CN110331849B CN201910620203.3A CN201910620203A CN110331849B CN 110331849 B CN110331849 B CN 110331849B CN 201910620203 A CN201910620203 A CN 201910620203A CN 110331849 B CN110331849 B CN 110331849B
Authority
CN
China
Prior art keywords
hanging basket
basket frame
frame
electric telescopic
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910620203.3A
Other languages
Chinese (zh)
Other versions
CN110331849A (en
Inventor
夏华
谢贻军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang & Jinggong Steel Structure Group Co ltd
Original Assignee
Changjiang & Jinggong Steel Structure Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang & Jinggong Steel Structure Group Co ltd filed Critical Changjiang & Jinggong Steel Structure Group Co ltd
Priority to CN201910620203.3A priority Critical patent/CN110331849B/en
Publication of CN110331849A publication Critical patent/CN110331849A/en
Application granted granted Critical
Publication of CN110331849B publication Critical patent/CN110331849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses an outer wall operation device for building construction, which comprises a mounting plate, a loading frame and a hanging basket frame, wherein the bottom of the mounting plate is welded with the loading frame, the top of the mounting plate is movably clamped with the hanging basket frame, the upper end and the lower end of the periphery of the hanging basket frame are both welded with side plates, the periphery of the middle part of each side plate is provided with a through hole, the bottom of each through hole is uniformly provided with a plurality of third electric telescopic columns, one side of the hanging basket frame is provided with a second inflatable bag, the two sides of the bottom of the hanging basket frame are both welded with L-shaped buckles, and the middle parts of the two sides of the mounting plate are both provided with sliding grooves along the length direction. The staff is good at hanging flower basket frame during operation stability ability, and difficult emergence is rocked, and is safer. After high wind is encountered in high altitude, the safety of the building and the whole hanging basket frame can be protected, and the hanging basket is not easy to damage. The device is convenient to use, simple to operate, can guarantee the security, does not influence staff's normal work again.

Description

Exterior wall operation device for building construction and operation method thereof
Technical Field
The invention relates to an outer wall operation device, in particular to an outer wall operation device for building construction and an operation method thereof, and belongs to the field of application of building equipment.
Background
With the continuous development of the construction industry, high-rise buildings appear in daily life. The external construction of a wall in a building often requires personnel. The staff usually takes the outer wall operation device to move up and down outside the outer wall, and builds the building from top to bottom.
However, the existing exterior wall working device still has certain defects in use. The existing external wall operation device has simple structure and poor stability. The safety performance is high, and the staff can not be guaranteed in time when encountering dangerous situations in the construction. And the working efficiency in high altitude is low, the movable roof can not move freely in the air, and only can move up and down, so the construction speed is slow.
Disclosure of Invention
The invention aims to provide an outer wall operation device for building construction and an operation method thereof, which can solve the problems that the existing outer wall operation device is simple in structure and poor in stability. The safety performance is high, and the staff can not be guaranteed in time when encountering dangerous situations in the construction. And the working efficiency in high altitude is low, the movable roof can not move freely in the air, and only can move up and down, and the construction speed is slow.
The purpose of the invention can be realized by the following technical scheme:
an outer wall operation device for building construction comprises a mounting plate, a loading frame and a hanging basket frame, wherein the loading frame is welded at the bottom of the mounting plate, and the top of the mounting plate is movably clamped with a hanging basket frame, the upper end and the lower end of the periphery of the hanging basket frame are respectively welded with a side plate, the periphery of the middle part of each side plate is provided with a through hole, a plurality of third electric telescopic columns are uniformly arranged at the bottoms of the through holes, a second inflatable bag is arranged at one side of the hanging basket frame, L-shaped buckles are welded at the two sides of the bottom of the hanging basket frame, the both sides middle part of mounting panel all is provided with the sliding tray along length direction, the one end of sliding tray is sealed setting, and the inside of sliding tray has first electronic flexible post at the middle part horizontal installation of sealed end, and the buckle joint is in the inside of sliding tray, and the fixed orifices and the buckle fixed connection of buckle side are passed through to the one end of first electronic flexible post.
