CN110306400A - 园区内部连接通道及其铺设工艺 - Google Patents
园区内部连接通道及其铺设工艺 Download PDFInfo
- Publication number
- CN110306400A CN110306400A CN201910488284.6A CN201910488284A CN110306400A CN 110306400 A CN110306400 A CN 110306400A CN 201910488284 A CN201910488284 A CN 201910488284A CN 110306400 A CN110306400 A CN 110306400A
- Authority
- CN
- China
- Prior art keywords
- prefabricated board
- laid
- interface channel
- concrete
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了园区内部连接通道及其铺设工艺,连接通道包括由下至上依次设置的现浇混凝土层、预制板和沥青混凝土层;所述现浇混凝土层内设有水管;所述现浇混凝土层与预制板之间设有灌浆层;所述沥青混凝土层与预制板之间设有橡胶沥青层,铺设工艺包括以下步骤:挖设铺设通道;预埋水管;浇注C35混凝土;铺设预制板;铺设橡胶沥青;铺设沥青混凝土。本发明的连接通道通过在现浇混凝土基层上铺设预制板,随后在预制板上直接铺设沥青混凝土的方式,极大的简化了施工流程,耗时更短,且成本低廉,无需大型器械,施工更加方便。
Description
技术领域
本发明涉及路面施工技术领域,特别是涉及园区内部连接通道及其铺设工艺。
背景技术
传统的园区内部的道路与外界的道路施工方式是相同的,对于园区内部的道路施工来说,常规的道路施工方式成本较高、耗时较长,且不利于施工。
发明内容
为解决现有技术中存在的问题,本发明提供了园区内部连接通道及其铺设工艺,本发明的连接通道通过在现浇混凝土基层上铺设预制板,随后在预制板上直接铺设沥青混凝土的方式,极大的简化了施工流程,耗时更短,且成本低廉,无需大型器械,施工更加方便。
为实现上述目的,本发明采用以下技术方案:
园区内部连接通道,包括由下至上依次设置的现浇混凝土层、预制板和沥青混凝土层;
所述现浇混凝土层内设有水管;
所述现浇混凝土层与预制板之间设有灌浆层;
所述沥青混凝土层与预制板之间设有橡胶沥青层。
优选的,所述灌浆层的两侧设有泡沫条。
优选的,所述预制板铺设橡胶沥青层的表面为拉毛面。
园区内部连接通道的铺设工艺,包括以下步骤:
S1、沿规划路径挖设铺设通道;
S2、在铺设通道内预埋水管;
S3、在铺设通道内浇注C35混凝土;
S4、在C35混凝土基础的上方铺设预制板;
S5、在预制板的上方铺设橡胶沥青;
S6、在橡胶沥青层上方铺设沥青混凝土。
优选的,所述步骤S4与步骤S5之间还包括以下步骤:
S4.1、在步骤S3现浇的C35混凝土与步骤S4铺设的预制板之间灌浆。
优选的,所述步骤S4.1之后还包括以下步骤:
S4.2、在灌浆层的边缘处设置泡沫条进行封堵。
优选的,所述步骤S3中,还包括以下步骤:
S3.1、浇注C35混凝土时,进行分幅处理,分幅缝隙采用1cm厚的沥青木板填实。
有益效果在于:
本发明的连接通道通过在现浇混凝土基层上铺设预制板,随后在预制板上直接铺设沥青混凝土的方式,极大的简化了施工流程,耗时更短,且成本低廉,无需大型器械,施工更加方便。
附图说明
图1是本发明实施例的连接通道的侧剖示意图;
图2是图1中A-A处的剖视结构示意图。
附图标记:
10、现浇混凝土层;20、预制板;30、沥青混凝土层;40、水管;50、橡胶沥青层;60、灌浆层;70、泡沫条。
具体实施方式
下面结合附图对本发明作进一步说明:
实施例:
如图1和图2所示,园区内部连接通道,包括由下至上依次设置的现浇混凝土层、预制板和沥青混凝土层;
所述现浇混凝土层内设有水管;
所述现浇混凝土层与预制板之间设有灌浆层;
所述沥青混凝土层与预制板之间设有橡胶沥青层。
在另外一个实施例中,所述灌浆层的两侧设有泡沫条。
在灌浆层两侧设置泡沫条可封堵灌注的灌浆料,避免灌浆料外流,提高灌浆效果。
在另外一个实施例中,所述预制板的顶面为拉毛面。将预制板顶面设置成拉毛面,提高了预制板与橡胶沥青层之间的接触面积,使得预制板与橡胶沥青层之间以及沥青混凝土之间连接更加紧密。
园区内部连接通道的铺设工艺,包括以下步骤:
S1、沿规划路径挖设铺设通道;
S2、在铺设通道内预埋水管;
S3、在铺设通道内浇注80cm厚的C35混凝土;
S4、在C35混凝土基础的上方铺设预制板,预制板选用厚度为20cm的预制板;
S5、在预制板的上方铺设1cm厚的橡胶沥青;
S6、在橡胶沥青层上方铺设10cm厚的沥青混凝土。
在另外一个实施例中,所述步骤S4与步骤S5之间还包括以下步骤:
S4.1、在步骤S3现浇的C35混凝土与步骤S4铺设的预制板之间灌浆。在混凝土与预制板之间灌浆能够有效增强预制板与C35混凝土基础之间的连接强度。在本实施例中,灌浆厚度为1cm。
在另外一个实施例中,所述步骤S4.1之后还包括以下步骤:
S4.2、在灌浆层的边缘处使用3cm乘以3cm的泡沫条进行封堵。
在灌浆层两侧设置泡沫条可封堵灌注的灌浆料,避免灌浆料外流,提高灌浆效果。
在另外一个实施例中,所述步骤S3中,还包括以下步骤:
S3.1、浇注C35混凝土时,进行分幅处理,分幅缝隙采用1cm厚的沥青木板填实。
分幅处理提高了连接通道抵抗地质变化及热胀冷缩等基础变动的能力。
有益效果在于:
本发明的连接通道通过在现浇混凝土基层上铺设预制板,随后在预制板上直接铺设沥青混凝土的方式,极大的简化了施工流程,耗时更短,且成本低廉,无需大型器械,施工更加方便。
以上显示和描述了本发明的基本原理、主要特征和优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。
Claims (7)
1.一种园区内部连接通道,其特征在于,包括由下至上依次设置的现浇混凝土层、预制板和沥青混凝土层;所述现浇混凝土层内设有水管;所述现浇混凝土层与预制板之间设有灌浆层;所述沥青混凝土层与预制板之间设有橡胶沥青层。
2.根据权利要求1所述的园区内部连接通道,其特征在于,所述灌浆层的两侧设有泡沫条。
3.根据权利要求1所述的园区内部连接通道,其特征在于,所述预制板铺设橡胶沥青层的表面为拉毛面。
4.一种根据权利要求1-3任一项所述的园区内部连接通道的铺设工艺,其特征在于,包括以下步骤:
S1、沿规划路径挖设铺设通道;
S2、在铺设通道内预埋水管;
S3、在铺设通道内浇注C35混凝土;
S4、在C35混凝土基础的上方铺设预制板;
S5、在预制板的上方铺设橡胶沥青;
S6、在橡胶沥青层上方铺设沥青混凝土。
5.根据权利要求4所述的园区内部连接通道的铺设工艺,其特征在于,所述步骤S4与步骤S5之间还包括以下步骤:
S4.1、在步骤S3现浇的C35混凝土与步骤S4铺设的预制板之间灌浆。
6.根据权利要求5所述的园区内部连接通道的铺设工艺,其特征在于,所述步骤S4.1之后还包括以下步骤:
S4.2、在灌浆层的边缘处设置泡沫条进行封堵。
7.根据权利要求4所述的园区内部连接通道的铺设工艺,其特征在于,所述步骤S3中,还包括以下步骤:
S3.1、浇注C35混凝土时,进行分幅处理,分幅缝隙采用1cm厚的沥青木板填实。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910488284.6A CN110306400A (zh) | 2019-06-05 | 2019-06-05 | 园区内部连接通道及其铺设工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910488284.6A CN110306400A (zh) | 2019-06-05 | 2019-06-05 | 园区内部连接通道及其铺设工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110306400A true CN110306400A (zh) | 2019-10-08 |
Family
ID=68075248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910488284.6A Pending CN110306400A (zh) | 2019-06-05 | 2019-06-05 | 园区内部连接通道及其铺设工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110306400A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411285A (zh) * | 2020-11-04 | 2021-02-26 | 黄雪松 | 一种市政工程道路铺设结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998007929A1 (fr) * | 1996-08-16 | 1998-02-26 | Mitsubishi Materials Corporation | STRUCTURE DE PAVE SUPPRIMANT NOx |
JP2006028828A (ja) * | 2004-07-14 | 2006-02-02 | Univ Osaka Sangyo | 大粒径骨材を使用した排水性アスファルト舗装 |
CN202898938U (zh) * | 2012-11-26 | 2013-04-24 | 上海千年城市规划工程设计股份有限公司 | 用于城市道路及景观道路的渗排结合型路面结构 |
