CN110324190A - A kind of network plan method and device - Google Patents
A kind of network plan method and device Download PDFInfo
- Publication number
- CN110324190A CN110324190A CN201910611729.5A CN201910611729A CN110324190A CN 110324190 A CN110324190 A CN 110324190A CN 201910611729 A CN201910611729 A CN 201910611729A CN 110324190 A CN110324190 A CN 110324190A
- Authority
- CN
- China
- Prior art keywords
- olt
- network
- service
- planning
- live broadcast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/14—Network analysis or design
- H04L41/145—Network analysis or design involving simulating, designing, planning or modelling of a network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/10—Flow control; Congestion control
- H04L47/12—Avoiding congestion; Recovering from congestion
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/10—Flow control; Congestion control
- H04L47/29—Flow control; Congestion control using a combination of thresholds
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Small-Scale Networks (AREA)
Abstract
The embodiment of the present invention provides a kind of network plan method and device, is related to npt field, can be determined the need for carrying out the network planning according to flow service condition.This method comprises: handling capacity is surveyed in the PON cause for gossip for obtaining broadband network parameter and OLT, the Mean Speed of VOD service is calculated according to network parameter, the Mean Speed of video live broadcast service and the Mean Speed of target service, according to the Mean Speed of VOD service, the Mean Speed of video live broadcast service and the Mean Speed of target service determine broadband user's Mean Speed, the PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed, when the PON mouth total flow of the estimated OLT of determination is more than or equal to the PON mouth flow threshold of OLT, broadband network is planned according to planing method is preset.Scheme provided by the present application is suitable for planning broadband network.
Description
Technical field
The present invention relates to npt field more particularly to a kind of network plan methods and device.
Background technique
Demand with people to network speed is higher and higher, and broadband network is with intelligent acess (Fiber To The X, FTTx)
Mode it is fast-developing, under the demand taken of speed-raising drop, mainstream downlink downlink bandwidth is from 100Mbps, to 500Mbps,
1Gbps evolution, while FTTx network flow rapid growth, the FTTx network equipment needs continuous dilatation and upgrading, it is also desirable to right
The optical network unit of local side apparatus optical line terminal (optical the line terminal, OLT) and user side of FTTx network
Between (optical network unit, ONU) equipment optical distribution network (Optical Distribution Network,
ODN it) is adjusted.
The FTTx network of Internet protocol address (internet protocol address, IP) carrying is a statistics
How the network of multiplexing according to the timely optimization and upgrading FTTx network of increase of network flow avoids congestion, becomes urgently to be resolved
Problem.
Summary of the invention
The embodiment of the present invention provides a kind of network plan method and device, can be excellent in time according to the variation of network flow
Change upgrade of network, avoids network congestion.
In order to achieve the above objectives, the embodiment of the present invention adopts the following technical scheme that
In a first aspect, providing a kind of network plan method, comprising:
Handling capacity is surveyed in the PON cause for gossip for obtaining broadband network parameter and OLT, and network parameter includes at least: content distributing network
Total flow, total number of concurrent of CDN, the coincidence of VOD service, the user's permeability of video traffic, net cast of CDN
User's Mean Speed of the average bit rate of business, the coincidence of video live broadcast service, the coincidence of target service and target service;
Video traffic includes VOD service and video live broadcast service;Target service is the industry in network service in addition to video traffic
Business;
It is seeped according to the user of the total flow of CDN, total number of concurrent of CDN, the coincidence of VOD service and video traffic
Saturating rate calculates the Mean Speed of VOD service according to the first preset formula;
It is permeated according to the user of the average bit rate of video live broadcast service, the coincidence of video live broadcast service and video traffic
Rate calculates the Mean Speed of video live broadcast service according to the second preset formula;
According to user's Mean Speed of the coincidence of target service and target service, target is calculated according to third preset formula
The Mean Speed of business;
According to the average speed of the Mean Speed of VOD service, the Mean Speed of video live broadcast service and target service
Rate calculates broadband user's Mean Speed according to the 4th preset formula;
The PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed;
Handling capacity is surveyed according to the PON cause for gossip of OLT, the PON mouth flow threshold of OLT is calculated according to the 5th preset formula;
When the PON mouth total flow of the estimated OLT of determination is more than or equal to the PON mouth flow threshold of OLT, according to default planning side
Method plans broadband network.
The PON cause for gossip survey of network plan method provided in an embodiment of the present invention, first acquisition broadband network parameter and OLT gulps down
The amount of spitting obtains what current network needed to meet by the way that broadband user's Mean Speed is calculated, then by broadband user's Mean Speed
It is expected that the PON mouth total flow of OLT, surveys handling capacity for the PON cause for gossip of the PON mouth total flow of the estimated OLT obtained and OLT and compares
Compared with judgement, judge whether to need to plan network.So technical solution provided in an embodiment of the present invention can be based on PON's
Flow service condition, determines whether current network needs to carry out the network planning in time, can when needing to carry out the network planning,
In time adjustment physical network, avoid because the network planning adjustment not in time caused by user experience reduce and resource utilization drop
It is low.
Second aspect provides a kind of network planning device, comprising: module is obtained, for obtaining broadband network parameter and OLT
PON cause for gossip survey handling capacity, network parameter includes at least: total flow, the total number of concurrent of CDN, video of content distributing network CDN
The coincidence of demand (telecommunication) service, user's permeability of video traffic, the average bit rate of video live broadcast service, video live broadcast service and
User's Mean Speed of hair rate, the coincidence of target service and target service;Video traffic includes VOD service and video
Live broadcast service;Target service is the business in network service in addition to video traffic;
Processing module, for according to total flow, the total number of concurrent of CDN, VOD service for obtaining the CDN that module obtains
Coincidence and video traffic user's permeability, according to the first preset formula calculate VOD service Mean Speed;
Processing module is also used to according to average bit rate, the video live broadcast service for obtaining the video live broadcast service that module obtains
Coincidence and video traffic user's permeability, according to the second preset formula calculate video live broadcast service Mean Speed;
Processing module is also used to average according to the user of the coincidence and target service that obtain the target service that module obtains
Rate calculates the Mean Speed of target service according to third preset formula;
Processing module is also used to according to Mean Speed, the video live broadcast service for obtaining the VOD service that module obtains
Mean Speed and target service Mean Speed, according to the 4th preset formula calculate broadband user's Mean Speed;
Processing module is also used to determine that the PON mouth of estimated OLT is total according to the broadband user's Mean Speed for obtaining module acquisition
Flow;
Processing module is also used to survey handling capacity according to the PON cause for gossip for obtaining the OLT that module obtains, according to the 5th default public affairs
The PON mouth flow threshold of formula calculating OLT;
Processing module is also used to when PON mouth flow threshold of the PON mouth total flow more than or equal to OLT for determining estimated OLT
When, broadband network is planned according to planing method is preset.
Network plan method and device provided in an embodiment of the present invention, because this method comprises: obtaining broadband network parameter
And handling capacity is surveyed in the PON cause for gossip of OLT, network parameter includes at least: the total flow of content distributing network CDN, CDN it is total concurrent
Number, the coincidence of VOD service, user's permeability of video traffic, the average bit rate of video live broadcast service, net cast
The coincidence of business, the coincidence of target service, target service user's Mean Speed;Video traffic includes VOD service
And video live broadcast service;Target service is the business in network service in addition to video traffic;According to the total flow of CDN, CDN
User's permeability of total number of concurrent, the coincidence of VOD service and video traffic calculates video according to the first preset formula
The Mean Speed of demand (telecommunication) service;According to the average bit rate of video live broadcast service, the coincidence and video traffic of video live broadcast service
User's permeability, according to the second preset formula calculate video live broadcast service Mean Speed;According to the coincidence of target service
With user's Mean Speed of target service, the Mean Speed of target service is calculated according to third preset formula;According to video on demand
The Mean Speed of the Mean Speed of business, the Mean Speed of video live broadcast service and target service, according to the 4th preset formula meter
Calculate broadband user's Mean Speed;The PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed;According to the PON of OLT
Handling capacity is surveyed in cause for gossip, and the PON mouth flow threshold of OLT is calculated according to the 5th preset formula;When the PON mouth of the estimated OLT of determination always flows
When amount is more than or equal to the PON mouth flow threshold of OLT, broadband network is planned according to planing method is preset.So of the invention
The technical solution that embodiment provides can pass through the broadband network parameter of acquisition and the PON cause for gossip of OLT when carrying out the network planning
Handling capacity is surveyed, the PON mouth total flow for the estimated OLT that current network needs to meet is calculated, by the PON mouth of the estimated OLT obtained
The PON mouth flow threshold of total flow OLT relevant to the PON cause for gossip of OLT survey handling capacity is compared judgement, judges whether to need
Network is planned, when the PON mouth total flow of the estimated OLT of increase with service traffics is greater than the PON mouth flow threshold of OLT
When, illustrate that the performance of PON at this time needs to increase and needs the network planning.Therefore technical solution provided in an embodiment of the present invention, can
To realize the prediction based on service traffics, adjust physical network in time, avoid because the network planning adjustment not in time caused by
User experience reduces and resource utilization reduces.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of network plan method flow diagram provided in an embodiment of the present invention;
Fig. 2 is another network plan method flow diagram provided in an embodiment of the present invention;
Fig. 3 is another network plan method flow diagram provided in an embodiment of the present invention;
Fig. 4 is a kind of network diagram provided in an embodiment of the present invention;
Fig. 5 is a kind of network planning apparatus structure schematic diagram provided in an embodiment of the present invention;
Fig. 6 is another network planning apparatus structure schematic diagram provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It should be noted that in the embodiment of the present invention, " illustrative " or " such as " etc. words make example, example for indicating
Card or explanation.Be described as in the embodiment of the present invention " illustrative " or " such as " any embodiment or design scheme do not answer
It is interpreted than other embodiments or design scheme more preferably or more advantage.Specifically, " illustrative " or " example are used
Such as " word is intended to that related notion is presented in specific ways.
It should also be noted that, in the embodiment of the present invention, " (English: of) ", " corresponding (English:
Corresponding, relevant) " it sometimes can be mixed with " corresponding (English: corresponding) ", it should be pointed out that
It is that, when not emphasizing its difference, meaning to be expressed is consistent.
For the ease of clearly describing the technical solution of the embodiment of the present invention, in an embodiment of the present invention, use " the
One ", the printed words such as " second " distinguish function and the essentially identical identical entry of effect or similar item, and those skilled in the art can
To understand that the printed words such as " first ", " second " are not to be defined to quantity and execution order.
Broadband network is fast-developing in a manner of intelligent acess, while service traffics rapid growth, also to network
Equipment brings burden, how according to the timely optimization and upgrading network of increase of network flow to avoid congestion, becomes urgently to be resolved
Problem.
In view of the above-mentioned problems, the embodiment of the present invention provides a kind of network plan method shown in referring to Fig.1, this method comprises:
101, handling capacity is surveyed in the PON cause for gossip for obtaining broadband network parameter and OLT.
Wherein, network parameter includes at least: the total flow of CDN, total number of concurrent of CDN, VOD service coincidence,
User's permeability of video traffic, the average bit rate of video live broadcast service, the coincidence of video live broadcast service, target service and
User's Mean Speed of hair rate and target service;Wherein video traffic includes VOD service and video live broadcast service;Target
Business is the business in network service in addition to video traffic;The PON mouth of OLT is the interface of OLT user oriented side, that is, is connected
The interface of ODN network.
Specifically, target service can be high speed Internet access business (High Internet Service, HIS).Video traffic
It can be internet protocol TV (Internet Protocol television, IPTV) business.
It should be noted that the bandwidth calculation in broadband network is usually subject to down direction and is referred both to unless otherwise specified
Handling capacity, flow, the bandwidth of down direction, user's Mean Speed of target service are the use for the target service being being currently used
Family Mean Speed, PON (Passive Optical Network) passive optical network, also known as passive optical-fiber network.
Illustratively, it is to be obtained according to set discharge model by instrument actual test that handling capacity is surveyed in the PON cause for gossip of OLT
OLT any one PON mouthfuls of downlink throughput capacity that can reach.The OLT actual measurement of identical standard same model same size gulps down
The amount of spitting is identical.
PON mouthfuls are connected to the network with ODN, i.e., the PON mouth of ODN network one end connection OLT, one end connect the PON mouth of ONU.It needs
It is noted that an OLT has multiple PON boards, a PON board has PON mouthfuls multiple again.
Specifically, the coincidence of VOD service is equal to the number of users for carrying out VOD service within a certain period of time
Measure the accounting of the total number of users for opening video traffic of Zhan;User's permeability of video traffic opens video traffic equal to total
The total broadband services user of number of users Zhan quantity accounting;The coincidence of video live broadcast service is equal in certain period of time
Inside it is broadcast live the accounting of the number of users for opening video traffic of the number of users Zhan of business always;The coincidence etc. of target service
In the accounting of the number of users Zhan for carrying out target service simultaneously total broadband services number of users.
Illustratively, the average bit rate that video live broadcast service is obtained in 101 steps, specifically includes:
Accounting, the accounting of the accounting of high-definition live broadcasting business and 4K live broadcast service for obtaining SD live broadcast service, according to the 7th
The average bit rate of preset formula calculating video live broadcast service;
It should be noted that the accounting of the accounting of SD live broadcast service, the accounting of high-definition live broadcasting business and 4K live broadcast service
Respectively its quantity for respectively corresponding to user accounting for accounting for the quantity of the corresponding user of video live broadcast service.
7th preset formula are as follows:
R=R1I1+R2I2+R3I3;
Wherein, r is the average bit rate of video live broadcast service, R1For the accounting of SD live broadcast service, I1For SD code rate, R2
For the accounting of high-definition live broadcasting business, I2For high definition code rate, R3For the accounting and I of 4K live broadcast service3For 4K code rate;Certainly such as fruit
Occur the live streaming (such as 8K) of other video definitions in border again, expands above-mentioned formula using average weighted method.
Illustratively, R1、R2And R3Numerical value can be obtained from video traffic server or video traffic platform.
102, according to the total flow of CDN, total number of concurrent of CDN, the coincidence of VOD service and the use of video traffic
Family permeability calculates the Mean Speed of VOD service according to the first preset formula.
Illustratively, the first preset formula are as follows:
M=(a/b) * c*d;
Wherein, M is the Mean Speed of VOD service, and a is the total flow of CDN, and b is total number of concurrent of CDN, and c is view
The coincidence of frequency demand (telecommunication) service, d are user's permeability of video traffic.
103, it is seeped according to the user of the average bit rate of video live broadcast service, the coincidence of video live broadcast service and video traffic
Saturating rate calculates the Mean Speed of video live broadcast service according to the second preset formula.
Illustratively, the second preset formula are as follows:
N=r*d*e;
Wherein, N is the Mean Speed of video live broadcast service, and r is the average bit rate of video live broadcast service, and d is video traffic
User's permeability, e be video live broadcast service coincidence.
Illustratively, the numerical value of a and b is obtained from CDN server;C, the numerical value of d and e is obtained from video traffic server.
104, it according to user's Mean Speed of the coincidence of target service and target service, is calculated according to third preset formula
The Mean Speed of target service.
Illustratively, third preset formula are as follows:
P=f*g;
Wherein, P is the Mean Speed of target service, and f is the coincidence of target service, i.e., uses mesh within a certain period of time
The number of users of mark business accounts for the ratio of general objective service-user quantity;G is user's Mean Speed of target service.
105, being averaged according to the Mean Speed of VOD service, the Mean Speed of video live broadcast service and target service
Rate calculates broadband user's Mean Speed according to the 4th preset formula.
Illustratively, the 4th preset formula are as follows:
S=(M+N) * u+P;
Wherein, S is broadband user's Mean Speed, and M is the Mean Speed of VOD service, and N is video live broadcast service
Mean Speed, P are the Mean Speed of target service, and u is overlap coefficient, and the value of u > 1, u and user are switched to from video on demand
When net cast in network there are still program request stream the case where and user be switched to video on demand from net cast when network in
There are still live stream the case where it is related.
Illustratively, u is related with CND and network protocol;Network can be connected by flow instrument carry out analysis acquisition,
Time delay d1, the time delay d2 of demand (telecommunication) service signaling, the Mean Speed N of video live broadcast service can also be left by live broadcast service,
User is average to use video live broadcast service time t1 every time, and user is average to be obtained using parameters such as VOD service time t2 every time
?.
106, the PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed.
Illustratively, referring to shown in Fig. 2,106 steps are specifically included:
1061, the planning number of users under the PON mouth of OLT is obtained.
Wherein, planning number of users subtracts the reserved number of fibers of optical splitter branch by optical splitter branch optical fibers quantity and obtains.
Illustratively, when the ODN network of a PON mouthfuls of connections of OLT only has level-one optical splitter, level-one optical splitter is obtained
The quantity and level-one optical splitter branch of branch optical fibers reserve the quantity of optical fiber, and planning number of users is calculated;
X=y1-q1;
Wherein, X is planning number of users, y1For the quantity of level-one optical splitter branch optical fibers, q1It is pre- for level-one optical splitter branch
Stay the quantity of optical fiber.
Illustratively, according to professional standard, planning guide/guidance, the secondary light-splitting of the ODN network of a PON mouthfuls of connections
The splitting ratio of device is identical;In this case when the ODN network of a PON mouthfuls of connections of OLT has secondary light-splitting device, level-one is obtained
The quantity and level-one optical splitter branch of optical splitter branch optical fibers reserve the quantity of optical fiber, obtain the number of secondary light-splitting device branch optical fibers
Amount and secondary light-splitting device branch reserve the quantity of optical fiber, planning number of users are calculated, as shown in Figure 4, wherein 401 marks
Optical fiber be trunk optical fiber, 402,403 mark optical fiber be level-one optical splitter branch optical fibers, 404 and 405 mark optical fiber be two
Grade optical splitter branch optical fibers, the optical fiber of 403 marks are that level-one optical splitter branch reserves optical fiber, and the optical fiber of 405 marks is two fractions
Light device branch reserves optical fiber;
X=(y1-q1)*(y2-q2);
Wherein, y1For the quantity of level-one optical splitter branch optical fibers, q1The quantity of optical fiber, y are reserved for level-one optical splitter branch2
For the quantity of secondary light-splitting device branch optical fibers, q2The quantity of optical fiber is reserved for secondary light-splitting device branch.
Illustratively, the ODN network connected when PON mouthfuls is when having secondary light-splitting device network, it is possible to which existing not is institute
There is the situation of secondary light-splitting device under the branch optical fibers that some level-one optical splitters separate, X plans number of users at this time, as connects
All main line optical branch of ONU, but from the aspect of planning from real network and save resource, it is generally not present this situation.
ONU includes: more resident/commercials (multi dwelling unit, MDU), home gateway (home
Gateway uni t, HGU), simple home unit (single family unit, SFU).
1062, according to broadband user's Mean Speed and planning number of users, calculate estimated OLT's according to the 6th preset formula
PON mouthfuls of total flows.
Illustratively, the 6th preset formula are as follows:
W=S*X;
Wherein, W is estimated OLT PON mouth total flow, S are broadband user's Mean Speed, X is planning number of users.
Illustratively, W is one PON mouthfuls of the total flow of OLT, the planning number of users under one PON mouthfuls of X OLT thus
Amount.
107, handling capacity is surveyed according to the PON cause for gossip of OLT, the PON mouth flow threshold of OLT is calculated according to the 5th preset formula.
Illustratively, the 5th preset formula are as follows:
K=L*h;
Wherein, K is the PON mouth flow threshold of OLT, and the PON cause for gossip survey handling capacity that L is OLT, h is peak factor, 0 < h <
100%, peak factor is at least used to determine the reasonable threshold value of current network.
Illustratively, the business demand bandwidth of current network carrying increases, and repeatedly service traffics increase within a short period of time,
Therefore, we can determine peak factor according to actual measurement situation.
Illustratively, the value of h can be by acquiring one or more PON mouthfuls of the mean flow of the OLT in a period of time
Acquisition is calculated after measuring α and peak flow β;
H=α/β;
Wherein, α is the average flow rate of the PON mouth of OLT, and β is the peak flow of the PON mouth of OLT.
Optionally, peak factor can be 65%, then according to the PON of OLT mouth downlink throughput capacity (actual measurement downlink throughput capacity)
It can be concluded that the PON mouth flow threshold of OLT, as shown in table 1 below, handling capacity unit Mbps.
The PON mouth flow threshold example of table 1:OLT
Choosing actual measurement downlink throughput capacity is that will cause loss due to environmental factor, long distance transmission etc., and peak factor is chosen
65% is determined based on current network conditions, and 65% actual measurement downlink throughput capacity is different port type in network in table 1
Flow threshold;FTTH (fibre (fiber) to the home, fiber to the home), FTTB (fiber to the building,
Fiber to the floor), EPON (ethernet passive optical network, Ethernet passive optical network), GPON
(gigabit capable PON, gigabit passive optical network), XG-PON (10gigabit capable PON, ten gigabits
Passive optical network), 10G EPON (10gigabit ethernet passive optical network, ten gigabit ether
Net passive optical network).The OLT of different systems corresponds to the PON mouth of different systems.The PON mouth of OLT refers to the end on the PON board of OLT
Mouthful, commonly referred to as PON mouthfuls.EPON, PON standard its i.e. corresponding OLT that GPON, 10G EPON, XG-PON are current main-stream
Port standard.EPON network, that is, EPON standard PON network, and so on.
Illustratively, above-mentioned equipment 101-107 step acquisition relevant parameter and export corresponding result is executed, can be clothes
Business device, such as network management system are also possible to other terminals, such as PC.
108, when the PON mouth total flow of the estimated OLT of determination is more than or equal to the PON mouth flow threshold of OLT, according to default rule
The method of drawing plans broadband network.
Illustratively, when the PON mouth total flow W of the estimated OLT PON mouth flow threshold K for being 7000, OLT is 6950, i.e.,
7000 > 6950, it needs to plan network at this time.
In the embodiment of the present application, it first obtains broadband network parameter and handling capacity is surveyed in the PON cause for gossip of OLT, joined according to network
Number, determines broadband user's Mean Speed, so that the PON mouth total flow of estimated OLT is obtained, when the PON mouth total flow of estimated OLT is big
When handling capacity is surveyed in the PON cause for gossip of OLT, planning processing is carried out to network, it can realize and determine when to need based on service traffics
Planning processing is carried out to physical network, so as to plan in time broadband network, promote wideband user service experience.
In a kind of achievable mode, as shown in Fig. 2, being carried out to broadband network in 108 steps according to presetting planing method
Planning, specifically includes:
1081, judge whether the PON mouth total flow of estimated OLT is more than or equal to the PON mouth flow threshold of OLT.
When the PON mouth total flow of estimated OLT is less than the PON mouth flow threshold of OLT, 101 steps are executed;As estimated OLT
PON mouth total flow be more than or equal to OLT PON mouth flow threshold when, execution 1082 steps.
1082, whether the specification for judging OLT is maximum specification.
When the specification for determining OLT is maximum specification, 1083 are executed;When the specification for determining OLT is not maximum specification, hold
Row 1084.
Illustratively, as shown in table 1, in the network of FTTH and FTTB access at present, OLT maximum specification is 10G PON output
The OLT of port, that is, judge OLT port whether be 10G PON standard port, it should be noted that with advances in technology,
OLT can also further develop, update, and not be defined herein to the standard of OLT.The portion OLT of the following 25G, 50G PON
After administration, this method also can be used.
1083, the first planning instruction is sent to management terminal.
Wherein, the total splitting ratio for the ODN that the first planning instruction is at least used to indicate OLT connection at least needs to reduce by one etc.
Grade, the first planning instruction can be to be generated according to data, is also possible to pre-stored, the application is not particularly limited;Institute
The primary number of fibers in main line that the total splitting ratio for stating ODN is ODN is divided by the user side branch optical fibers total quantity of ODN;The main line of ODN
Primary optical fiber is the optical fiber for the PON mouth that ODN is used to connect local side OLT, and usual quantity is 1;The user side branch optical fibers of ODN are
ODN is used to connect the optical fiber of the PON mouth of user side ONU;It should be noted that total splitting ratio of ODN reduces a grade, reduce
A grade determine according to the actual situation, can be and 1:32 is reduced to by 1:64, be also possible to be reduced to 1 by 1:64:
48, the application is defined not to this.
Illustratively, according to professional standard, planning guide/guidance, the secondary light-splitting of the ODN network of a PON mouthfuls of connections
The splitting ratio of device is identical, and in this case, total splitting ratio of ODN is the product of the splitting ratio of optical splitters at different levels, any level light splitting
The splitting ratio of device is the splitting ratio of any of any level optical splitter optical splitter, point of each optical splitter in any level optical splitter
Light is than identical.
Illustratively, in the presence of there was only level-one optical splitter in ODN, total splitting ratio of ODN is the light splitting of level-one optical splitter
Than when level-one optical splitter in ODN and secondary light-splitting device exist simultaneously, total splitting ratio of ODN is equal to the light splitting of level-one optical splitter
Than the splitting ratio multiplied by secondary light-splitting device.
Optionally, management terminal can be management equipment, after management terminal receives the first planning instruction, management terminal pair
The administrative staff answered can instruct according to the first planning, be adjusted to physical network, reduce the light splitting of optical splitter in ODN network
Than, reduce total splitting ratio, then change attachable number of users so that the network query function after reducing splitting ratio go out it is estimated
The PON mouth total flow of OLT is less than the PON mouth flow threshold of OLT.
Optionally, for not building according to professional standard, planning guide/guidance, the secondary light-splitting device of ODN network is caused to be deposited
Multiple splitting ratios the case where, if secondary light-splitting device is there are 1:4, more kinds of splitting ratios of 1:8,1:16, management terminal receives first
After planning instruction, the corresponding administrative staff of management terminal can instruct according to the first planning, be adjusted to physical network, by high score
Two fractions of light ratio (splitting ratio of the optical splitter i.e. more than the branch optical fibers quantity that is separated than other optical splitters of branch optical fibers quantity)
The splitting ratio of light device reduces, and makes the splitting ratio of the secondary light-splitting device of ODN network identical, and to meet professional standard, planning refers to
South/guidance.
In the description of the present application, management terminal can be the management equipment (user equipment, UE) of administrative staff,
Such as: mobile phone, computer can also be cellular phone, wireless phone, Session initiation Protocol (session initiation
Protocol, SIP) phone, smart phone, wireless local loop (wireless loca l loop, WLL) stand, individual digital
Assistant (personal digital assistant, PDA), laptop computer, hand-held communication device, hand-held calculating are set
Standby, satellite radio, wireless modem card, TV set-top box (set top box, STB), customer premises equipment, CPE
(customer premise equipment, CPE) and/or other equipment for being communicated on wireless system.
1085, it receives the first Planning response for carrying the first information that management terminal is sent and is synchronized to the first information
Presetting database.
Wherein, the corresponding first planning instruction of the first Planning response, it should be noted that reducing splitting ratio refers to reduction optical splitter
Branch optical fibers quantity;The first information includes at least: the optical splitter after total splitting ratio of ODN reduces cascades quantity, light splitting at different levels
The splitting ratio of device and total splitting ratio of ODN;Optical splitter cascade quantity refers to the grade of highest level optical splitter in ODN, second level in ODN
The grade of optical splitter is greater than the grade of level-one optical splitter, as shown in figure 4, there are secondary light-splitting devices in figure, then optical splitter cascades number
Amount is 2.
Illustratively, optical splitter cascade quantity can be determined according to the actual conditions of PON network.Due to being concatenated in light-path
Optical splitter can bring biggish loss, total splitting ratio should be no more than EPON, GPON, 10G EPON, XG PON and be wanted after cascade
The total splitting ratio of maximum asked, to meet increasing access net bandwidth requirement, now net is typically not greater than 1:64, thus at one
Optical splitter cascade quantity is usually no more than 2 on light-path.
The splitting ratio of optical splitter=optical splitter trunk optical fiber quantity/optical splitter branch optical fibers quantity, as shown in figure 4,401 marks
The optical fiber of knowledge is level-one optical splitter trunk optical fiber, and the optical fiber of 402,403 marks is level-one optical splitter branch optical fibers.
In the case where ODN uses two-stage light splitting (optical splitter cascades quantity as 2 i.e. on light-path):
The splitting ratio of total splitting ratio=level-one optical splitter splitting ratio * secondary light-splitting device of ODN.
Wherein, the splitting ratio of level-one optical splitter refers to the splitting ratio of any of level-one optical splitter optical splitter, secondary light-splitting device
Splitting ratio refer to the splitting ratio of any of secondary light-splitting device optical splitter.The optical splitter trunk optical fiber quantity of ODN is usually 1, when
When the trunk optical fiber quantity of the optical splitter of ODN is 2, one primary one spare, since only one trunk optical fiber is (based on usually
With trunk optical fiber) it is connected to the PON mouth of OLT, it is 1 calculating that trunk optical fiber quantity is still pressed when calculating total splitting ratio.
In the case where ODN uses level-one light splitting (optical splitter cascades quantity as 1 i.e. on light-path):
Total splitting ratio=level-one optical splitter splitting ratio of ODN.
Illustratively, in order not to change ODN network structure, ODN is usually dropped there are in the case where multiple cascade optical splitters
The splitting ratio of the low optical splitter near user side.
Optionally, it is assumed that former PON only has level-one optical splitter, and splitting ratio 1:32 after splitting ratio reduces a grade, is divided
Than for 1:16, the first information that the first response carries includes: the splitting ratio data of 1:16, the optical splitter grade after reducing splitting ratio
Joining quantity is 1.
Illustratively, ODN network is secondary light-splitting structure, and the splitting ratio of the level-one optical splitter of ODN network originally is 1:
16, the splitting ratio of secondary light-splitting device is 1:8, and total splitting ratio of the ODN is 1:128;After receiving the first planning instruction, ODN's is total
Splitting ratio reduces a grade, and the splitting ratio of secondary light-splitting device is reduced to 1:4, and total splitting ratio of the ODN is 1:64.The first information
Include at least: the optical splitter cascade quantity after reducing splitting ratio is 2;The splitting ratio of each grade of optical splitter are as follows: level-one optical splitter
Splitting ratio is 1:16, and the splitting ratio of secondary light-splitting device is 1:8;Total splitting ratio of ODN is 1:64.
1084, judge whether OLT may be updated.
When determining that OLT may be updated, 1086 are executed;When determining that OLT is non-renewable, 1087 are executed.
1086, the second planning instruction is sent to management terminal.
Wherein, the second planning instruction, which is at least used to indicate OLT, may be updated as the OLT of maximum specification.
Illustratively, the second planning instruction specifically includes the first sub-instructions, the second sub-instructions, third sub-instructions and the 4th son
Instruction;
Illustratively, referring to shown in Fig. 3,1086 steps are specifically included:
10861, judge whether OLT is EPON standard.
When determining OLT is EPON standard, 10862 are executed;When determining OLT not is EPON standard, 10863 are executed.
10862, judge whether OLT can increase 10G EPON board.
When determining that OLT can increase 10G EPON board, 10864 are executed;When determining that OLT cannot increase 10G EPON
When board, 10865 are executed.
10864, the first sub-instructions are sent to management terminal.
Illustratively, administrative staff can increase 10G EPON newly according to received first sub-instructions of management terminal on OLT
The user terminal conversion of the OLT connection of original EPON standard is to be connected on 10G EPON standard OLT, for 500M by board
The user terminal access ONU equipment of following access rate remains unchanged, and the user terminal access of 500M and the above access rate are set
Standby to need replacing as the ONU of 10G EPON standard, ODN network is without transformation.
10865, the second sub-instructions are sent to management terminal.
Illustratively, original OLT can be changed to 10G according to received second sub-instructions of management terminal by administrative staff
The OLT of EPON standard, originally in the user terminal ONU cutover of the OLT connection of EPON standard to 10G EPON standard OLT, for
The user terminal access device of 500M or less access rate remains unchanged, and the user terminal access of 500M and the above access rate are set
Standby to need replacing as the ONU of 10G EPON standard, ODN network is without transformation.
10863, judge that can the optical power budget of optical link meet the requirement for increasing 2dB insertion loss.
When the optical power budget for determining optical link is able to satisfy the requirement for increasing 2dB insertion loss, 10866 are executed;When true
Determine optical link optical power budget be not able to satisfy increase 2dB insertion loss requirement when, execute 10867.
It should be noted that optical power budget (the i.e. optical link from OLT to ONU of above-mentioned judgement optical link from OLT to ONU
Overall loss) can meet increase 2dB insertion loss requirement, be total for the optical link in FTTx network from OLT to ONU
Splitting ratio (that is: total splitting ratio of ODN) be equal to or more than 1:32 and the above splitting ratio the case where.When in FTTx network from OLT
When being less than 1:32 to the total splitting ratio of the optical link of ONU (that is: total splitting ratio of ODN), the light of the optical link from OLT to ONU is defaulted
Power budget be able to satisfy increase 2dB insertion loss requirement, i.e., the optical link increase 2dB loss after, the optical link it is complete
> (reserved value of the threshold value+2dB of the sensitivity of optical module) is lost in journey.
Illustratively, judge that can the optical power budget of optical link meet the requirement for increasing 2dB insertion loss specifically: obtain
Take the overall loss of PON mouth (i.e. the port of PON board) each optical fiber (trunk optical fiber+branch optical fiber) of OLT;When OLT's
The threshold value of the overall loss+2dB+2dB > GPON optical module sensitivity of PON mouthfuls of each optical fiber (trunk optical fiber+branch optical fiber),
And overall loss+2dB+2dB > XG-PON the optical module of PON mouth each optical fiber (trunk optical fiber+branch optical fiber) of OLT is sensitive
When the threshold value of degree, illustrate the reserved value including 2dB, i.e. the optical power budget of optical link, which is able to satisfy, increases 2dB insertion loss
Requirement.Wherein, the threshold value of the threshold value of GPON optical module sensitivity and XG-PON optical module sensitivity, by national standard, industry
It is obtained in standard.
10866, third sub-instructions are sent to management terminal.
Illustratively, administrative staff can increase WDM1r (wavelength according to the received third sub-instructions of management terminal
Division multiplexor 1revised, adds wavelength-division multiplex to correct) equipment, by connect GPON standard port optical fiber and
In the fiber coupling to same ODN for connecting XG-PON standard port, for the user terminal access device of 500M or less access rate
It remains unchanged, the access terminal for being changed to XG-PON standard for the user terminal access device of 500M and the above access rate is set
It is standby;When the GPON standard that a WDM1r is connected the cutover of ONU equipment whole/replace with the ONU equipment of XG-PON standard after,
It no longer needs using by the OLT and ONU equipment of GPON standard, i.e. the OLT and ONU that the WDM1r is only connected to XG-PON standard are set
It is standby;WDM1r can be removed at this time, to reduce the overall loss of optical link.
10867, the 4th sub-instructions are sent to management terminal.
Illustratively, administrative staff can increase GPON newly according to received 4th sub-instructions of management terminal on local side OLT
The PON board (i.e. Combo PON board) unified with XG-PON, by the subscriber installation of the port of original GPON to Combo PON
On port, the user terminal access device ONU of 500M or less access rate is remained unchanged, for 500M and the above access rate
User terminal access device be changed to the ONU of XG-PON standard.
Illustratively, it when the PON mouth of Combo PON board selects D1, D2 type optical module, needs to existing whole light chain
Path loss consumption is more than that threshold value (is 26dB as selected threshold value when D1, threshold value when D2 is selected to be rectified and improved for the route of 30dB), to reduce
Overall loss, can the excessive fusion point of splice loss, splice attenuation again, can also replace and the side such as excessive connector/optical splitter is lost
Method, so that route overall loss is no more than threshold value.
1087, third planning instruction is sent to management terminal.
Wherein, third planning instruction be at least used to indicate that OLT is non-renewable and total splitting ratio of the ODN of OLT connection at least
Need to reduce a grade, third planning instruction can be processing module generation, be also possible to what processing module prestored, this Shen
It please be not particularly limited.
It is caused it should be noted that can be when OLT is non-renewable by factors such as environment locating for current device, spaces.
Optionally, after management terminal receives third planning instruction, administrative staff plan according to third and instruct, to Physical Network
Network is adjusted, and the splitting ratio of optical splitter in network is reduced, so that reducing the PON of the estimated OLT of the network after total splitting ratio
Mouth total flow is less than the PON mouth flow threshold of OLT.
1088, receive management terminal send the third Planning response for carrying the second information and by the second synchronizing information extremely
Presetting database.
The first information, the second information are used to distinguish the optical path information of ODN under different step, different scenes, embodiment and
Method does not limit ODN network using level-one beam-splitting structure or secondary light-splitting structure.
Illustratively, ODN network is secondary light-splitting structure, and the splitting ratio of the level-one optical splitter of ODN network originally is 1:
16, the splitting ratio of secondary light-splitting device is 1:8, and total splitting ratio of the ODN is 1:128;After receiving the first planning instruction, ODN's is total
Splitting ratio reduces a grade, and the splitting ratio of secondary light-splitting device is reduced to 1:4, and total splitting ratio of the ODN is 1:64.Second information
Include at least: the optical splitter cascade quantity after reducing total splitting ratio is 2;The splitting ratio of each grade of optical splitter are as follows: level-one optical splitter
Splitting ratio be 1:16, the splitting ratio of secondary light-splitting device is 1:8;Total splitting ratio of ODN is 1:64.
Wherein, third Planning response corresponds to third planning instruction.
Illustratively, third Planning response carries the second information, and the second information includes at least: total splitting ratio drop of ODN
Optical splitter cascade quantity, the splitting ratio of optical splitter at different levels and total splitting ratio of ODN after low.
Network plan method provided in an embodiment of the present invention, the PON cause for gossip survey that can obtain broadband network parameter and OLT gulp down
The amount of spitting;Network parameter includes at least: the total flow of content distributing network CDN, total number of concurrent of CDN, VOD service and
Hair rate, user's permeability of video traffic, the average bit rate of video live broadcast service, the coincidence of video live broadcast service, target industry
The coincidence of business and user's Mean Speed of target service;Video traffic includes VOD service and video live broadcast service;Mesh
Mark business is the business in network service in addition to video traffic;Throughput calculation is surveyed according to the PON cause for gossip of network parameter and OLT
The Mean Speed of the Mean Speed of VOD service, the Mean Speed of video live broadcast service and target service;According to video point
The Mean Speed for broadcasting the Mean Speed of business, the Mean Speed of video live broadcast service and target service calculates the average speed of broadband user
Rate;The PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed;Throughput calculation is surveyed according to the PON cause for gossip of OLT
The PON mouth flow threshold of OLT;When the PON mouth total flow of the estimated OLT of determination is more than or equal to the PON mouth flow threshold of OLT, according to
Broadband network is planned according to default planing method.Technical solution provided in an embodiment of the present invention can carry out the network planning
When, handling capacity is surveyed by the PON cause for gossip of the network parameter and OLT of acquisition, calculates the estimated OLT's that current network needs to meet
PON mouthfuls of total flows, by the PON of the PON mouth total flow of the estimated OLT obtained OLT relevant to the PON cause for gossip of OLT survey handling capacity
Mouth flow threshold is compared judgement, judges whether to need to plan network, the estimated OLT when service traffics increase
When PON mouthfuls of total flows are greater than the PON mouth flow threshold of OLT, illustrate that the performance of PON at this time needs to be promoted and need the network planning.
Therefore technical solution provided in an embodiment of the present invention, may be implemented the prediction based on service traffics, adjusts physical network in time, keep away
Exempt from because the network planning adjustment not in time caused by user experience reduce and resource utilization reduce.
The embodiment of the present application can carry out functional module to the network equipment according to above method example or functional unit is drawn
Point, it, can also will be two or more for example, each functional module of each function division or functional unit can be corresponded to
Function is integrated in a processing module.Above-mentioned integrated module both can take the form of hardware realization, can also use soft
Part functional module or the form of functional unit are realized.It wherein, is to show to the division of module or unit in the embodiment of the present application
Meaning property, only a kind of logical function partition, there may be another division manner in actual implementation.
As shown in figure 5, the embodiment of the present application provides a kind of network planning device 500, comprising: obtain module 501, processing mould
Block 502;
Module 501 is obtained, handling capacity is surveyed in the PON cause for gossip for obtaining broadband network parameter and OLT, and network parameter at least wraps
Include: the total flow of content distributing network CDN, total number of concurrent of CDN, the coincidence of VOD service, video traffic user
Permeability, the average bit rate of video live broadcast service, the coincidence of video live broadcast service, the coincidence of target service and target service
User's Mean Speed;Video traffic includes VOD service and video live broadcast service;Target service is to remove in network service
Business other than video traffic;
Processing module 502, for according to total flow, the total number of concurrent of CDN, video point for obtaining the CDN that module 501 obtains
The coincidence of business and user's permeability of video traffic are broadcast, the average speed of VOD service is calculated according to the first preset formula
Rate;
Optionally, the first preset formula are as follows:
M=(a/b) * c*d;
Wherein, M is the Mean Speed of VOD service, and a is the total flow of CDN, and b is total number of concurrent of CDN, and c is view
The coincidence of frequency demand (telecommunication) service, d are user's permeability of video traffic.
Processing module 502, for according to average bit rate, the net cast for obtaining the video live broadcast service that module 501 obtains
The coincidence of business and user's permeability of video traffic calculate the average speed of video live broadcast service according to the second preset formula
Rate;
Optionally, the second preset formula are as follows:
N=r*d*e;
Wherein, N is the Mean Speed of video live broadcast service, and r is the average bit rate of video live broadcast service, and d is video traffic
User's permeability, e be video live broadcast service coincidence.
Processing module 502, for the user according to the coincidence and target service for obtaining the target service that module 501 obtains
Mean Speed calculates the Mean Speed of target service according to third preset formula;
Optionally, third preset formula are as follows:
P=f*g;
Wherein, P is the Mean Speed of target service, and f is the coincidence of target service, and g is that the user of target service is average
Rate.
Processing module 502, for according to Mean Speed, the net cast for obtaining the VOD service that module 501 obtains
The Mean Speed of business and the Mean Speed of target service calculate broadband user's Mean Speed according to the 4th preset formula;
Optionally, the 4th preset formula are as follows:
S=(M+N) * u+P;
Wherein, S is broadband user's Mean Speed, and M is the Mean Speed of VOD service, and N is video live broadcast service
Mean Speed, P are the Mean Speed of target service, and u is overlap coefficient.
Processing module 502, for determining the PON of estimated OLT according to the broadband user's Mean Speed for obtaining the acquisition of module 501
Mouth total flow;
Processing module 502, it is pre- according to the 5th for surveying handling capacity according to the PON cause for gossip for obtaining the OLT that module 501 obtains
If the PON mouth flow threshold of formula calculating OLT;
Optionally, the 5th preset formula are as follows:
K=L*h;
Wherein, K is the PON mouth flow threshold of OLT, and the PON cause for gossip survey handling capacity that L is OLT, h is peak factor, 0 < h <
100%.
Processing module 502, for when PON mouth flow threshold of the PON mouth total flow more than or equal to OLT for determining estimated OLT
When, broadband network is planned according to planing method is preset.
Optionally, module 501 is obtained to be specifically used for:
Obtain accounting, the accounting of the accounting of high-definition live broadcasting business and 4K live broadcast service of SD live broadcast service, SD live streaming
The accounting of the accounting of business, the accounting of high-definition live broadcasting business and 4K live broadcast service is respectively that its quantity for respectively corresponding to user accounts for view
Frequency live broadcast service corresponds to the accounting of the quantity of user.
According to the accounting of SD live broadcast service, the accounting of the accounting of high-definition live broadcasting business and 4K live broadcast service, according to the 7th
The average bit rate of preset formula calculating video live broadcast service.
Optionally, it obtains module 501 to be also used to: obtaining the planning number of users under the PON mouth of OLT.
Processing module 502, broadband user's Mean Speed and planning number of users for being obtained according to acquisition module 501,
The PON mouth total flow of estimated OLT is calculated according to the 6th preset formula.
Optionally, the present embodiment network planning device 500 further includes communication module 503.
Processing module 502 is specifically used for: whether the specification for judging OLT is maximum specification;
When the specification for determining OLT is maximum specification, the first planning is sent to management terminal by communication module and is instructed;The
The total splitting ratio for the ODN that one planning instruction is at least used to indicate OLT connection at least needs to reduce a grade, total light splitting of ODN
Number of fibers more primary than main line for ODN divided by ODN user side branch optical fibers total quantity;
The first Planning response for carrying the first information of management terminal transmission is received by communication module and is believed first
Breath is synchronized to presetting database;The first information includes at least: total splitting ratio of ODN reduce after optical splitter cascade quantity and its each
The splitting ratio of grade optical splitter;The corresponding first planning instruction of first Planning response.
Processing module 502 is also used to: when the specification for determining OLT is not maximum specification, judging whether OLT may be updated;
When processing module 502 determines that OLT is renewable, the second planning is sent to management terminal by communication module and is instructed;
Second planning instruction is at least used to indicate OLT and may be updated as the OLT of maximum specification;
When processing module 502 determines that OLT is non-renewable, third planning is sent to management terminal by communication module and is referred to
It enables;Third planning instruction is at least used to indicate that OLT is non-renewable and total splitting ratio of the ODN of OLT connection at least needs to reduce by one
A grade;
The third Planning response for carrying the second information of management terminal transmission is received by communication module and is believed second
Breath is synchronized to presetting database;Second information includes at least: total splitting ratio of ODN reduce after optical splitter cascade quantity and its each
The splitting ratio of grade optical splitter;Third Planning response corresponds to third planning instruction.
Network planning device provided in an embodiment of the present invention, because the device includes: to obtain module and processing module;It obtains
Handling capacity is surveyed in module, the PON cause for gossip for obtaining broadband network parameter and OLT, and network parameter includes at least: content distributing network
Total flow, total number of concurrent of CDN, the coincidence of VOD service, the user's permeability of video traffic, net cast of CDN
User's Mean Speed of the average bit rate of business, the coincidence of video live broadcast service, the coincidence of target service and target service;
Video traffic includes VOD service and video live broadcast service;Target service is the industry in network service in addition to video traffic
Business;Processing module, for according to obtain the total flow of CDN that module obtains, total number of concurrent of CDN, VOD service and
User's permeability of hair rate and video traffic calculates the Mean Speed of VOD service according to the first preset formula;Handle mould
Block is also used to the average bit rate of video live broadcast service, the coincidence of video live broadcast service and the video obtained according to module is obtained
User's permeability of business, the second preset formula calculate the Mean Speed of video live broadcast service;Processing module is also used to basis and obtains
The coincidence for the target service that modulus block obtains and user's Mean Speed of target service calculate target according to third preset formula
The Mean Speed of business;It is straight to be also used to the Mean Speed according to the VOD service for obtaining module acquisition, video for processing module
The Mean Speed of business and the Mean Speed of target service are broadcast, calculates broadband user's Mean Speed according to the 4th preset formula;Place
Module is managed, is also used to determine the PON mouth total flow of estimated OLT according to the broadband user's Mean Speed for obtaining module acquisition;Processing
Module is also used to survey handling capacity according to the PON cause for gossip for obtaining the OLT that module obtains, calculates OLT's according to the 5th preset formula
PON mouthfuls of flow thresholds;Processing module is also used to when PON mouth flow of the PON mouth total flow more than or equal to OLT for determining estimated OLT
When threshold value, broadband network is planned according to planing method is preset.So technical solution provided in an embodiment of the present invention can be with
When carrying out the network planning, handling capacity is surveyed by the PON cause for gossip of the network parameter and OLT of acquisition, calculates current network needs
The PON cause for gossip of the PON mouth total flow of the estimated OLT obtained and OLT are surveyed handling capacity by the PON mouth total flow of the estimated OLT met
The PON mouth flow threshold of relevant OLT is compared judgement, judges whether to need to plan network, when service traffics increase
When the PON mouth total flow of added-time estimated OLT is greater than the PON mouth flow threshold of OLT, illustrate that the performance of PON at this time needs to be promoted i.e.
Need the network planning.Therefore technical solution provided in an embodiment of the present invention, may be implemented the prediction based on service traffics, adjust in time
Whole physical network, avoid because the network planning adjustment not in time caused by user experience reduce and resource utilization reduce.
Referring to shown in Fig. 6, the embodiment of the present invention also provides another network planning device, including memory 61, processor
62, bus 63 and communication interface 64;Memory 61 passes through always for storing computer executed instructions, processor 62 and memory 61
Line 63 connects;When the operation of network planning device, processor 62 executes the computer executed instructions that memory 61 stores, so that net
Network device for planning executes such as network plan method provided by the above embodiment.
In concrete implementation, as one embodiment, processor 62 (62-1 and 62-2) may include one or more
CPU, such as CPU0 and CPU1 shown in Fig. 6.And as one embodiment, network planning device may include multiple processors
62, such as processor 62-1 and processor 62-2 shown in Fig. 6.Each of these processors 62 CPU can be one
Single core processor (single-CPU) is also possible to a multi-core processor (multi-CPU).Here processor 62 can refer to
One or more equipment, circuit, and/or the processing core for handling data (such as computer program instructions).
Memory 61 can be read-only memory 61 (read-only memory, ROM) or can store static information and refer to
The other kinds of static storage device enabled, random access memory (random access memory, RAM) or can store
The other kinds of dynamic memory of information and instruction, is also possible to Electrically Erasable Programmable Read-Only Memory
(electrically erasable programmable read-only memory, EEPROM), CD-ROM (compact
Disc read-only memory, CD-ROM) or other optical disc storages, optical disc storage (including compression optical disc, laser disc, light
Dish, Digital Versatile Disc, Blu-ray Disc etc.), magnetic disk storage medium or other magnetic storage apparatus or can be used in carry or
Store have instruction or data structure form desired program code and can by any other medium of computer access, but
It is without being limited thereto.Memory 61, which can be, to be individually present, and is connected by bus 63 with processor 62.Memory 61 can also and be located
Reason device 62 integrates.
In concrete implementation, memory 61, for storing the data in the application and executing the software program of the application
Corresponding computer executed instructions.Processor 62 can by running or executing the software program being stored in memory 61, with
And call the data being stored in memory 61, the various functions of network planning device.
Communication interface 64 is used for and other equipment or communication, such as control using the device of any transceiver one kind
System processed, wireless access network (radio access network, RAN), WLAN (wireless local area
Networks, WLAN) etc..Communication interface 64 may include that receiving unit realizes that receive capabilities and transmission unit realize transmission
Function.
Bus 63, can be industry standard architecture (idustry standard architecture, ISA) bus,
External equipment interconnection (peripheral component interconnect, PCI) bus or extended industry-standard architecture
(extendedindustry standard architecture, EISA) bus etc..The bus 63 can be divided into address bus,
Data/address bus, control bus etc..Only to be indicated with a thick line convenient for indicating, in Fig. 6, it is not intended that an only bus or
A type of bus.
The embodiment of the present invention also provides a kind of computer storage medium, and computer storage medium includes that computer execution refers to
It enables, when computer executed instructions are run on computers, so that computer executes such as the network planning provided by the above embodiment
Method.
The embodiment of the present invention also provides a kind of computer program, which can be loaded directly into memory, and
Containing software code, which is loaded into via computer and can be realized network provided by the above embodiment after executing and advise
The method of drawing.
Those skilled in the art are it will be appreciated that in said one or multiple examples, function described in the invention
It can be realized with hardware, software, firmware or their any combination.It when implemented in software, can be by these functions
Storage in computer-readable medium or as on computer-readable medium one or more instructions or code transmitted.
Computer-readable medium includes computer storage media and communication media, and wherein communication media includes convenient for from a place to another
Any medium of one place transmission computer program.Storage medium can be general or specialized computer can access it is any
Usable medium.
Through the above description of the embodiments, it is apparent to those skilled in the art that, for description
It is convenienct and succinct, only the example of the division of the above functional modules, in practical application, can according to need and will be upper
It states function distribution to be completed by different functional modules, i.e., the internal structure of device is divided into different functional modules, to complete
All or part of function described above.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it
Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of module or unit,
Only a kind of logical function partition, there may be another division manner in actual implementation.Such as multiple units or components can be with
In conjunction with or be desirably integrated into another device, or some features can be ignored or not executed.Another point, it is shown or discussed
Mutual coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING of device or unit or
Communication connection can be electrical property, mechanical or other forms.Unit can be or can not also as illustrated by the separation member
It is to be physically separated, component shown as a unit can be a physical unit or multiple physical units, it can be located at
One place, or may be distributed over multiple and different places.Part therein or complete can be selected according to the actual needs
Portion unit achieves the purpose of the solution of this embodiment.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.If integrated unit with
The form of SFU software functional unit is realized and when sold or used as an independent product, can store and storage Jie can be read at one
In matter.Based on this understanding, the portion that the technical solution of the embodiment of the present application substantially in other words contributes to the prior art
Divide or all or part of the technical solution can be embodied in the form of software products, which is stored in one
In storage medium, including some instructions are used so that an equipment (can be single-chip microcontroller, chip etc.) or processor
(processor) all or part of the steps of each embodiment method of the present invention is executed.And storage medium above-mentioned include: USB flash disk,
The various media that can store program code such as mobile hard disk, ROM, RAM, magnetic or disk.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those familiar with the art, all answers
It is included within the scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.
Claims (13)
1. a kind of network plan method characterized by comprising
Handling capacity, the broadband network ginseng are surveyed in the passive optical network PON cause for gossip for obtaining broadband network parameter and optical line terminal OLT
Number includes at least: total flow, total number of concurrent of CDN, the coincidence of VOD service, the video industry of content distributing network CDN
User's permeability of business, the average bit rate of video live broadcast service, the coincidence of video live broadcast service, target service coincidence and
User's Mean Speed of target service;The video traffic includes the VOD service and the video live broadcast service;Institute
Stating target service is the business in network service in addition to video traffic;
According to the total flow of the CDN, total number of concurrent of the CDN, the VOD service coincidence and the video
User's permeability of business calculates the Mean Speed of VOD service according to the first preset formula;
According to the use of the average bit rate of the video live broadcast service, the coincidence of the video live broadcast service and the video traffic
Family permeability calculates the Mean Speed of video live broadcast service according to the second preset formula;
According to user's Mean Speed of the coincidence of the target service and the target service, calculated according to third preset formula
The Mean Speed of target service;
According to the Mean Speed of the VOD service, the Mean Speed of the video live broadcast service and the target service
Mean Speed calculates broadband user's Mean Speed according to the 4th preset formula;
The PON mouth total flow of estimated OLT is determined according to broadband user's Mean Speed;
Handling capacity is surveyed according to the PON cause for gossip of the OLT, the PON mouth flow threshold of OLT is calculated according to the 5th preset formula;
When the PON mouth total flow for determining the estimated OLT is more than or equal to the PON mouth flow threshold of the OLT, according to default rule
The method of drawing plans the broadband network.
2. network plan method according to claim 1, which is characterized in that
First preset formula are as follows:
M=(a/b) * c*d;
Second preset formula are as follows:
N=r*d*e;
The third preset formula are as follows:
P=f*g;
4th preset formula are as follows:
S=(M+N) * u+P;
5th preset formula are as follows:
K=L*h;
Wherein, M is the Mean Speed of the VOD service, and a is the total flow of the CDN, and b is the total concurrent of the CDN
Number, c are the coincidence of the VOD service, and d is user's permeability of the video traffic;
N is the Mean Speed of the video live broadcast service, and r is the average bit rate of the video live broadcast service, and e is that the video is straight
Broadcast the coincidence of business;
P is the Mean Speed of the target service, and f is the coincidence of the target service, and g is that the user of the target service is flat
Equal rate;
S is broadband user's Mean Speed, and u is overlap coefficient, and u is greater than 1;
K is the PON mouth flow threshold of the OLT, and the PON cause for gossip survey handling capacity that L is the OLT, h is peak factor, 0 < h <
100%.
3. network plan method according to claim 2, which is characterized in that described to obtain the flat of the video live broadcast service
Equal code rate includes:
Accounting, the accounting of the accounting of high-definition live broadcasting business and 4K live broadcast service for obtaining SD live broadcast service, it is default according to the 7th
Formula calculates the average bit rate of the video live broadcast service, the accounting of the SD live broadcast service, the high-definition live broadcasting business
Accounting and the accounting of the 4K live broadcast service are respectively that its quantity for respectively corresponding to user accounts for the video live broadcast service to application
The accounting of the quantity at family;
7th preset formula are as follows:
R=R1I1+R2I2+R3I3;
Wherein R1For the accounting of the SD live broadcast service, I1For SD code rate, R2For the accounting of the high-definition live broadcasting business, I2For
High definition code rate, R3For the accounting of the 4K live broadcast service, I3For 4K code rate.
4. network plan method according to claim 1, which is characterized in that described according to broadband user's Mean Speed
Determine the PON mouth total flow of estimated OLT, comprising:
Obtain the planning number of users under the PON mouth of OLT;
According to broadband user's Mean Speed and the planning number of users, calculated according to the 6th preset formula described estimated
The PON mouth total flow of OLT;
6th preset formula are as follows:
W=S*X;
Wherein, W is the PON mouth total flow of the estimated OLT, and S is broadband user's Mean Speed, and X is the planning user
Quantity.
5. network plan method according to claim 1, which is characterized in that described when the PON mouth for determining the estimated OLT
When total flow is more than or equal to the PON mouth flow threshold of the OLT, the broadband network is advised according to planing method is preset
It draws, comprising:
Whether the specification for judging the OLT is maximum specification;
When the specification for determining the OLT is maximum specification, the first planning instruction is sent to management terminal;First planning refers to
The total splitting ratio for the optical distribution network ODN for being at least used to indicate the OLT connection is enabled at least to need to reduce a grade, it is described
The primary number of fibers in main line that total splitting ratio of ODN is ODN is divided by the user side branch optical fibers total quantity of ODN;
It receives the first Planning response for carrying the first information that management terminal is sent and is synchronized to the first information default
Database;The first information includes at least: the optical splitter after total splitting ratio of the ODN reduces cascades quantity and its each fraction
The splitting ratio of light device;First Planning response corresponds to the first planning instruction.
6. network plan method according to claim 5, which is characterized in that the specification for judging the OLT whether be
After maximum specification further include:
When the specification for determining the OLT is not maximum specification, judge whether the OLT may be updated;
When determining that the OLT may be updated, the second planning instruction is sent to management terminal;The second planning instruction is at least used for
Indicate that the OLT may be updated as the OLT of maximum specification;
When determining that the OLT is non-renewable, Xiang Suoshu management terminal sends third planning instruction;The third planning instruction is extremely
It is used to indicate that the OLT is non-renewable and total splitting ratio of the ODN of the OLT connection at least needs to reduce a grade less;
Receive the third Planning response for carrying the second information that management terminal is sent and by second synchronizing information to described
Presetting database;Second information includes at least: total splitting ratio of the ODN reduce after optical splitter cascade quantity and its each
The splitting ratio of grade optical splitter;The third Planning response corresponds to the third planning instruction.
7. a kind of network planning device characterized by comprising
Module is obtained, handling capacity is surveyed in the PON cause for gossip for obtaining broadband network parameter and OLT, and the network parameter includes at least:
User's infiltration of the total flow, total number of concurrent of CDN, the coincidence of VOD service, video traffic of content distributing network CDN
The use of rate, the average bit rate of video live broadcast service, the coincidence of video live broadcast service, the coincidence of target service and target service
Family Mean Speed;The video traffic includes the VOD service and the video live broadcast service;The target service is
Business in network service in addition to video traffic;
Processing module, it is the total flow of the CDN, total number of concurrent of the CDN for being obtained according to the acquisition module, described
User's permeability of the coincidence of VOD service and the video traffic calculates video on demand industry according to the first preset formula
The Mean Speed of business;
Processing module, average bit rate, the video of the video live broadcast service for being also used to be obtained according to the acquisition module
User's permeability of the coincidence of live broadcast service and the video traffic calculates video live broadcast service according to the second preset formula
Mean Speed;
Processing module, the coincidence for the target service for being also used to be obtained according to the acquisition module and the target service
User's Mean Speed calculates the Mean Speed of target service according to third preset formula;
Processing module, the Mean Speed for the VOD service for being also used to be obtained according to the acquisition module, the video
The Mean Speed of the Mean Speed of live broadcast service and the target service calculates the average speed of broadband user according to the 4th preset formula
Rate;
Processing module is also used to determine the PON of estimated OLT according to broadband user's Mean Speed that the acquisition module obtains
Mouth total flow;
Handling capacity is surveyed in the PON cause for gossip of processing module, the OLT for being also used to be obtained according to the acquisition module, pre- according to the 5th
If the PON mouth flow threshold of formula calculating OLT;
Processing module is also used to be more than or equal to the PON mouth flow threshold of the OLT when the PON mouth total flow for determining the estimated OLT
When value, the broadband network is planned according to planing method is preset.
8. network planning device according to claim 7, which is characterized in that the acquisition module is specifically used for:
Obtain accounting, the accounting of the accounting of high-definition live broadcasting business and 4K live broadcast service of SD live broadcast service, the SD live streaming
The accounting of the accounting of business, the accounting of the high-definition live broadcasting business and the 4K live broadcast service is respectively that it respectively corresponds to user's
Quantity accounts for the accounting that the video live broadcast service corresponds to the quantity of user;
According to the accounting of the SD live broadcast service, the accounting of the accounting of the high-definition live broadcasting business and the 4K live broadcast service,
The average bit rate of the video live broadcast service is calculated according to the 7th preset formula.
9. network planning device according to claim 7, which is characterized in that
The acquisition module is also used to obtain the planning number of users under the PON mouth of OLT;
The processing module is specifically used for the broadband user's Mean Speed and the planning obtained according to the acquisition module
Number of users calculates the PON mouth total flow of estimated OLT according to the 6th preset formula.
10. network planning device according to claim 7, which is characterized in that further include communication module;
The processing module is specifically used for:
Whether the specification for judging the OLT is maximum specification;
When the specification for determining the OLT is maximum specification, the first planning is sent to management terminal by the communication module and is referred to
It enables;The total splitting ratio for the ODN that the first planning instruction is at least used to indicate the OLT connection at least needs to reduce by one etc.
Grade, the primary number of fibers in main line that total splitting ratio of the ODN is ODN is divided by the user side branch optical fibers total quantity of ODN;
The first Planning response for carrying the first information that management terminal is sent is received by the communication module and by described the
One synchronizing information is to presetting database;The first information includes at least: the optical splitter grade after total splitting ratio reduction of the ODN
Join the splitting ratio of quantity and its optical splitter at different levels;First Planning response corresponds to the first planning instruction.
11. network planning device according to claim 10, which is characterized in that the processing module is also used to:
When the processing module determines that the specification of the OLT is not maximum specification, judge whether the OLT may be updated;
When the processing module determines that the OLT may be updated, second is sent to the management terminal by the communication module
Planning instruction;The second planning instruction is at least used to indicate the OLT and may be updated as the OLT of maximum specification;
When the processing module determines that the OLT is non-renewable, the is sent to the management terminal by the communication module
Three planning instructions;Third planning instruction be at least used to indicate that the OLT is non-renewable and the ODN of the OLT connection it is total
Splitting ratio at least needs to reduce a grade;
The third Planning response for carrying the second information that the management terminal is sent is received by the communication module and by institute
The second synchronizing information is stated to the presetting database;Second information includes at least: after total splitting ratio of the ODN reduces
Optical splitter cascades the splitting ratio of quantity and its optical splitter at different levels;The third Planning response corresponds to the third planning instruction.
12. a kind of network planning device, which is characterized in that including memory, processor, bus and communication interface;The storage
For storing computer executed instructions, the processor is connect with the memory by the bus device;When the network is advised
When drawing device operation, the processor executes the computer executed instructions of the memory storage, so that the network is advised
It draws device and executes network plan method as claimed in any one of claims 1 to 6.
13. a kind of computer storage medium, which is characterized in that the computer storage medium includes computer executed instructions, when
When the computer executed instructions are run on computers, so that the computer is executed as described in claim any one of 1-6
Network plan method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611729.5A CN110324190B (en) | 2019-07-08 | 2019-07-08 | Network planning method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611729.5A CN110324190B (en) | 2019-07-08 | 2019-07-08 | Network planning method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110324190A true CN110324190A (en) | 2019-10-11 |
CN110324190B CN110324190B (en) | 2022-02-15 |
Family
ID=68123059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910611729.5A Active CN110324190B (en) | 2019-07-08 | 2019-07-08 | Network planning method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110324190B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111147962A (en) * | 2019-12-23 | 2020-05-12 | 中国联合网络通信集团有限公司 | Method and device for configuring broadband network |
CN117395783A (en) * | 2023-12-13 | 2024-01-12 | 武汉长光科技有限公司 | Signal quality optimization method and device, electronic equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1983877A (en) * | 2004-04-14 | 2007-06-20 | 烽火通信科技股份有限公司 | Method and device for dynamically distributing bandwith based on Ethernet passive light network up-link |
CN104734899A (en) * | 2013-12-19 | 2015-06-24 | ***通信集团四川有限公司 | Method and device for adjusting bandwidth parameter |
CN106412636A (en) * | 2015-07-29 | 2017-02-15 | 中兴通讯股份有限公司 | Playing control method and device |
US20170264749A1 (en) * | 2015-10-19 | 2017-09-14 | Nanjing Howso Technology Co., Ltd | CROWDSOURCING-MODE-BASED ANALYSIS METHOD FOR UTILIZATION OF WIRELESS NETWORK RESOURCES BY MOBILE Apps |
CN108260034A (en) * | 2018-02-13 | 2018-07-06 | 中国联合网络通信集团有限公司 | It is a kind of to obtain the method and device for accessing net loaded professional ability |
-
2019
- 2019-07-08 CN CN201910611729.5A patent/CN110324190B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1983877A (en) * | 2004-04-14 | 2007-06-20 | 烽火通信科技股份有限公司 | Method and device for dynamically distributing bandwith based on Ethernet passive light network up-link |
CN104734899A (en) * | 2013-12-19 | 2015-06-24 | ***通信集团四川有限公司 | Method and device for adjusting bandwidth parameter |
CN106412636A (en) * | 2015-07-29 | 2017-02-15 | 中兴通讯股份有限公司 | Playing control method and device |
US20170264749A1 (en) * | 2015-10-19 | 2017-09-14 | Nanjing Howso Technology Co., Ltd | CROWDSOURCING-MODE-BASED ANALYSIS METHOD FOR UTILIZATION OF WIRELESS NETWORK RESOURCES BY MOBILE Apps |
CN108260034A (en) * | 2018-02-13 | 2018-07-06 | 中国联合网络通信集团有限公司 | It is a kind of to obtain the method and device for accessing net loaded professional ability |
Non-Patent Citations (1)
Title |
---|
赵扬: "基于用户行为分析的视频点播***优化技术研究", 《中国博士学位论文全文数据库信息科技辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111147962A (en) * | 2019-12-23 | 2020-05-12 | 中国联合网络通信集团有限公司 | Method and device for configuring broadband network |
CN117395783A (en) * | 2023-12-13 | 2024-01-12 | 武汉长光科技有限公司 | Signal quality optimization method and device, electronic equipment and storage medium |
CN117395783B (en) * | 2023-12-13 | 2024-02-27 | 武汉长光科技有限公司 | Signal quality optimization method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN110324190B (en) | 2022-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2955932B1 (en) | Communication system, station-side optical line terminating apparatus, user-side optical line terminating apparatus, control apparatus, and communication method | |
CN207819933U (en) | Optical line terminal and optical network unit | |
CN108260034B (en) | Method and device for acquiring service bearing capacity of access network | |
CN101755410A (en) | Passive optical network system for the delivery of bi-directional RF services | |
US11575441B2 (en) | Optical processing module and optical processing apparatus | |
CN107294637A (en) | A kind of method for being used to automatically configure the wavelength of optical network unit | |
CN101536537B (en) | Method for managing connections in an optical access network, and related platform, exchange, network and computer software product | |
CN110324190A (en) | A kind of network plan method and device | |
CN113489616B (en) | Fixed network evaluation method and device and computer readable storage medium | |
US9838149B2 (en) | Wavelength and bandwidth allocation method | |
Clarke | Costs of neutral/unmanaged IP networks | |
Ricciardi et al. | GPON and EP2P: A techno-economic study | |
CN104022831B (en) | Optical and wireless convergence access network based on periodic array waveguide grating | |
CN102217328B (en) | OMCI message transmission method, device and passive optical network | |
Dalamagkas et al. | Dynamic scheduling in TWDM-PONs using game theory | |
Dalamagkas et al. | PAS: a fair game-driven DBA scheme for XG-PON systems | |
CN100463517C (en) | Internet protocol video delivery in passive optical networks | |
Kyriakopoulos et al. | Bandwidth efficiency in the next generation access architecture XG-PON | |
Tsubokawa et al. | Evolution of next generation access | |
KR100646386B1 (en) | Method for allocating dynamic bandwidth in wavelength division multiplexed passive optical network with loop-back scheme | |
Abdellaoui et al. | Giga Passive Optical Network GPON Based upon Fiber to the Home FTTH: Design, Implementation and Evaluation | |
Kurnia et al. | Modification of RR DBA for Performance Improvement of C-RAN on NG-PON2. | |
Huelsermann et al. | Topology analysis of the access/aggregation network structure in future optical access networks | |
US20230362521A1 (en) | Olt power management system | |
Abdellaoui et al. | Giga Passive Optical Network GPON over Fiber To The Home FTTH: Design, Implementation and Evaluation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |