CN110298551A - A kind of rating model for market-oriented garden energy synthetic operation degree of urgency - Google Patents

A kind of rating model for market-oriented garden energy synthetic operation degree of urgency Download PDF

Info

Publication number
CN110298551A
CN110298551A CN201910472844.9A CN201910472844A CN110298551A CN 110298551 A CN110298551 A CN 110298551A CN 201910472844 A CN201910472844 A CN 201910472844A CN 110298551 A CN110298551 A CN 110298551A
Authority
CN
China
Prior art keywords
degree
garden
urgency
power
increment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910472844.9A
Other languages
Chinese (zh)
Inventor
齐彩娟
田星
张坤
董晓晶
党东升
王雁凌
梁冰
韩一鸣
靳盘龙
宫建锋
任凤琴
李钧超
任大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Original Assignee
North China Electric Power University
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University, Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd filed Critical North China Electric Power University
Priority to CN201910472844.9A priority Critical patent/CN110298551A/en
Publication of CN110298551A publication Critical patent/CN110298551A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of rating models for market-oriented garden energy synthetic operation degree of urgency, the following steps are included: S1: establishing standard diagrams system, three aspects of degree of urgency and efficient electricity consumption degree of urgency, which are run, using degree of urgency, power transmission and distribution resource coordinating by generation assets collaboration establishes garden integrated energy system synthetic operation degree of urgency standard diagrams system, S2: metrics evaluation standard, link evaluation criterion, power transmission and distribution resource coordinating operation link evaluation criterion and efficient electricity consumption link evaluation criterion, S3: ranking method are utilized including generation assets collaboration.Present invention is generally directed to a kind of rating models for market-oriented garden energy synthetic operation degree of urgency, its ranking method is more scientific and reasonable, it uses analytic hierarchy process (AHP) and weighted mean method for integrated evaluating method, is scored with completing the collaboration of garden generation assets using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency.

Description

A kind of rating model for market-oriented garden energy synthetic operation degree of urgency
Technical field
It is specially a kind of for market-oriented garden energy the present invention relates to the rating technique field of energy synthetic operation degree of urgency The rating model of source synthetic operation degree of urgency.
Background technique
Garden generation assets cooperate with use aspects there are the situation of Construction of Industrial Park operation power plant for self-supply, and there is an urgent need for specifications It guides, the industries huge energy consumption such as coal, electric power, petrochemical industry, metallurgy, machinery, light textile, building materials, medicine assembled in garden makes each production The industrial park Ye Yu becomes the nucleus of electricity consumption, in order to reduce electric cost, high energy enterprise construction operation in many gardens Power plant for self-supply, power plant for self-supply are mitigating enterprise with can play certain positive effect, but its in terms of burden, reduction How preferably energy consumption is high, blowdown is big and the cost issues of the ancillary services such as peak regulation, frequency modulation, spare are not resolved for a long time, Standard guidance power plant for self-supply health, orderly development, establish and improve fair, orderly, reasonable power market order and environment, become Major issue urgently to be resolved.
Summary of the invention
The purpose of the present invention is to provide a kind of rating model for market-oriented garden energy synthetic operation degree of urgency, with Solve the problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: it is a kind of for market-oriented garden energy synthetic operation The rating model of degree of urgency, comprising the following steps:
S1: establishing standard diagrams system, urgent using degree of urgency, the operation of power transmission and distribution resource coordinating by generation assets collaboration Three aspects of degree and efficiently electricity consumption degree of urgency establish garden integrated energy system synthetic operation degree of urgency standard diagrams system;
S2: metrics evaluation standard comprising generation assets collaboration is run using link evaluation criterion, power transmission and distribution resource coordinating Link evaluation criterion and efficient electricity consumption link evaluation criterion;
S3: ranking method uses analytic hierarchy process (AHP) and weighted mean method for integrated evaluating method, to complete garden power generation money Source collaboration is scored using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency.
Preferably, in S1, generation assets collaboration includes garden power supply confession level, power plant for self-supply's construction using degree of urgency Horizontal and power plant for self-supply and user-association degree.
Preferably, the ability that garden power supply confession horizontal reverse has answered power supply to meet own power demand, power plant for self-supply's construction Level includes that power plant for self-supply's type, power plant for self-supply's capacity and comprehensive energy utilize class power plant for self-supply capacity accounting, power plant for self-supply Power plant for self-supply, existing enterprise confession ability has been reacted with user-association degree and planning industrial power plant confesses ability.
Preferably, in S1, power transmission and distribution resource coordinating operation degree of urgency includes garden transmission of electricity resource efficiency, increment distribution Net construction level, increment distribution pilot load electricity consumption, increment power distribution network Allocation of Equity ratio and increment power distribution network and market master The body degree of association.