CN104452515A (zh) * | 2014-11-13 | 2015-03-25 | 长安大学 | 一种防排结合式路面综合排水*** |
CN107268379A (zh) * | 2017-06-26 | 2017-10-20 | 上海神通海绵城市建设发展有限公司 | 一种结实道路及其施工工艺 |
CN208844378U (zh) * | 2018-05-14 | 2019-05-10 | 辽宁大学 | 一种新型混合式过水路面结构 |
-
2019
- 2019-06-05 CN CN201910488284.6A patent/CN110306400A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998007929A1 (fr) * | 1996-08-16 | 1998-02-26 | Mitsubishi Materials Corporation | STRUCTURE DE PAVE SUPPRIMANT NOx |
JP2006028828A (ja) * | 2004-07-14 | 2006-02-02 | Univ Osaka Sangyo | 大粒径骨材を使用した排水性アスファルト舗装 |
CN202898938U (zh) * | 2012-11-26 | 2013-04-24 | 上海千年城市规划工程设计股份有限公司 | 用于城市道路及景观道路的渗排结合型路面结构 |
CN104452515A (zh) * | 2014-11-13 | 2015-03-25 | 长安大学 | 一种防排结合式路面综合排水*** |
CN107268379A (zh) * | 2017-06-26 | 2017-10-20 | 上海神通海绵城市建设发展有限公司 | 一种结实道路及其施工工艺 |
CN208844378U (zh) * | 2018-05-14 | 2019-05-10 | 辽宁大学 | 一种新型混合式过水路面结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411285A (zh) * | 2020-11-04 | 2021-02-26 | 黄雪松 | 一种市政工程道路铺设结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205741828U (zh) | 一种装配式透水路面结构 | |
CN108301293B (zh) | 一种路面水稳层及附属工程的施工方法 | |
CN104790436B (zh) | 高层建筑地下室顶板沉降后浇带超前止水施工方法 | |
CN108547195A (zh) | 一种排水沥青路面结构及施工方法 | |
CN205444254U (zh) | 变形缝结构 | |
CN107503450A (zh) | 一种现浇中空钢筋混凝土填充墙及其施工工艺 | |
CN203947406U (zh) | 新旧桥纵向弹性混凝土柔性拼接结构 | |
CN110306400A (zh) | 园区内部连接通道及其铺设工艺 | |
CN205669211U (zh) | 一种预制重力式挡墙 | |
CN105178134B (zh) | 一种道路绿色改造方法 | |
CN209602912U (zh) | 一种沥青铺装路面 | |
CN208009193U (zh) | 一种公路工程拼装式钢筋混凝土边沟结构 | |
CN208023406U (zh) | 一种沥青桥面排水结构 | |
CN207552833U (zh) | 一种高架桥梁基础周边地面道路结构 | |
CN207092299U (zh) | 一种现浇中空钢筋混凝土填充墙 | |
CN107354872B (zh) | 一种变截面鱼腹式现浇箱梁混凝土错台防治结构及施工方法 | |
CN208981055U (zh) | 一种主动延缓反射裂缝的刚性基层路面结构 | |
CN207686047U (zh) | 一种生态砌块墙 | |
CN207878303U (zh) | 水泥混凝土面板与明涵洞搭接结构 | |
CN208502024U (zh) | 一种地热采暖结构 | |
CN207597184U (zh) | 一种含装配式面层的快速装配的道路 | |
CN207091864U (zh) | 一种路面假缝传力杆施工辅助装置 | |
CN207260394U (zh) | 一种穿筋式全预制单向板 | |
CN207092154U (zh) | 一种地下室排水板 | |
CN206457837U (zh) | 一种输电线路铁塔装配式基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |