CN110306423A - 一种桥梁用的阻尼器放大装置 - Google Patents
一种桥梁用的阻尼器放大装置 Download PDFInfo
- Publication number
- CN110306423A CN110306423A CN201910580158.3A CN201910580158A CN110306423A CN 110306423 A CN110306423 A CN 110306423A CN 201910580158 A CN201910580158 A CN 201910580158A CN 110306423 A CN110306423 A CN 110306423A
- Authority
- CN
- China
- Prior art keywords
- damper
- bridge
- rigid arm
- amplifying device
- displacement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Vibration Prevention Devices (AREA)
Abstract
本发明公开了一种桥梁用的阻尼器放大装置,涉及工程结构减振领域,阻尼器放大装置包括:阻尼器、第一刚臂和第二刚臂;阻尼器、第一刚臂和第二刚臂一端通过球铰O相连,阻尼器的另一端与支柱通过球铰C固结,第一刚臂的另一端与主梁的顶部通过球铰A固结,第二刚臂的另一端与主梁的底部或者与横梁通过球铰B固结。本发明提供的一种桥梁用的阻尼器放大装置,可以将桥梁的结构位移进行放大,从而改变阻尼器的位移和出力,使阻尼器更好地发挥消能减震的作用。
Description
技术领域
本发明涉及工程结构减振领域,具体涉及一种桥梁用的阻尼器放大装置。
背景技术
在桥梁工程中,由于地震自然灾害,或者桥梁使用年限过长等因素,都容易使得主梁结构体系发生结构位移,即主梁发生竖向振动。然而,桥梁主体一般较长,跨中响应较大,跨中位置施工不便,进而导致无法安装阻尼器,无法对其起到消能减震的作用。
现有技术中,通常会在桥梁结构中设置减震支座,从而使桥梁能够在发生结构位移时起到一定的减震作用,然而,减震支座的相对位移较小,当桥梁振幅较小时,减震支座感应不灵敏,使用该方法所起到的减震作用并不明显,无法满足当前的需求。
发明内容
针对现有技术中存在的缺陷,本发明的目的在于提供一种桥梁用的阻尼器放大装置,可以将桥梁的结构位移进行放大,从而改变阻尼器的位移和出力,使阻尼器更好地发挥消能减震的作用。
为达到以上目的,本发明采取的技术方案是:
一种桥梁用的阻尼器放大装置,所述桥梁包括横梁、设于所述横梁上的主梁、以及设于所述横梁上的支柱,所述阻尼器放大装置包括:阻尼器、第一刚臂和第二刚臂;
所述阻尼器、第一刚臂和第二刚臂一端通过球铰O相连,所述阻尼器的另一端与所述支柱通过球铰C固结,所述第一刚臂的另一端与所述主梁的顶部通过球铰A固结,所述第二刚臂的另一端与所述主梁的底部或者与所述横梁通过球铰B固结。
在上述技术方案的基础上,所述阻尼器、第一刚臂和第二刚臂共面。
在上述技术方案的基础上,所述阻尼器、第一刚臂和第二刚臂不共面。
在上述技术方案的基础上,所述阻尼器为油阻尼器、磁流变阻尼器或摩擦阻尼器。
在上述技术方案的基础上,所述第一刚臂的长度与第二刚臂的长度的差值大于所述主梁的最大结构位移。
在上述技术方案的基础上,所述阻尼器的位移放大倍数n的计算公式为:
n=|OC-O’C|/AA’
其中,OC为桥梁发生结构位移前阻尼器的长度,O’C为桥梁发生结构位移后阻尼器的长度,AA’为桥梁发生的结构位移量。
在上述技术方案的基础上,设桥梁发生结构位移前球铰O的坐标为原点,桥梁发生结构位移后球铰O的位置记为O’,位置O’坐标为(x,y),则O’坐标的计算公式如下:
其中,a为桥梁发生结构位移前第一刚臂沿竖直方向的投影长度,α为桥梁发生结构位移前第一刚臂与竖直方向的夹角,b为桥梁发生结构位移前第二刚臂沿竖直方向的投影长度,β为桥梁发生结构位移前第二刚臂与竖直方向的夹角,d为桥梁发生的结构位移量,a、b为正数,α、β为锐角,d为实数。
与现有技术相比,本发明的优点在于:本发明的桥梁用的阻尼器放大装置,可以将桥梁的结构位移进行放大,从而改变阻尼器的位移和出力,使阻尼器更好地发挥消能减震的作用
附图说明
图1为本发明实施例中桥梁用的阻尼器放大装置的结构示意图;
图2为本发明实施例中桥梁用的阻尼器放大装置的坐标示意图。
图中:1-横梁,2-主梁,3-支柱,4-阻尼器,5-第一刚臂,6-第二刚臂。
具体实施方式
以下结合附图及实施例对本发明作进一步详细说明。
参见图1所示,本发明实施例提供了一种桥梁用的阻尼器放大装置,所述桥梁包括横梁1、设于所述横梁1上的主梁2、以及设于所述横梁1上的支柱3,其特征在于,所述阻尼器放大装置包括:阻尼器4、第一刚臂5和第二刚臂6。
所述阻尼器4、第一刚臂5和第二刚臂6一端通过球铰O相连,所述阻尼器4的另一端与所述支柱3通过球铰C固结,所述第一刚臂5的另一端与所述主梁2的顶部通过球铰A固结,所述第二刚臂6的另一端与所述主梁2的底部或者与所述横梁1通过球铰B固结。
在实际使用中,所述阻尼器4、第一刚臂5和第二刚臂6可以共面,也可以不共面。不仅可以进行平面振动放大,也可以进行空间振动放大,从而实现桥梁结构中三维振动位移的放大。
优选地,所述阻尼器4为油阻尼器、磁流变阻尼器或摩擦阻尼器等,特别适用于对位移和速度敏感的阻尼器,可有效提高阻尼器位移和出力,使阻尼器更好地发挥消能减震的作用。
进一步地,所述第一刚臂5的长度与第二刚臂6的长度的差值大于所述主梁2的最大结构位移,从而保证第一刚臂5和第二刚臂6活动的圆形轨迹始终存在交点。
参见图2所示,当所述阻尼器4、第一刚臂5和第二刚臂6可以共面时,所述阻尼器4的位移放大倍数n的计算公式为:
n=|OC-O’C|/AA’
其中,OC为桥梁发生结构位移前阻尼器的长度,O’C为桥梁发生结构位移后阻尼器的长度,AA’为桥梁发生的结构位移量。
设桥梁发生结构位移前球铰O的坐标为原点,桥梁发生结构位移后球铰O的位置记为O’,位置O’坐标为(x,y),则O’坐标的计算公式如下:
其中,a为桥梁发生结构位移前第一刚臂5沿竖直方向的投影长度,α为桥梁发生结构位移前第一刚臂5与竖直方向的夹角,b为桥梁发生结构位移前第二刚臂6沿竖直方向的投影长度,β为桥梁发生结构位移前第二刚臂6与竖直方向的夹角,d为桥梁发生的结构位移量,a、b为正数,α、β为锐角,d为实数。
根据上述计算公式,通过调整桥梁发生结构位移前第一刚臂5和第二刚臂6沿竖直方向的投影长度、以及与竖直方向的夹角,可以得到阻尼器位移不同的放大倍数。
在本发明实施例中,a=2000mm,b=1000mm,夹角α=10°,β=5°,A点发生向下位移AA’=d=-10mm,通过两圆方程求解交点坐标,两个交点中离原点O近的为新的阻尼器活动点O’,计算公式如下:
通过计算机解方程可求得交点O’坐标为(34.46,-3.62),阻尼器位移为-34.46mm,位移放大倍数达到3.45倍。
分析可知,放大倍数影响因素主要包括第一刚臂5和第二刚臂6的长度、夹角α和β的大小、以及桥梁发生的结构位移量d的大小,设计时应综合考虑各项参数对放大系数的影响。保持其他参数不变,分别分析桥梁发生的结构位移量d的大小对放大倍数n的影响如表1所示,放大系数可达到3倍以上。
表1结构位移量d的大小对放大倍数n的影响
本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。
Claims (7)
1.一种桥梁用的阻尼器放大装置,所述桥梁包括横梁(1)、设于所述横梁(1)上的主梁(2)、以及设于所述横梁(1)上的支柱(3),其特征在于,所述阻尼器放大装置包括:阻尼器(4)、第一刚臂(5)和第二刚臂(6);
所述阻尼器(4)、第一刚臂(5)和第二刚臂(6)一端通过球铰O相连,所述阻尼器(4)的另一端与所述支柱(3)通过球铰C固结,所述第一刚臂(5)的另一端与所述主梁(2)的顶部通过球铰A固结,所述第二刚臂(6)的另一端与所述主梁(2)的底部或者与所述横梁(1)通过球铰B固结。
2.如权利要求1所述的桥梁用的阻尼器放大装置,其特征在于:所述阻尼器(4)、第一刚臂(5)和第二刚臂(6)共面。
3.如权利要求1所述的桥梁用的阻尼器放大装置,其特征在于:所述阻尼器(4)、第一刚臂(5)和第二刚臂(6)不共面。
4.如权利要求1所述的桥梁用的阻尼器放大装置,其特征在于:所述阻尼器(4)为油阻尼器、磁流变阻尼器或摩擦阻尼器。
5.如权利要求1所述的桥梁用的阻尼器放大装置,其特征在于:所述第一刚臂(5)的长度与第二刚臂(6)的长度的差值大于所述主梁(2)的最大结构位移。
6.如权利要求2所述的桥梁用的阻尼器放大装置,其特征在于:所述阻尼器(4)的位移放大倍数n的计算公式为:
n=|OC-O’C|/AA’
其中,OC为桥梁发生结构位移前阻尼器的长度,O’C为桥梁发生结构位移后阻尼器的长度,AA’为桥梁发生的结构位移量。
7.如权利要求6所述的桥梁用的阻尼器放大装置,其特征在于:设桥梁发生结构位移前球铰O的坐标为原点,桥梁发生结构位移后球铰O的位置记为O’,位置O’坐标为(x,y),则O’坐标的计算公式如下:
其中,a为桥梁发生结构位移前第一刚臂(5)沿竖直方向的投影长度,α为桥梁发生结构位移前第一刚臂(5)与竖直方向的夹角,b为桥梁发生结构位移前第二刚臂(6)沿竖直方向的投影长度,β为桥梁发生结构位移前第二刚臂(6)与竖直方向的夹角,d为桥梁发生的结构位移量,a、b为正数,α、β为锐角,d为实数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910580158.3A CN110306423B (zh) | 2019-06-28 | 2019-06-28 | 一种桥梁用的阻尼器放大装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910580158.3A CN110306423B (zh) | 2019-06-28 | 2019-06-28 | 一种桥梁用的阻尼器放大装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110306423A true CN110306423A (zh) | 2019-10-08 |
CN110306423B CN110306423B (zh) | 2021-03-02 |
Family
ID=68079580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910580158.3A Active CN110306423B (zh) | 2019-06-28 | 2019-06-28 | 一种桥梁用的阻尼器放大装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110306423B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112064492A (zh) * | 2020-08-17 | 2020-12-11 | 中铁大桥局集团有限公司 | 一种主梁竖向减振和纵向阻尼装置及大跨度桥 |
CN112064490A (zh) * | 2020-08-17 | 2020-12-11 | 中铁大桥局集团有限公司 | 一种工型钢梁减振装置及工型钢组合梁 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140069694A (ko) * | 2012-11-29 | 2014-06-10 | 한국건설기술연구원 | 면외좌굴 방지 접합부를 구비한 가새형 제진 시스템 |
CN204781415U (zh) * | 2015-07-13 | 2015-11-18 | 贵州正业工程技术投资有限公司 | 一种阻尼器放大装置 |
CN105239695A (zh) * | 2015-11-09 | 2016-01-13 | 同济大学建筑设计研究院(集团)有限公司 | 一种肘节式变形放大装置 |
CN205134606U (zh) * | 2015-11-23 | 2016-04-06 | 常州容大结构减振股份有限公司 | 一种消除面外弯矩的粘滞阻尼器连接*** |
CN206477463U (zh) * | 2016-12-30 | 2017-09-08 | 上海建工集团股份有限公司 | 针对粘滞流体阻尼器的速度和位移放大装置 |
CN108824923A (zh) * | 2018-08-29 | 2018-11-16 | 唐山铭嘉建筑设计咨询有限公司 | 一种双重阻尼器放大装置 |
CN109403488A (zh) * | 2018-11-13 | 2019-03-01 | 华中科技大学 | 一种铰接式支撑阻尼器减振***及其减振效能评估方法 |
-
2019
- 2019-06-28 CN CN201910580158.3A patent/CN110306423B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140069694A (ko) * | 2012-11-29 | 2014-06-10 | 한국건설기술연구원 | 면외좌굴 방지 접합부를 구비한 가새형 제진 시스템 |
CN204781415U (zh) * | 2015-07-13 | 2015-11-18 | 贵州正业工程技术投资有限公司 | 一种阻尼器放大装置 |
CN105239695A (zh) * | 2015-11-09 | 2016-01-13 | 同济大学建筑设计研究院(集团)有限公司 | 一种肘节式变形放大装置 |
CN205134606U (zh) * | 2015-11-23 | 2016-04-06 | 常州容大结构减振股份有限公司 | 一种消除面外弯矩的粘滞阻尼器连接*** |
CN206477463U (zh) * | 2016-12-30 | 2017-09-08 | 上海建工集团股份有限公司 | 针对粘滞流体阻尼器的速度和位移放大装置 |
CN108824923A (zh) * | 2018-08-29 | 2018-11-16 | 唐山铭嘉建筑设计咨询有限公司 | 一种双重阻尼器放大装置 |
CN109403488A (zh) * | 2018-11-13 | 2019-03-01 | 华中科技大学 | 一种铰接式支撑阻尼器减振***及其减振效能评估方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112064492A (zh) * | 2020-08-17 | 2020-12-11 | 中铁大桥局集团有限公司 | 一种主梁竖向减振和纵向阻尼装置及大跨度桥 |
CN112064490A (zh) * | 2020-08-17 | 2020-12-11 | 中铁大桥局集团有限公司 | 一种工型钢梁减振装置及工型钢组合梁 |
CN112064492B (zh) * | 2020-08-17 | 2022-03-18 | 中铁大桥局集团有限公司 | 一种主梁竖向减振和纵向阻尼装置及大跨度桥 |
Also Published As
Publication number | Publication date |
---|---|
CN110306423B (zh) | 2021-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306423A (zh) | 一种桥梁用的阻尼器放大装置 | |
CN110258317B (zh) | 一种桥梁用的双支撑阻尼器放大装置 | |
CN106702885B (zh) | 一种桥梁减震的变速质量阻尼器*** | |
CN109440960A (zh) | 一种可对阻尼器位移进行放大的消能支撑体系 | |
CN207244436U (zh) | 一种用于桥墩和桥梁之间的桥梁减震支座 | |
CN207177424U (zh) | 防震型通信塔 | |
CN209384428U (zh) | 可对阻尼器位移进行放大的消能支撑体系 | |
CN209260540U (zh) | 一种道路桥梁减震缓冲的基座结构 | |
CN210657966U (zh) | 一种桥梁用的双支撑阻尼器放大装置 | |
CN103422422B (zh) | 具有抑制纵向地震响应的多塔斜拉桥支承体系及工作方法 | |
CN206539361U (zh) | 一种防冲击地压加长锚杆 | |
CN206903302U (zh) | 一种大型计算机服务器保护装置 | |
CN105095585B (zh) | 锚杆抗浮地下室整体协同设计方法 | |
CN206289526U (zh) | 一种桥梁减震的变速质量阻尼器*** | |
CN208138598U (zh) | 水利水电管道施工用固定装置 | |
CN207846735U (zh) | 一种gmm-软钢复合阻尼器 | |
CN207405807U (zh) | 一种双向大位移变阻尼金属阻尼装置 | |
CN206710451U (zh) | 一种新型测风塔顶部传感器支撑结构 | |
CN208000188U (zh) | 一种角钢输电塔气弹模型 | |
CN205639445U (zh) | 一种可调节高度的吊装式机械减震器 | |
CN102561544B (zh) | 烟囱减振阻尼器 | |
CN205814962U (zh) | 一种田径用安全气垫 | |
CN208329745U (zh) | 一种柴油发电机组数据中心机房 | |
CN216406870U (zh) | 一种适用于偏压隧道的可伸缩锚杆 | |
CN207812268U (zh) | 一种斜拉桥的防摇摆结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |