CN110318540A - A kind of civil construction pours device with concrete slab - Google Patents

A kind of civil construction pours device with concrete slab Download PDF

Info

Publication number
CN110318540A
CN110318540A CN201810290614.6A CN201810290614A CN110318540A CN 110318540 A CN110318540 A CN 110318540A CN 201810290614 A CN201810290614 A CN 201810290614A CN 110318540 A CN110318540 A CN 110318540A
Authority
CN
China
Prior art keywords
support plate
plate
concrete slab
lateral frame
snap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810290614.6A
Other languages
Chinese (zh)
Inventor
李禹峰
石涛
李富
曹涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Qian Ao Construction Engineering Co Ltd
Original Assignee
Hubei Qian Ao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Qian Ao Construction Engineering Co Ltd filed Critical Hubei Qian Ao Construction Engineering Co Ltd
Priority to CN201810290614.6A priority Critical patent/CN110318540A/en
Publication of CN110318540A publication Critical patent/CN110318540A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/06Solidifying concrete, e.g. by application of vacuum before hardening
    • E04G21/08Internal vibrators, e.g. needle vibrators

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of civil construction and pours device with concrete slab, including pedestal, it is equipped on the upside of pedestal and pours mold, mold is poured to feed by charge pipe, charge pipe connects charge pump, it pours and is equipped with horizontal supporting plate above mold, horizontal supporting plate is supported by support plate, support plate lower end is connect with pedestal, motor rack is equipped with above horizontal supporting plate, driving motor is fixed on motor rack, the output shaft hinged cam of driving motor, cam is hinged with connecting rod, the other end of connecting rod and connecting column upper end are hinged, connecting column is slidably mounted in the through-hole of horizontal supporting plate, connecting column lower end connects horizontal connecting plate, horizontal connecting plate bottom is equipped with several columns that vibrate.The device can vibrate automatically to concrete, prevent honeycomb or pitted skin, guarantee the product quality of concrete slab.

Description

A kind of civil construction pours device with concrete slab
Technical field
The invention belongs to the realm of building construction, in particular to a kind of civil construction pours device with concrete slab.
Background technique
Concrete slab, being will made of moulding in concrete slurry casting to template, be building construction and various engineering knots Basic structure or component in structure, are commonly used for roof system, superstructure, platform, wall, retaining wall, basis, terrace, road surface, pond etc., answer It is extremely wide with range.Existing concrete slab pours device, and most of use manually vibrates to concrete, inefficiency, and Effect is undesirable, is easy to produce pitted skin, influences construction effect and product quality.
And different size of concrete slab may be needed during civil construction, existing concrete casting device In, template be it is fixed, every time using needing to make a reservation for different templates, increase use cost, waste the construction time.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of civil constructions to pour device with concrete slab, can be to mixed Solidifying soil is vibrated automatically, is prevented honeycomb or pitted skin, is guaranteed the product quality of concrete slab.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of civil construction is poured with concrete slab Device, including pedestal are built, is equipped on the upside of pedestal and pours mold, poured mold and fed by charge pipe, charge pipe connection adds Material pump pours and is equipped with horizontal supporting plate above mold, and horizontal supporting plate is supported by support plate, and support plate lower end and pedestal connect It connects, motor rack is equipped with above horizontal supporting plate, fixes driving motor on motor rack, the output shaft hinged cam of driving motor is convex Wheel is hinged with connecting rod, and the other end of connecting rod and connecting column upper end are hinged, and connecting column is slidably mounted in the through-hole of horizontal supporting plate, Connecting column lower end connects horizontal connecting plate, and horizontal connecting plate bottom is equipped with several columns that vibrate.
In preferred scheme, the support plate includes the first support plate and the second support plate, and the first support plate upper end is equipped with Mounting groove, the second support plate lower end be arranged in mounting groove, the second support plate upper end connect horizontal supporting plate, the first support plate and It is equipped with the corresponding fixation hole of several rows along height in second support plate, fixing bolt passes through fixation hole for the first support plate and the Two support plates are attached.
In preferred scheme, the mold that pours includes bottom plate, the first lateral frame, the second lateral frame and two longitudinal frames, First lateral frame and longitudinal frame are fixed on bottom plate, and the first lateral frame setting is equipped on the upside of longitudinal frame between two longitudinal frames The both ends of first sliding groove, the second lateral frame are equipped with the first snap-gauge, and the first snap-gauge is slidably mounted in first sliding groove.
In further embodiment, it is equipped with partition between the first lateral frame and the second lateral frame, the first lateral frame and the The upside of two lateral frames is equipped with second sliding slot, and the both ends of partition are equipped with the second snap-gauge being slidably mounted in second sliding slot.
In further scheme, the first sliding groove and second sliding slot are respectively equipped with and clamp the first snap-gauge and the second snap-gauge Clamping device, the clamping device includes clamping plate, and clamping plate is arranged along the length of first sliding groove or second sliding slot, and first is sliding Side or second sliding slot of the slot far from the second lateral frame are equipped with bolt hole far from the side of partition, and puller bolt will across bolt hole Clamping plate is held out against on the first snap-gauge or the second snap-gauge.
In preferred scheme, the support plate is equipped with the through-hole for wearing charge pipe.
In preferred scheme, universal wheel is equipped with below the pedestal.
A kind of civil construction provided by the invention pours device with concrete slab, drives the column that vibrates or more by driving motor It moves back and forth, realizes vibrating to the concrete poured in mold, compared to manually vibrating, vibration efficiency is higher, generates honeycomb Or the probability of pitted skin reduces, and ensure that product quality, meanwhile, the labor intensity of construction personnel is also reduced, construction effect is improved Rate.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is the top view for pouring mold.
Fig. 3 is the scheme of installation of the second lateral frame.
Fig. 4 is the scheme of installation of partition.
In figure: pedestal 1 pours mold 2, and charge pipe 3, charge pump 4, horizontal supporting plate 5, vibrate column 6, motor rack 7, driving Motor 8, cam 9, connecting rod 10, connecting column 11, through-hole 12, horizontal connecting plate 13, the first support plate 14, the second support plate 15, peace Tankage 16, fixation hole 17, fixing bolt 18, bottom plate 19, the first lateral frame 20, the second lateral frame 21, longitudinal frame 22, first sliding groove 23, the first snap-gauge 24, partition 25, second sliding slot 26, the second snap-gauge 27, clamping plate 28, bolt hole 29, puller bolt 30, through-hole 31。
Specific embodiment
As shown in Figure 1, a kind of civil construction pours device, including pedestal 1 with concrete slab, it is equipped with and pours on the upside of pedestal 1 Mold 2 pours mold 2 and is fed by charge pipe 3, and charge pipe 3 connects charge pump 4, and charge pipe 3 and charge pump 4 will The concrete addition being uniformly mixed pours in mold, and in the present embodiment, charge pipe 3 selects hose, and adjustment is facilitated to feed Angle.
The support plate is equipped with the through-hole 31 for wearing charge pipe 3.Through-hole 31 plays the work supported and fixed to charge pipe 3 With.
It pours and is equipped with horizontal supporting plate 5 above mold 2, horizontal supporting plate 5 is supported by support plate, support plate lower end and bottom Seat 1 connects, and motor rack 7 is equipped with above horizontal supporting plate 5, fixes driving motor 8 on motor rack 7, in the present embodiment driving electricity Machine 8 selects decelerating motor.The output shaft hinged cam 9 of driving motor 8, cam 9 and connecting rod 10 are hinged, the other end of connecting rod 10 with 11 upper end of connecting column is hinged, and connecting column 11 is slidably mounted in the through-hole 12 of horizontal supporting plate 5, and the connection of 11 lower end of connecting column is horizontal Connecting plate 13,13 bottom of horizontal connecting plate are equipped with several columns 6 that vibrate.
Driving motor 8 starts, and band moving cam 9 rotates, and realizes moving repeatedly up and down for connecting column 11, to realize the column that vibrates 6 up and down motions, which are realized, stirs smashing for the concrete poured in mold 2.
The support plate includes the first support plate 14 and the second support plate 15, and 14 upper end of the first support plate is equipped with mounting groove 16,15 lower end of the second support plate is arranged in mounting groove 16, and 15 upper end of the second support plate connects horizontal supporting plate 5, the first support It is equipped with the corresponding fixation hole 17 of several rows along height on plate 14 and the second support plate 15, fixing bolt 18 will across fixation hole 17 First support plate 14 and the second support plate 15 are attached.
First is passed through by adjusting the relative position of the first support plate 14 and the second support plate 15, and by fixing bolt 18 Corresponding fixation hole 17, adjusts the height of support plate, to adapt to the coagulation of different-thickness on fagging 14 and the second support plate 15 Smashing for native plate is stirred, and applicability is stronger.
As shown in Figures 2 and 3, the mold 2 that pours includes the lateral frame 21 and two of the lateral frame 20, second of bottom plate 19, first A longitudinal direction frame 22, the first lateral frame 20 and longitudinal frame 22 are fixed on bottom plate 19, and the first lateral setting of frame 20 is in two longitudinal frames Between 22, first sliding groove 23 is equipped on the upside of longitudinal frame 22, the both ends of the second lateral frame 21 are equipped with the first snap-gauge 24, the first snap-gauge 24 It is slidably mounted in first sliding groove 23.
First snap-gauge 24 is " L " type, and one end is connect with the second lateral frame 21, and the other end is fastened in first sliding groove 23, is led to It crosses mobile first snap-gauge 24 and realizes the second lateral frame 21 22 change in location of longitudinal frame relatively, pour 2 width of mold to change Variation can not have to the concrete slab of specification with pouring molding.
Partition 25, the first lateral frame 20 and the second lateral frame are equipped between described first lateral frame 20 and the second lateral frame 21 21 upside is equipped with second sliding slot 26, and the both ends of partition 25 are equipped with the second snap-gauge 27 being slidably mounted in second sliding slot 26.
Second snap-gauge 27 is identical as the structure of the first snap-gauge 24.
By the position of second snap-gauge 27 mobile in second sliding slot 26, realize that the position of partition 25 is adjusted, so as to Adjustment pours the length of mold 2, realizes pouring for different length concrete slab.
As shown in Figure 3 and Figure 4, the first sliding groove 23 and second sliding slot 26, which are respectively equipped with, clamps the first snap-gauge 24 and second The clamping device of snap-gauge 27, the clamping device include clamping plate 28, and clamping plate 28 is along first sliding groove 23 or second sliding slot 26 Length setting, side or second sliding slot 26 of the first sliding groove 23 far from the second lateral frame 21 are equipped with bolt far from the side of partition 25 Hole 29, puller bolt 30 pass through bolt hole 29 and hold out against clamping plate 28 on the first snap-gauge 24 or the second snap-gauge 27.
Clamping device can guarantee that the second lateral frame 21 and partition 25 will not be moved arbitrarily during pouring and vibrating It is dynamic, during the column 6 that prevents from vibrating moves up and down, the second lateral frame 21 or partition 25 is made to be displaced and influence concrete slab Compact dimensions precision.
Universal wheel is equipped with below the pedestal 1.Universal wheel facilitates the movement of device, and universal wheel is equipped with locking device, will fill Setting can carry out pouring operation after being locked after being moved to construction location.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this hair Bright protection scope should be with the technical solution of claim record, technical characteristic in the technical solution recorded including claim Equivalents are protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.

Claims (7)

1. a kind of civil construction pours device with concrete slab, it is characterised in that: including pedestal (1), be equipped with and pour on the upside of pedestal (1) Mold (2) are built, mold (2) is poured and is fed by charge pipe (3), charge pipe (3) connects charge pump (4), pours mold (2) Top is equipped with horizontal supporting plate (5), and horizontal supporting plate (5) is supported by support plate, and support plate lower end is connect with pedestal (1), water Motor rack (7) are equipped with above flat support plate (5), are fixed driving motor (8) on motor rack (7), the output shaft hinge of driving motor (8) It connects cam (9), hingedly, the other end of connecting rod (10) and connecting column (11) upper end are hinged, connecting column for cam (9) and connecting rod (10) (11) it is slidably mounted in the through-hole (12) of horizontal supporting plate (5), connecting column (11) lower end connects horizontal connecting plate (13), horizontal Connecting plate (13) bottom is equipped with several columns that vibrate (6).
2. a kind of civil construction according to claim 1 pours device with concrete slab, it is characterised in that: the support plate Including the first support plate (14) and the second support plate (15), the first support plate (14) upper end is equipped with mounting groove (16), the second support The setting of plate (15) lower end is in mounting groove (16), and the second support plate (15) upper end connects horizontal supporting plate (5), the first support plate (14) and in the second support plate (15) it is equipped with the corresponding fixation hole of several rows (17) along height, fixing bolt (18), which passes through, to be fixed First support plate (14) and the second support plate (15) are attached by hole (17).
3. a kind of civil construction according to claim 1 pours device with concrete slab, it is characterised in that: described to pour mould Tool (2) includes bottom plate (19), the first lateral frame (20), the second lateral frame (21) and two longitudinal frames (22), the first lateral frame (20) it is fixed on bottom plate (19) with longitudinal frame (22), the first lateral frame (20) is arranged between two longitudinal frames (22), longitudinal First sliding groove (23) are equipped on the upside of frame (22), the both ends of the second lateral frame (21) are equipped with the first snap-gauge (24), the first snap-gauge (24) It is slidably mounted in first sliding groove (23).
4. a kind of civil construction according to claim 3 pours device with concrete slab, it is characterised in that: described first is horizontal Partition (25) are equipped between frame (20) and the second lateral frame (21), the upside of the first lateral frame (20) and the second lateral frame (21) Equipped with second sliding slot (26), the both ends of partition (25) are equipped with the second snap-gauge (27) being slidably mounted in second sliding slot (26).
5. a kind of civil construction according to claim 4 pours device with concrete slab, it is characterised in that: described first is sliding Slot (23) and second sliding slot (26) are respectively equipped with the clamping device for clamping the first snap-gauge (24) and the second snap-gauge (27), the clamping Device includes clamping plate (28), and clamping plate (28) is arranged along the length of first sliding groove (23) or second sliding slot (26), first sliding groove (23) side or second sliding slot (26) far from the second lateral frame (21) are equipped with bolt hole (29) far from the side of partition (25), top Tight bolt (30) passes through bolt hole (29) and holds out against clamping plate (28) on the first snap-gauge (24) or the second snap-gauge (27).
6. a kind of civil construction according to claim 1 pours device with concrete slab, it is characterised in that: the support plate It is equipped with the through-hole (31) for wearing charge pipe (3).
7. a kind of civil construction according to claim 1 pours device with concrete slab, it is characterised in that: the pedestal (1) lower section is equipped with universal wheel.
CN201810290614.6A 2018-03-30 2018-03-30 A kind of civil construction pours device with concrete slab Pending CN110318540A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810290614.6A CN110318540A (en) 2018-03-30 2018-03-30 A kind of civil construction pours device with concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810290614.6A CN110318540A (en) 2018-03-30 2018-03-30 A kind of civil construction pours device with concrete slab

Publications (1)

Publication Number Publication Date
CN110318540A true CN110318540A (en) 2019-10-11

Family

ID=68112224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810290614.6A Pending CN110318540A (en) 2018-03-30 2018-03-30 A kind of civil construction pours device with concrete slab

Country Status (1)

Country Link
CN (1) CN110318540A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196127A (en) * 2020-09-29 2021-01-08 江苏开放大学 A outer window body enclosed construction for mixing earth pouring construction
CN113352438A (en) * 2021-07-05 2021-09-07 南京工程学院 Adjustable concrete specimen pouring mold
CN114571597A (en) * 2022-02-08 2022-06-03 山东临沂水利工程总公司 Concrete placement equipment for hydraulic engineering construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196127A (en) * 2020-09-29 2021-01-08 江苏开放大学 A outer window body enclosed construction for mixing earth pouring construction
CN112196127B (en) * 2020-09-29 2022-05-27 江苏开放大学 A outer window body enclosed construction for mixing earth pouring construction
CN113352438A (en) * 2021-07-05 2021-09-07 南京工程学院 Adjustable concrete specimen pouring mold
CN113352438B (en) * 2021-07-05 2023-03-24 南京工程学院 Adjustable concrete specimen pouring mold
CN114571597A (en) * 2022-02-08 2022-06-03 山东临沂水利工程总公司 Concrete placement equipment for hydraulic engineering construction
CN114571597B (en) * 2022-02-08 2024-03-26 山东临沂水利工程总公司 Concrete placement equipment for hydraulic engineering construction

Similar Documents

Publication Publication Date Title
CN110318540A (en) A kind of civil construction pours device with concrete slab
CN208267380U (en) A kind of civil construction pours device with concrete slab
CN111941590B (en) Forming and manufacturing method of assembled composite floor slab
CN102294741A (en) Hinged draw type steel internal mould and construction method for prefabricating hollow slab beams
US4005972A (en) Invertible apparatus for molding a concrete panel
CN211541689U (en) Template device for cushion stone
CN207327246U (en) A kind of precast beam molding die
CN109465946A (en) Superimposed sheet cloth vibrates all-in-one machine
CN210767805U (en) Structure is pour in construction of building
CN208343138U (en) A kind of concrete mats block shaping device
CN208290133U (en) A kind of concrete prefabricated element compaction device
CN113263606B (en) Concrete wallboard pouring device for civil construction engineering
CN213005796U (en) PC component pouring device
CN215038687U (en) Vibrating demolding equipment
CN209718090U (en) A kind of casting platform of prefabricated panel
CN114800845A (en) Cement pumping and casting device and method for civil engineering laboratory
CN211006254U (en) Town road construction device of levelling that shakes
CN212375695U (en) Template system suitable for hollow high pier
CN107558734B (en) Building pouring device and pouring method
CN210508408U (en) Concrete pouring workbench for house construction
CN111231076A (en) Template device for cushion stone
CN209425685U (en) A kind of concrete vibrating stand and vibration table
CN210002261U (en) Small-interval separating type thin-wall pier template
CN105862600B (en) A kind of multistage bridge placing installation and its construction method
CN210798079U (en) Floor reinforcing bar protective layer thickness control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191011