The bottom of loading frame evenly installs the first gas cell of a plurality of, and the bottom of loading frame installs the atress board that the level set up between the first gas cell of a plurality of, just evenly be connected with a plurality of damping spring between the top of atress board and the bottom of loading frame.
The equal horizontal welding in both ends of mounting panel has the flange, and the welding in the top of flange has the montant of vertical setting, two the welding has the roof between the montant top, and the both ends of roof and the one side of keeping away from the second gas cell all are provided with the mounting hole, the electronic flexible post of a plurality of second is evenly installed to the inside of mounting hole, and the electronic flexible post of a plurality of second all is connected with the curtain cloth each other, the inside lateral wall of the one end fixed connection mounting hole of curtain cloth, the other end and the tip fixed connection of the electronic flexible post of second.
Preferably, the switch board is installed to inside one side of hanging flower basket frame, and the switch board is electric connection with first electronic flexible post, the electronic flexible post of second, the electronic flexible post of third and air pump.
Preferably, the bottom of the hanging basket frame is evenly provided with a plurality of clamping grooves along the length direction, and the inner side walls of the clamping grooves are connected with rubber pads.
Preferably, a plurality of fixing buckles are uniformly welded around the loading frame, and a plurality of friction layers are uniformly connected to the outer portion of the second inflatable bag.
Preferably, the inside of mounting panel has a plurality of pivot along the even fixed mounting of width direction, and the outside of pivot is evenly rotated and is installed a plurality of gyro wheel, and the gyro wheel joint is in the inside of draw-in groove, the internal dimension of draw-in groove and the size phase-match of gyro wheel.
An operation method of an outer wall operation device for building construction comprises the following specific steps:
the method comprises the following steps: connecting a plurality of fixing buckles on the periphery of the loading frame with ropes, wherein the ropes are connected with external power equipment; the power apparatus is fixed at the top of the building, the loading frame is tightly attached to the outer wall of the building, the power apparatus drives the rope to extend and contract, the loading frame, the hanging basket frame and the mounting plate are driven to move up and down on the outer side of the wall, and a worker can construct the outer part of the building wall when standing in the hanging basket frame;
step two: during construction, workers control the air pump inside the loading frame to work through the control cabinet, the air pump fills air into the first inflatable bag and the second inflatable bag, the volume of the air bag is increased after the air enters the air bag, and the periphery and the bottom of the loading frame and the outer portion of the hanging basket frame play a role in buffering;
step three: during work, a worker starts the first electric telescopic column through the control cabinet according to actual needs, the first electric telescopic column freely extends and contracts in the sliding groove, and then the basket frame is driven to horizontally move on the upper portion of the mounting plate; the buckles on the two sides of the bottom of the basket frame during movement are clamped in the sliding grooves to limit the moving direction of the basket frame;
step four: when the work is in danger of shaking, the third electric telescopic column is started to extend upwards through the control cabinet, and the through hole in the middle of the side plate is plugged; run into the rope fracture simultaneously, whole device falls behind, starts the flexible post of second through the switch board and stretches out from the inside of mounting hole, and then drives the curtain cloth and stretch out from the inside of mounting hole, and the curtain cloth tiling back produces great resistance with the air, reduces the speed that whole device descends.
The invention has the beneficial effects that:
1. the first inflatable bag is arranged at the bottom of the loading frame, and the second inflatable bag is arranged on the side face of the hanging basket frame, so that the air pump can fill air into the first inflatable bag and the second inflatable bag in construction, the volume of the air bag is increased after the air enters the air bag, and the periphery and the bottom of the loading frame and the outer portion of the hanging basket frame can play a role in buffering. When the hanging basket frame is in contact with a wall body, rigid collision is not easy to occur, the stability of workers in the operation process inside the hanging basket frame is good, shaking is not easy to occur, and the hanging basket frame is safer. After high wind is encountered in high altitude, the safety of the building and the whole hanging basket frame can be protected, and the hanging basket is not easy to damage.
2. The sliding grooves are formed in the two sides of the mounting plate, and the sliding grooves are connected with the two sides of the bottom of the hanging basket through the first electric telescopic columns, so that workers in work can drive the hanging basket to horizontally move on the upper portion of the mounting plate in the sliding grooves through the first electric telescopic columns according to actual needs. The position of the hanging basket frame can be freely moved, the range of workers working outside a building is wider, the working efficiency is improved, and the workers can freely move in the high altitude. And the buckles at the two sides of the bottom of the basket frame are clamped in the sliding grooves during moving, so that the moving direction of the basket frame is limited, and the basket frame is more stable during moving. And a plurality of clamping grooves at the bottom of the hanging basket frame are clamped outside the roller, and the hanging basket frame generates rolling friction with the roller in the moving process. The roller rotates outside the rotating shaft, so that the moving stability of the hanging basket frame can be guaranteed, the moving direction of the hanging basket frame is limited, the hanging basket frame is safe in moving, meanwhile, the friction force between the roller and the bottom of the hanging basket frame can be reduced, the hanging basket frame is not easy to wear in moving, and the service life of the hanging basket frame is prolonged.
3. Through the electronic flexible post of a plurality of third of installation at the top of curb plate for when meetting in the work and rocking danger, the electronic flexible post of third upwards extends, carries out the shutoff with the perforation at curb plate middle part, and the staff of hanging flower basket frame inside can be safe treat in inside, can not follow dropping of hanging flower basket frame, can guarantee the safety of work.
4. Through the top installation roof at the mounting panel for in operation whole device falls behind, and the flexible post of second stretches out from the inside of mounting hole, and then drives the curtain cloth and stretches out from the inside of mounting hole, and the curtain cloth tiling back produces great resistance with the air, reduces the speed that whole device descends, makes whole device fall to the ground after speed little, and inside staff can reduce the damage. Meanwhile, after the cloth curtain on one side is subjected to wind resistance, one side, close to the wall, of the hanging basket frame and the loading frame moves towards the wall, friction force between the hanging basket frame and the wall can be increased, the falling speed of the whole device is further reduced, and the safety performance of internal personnel is improved. Simultaneously, the first inflatable bag and the stress plate which fall behind the bottom play a role in buffering, and the damping spring at the top of the stress plate is stressed to contract, so that the safety performance of workers is fully protected. The device is convenient to use, simple to operate, can guarantee the security, does not influence staff's normal work again.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention.
Figure 2 is a side view of the basketball rim of the present invention.
FIG. 3 is an enlarged view of detail A in FIG. 1.
Fig. 4 is a schematic view of the internal structure of the sliding groove of the present invention.
FIG. 5 is a schematic view of the top plate structure of the present invention.
Fig. 6 is a schematic view of the internal structure of the mounting hole of the present invention.
In the figure: 1. mounting a plate; 2. a loading frame; 3. a stress plate; 4. a first inflatable bladder; 5. a damping spring; 6. a convex plate; 7. a vertical rod; 8. a top plate; 9. a basket frame; 10. a third electric telescopic column; 11. a side plate; 12. a control cabinet; 13. a card slot; 14. buckling; 15. a fixing hole; 16. a second inflatable bag; 17. a friction layer; 18. a sliding groove; 19. a rotating shaft; 20. a roller; 21. a first electric telescopic column; 22. mounting holes; 23. a second electric telescopic column; 24. cloth curtain.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 6, an exterior wall working apparatus for building construction includes a mounting plate 1, a loading frame 2, and a basket frame 9, the loading frame 2 is welded to the bottom of the mounting plate 1, and the top of the mounting plate 1 is movably clamped with a hanging basket frame 9, the upper and lower ends of the periphery of the hanging basket frame 9 are welded with side plates 11, the periphery of the middle part of each side plate 11 is provided with a through hole, a plurality of third electric telescopic columns 10 are uniformly arranged at the bottoms of the through holes, a second inflatable bag 16 is arranged on one side of the hanging basket frame 9, L-shaped buckles 14 are welded on two sides of the bottom of the hanging basket frame 9, sliding grooves 18 are formed in the middles of two sides of the mounting plate 1 along the length direction, one ends of the sliding grooves 18 are arranged in a sealing mode, first electric telescopic columns 21 are horizontally arranged in the middles of the sealing ends in the sliding grooves 18, the buckles 14 are clamped in the sliding grooves 18, and one ends of the first electric telescopic columns 21 are fixedly connected with the buckles 14 through fixing holes 15 in the side faces of the buckles 14;
a plurality of first inflatable bags 4 are uniformly arranged at the bottom of the loading frame 2, a stress plate 3 which is horizontally arranged is arranged between the first inflatable bags 4 at the bottom of the loading frame 2, and a plurality of damping springs 5 are uniformly connected between the top of the stress plate 3 and the bottom of the loading frame 2;
the equal horizontal welding in both ends of mounting panel 1 has flange 6, the welding in the top of flange 6 has vertical montant 7 that sets up, the welding has roof 8 between two montant 7 tops, roof 8's both ends all are provided with mounting hole 22 with the one side of keeping away from second gas cell 16, a plurality of second electric telescopic column 23 is evenly installed to mounting hole 22's inside, a plurality of second electric telescopic column 23 all is connected with cloth curtain 24 each other, the inside lateral wall of cloth curtain 24's one end fixed connection mounting hole 22, the other end and the tip fixed connection of second electric telescopic column 23.
As a technical optimization scheme of the invention, a control cabinet 12 is arranged on one side inside a hanging basket frame 9, the control cabinet 12 is electrically connected with a first electric telescopic column 21, a second electric telescopic column 10, a third electric telescopic column 23 and an air pump, the control cabinet 12 can control the start and stop of the first electric telescopic column 21, the second electric telescopic column 10, the third electric telescopic column 23 and the air pump during working, and the operation of a worker is simpler and faster.
As a technical optimization scheme of the invention, a plurality of clamping grooves 13 are uniformly arranged at the bottom of the hanging basket frame 9 along the length direction, the inner side walls of the clamping grooves 13 are connected with rubber pads, the clamping grooves 13 are clamped with the rollers 20 to limit the moving direction of the hanging basket frame 9, so that the hanging basket frame moves stably, and the rubber pads reduce the vibration force in the moving process.
As a technical optimization scheme of the invention, a plurality of fixing buckles are uniformly welded around the loading frame 2, a plurality of friction layers 17 are uniformly connected to the outer part of the second inflatable bag 16, the fixing buckles are used for fixedly connecting a rope, and the friction layers 17 can increase the friction force between the second inflatable bag 16 and the wall and reduce the falling speed.
As a technical optimization scheme of the invention, a plurality of rotating shafts 19 are uniformly and fixedly arranged in the mounting plate 1 along the width direction, a plurality of rollers 20 are uniformly and rotatably arranged outside the rotating shafts 19, the rollers 20 are clamped in the clamping grooves 13, the internal size of the clamping grooves 13 is matched with the size of the rollers 20, and the rollers 20 rotate outside the rotating shafts 19, so that the moving stability of the hanging basket frame 9 can be ensured, the moving direction of the hanging basket frame is limited, the hanging basket frame is safe in moving, meanwhile, the friction force between the rollers 20 and the bottom of the hanging basket frame 9 can be reduced, the hanging basket frame is not easy to wear in moving, and the service life is prolonged.
An operation method of an outer wall operation device for building construction comprises the following specific steps:
the method comprises the following steps: connecting a plurality of fixing buckles around the loading frame 2 with ropes, wherein the ropes are connected with external power equipment; the power apparatus is fixed at the top of the building, the loading frame 2 is tightly attached to the outer wall of the building, the power apparatus drives the rope to extend and contract, the loading frame 2, the hanging basket frame 9 and the mounting plate 1 are driven to move up and down on the outer side of the wall, and a worker can construct the outer part of the building wall when standing in the hanging basket frame 9;
step two: during construction, a worker controls an air pump inside the loading frame 2 to work through the control cabinet 12, the air pump fills air into the first inflatable bag 4 and the second inflatable bag 16, the volume of the air entering the air bags is increased, and the periphery and the bottom of the loading frame 2 and the outer part of the hanging basket frame 9 play a role in buffering;
step three: during work, a worker starts the first electric telescopic column 21 through the control cabinet 12 according to actual needs, and the first electric telescopic column 21 freely extends and contracts in the sliding groove 18, so that the basket frame 9 is driven to horizontally move on the upper part of the mounting plate 1; the buckles 14 on the two sides of the bottom of the lifting basket frame 9 are clamped in the sliding grooves 18 during moving, so that the moving direction of the lifting basket frame 9 is limited;
step four: when the work is in danger of shaking, the third electric telescopic column 10 is started to extend upwards through the control cabinet 12, and the through hole in the middle of the side plate 11 is plugged; run into the rope simultaneously and split, whole device falls behind, starts the flexible post 23 of second through switch board 12 and stretches out from the inside of mounting hole 22, and then drives curtain cloth 24 and stretches out from the inside of mounting hole 22, and curtain cloth 24 tiles the back and produces great resistance with the air, reduces the speed that whole device descends.
When the multifunctional loading frame is used, the fixing buckles on the periphery of the loading frame 2 are connected with the ropes, and the ropes are connected with external power equipment. The power apparatus is fixed at the top of building, loads frame 2 and hugs closely at the outside wall of building, and the power apparatus drives rope extension and shrink, and then drives and load frame 2 and hanging flower basket frame 9 and mounting panel 1 and reciprocate in the outside of wall, and the workman stands and can be under construction to building wall's outside in hanging flower basket frame 9's inside, and whole device passes through the electric wire simultaneously and is connected with outside power.
During construction, a worker can control the air pump inside the loading frame 2 to work through the control cabinet 12 with the model of PZ-30, the air pump charges air into the first inflatable bag, the second inflatable bag and the first inflatable bag 4 and the second inflatable bag 16, the volume of the air bag is increased after the air enters the air bag, and the air bag can play a role in buffering the periphery and the bottom of the loading frame 2 and the outside of the hanging basket frame 9. When making hanging flower basket frame 9 and wall body contact, difficult emergence rigidity collision, staff's stability can be good at hanging flower basket frame 9 inside during operation, and difficult emergence is rocked, and is safer. When high wind is encountered in high altitude, the safety of the building and the whole hanging basket frame 9 can be protected, and the hanging basket frame is not easy to damage.
During operation, a worker can start the first electric telescopic column 21 through the control cabinet 12 according to actual needs, and the first electric telescopic column 21 can freely extend and contract in the sliding groove 18, so as to drive the hanging basket frame 9 to horizontally move on the upper portion of the mounting plate 1. The position of the hanging basket frame 9 can be freely moved, the range of workers working outside a building is wider, the working efficiency is improved, and the workers can freely move in the high altitude. And the buckles 14 at the two sides of the bottom of the lifting basket frame 9 are clamped in the sliding grooves 18 during movement, so that the moving direction of the lifting basket frame 9 is limited, and the lifting basket frame is more stable during movement. And a plurality of clamping grooves 13 at the bottom of the hanging basket frame 9 are clamped outside the roller 20, and the hanging basket frame 9 generates rolling friction with the roller 20 in the moving process. The roller 20 rotates outside the rotating shaft 19, which not only can ensure the moving stability of the hanging basket frame 9 and limit the moving direction of the hanging basket frame to ensure the safety of the hanging basket frame during moving, but also can reduce the friction force between the roller 20 and the bottom of the hanging basket frame 9, is not easy to wear during moving, and prolongs the service life.
Run into in the work and rock when dangerous, start the electronic flexible post 10 of third through switch board 12 and upwards extend, carry out the shutoff with the perforation at curb plate 11 middle part, the staff of hanging flower basket frame 9 inside can be safe treat in inside, can not follow dropping of hanging flower basket frame 9, can guarantee the safety of work.
Run into the rope simultaneously and split, whole device falls behind, starts the flexible post 23 of second through switch board 12 and stretches out from the inside of mounting hole 22, and then drives curtain cloth 24 and stretches out from the inside of mounting hole 22, and curtain cloth 24 tiles the back and produces great resistance with the air, reduces the speed that whole device descends for speed is little after whole device falls to the ground, and inside staff can reduce the damage. Meanwhile, after the cloth curtain 24 on one side is subjected to wind resistance, one side, close to the wall, of the hanging basket frame 9 and the loading frame 24 moves towards the wall, friction force between the hanging basket frame and the wall can be increased, the falling speed of the whole device is further reduced, and the safety performance of internal personnel is improved. The frictional layer 17 outside the second side airbag 16 contacts the wall to increase the frictional force and decrease the speed. Meanwhile, the first inflatable bag 4 and the stress plate 3 which fall behind the bottom play a role in buffering, and the damping spring 5 at the top of the stress plate 3 contracts under stress, so that the safety performance of workers is fully protected. The device is convenient to use, simple to operate, can guarantee the security, does not influence staff's normal work again.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (3)

1. The outer wall operation device for building construction is characterized by comprising a mounting plate (1), a loading frame (2) and a hanging basket frame (9), wherein the loading frame (2) is welded at the bottom of the mounting plate (1), the hanging basket frame (9) is movably clamped at the top of the mounting plate (1), side plates (11) are welded at the upper end and the lower end of the periphery of the hanging basket frame (9), through holes are formed in the periphery of the middle of each side plate (11), a plurality of third electric telescopic columns (10) are uniformly installed at the bottoms of the through holes, a second inflatable bag (16) is installed at one side of the hanging basket frame (9), L-shaped buckles (14) are welded at two sides of the bottom of the hanging basket frame (9), sliding grooves (18) are formed in the middle parts of two sides of the mounting plate (1) along the length direction, one ends of the sliding grooves (18) are arranged in a sealing mode, first electric telescopic columns (21) are horizontally installed in the middle parts of the sealing ends in the sliding grooves (18), the buckle (14) is clamped in the sliding groove (18), and one end of the first electric telescopic column (21) is fixedly connected with the buckle (14) through a fixing hole (15) in the side surface of the buckle (14);
a plurality of first inflatable bags (4) are uniformly installed at the bottom of the loading frame (2), a stress plate (3) which is horizontally arranged is installed between the first inflatable bags (4) at the bottom of the loading frame (2), and a plurality of damping springs (5) are uniformly connected between the top of the stress plate (3) and the bottom of the loading frame (2);
the two ends of the mounting plate (1) are both horizontally welded with the convex plates (6), the tops of the convex plates (6) are welded with vertical rods (7) which are longitudinally arranged, a top plate (8) is welded between the tops of the two vertical rods (7), the two ends of the top plate (8) and one side far away from the second inflatable bag (16) are both provided with mounting holes (22), a plurality of second electric telescopic columns (23) are uniformly mounted inside the mounting holes (22), cloth curtains (24) are connected between the second electric telescopic columns (23), one end of each cloth curtain (24) is fixedly connected with the inner side wall of the mounting hole (22), and the other end of each cloth curtain is fixedly connected with the end part of the second electric telescopic column (23);
a control cabinet (12) is installed on one side inside the hanging basket frame (9), and the control cabinet (12) is electrically connected with the first electric telescopic column (21), the second electric telescopic column, the third electric telescopic column and the air pump;
the operation method of the outer wall operation device for building construction comprises the following specific steps:
the method comprises the following steps: connecting a plurality of fixing buckles at the periphery of the loading frame (2) with ropes, wherein the ropes are connected with external power equipment; the power apparatus is fixed at the top of the building, the loading frame (2) is tightly attached to the outer wall of the building, the power apparatus drives the rope to extend and contract, the loading frame (2), the hanging basket frame (9) and the mounting plate (1) are driven to move up and down on the outer side of the wall, and a worker can construct the outer part of the building wall when standing in the hanging basket frame (9);
step two: during construction, a worker controls an air pump inside the loading frame (2) to work through the control cabinet (12), the air pump fills air into the first inflatable bag (4) and the second inflatable bag (16), the volume of the air bag is increased after the air enters the air bag, and the periphery and the bottom of the loading frame (2) and the outer part of the hanging basket frame (9) play a role in buffering;
step three: during work, a worker starts the first electric telescopic column (21) through the control cabinet (12) according to actual needs, the first electric telescopic column (21) freely extends and contracts in the sliding groove (18), and then the hanging basket frame (9) is driven to horizontally move on the upper portion of the mounting plate (1); the buckles (14) on the two sides of the bottom of the basket (9) are clamped in the sliding groove (18) during moving, so that the moving direction of the basket (9) is limited;
step four: when shaking danger occurs in work, the third electric telescopic column (10) is started to extend upwards through the control cabinet (12), and the through hole in the middle of the side plate (11) is plugged; when the rope is broken and the whole device falls, the control cabinet (12) starts the second telescopic column (23) to extend out of the mounting hole (22), so that the cloth curtain (24) is driven to extend out of the mounting hole (22), and the cloth curtain (24) is paved to generate larger resistance with air, so that the descending speed of the whole device is reduced;
the periphery of the loading frame (2) is uniformly welded with a plurality of fixing buckles, and the outside of the second inflatable bag (16) is uniformly connected with a plurality of friction layers (17).
2. The exterior wall working device for building construction according to claim 1, wherein a plurality of clamping grooves (13) are uniformly arranged at the bottom of the hanging basket frame (9) along the length direction, and rubber pads are connected to the inner side walls of the clamping grooves (13).
3. The exterior wall working device for building construction according to claim 1, wherein a plurality of rotating shafts (19) are uniformly and fixedly installed inside the mounting plate (1) along the width direction, a plurality of rollers (20) are uniformly and rotatably installed outside the rotating shafts (19), the rollers (20) are clamped inside the clamping grooves (13), and the inner size of each clamping groove (13) is matched with the size of each roller (20).
CN201910620203.3A 2019-07-10 2019-07-10 Exterior wall operation device for building construction and operation method thereof Active CN110331849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910620203.3A CN110331849B (en) 2019-07-10 2019-07-10 Exterior wall operation device for building construction and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910620203.3A CN110331849B (en) 2019-07-10 2019-07-10 Exterior wall operation device for building construction and operation method thereof

Publications (2)

Publication Number Publication Date
CN110331849A CN110331849A (en) 2019-10-15
CN110331849B true CN110331849B (en) 2021-11-16

Family

ID=68146194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910620203.3A Active CN110331849B (en) 2019-07-10 2019-07-10 Exterior wall operation device for building construction and operation method thereof

Country Status (1)

Country Link
CN (1) CN110331849B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779252B (en) * 2020-07-14 2021-11-05 海南本源建筑安装工程有限公司 Multifunctional hanging basket platform for wall surface design of building engineering
CN112627565B (en) * 2020-12-21 2022-02-22 美晟通科技(苏州)有限公司 Suspension mechanism of building curtain wall cleaning device and using method thereof
CN113107179B (en) * 2021-04-23 2022-05-27 湖南汉坤实业有限公司 Hanging basket clamping device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011018615A2 (en) * 2009-08-10 2011-02-17 Conbisafe International Ab Edge protection system
CN205502560U (en) * 2016-03-08 2016-08-24 吕雪真 Gasbag formula buffering construction hanging basket
CN107119898A (en) * 2017-05-09 2017-09-01 广东联高技术推广服务有限公司 A kind of building construction hanging basket
CN206784895U (en) * 2017-04-27 2017-12-22 郑州祥中脚手架有限公司 Construction nacelle device
CN107724663A (en) * 2017-10-31 2018-02-23 成都佰富隆精工机械有限公司 It is a kind of to be automatically positioned the nacelle device not shaken
CN207377088U (en) * 2017-10-21 2018-05-18 深圳市中兴建工程有限公司 A kind of exterior wall finishing lifting type workbench
CN108385960A (en) * 2018-03-12 2018-08-10 刘爱华 A kind of building hanging basket anti-shake damping device
CN108394781A (en) * 2018-03-23 2018-08-14 中国十七冶集团有限公司 A kind of safe building hoist
CN207920039U (en) * 2018-01-17 2018-09-28 中煤建工集团有限公司 A kind of building hanging basket with buffer protection function
CN109518925A (en) * 2018-11-19 2019-03-26 苏州金螳螂幕墙有限公司 A kind of four-dimension travelling cradle mechanism

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011018615A2 (en) * 2009-08-10 2011-02-17 Conbisafe International Ab Edge protection system
CN205502560U (en) * 2016-03-08 2016-08-24 吕雪真 Gasbag formula buffering construction hanging basket
CN206784895U (en) * 2017-04-27 2017-12-22 郑州祥中脚手架有限公司 Construction nacelle device
CN107119898A (en) * 2017-05-09 2017-09-01 广东联高技术推广服务有限公司 A kind of building construction hanging basket
CN207377088U (en) * 2017-10-21 2018-05-18 深圳市中兴建工程有限公司 A kind of exterior wall finishing lifting type workbench
CN107724663A (en) * 2017-10-31 2018-02-23 成都佰富隆精工机械有限公司 It is a kind of to be automatically positioned the nacelle device not shaken
CN207920039U (en) * 2018-01-17 2018-09-28 中煤建工集团有限公司 A kind of building hanging basket with buffer protection function
CN108385960A (en) * 2018-03-12 2018-08-10 刘爱华 A kind of building hanging basket anti-shake damping device
CN108394781A (en) * 2018-03-23 2018-08-14 中国十七冶集团有限公司 A kind of safe building hoist
CN109518925A (en) * 2018-11-19 2019-03-26 苏州金螳螂幕墙有限公司 A kind of four-dimension travelling cradle mechanism

Also Published As

Publication number Publication date
CN110331849A (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN110331849B (en) Exterior wall operation device for building construction and operation method thereof
CN107500182A (en) A kind of interior architecture construction lowering or hoisting gear
CN207341720U (en) It is a kind of to climb building sweeping robot suitable for skyscraper
CN112977747B (en) Semi-submersible type ocean platform anti-overturning device
CN215055098U (en) Lifting movable type anti-falling device for building construction
CN106968448A (en) A kind of building purging system and cleaning method
CN207375711U (en) A kind of power construction vehicle
CN109184174B (en) Outer wall climbing frame and application method thereof
CN210217075U (en) Multifunctional scaffold
CN210885045U (en) Tower crane with vertical ladder anti-falling device
CN109231036B (en) Building promotes panel with fixed steady equipment of hanging
CN203255939U (en) Universal adjustable type hoist high-place operation platform
CN208200251U (en) A kind of electromechanical installation Special lifting device
CN112681701A (en) Scaffold for building construction
CN207245144U (en) A kind of combination type high-altitude suspension apparatus fixed frame
CN105293311A (en) Tower crane having windproof function
CN106241676B (en) Climbing device and climbing system
CN216109601U (en) Protection supporting platform for building construction
CN217947598U (en) Lifting device for be used for installing electrical equipment
CN214220532U (en) Engineering construction scaffold
CN114673334B (en) Scaffold frame for civil engineering with telescopic pillar
CN108952195A (en) A kind of construction site anti-falling device
CN218541457U (en) Hanging basket for constructional engineering
CN215803069U (en) Building site is with construction platform convenient to remove
CN220814798U (en) Building construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant