessed based on big data |
CN109031143A (en) * | 2018-07-20 | 2018-12-18 | 天津市气象探测中心 | A kind of field automatic weather station battery abnormality comprehensive judging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3288135B1 (en) | Battery pack charge control device and method | |
EP3098927B1 (en) | Modular energy storage method and system | |
CN106680723B (en) | The method and apparatus for monitoring battery group operating status | |
CN102916456B (en) | A kind of charging and discharging lithium battery management system and method | |
CN109450013A (en) | A kind of management method and device of base station battery | |
CN109617167B (en) | Battery overdischarge warning method and device, battery and aircraft | |
CN107425572A (en) | A kind of energy intelligent management system of power battery pack | |
CN110333464A (en) | Method of instructing operation and device | |
CN110854954A (en) | Intelligent scheduling system and scheduling method for battery cluster of energy storage system | |
CN115276181A (en) | Parallel operation control method, device and equipment of battery pack and storage medium | |
CN116316984A (en) | Power control method and device, energy storage system and nonvolatile storage medium | |
CN109830958A (en) | Dual power supply measure and control device and load access management system | |
CN111186338A (en) | Quick-response energy storage battery BMS system | |
CN111130154A (en) | Terminal charging and discharging control method and device, storage medium and electronic device | |
CN108336771A (en) | The guard method and device of charging circuit, charge protector and mobile terminal | |
CN209955803U (en) | Battery pack charging device | |
CN106772076B (en) | Battery group method for determining running state and device | |
CN113537843A (en) | Energy storage energy management system and method | |
CN112701746B (en) | Battery equalization control method and device, storage medium and electronic device | |
CN111505432A (en) | Parameter simulation circuit, battery management device, and control method for battery management device | |
CN109884535A (en) | The detection method and device of battery group | |
CN105429283A (en) | Power supply system for substation | |
CN110518611B (en) | Charging and discharging autonomous control method and device of energy storage module and energy storage equipment | |
CN216290317U (en) | Power supply system | |
US20240106254A1 (en) | Power Storage System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191015 |