Preferably, transmission of electricity resource efficiency in garden includes transformer maximum load rate and transmission line of electricity maximum load rate, increment Distribution network construction level includes increment distribution network voltage grade, increment power distribution network scale, increment power distribution network maximum load rate, is increased Amount distribution pilot load electricity consumption includes increment distribution pilot annual peak load, the estimated growth speed of increment distribution pilot load The estimated growth rate of degree, increment distribution pilot year electricity consumption and increment distribution pilot year electricity consumption, increment power distribution network Allocation of Equity Ratio includes equity holding unit and main market players's equity accounting, and increment power distribution network and main market players's degree of association include market Main body increment power distribution network degree of possessing.
Preferably, in S1, efficient electricity consumption degree of urgency includes that garden user's basic horizontal, power trade mode and electricity consumption are excellent Favour degree, garden user's basic horizontal include garden year electricity consumption level, user type and emphasis user power consumption accounting, electric energy hands over Easy mode includes that emphasis user participates in direct dealing electricity accounting, emphasis user entrusts sale of electricity company purchase of electricity accounting, and electricity consumption is excellent Favour degree includes that emphasis user enjoys preferential policies electricity accounting, electricity consumption preferential tax revenue degree and the preferential degree of electricity consumption electricity price.
Preferably, in S2, it includes that garden power supply confession is horizontal that generation assets, which are cooperateed with using link evaluation criterion, provides electricity for oneself Factory's construction level and power plant for self-supply and user-association degree, power transmission and distribution resource coordinating operation link evaluation criterion include garden transmission of electricity money Source efficiency, increment distribution network construction level, increment distribution pilot load electricity consumption and increment power distribution network Allocation of Equity ratio, efficiently Electricity consumption link evaluation criterion includes garden user's basic horizontal, power trade mode and the preferential degree of electricity consumption.
Preferably, in S3, index weights and composite rating are determined, it can be according to hair, defeated, three links of electricity consumption degree of urgency Scoring event, analysis obtain the degree of urgency of garden whole synthesis energy resource system synthetic operation.
Compared with prior art, the beneficial effects of the present invention are: utilizing degree of urgency, transmission & distribution electric resources by generation assets collaboration It is urgent that three aspects of synthetic operation degree of urgency and efficient electricity consumption degree of urgency establish experiment garden grade integrated energy system synthetic operation Rating system is spent, index system is divided into level Four, more comprehensively considers the feelings such as power plant for self-supply, increment distribution network construction and planning Condition;Secondly according to relevant standard content in country or the related regulation of industry, the practical experience and tool of the operation of Binding experiment garden Concrete conditions in the establishment of a specific crime is used as according to evaluation criterion is formulated, and is finally selected and is used analytic hierarchy process (AHP) and weighted mean method for integrated evaluating method, It is commented with completing the collaboration of garden generation assets using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency Point, and establish the garden whole synthesis energy resource system synthetic operation based on hair, defeated, three links of electricity consumption degree of urgency scoring event Degree of urgency constant current journey really.
Detailed description of the invention
Fig. 1 is overall flow block diagram of the invention;
Fig. 2 is the flow diagram for establishing standard diagrams system Yu metrics evaluation standard of the invention;
Fig. 3 is the structural model figure of analytic hierarchy process (AHP) of the invention;
Fig. 4 is garden integrated energy system synthetic operation degree of urgency decision flow chart of the invention;
Fig. 5 is index system figure of the invention;
Fig. 6 is the flow chart of evaluation method of the invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Please refer to Fig. 1-4, the present invention provides a kind of technical solution: one kind is urgent for market-oriented garden energy synthetic operation The rating model of degree, comprising the following steps:
As depicted in figs. 1 and 2, S1: establishing standard diagrams system, utilizes degree of urgency, power transmission and distribution by generation assets collaboration It is tight that three aspects of resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency establish garden integrated energy system synthetic operation Compel degree standard diagrams system, emphasis considers the case where power plant for self-supply in garden, increment power distribution network and user are developed, such as table 1 It is shown;
1 index system table of table
(1) generation assets collaboration utilizes degree of urgency
Generation assets collaboration using degree of urgency and garden interior power situation especially power plant for self-supply the case where closely bound up, garden Area general supply supply level x1Meet the ability of own power demand for all power supplys in reaction garden, garden general supply supplies water Flat related with power supply type, coal motor group can satisfy steady electricity supply output, and photovoltaic and wind power output situation are unstable, Wu Fabao Card provides power output in busy hour, and in testing each garden interior power construction, scene power output is smaller, has little influence on garden General supply supply level, therefore the ratio between all power supply capacities that can stablize power output and peak load demand table in the index garden Show:
In formula: x1Represent garden general supply supply level;∑Psource-cFor all power supplys that can stablize power output in the garden The sum of capacity, unit MW;Pload-ymFor garden annual peak load, unit MW;
Power plant for self-supply supply level x2Power plant for self-supply's power supply meets the ability of own power demand in reaction garden, if providing for oneself Power plant unit capacity can largely meet customer charge demand in area, and garden forms, power plant for self-supply confession larger from donor site risk The ratio between the installed capacity steadily contributed and peak load demand can be provided to all power plants for self-supply in level garden to be indicated:
In formula: x2Represent garden power plant for self-supply supply level;∑Pself-cFor power output can be stablized in power plant for self-supply in the garden The sum of all capacity, unit MW;Pload-ymFor garden annual peak load, unit MW;
Power plant for self-supply's type in power plant for self-supply's construction level refers to the type of garden Nei Suojian power plant for self-supply, and fire coal is provided for oneself Power plant exist to waste heat, overbottom pressure, residual air power plant for self-supply make the transition possibility, the index be qualitative index, the present invention according to garden from The existing situation and planning situation of the component type of standby power plant score;
The existing capacity x of power plant for self-supply in power plant for self-supply's construction level4: unit MW, existing (2017) are each in garden The sum of class power plant for self-supply capacity;
x4=∑ Pcoal+∑PMulti
In formula: x4Represent the existing capacity of garden power plant for self-supply, unit MW;∑PcoalElectricity is provided for oneself for fire coal existing in garden Factory's total capacity, unit MW;∑PMultiFor comprehensive energy existing in garden utilize class power plant for self-supply total capacity, unit MW, from Standby power plant's planned capacity x5: unit MW plans the sum of (2018-2020) all kinds of power plant for self-supply's capacity in garden, advises in each year It draws calculation of capacity mode and refers to power plant for self-supply's calculation of capacity mode in 2017, each capacity for planning year shared power in this index Weight is different, and calculation formula is as follows:
x51x4-182x4-193x4-20
In formula: x5Represent garden power plant for self-supply planned capacity, unit MW;x4-18、x4-19、x4-20Respectively represent each planning Year power plant for self-supply planning construction capacity, unit MW;λ1、λ2、λ3Respectively represent 2018,2019, the year two thousand twenty is in planning class index Weight coefficient in calculating, it is also bigger more the time degree of urgency closed on, therefore it is 0.5,0.3,0.2 that the present invention, which is distinguished value,;
Comprehensive energy utilizes the existing capacity accounting of class power plant for self-supply using the comprehensive energy in class power plant for self-supply capacity accounting x6: all kinds of power plant for self-supply's capacity of (2017) existing in garden account for the ratio of whole power plant for self-supply's capacity, to the comprehensive energy in garden Source synthetic operation degree of urgency is affected, therefore embodies the importance that comprehensive energy utilizes class power plant for self-supply with the index,
In formula: x6It represents comprehensive energy and utilizes the existing capacity accounting of class power plant for self-supply;
Comprehensive energy utilizes class power plant for self-supply planned capacity accounting x7: in garden plan (2018-2020) it is all kinds of oneself Standby power plant's capacity accounts for the ratio of whole power plant for self-supply's capacity, and each year planned capacity accounting calculation refers to power plant for self-supply in 2017 Capacity accounting calculation, each capacity for planning year shared weighted, calculation formula in this index are as follows:
x71x6-182x6-193x6-20
In formula: x7It represents comprehensive energy and utilizes class power plant for self-supply planned capacity accounting;x6-18、x6-19、x6-20It respectively represents each Plan that year comprehensive energy utilizes class power plant for self-supply capacity accounting;
Power plant for self-supply in garden is divided into garden power plant for self-supply and two kinds of industrial power plant: when power plant for self-supply generates power for their own use When, it can be by carrying out participating in obtaining portion distribution electricity receipts by shares to garden distribution for generated energy power grid enterprises, institute, garden power plant for self-supply Benefit;And industrial power plant institute generated energy is zero income electricity for power grid enterprises,
Ability x confesses in power plant for self-supply, existing enterprise8, industrial power plant confess ability refer to that industrial power plant (uses The power plant for self-supply that family is built) generate electricity capacity and enterprise's workload demand situation, if the power generation supply of industrial power plant is greater than load Demand, then in addition to that can meet in enterprise other than user power utilization demand, can also into garden other enterprise power supplies, it is existing (2017) Industrial power plant confesses that ability calculation formula is as follows:
In formula: x8Represent power plant for self-supply, existing enterprise confession ability, Pself-i-cPossess enterprise's energy of power plant for self-supply for i-th Enough unit capacities steadily contributed, unit MW, Pload-i-ymPossess the year electricity consumption of the enterprise of power plant for self-supply, unit for i-th For hundred million kWh, ηiRespectively to possess weight coefficient shared by the enterprise of power plant for self-supply, value and i-th possess the enterprise of power plant for self-supply Year electricity consumption and confession ability are related, year electricity consumption and the confession biggish enterprise's weight coefficient of ability it is also larger, planning enterprise is certainly Ability x confesses in standby power plant9, each corporate planning (2018-2020) power plant for self-supply of planning generates electricity capacity and corporate planning in garden Workload demand situation, each confession ability calculation for planning year confess capacity calculation with reference to industrial power plant in 2017, Middle unit capacity and year electricity consumption take predicted value, and each confession ability for planning year shared weighted in this index calculates Formula is as follows:
x91x8-182x8-193x8-20
In formula: x9It represents planning industrial power plant and confesses ability;x8-18、x8-19、x8-20Respectively represent each planning year enterprise Ability is confessed by power plant for self-supply;
(2) power transmission and distribution resource coordinating runs degree of urgency
Power transmission and distribution resource coordinating run degree of urgency by grid condition in garden especially increment power distribution network the case where influence determine It is fixed, mainly matched by garden transmission of electricity resource efficiency, increment distribution network construction level, increment distribution pilot load electricity consumption, increment Power grid Allocation of Equity ratio and increment power distribution network are determined with main market players's degree of association, under the situation that increment distribution business is decontroled Garden confession mode is more readily formed;
Garden transmission of electricity resource efficiency include:
Transformer maximum load rate x10, capacity-load ratio held in engineering with public transformer substation main transformer in certain voltage class service area The year net of the sum of amount and the voltage class service area is indicated for the ratio between peak load, for convenience of subsequent weight determination and is calculated, Inverse, that is, transformer maximum load the rate for choosing capacity-load ratio measures garden transformer capacity level and workload demand as index Between relationship, calculation formula is as follows:
In formula: x10Represent the existing transformer maximum load rate in garden;SkRepresent certain voltage class transforming plant main transformer capacity it With unit MVA, PkmaxCertain net is represented for peak load, unit MW in voltage class year;γkFor the voltage class maximum load Weight shared by rate situation, value is related with voltage class and the voltage class transformer maximum load rate size cases, works as voltage When higher grade, maximum load rate is bigger, weight value is bigger;
Consider the estimated maximum load rate x of the transformer of newly-built load11:
Consider that the existing transformer capacity in garden will reach under the load condition (2018-2020) of newly-built user enterprise in garden The maximum load rate arrived calculates under newly-built load condition of each planning year with reference to the calculation method of existing transformer maximum load rate The estimated maximum load rate of transformer, the index calculation formula are as follows:
x111x10-182x10-193x10-20
In formula: x11It represents and considers the estimated maximum load rate of the transformer of newly-built load;x10-18、x10-19、x10-20It respectively represents Each estimated maximum load rate of planning year transformer;
Existing transmission line of electricity maximum load rate x12:
Existing each voltage class transmission line of electricity maximum load rate reflection garden power grid transmission capacity level and load in garden Relationship between demand, calculating formula are as follows:
In formula: x12Represent the existing transmission line of electricity maximum load rate in garden;DkRepresent certain voltage class power distribution network capacity (route The sum of the thermostabilization limit), unit MW;PkmaxCertain net is represented for peak load, unit MW in voltage class year;γkFor the voltage Weight shared by grade route maximum load rate situation, value and voltage class and the voltage class route maximum load rate size feelings Condition is related, and when voltage class is higher, route maximum load rate is higher, weight value is bigger;
Consider the transmission line of electricity maximum load rate x of newly-built load13:
Consider that existing each voltage class is defeated in garden under the load condition (2018-2020) of newly-built user enterprise in garden The load factor that electric line is up to calculates each newly-built load of planning year consideration with reference to the calculation method of transmission line of electricity maximum load rate Transmission line of electricity maximum load rate, the index calculation formula is as follows:
x131x12-182x12-193x12-20
In formula: x13Represent the transmission line of electricity maximum load rate for considering newly-built load;x12-18、x12-19、x12-20It respectively represents each Plan year transmission line of electricity maximum load rate;
Increment distribution network construction level includes:
Increment distribution network voltage grade, increment power distribution network refer to 110 kilovolts and following voltage class power grid and 220 in principle (330) local power nets such as kilovolt and following voltage class industrial park (economic development zone);The increasing of high voltage grade in garden Amount power distribution network means to be formed larger from the risk of donor site customer power supply even to outside garden;
Existing increment distribution network voltage grade x14: the voltage class of existing increment power distribution network is constituted in garden;
Plan increment distribution network voltage grade x15: plan that the voltage class of increment power distribution network is constituted in garden;
Above-mentioned two index is qualitative index, and the present invention is according to increment power distribution network existing in garden and planning voltage class The case where score;
Existing increment power distribution network scale x16: unit MVA, the increment power distribution network transformer of existing each voltage class in garden Capacity,
In formula: x16Represent the existing increment power distribution network scale in garden;IkRepresent certain voltage level increment power distribution network transformer appearance The sum of amount, unit MW;μkFor weight shared by the voltage level increment power distribution network transformer capacity, value and voltage class and this Voltage level increment power distribution network transformer capacity situation is related, when voltage class is higher, increment power distribution network transformer capacity is bigger When, weight value is bigger;
Plan increment power distribution network scale x17: unit MVA plans the increasing of (2018-2020) each voltage class in garden Power distribution network transformer capacity is measured, calculation formula is as follows:
x171x16-182x16-193x16-20
In formula: x17Represent planning increment power distribution network scale;x16-18、x16-19、x16-20Respectively represent each planning annual increment distribution Network planning mould;
Existing increment power distribution network maximum load rate x18, the maximum of existing each voltage level increment power distribution network transformer in garden Load factor, calculating formula are as follows:
In formula: x18Represent the existing increment power distribution network maximum load rate in garden;IkCertain voltage level increment is represented with transformer The sum of capacity, unit MVA;PIkmaxCertain voltage level increment is represented with annual peak load, unit MW;γkFor the voltage etc. Grade increment matches route with voltage class and the voltage level increment with weight shared by route maximum load rate situation, value and increment Maximum load rate size cases are related, and when higher, increment is higher with route maximum load rate with voltage class for increment, weight is taken It is worth bigger;
Plan the estimated maximum load rate x of increment power distribution network19, (2018-2020) each voltage level increment is planned in garden The estimated maximum load rate reached of power distribution network, calculation formula are as follows:
x191x18-182x18-193x18-20
In formula: x19Represent the estimated maximum load rate of planning increment power distribution network;x18-18、x18-19、x18-20Respectively represent each planning Annual increment power distribution network maximum load rate;
Increment distribution pilot load electricity consumption includes:
Increment distribution pilot annual peak load x20: unit MW, the annual peak load (2017 of garden increment distribution pilot Year);
The estimated growth rate x of increment distribution pilot load21: it is expected that increment distribution pilot annual peak load (2016-2020 Year) period average growth rate per annum;
Increment distribution pilot year electricity consumption x22: unit is hundred million kWh, the year electricity consumption (2017 of garden increment distribution pilot Year);
The estimated growth rate x of increment distribution pilot year electricity consumption23: it is expected that increment distribution pilot year electricity consumption (2016-2020 Year) period average growth rate per annum,
Increment power distribution network Allocation of Equity ratio includes:
Equity holding unit x24, the share-holding unit of increment power distribution network is different in different gardens, which is qualitative finger Mark, the present invention score according to equity holding unit situation;
Main market players equity accounting x25: main market players in garden (including electricity power enterprise, with sale of electricity company and user etc.) institute The increment power distribution network share held,
In formula: x25Represent main market players's equity accounting;KiFor main market players's holding of shares of i-th of increment distribution pilot; δiFor the weight of main market players's holding of shares of i-th of increment distribution pilot, value and increment are with the voltage etc. for trying electric pilot Grade, capacity and main market players's holding shares are related, and increment distribution network voltage higher grade, capacity is bigger, main market players is held Share is higher, and weight value is bigger;
Increment power distribution network includes: with main market players's degree of association
Main market players increment power distribution network degree of possessing x26: main market players, which accounts for a strand capacity for increment power distribution network and accounts for garden total increment, matches Electrical network capacity accounting,
In formula: x26Represent main market players's increment power distribution network degree of possessing;IkFor garden voltage level increment power distribution network transformation Device capacity, unit MVA;IukThe voltage level increment power distribution network transformer capacity of stock, unit are accounted for for main market players in garden For MVA;γkFor the weight of the voltage class main market players increment power distribution network accounting situation, value and increment match voltage class Related with main market players's increment power distribution network accounting situation, increment distribution network voltage higher grade, main market players's increment power distribution network accounts for Than bigger, weight value is bigger;
(3) efficient electricity consumption degree of urgency
Shadow of the efficient electricity consumption degree of urgency by the electricity consumption situation of garden user, user's power trade mode and the preferential degree of electricity consumption It rings;
Garden user's basic horizontal includes:
Garden year electricity consumption level, the garden horizontal x of year electricity consumption27: hundred million kWh of unit, year total electricity consumption (2017 in garden Year);
Garden year electricity consumption growth rate x28: it is expected that average growth rate per annum during garden electricity consumption (2016-2020);
The horizontal x of garden annual peak load29: unit MW, annual peak load (2017) in area;
Garden annual peak load growth rate x30: it is expected that average annual during garden annual peak load (2016-2020) increase Rate;
It is expected that each year electricity consumption x in garden31: unit is hundred million kWh, it is contemplated that the total electricity consumption of each year (2018-2020) in garden Amount;
x311x27-182x27-193x27-20
In formula: x31Represent each year index on power consumption in estimated garden;x27-18、x27-19、x27-20Respectively represent each planning year electricity consumption Amount is horizontal, and unit is hundred million kWh;
It is expected that the garden horizontal x of each annual peak load32: unit MW, it is contemplated that each year (2018-2020) is maximum in garden Load level;
x321x29-182x29-193x29-20
In formula: x32Represent each annual peak load index in estimated garden;x29-18、x29-19、x29-20Respectively represent each planning year most Big load, unit MW;
User type x33, the user in garden is classified according to different load characters, is broadly divided into big industrial user, work Commercial user, residential building user, agricultural production user etc., this appraisement system pays close attention to big industrial user and industry and commerce is used Family is defined as emphasis user, which is qualitative index, and the present invention forms situation according to garden user type and scores;
Emphasis user power consumption accounting x34, big industrial user and industry and commerce user year electricity consumption, which account for, in garden uses in garden total year The ratio of electricity;
In formula: x34Represent emphasis user power consumption accounting;The sum of each emphasis user year electricity consumption is represented, unit is Hundred million kWh;
Power trade mode includes:
Emphasis user participates in direct dealing electricity accounting x35: the electricity that emphasis user participates in direct dealing within the year accounts for emphasis The ratio of total electricity consumption in user year;
In formula: x35It represents emphasis user and participates in direct dealing electricity accounting;It represents and is participated in directly in each emphasis user year The sum of transaction electricity is connect, unit is hundred million kWh,
Emphasis user entrusts sale of electricity company purchase of electricity accounting x36: emphasis user entrusts the electricity of sale of electricity company power purchase within the year Account for the ratio of total electricity consumption in emphasis user year;
In formula: x36It represents emphasis user and entrusts sale of electricity company purchase of electricity accounting;Represent commission in each emphasis user year The sum of sale of electricity company purchase of electricity, unit are hundred million kWh;
The preferential degree of electricity consumption includes:
Emphasis user enjoys preferential policies electricity accounting x37, the electricity that emphasis user enjoys preferential policies within the year accounts for emphasis The ratio of user's year electricity consumption, under certain preferential policy background, user's electricity ratio that enjoys preferential policies is bigger, electricity consumption at A possibility that this decline is more, and electricity consumption is caused to increase are bigger;
In formula: x37Emphasis user is represented to enjoy preferential policies electricity accounting;It is excellent to represent enjoyment in each emphasis user year The sum of the electricity that benevolent administration's plan is bought, unit are hundred million kWh;
Electricity consumption preferential tax revenue degree x38, propose that the VAT rate adjustment of release power industry and power grid enterprises are stayed in country Under the background for disposably returning to the electricity price space vacateed to refund, the electricity consumption preferential tax revenue situation that user is enjoyed in garden, The index is qualitative index, and the electricity consumption preferential tax revenue degree that the present invention is enjoyed according to garden user scores;
The preferential degree x of electricity consumption electricity price39, under the background of general commerce electricity price price reduction, user is enjoyed in garden The preferential degree of electricity price, the index are qualitative index, and the present invention scores according to the preferential degree of electricity price that garden user is enjoyed;
As depicted in figs. 1 and 2, S2: metrics evaluation standard includes that generation assets collaboration utilizes link evaluation criterion, power transmission and distribution Resource coordinating runs link evaluation criterion and efficient electricity consumption link evaluation criterion, garden integrated energy system synthetic operation degree of urgency In standard diagrams system, qualitative index includes that power plant for self-supply's type, increment distribution network voltage grade, equity occupy unit, user Type, electricity consumption preferential tax revenue degree and the preferential degree of electricity consumption electricity price etc., the present invention is directed to power plant for self-supply's class of each garden when scoring Type is constituted, increment distribution network voltage grade and equity occupy unit situation, user type composition situation and the preferential journey of user power utilization Degree situation obtains corresponding hundred-mark system score, remaining index is quantitative target, and the present invention is according to country or the related regulation of industry In relevant standard content, Binding experiment garden operation practical experience and actual conditions be used as according to formulate evaluation criterion, choosing It is more in index all to refer to for profit evaluation model with the broken line type nondimensionalization processing method that generally uses when being directed to multiple attribute synthetical evaluation Mark, i.e., the index quantity is bigger, and higher to reserved portion, garden integrated energy system synthetic operation degree of urgency is higher, can be under Formula carries out nondimensionalization processing, and corresponding hundred-mark system score is calculated;
In formula:It is quantitative target x to reserved portion, xmaxAnd xminIt respectively represents the index score and reaches upper and lower bound When corresponding index value;
(1) generation assets collaboration utilizes link evaluation criterion
Generation assets collaboration using link evaluation criterion include garden power supply confession is horizontal, power plant for self-supply's construction level with from Standby power plant and user-association degree;
Power supply confession in garden is horizontal:
Garden general supply supply level score
Power plant for self-supply's supply level score
Power plant for self-supply's construction level:
Power plant for self-supply's type scoresThe index is qualitative index, and the present invention is according to the component type of garden power plant for self-supply Existing situation and planning situation score, due to waste heat, overbottom pressure, residual air power plant for self-supply carry out deduction and exemption alternative subsidy political affairs Plan, development prospect is preferable, so if power plant for self-supply's type with comprehensive energy using based on class power plant for self-supply, get over by scoring in garden Height,
Power plant for self-supply's capacity score, the existing capacity score of power plant for self-supply
Power plant for self-supply's planned capacity score
Comprehensive energy utilizes the existing capacity accounting score of class power plant for self-supply
Comprehensive energy utilizes class power plant for self-supply planned capacity accounting score
Power plant for self-supply and user-association degree:
Ability score is confessed by power plant for self-supply, existing enterprise
Plan that industrial power plant confesses ability score
(2) power transmission and distribution resource coordinating runs link evaluation criterion
Power transmission and distribution resource coordinating operation link evaluation criterion includes garden transmission of electricity resource efficiency, increment distribution network construction water Flat, increment distribution pilot load electricity consumption and increment power distribution network Allocation of Equity ratio;
Garden transmission of electricity resource efficiency:
Transformer maximum load rate, existing transformer maximum load rate score
Consider the estimated maximum load rate score of the transformer of newly-built load
Transmission line of electricity maximum load rate, existing transmission line of electricity maximum load rate score
Consider the transmission line of electricity maximum load rate score of newly-built load
Increment distribution network construction is horizontal:
Increment distribution network voltage grade, existing increment distribution network voltage ranking scoreThe index is qualitative index, this hair It is bright according to scoring the case where the existing voltage class of increment power distribution network in garden, voltage class is higher, and gained scoring is higher; Plan increment distribution network voltage ranking scoreThe index is qualitative index, and the present invention is according to the rule of increment power distribution network in garden The case where drawing voltage class is scored, and voltage class is higher, and gained scoring is higher;
Increment power distribution network scale
Existing increment power distribution network scale score
Plan increment power distribution network scale score
Increment power distribution network maximum load rate, existing increment power distribution network maximum load rate score
Plan the estimated maximum load rate score of increment power distribution network
Increment distribution pilot load electricity consumption:
Increment distribution pilot annual peak load score
The estimated growth rate score of increment distribution pilot load
Increment distribution pilot year electricity consumption score
The estimated growth rate score of increment distribution pilot year electricity consumption
Increment power distribution network Allocation of Equity ratio:
Equity holding unit scoreThe index is qualitative index, and the present invention is commented according to equity holding unit situation Point, if user in area, electricity power enterprise, with main market players' stock options such as sale of electricity companies, then the scoring of this index is higher;
Main market players's equity accounting score
Increment power distribution network and main market players's degree of association:
Main market players's increment power distribution network degree of possessing score
(3) efficient electricity consumption link evaluation criterion
Efficient electricity consumption link evaluation criterion include garden user's basic horizontal, power trade mode, the preferential degree of electricity consumption with The preferential degree of electricity consumption;
Garden user's basic horizontal:
Garden year electricity consumption level, the horizontal score of garden year electricity consumption
Garden year electricity consumption growth rate score
The horizontal score of garden annual peak load
Garden annual peak load growth rate score
It is expected that each year electricity consumption score in garden
It is expected that the horizontal score of each annual peak load in garden
User type scoreThe index is qualitative index, and the present invention forms situation according to garden user type and comments Point, the scoring of this index is higher if based on big industrial user, industry and commerce user;
Emphasis user power consumption accounting score
Power trade mode:
Emphasis user participates in direct dealing electricity accounting score
Emphasis user entrusts sale of electricity company purchase of electricity accounting score
The preferential degree of electricity consumption:
Emphasis user enjoys preferential policies electricity accounting score
Electricity consumption preferential tax revenue degree scoreThe index is qualitative index, the use that the present invention is enjoyed according to garden user Electric preferential tax revenue degree scores;
2 electricity consumption preferential tax revenue degree standards of grading table of table
The preferential degree score of electricity consumption electricity priceThe index is qualitative index, the electricity that the present invention is enjoyed according to garden user The preferential degree of valence scores;
By taking the garden user of northwest China province enjoys electricity price preferential policy situation as an example, to meet national industrial policies, Trial zone industrial pattern, it is up to standard to reach industry advanced technology standard, energy consumption environmental-friendly, 20,000,000 yuan of the prior year output value or more and electricity consumption The emerging strong industry enterprise of 3,000,000 kilowatt hours or more is measured, productive power subsidizes 5 points/kilowatt hour;To the national new and high technology of acquirement The enterprise of identification, cloud computing, big data enterprise, 3,000,000 kilowatt hour of prior year electricity consumption or more, productive power subsidy 6 points/thousand Watt-hour;The present invention is 90 points of the garden marking that clear user enjoys the subsidy of 5 points/kilowatt hour, enjoys 6 points/kilowatt for clear user When the garden subsidized give a mark 95 points;
The preferential degree standards of grading table of 3 electricity consumption electricity price of table
As depicted in figs. 1 and 2, S3: ranking method uses analytic hierarchy process (AHP) and weighted mean method for integrated evaluating method, It is commented with completing the collaboration of garden generation assets using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency Point, under the premise of establishing indicator evaluation system and evaluation criterion, garden generation assets are obtained using calculated with weighted average method Collaboration using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency score, resettle based on hair, it is defeated, The garden whole synthesis energy resource system synthetic operation degree of urgency of the degree of urgency scoring event of three links of electricity consumption constant current journey really;
(1) analytic hierarchy process (AHP) determines index weights
Present invention selection carries out tax power to same layer index using analytic hierarchy process (AHP), determines the weight of above-mentioned each evaluation index, The step of determining index weights with analytic hierarchy process (AHP) is as follows:
Tectonic remnant basin analyzes structure, and application level analytic approach problem analysis first has to a problem methodization, stratification, structure The model for producing an analytic hierarchy structure, needing the clear decision of policymaker target to be achieved is what, what target was included It is arranged side by side or subordinate relation which and each influence factor influence factor (i.e. rule layer element), which have between: coordination Factor is in same level;The factor of subordinate relation is listed in adjacent level, typical AHP Model structure;
As shown in figure 3, line designates existing connection between upper and lower level element, top is destination layer, general to only have One element is rule layer below destination layer, i.e., the set of the factor composition of influence target, usual rule layer can have multilayer, That is it can establish subhierarchy between rule layer level, subhierarchy is subordinated to some element in main layer time, solution layer It is generally placed upon the bottom of hierarchical structure, the element in solution layer is exactly the object that we judge, sort, select;
Judgement Matricies, people provide judgement to factor relative importance each in each level, these judgements are by drawing Enter suitable scale to be showed with numerical value, is write as judgment matrix;Judgment matrix indicate be directed to upper level factor, this level with The comparison in relation to relative importance between factor;For n element, obtain two-by-two multilevel iudge Matrix C= (Cij)n×n
Judgement Matricies take following form:
In formula: CijImportance scale value of the expression factor i and factor j relative to target,
Judgment matrix component CijThe size of value generallys use 1~9 Scale Method and provides,
4 judgment matrix scale of table and its meaning table
Judgment matrix C has the property that
By matrix theory it is found that matrix (Cij)n×nIt is positive inverse matrix, in real work, it is only necessary to write out (Cij)n×nIt is upper Triangle or lower triangular form, if positive inverse matrix (Cij)n×nThere is C for arbitrary i, j, kij·Cjk=Cik, claim the square at this time Battle array is Consistent Matrix;In real work, to guarantee that judgment matrix is with uniformity, need to carry out consistency check;
The consistency check of judgment matrix keeps sentencing in order to which the conclusion for guaranteeing that application level analytic approach is analyzed is reasonable The consistency of disconnected thinking, it is also necessary to consistency check be carried out to the judgment matrix of construction, introduced in analytic hierarchy process (AHP) and judge square The negative average value of remaining characteristic root other than battle array Maximum characteristic root deviates the index of consistency as measurement judgment matrix, that is, uses
The value of CI is bigger, shows that the degree of judgment matrix deviation crash consistency is bigger;CI value is smaller (close to 0), table The consistency of bright judgment matrix is better;
Requirement of the judgment matrix of same order to CI value be not different, introduces the Aver-age Random Consistency Index RI of judgment matrix Value, for 1~9 rank judgment matrix;
The average coincident indicator value table immediately of 5 judgment matrix of table
When random consistency ratio
Think that judgment matrix has satisfied consistency, otherwise just needs to adjust judgment matrix, with satisfied Consistency;
Using root method parameter weight:
Calculate each row element C of judgment matrixijRootObtain vectorWherein,
By vectorNormalization, obtains weight Wi s, the single level weight of as i-th index;
Calculate sub- index final weight W at different levelsi,
Wi=Wi fWi s
Wherein, Wi fFor the weight of the upper layer index of i-th of index, Wi sFor the single level weight of i-th of index;
(1) composite rating method
It chooses weighted mean method and completes the collaboration of garden generation assets using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency It grades with efficient electricity consumption degree of urgency, weighted mean method is the basic skills of index comprehensive, and Computing Principle is simple and clear, is suitable for work Cheng Shiji, and determine by analytic hierarchy process (AHP) the single level weight of each index, upper layer index, which can be obtained, with calculated with weighted average method comments Point, and so on can be calculated garden generation assets collaboration using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and Efficient electricity consumption degree of urgency score, according to hair, defeated, three links of electricity consumption degree of urgency scoring event, it is integrally comprehensive that analysis obtains garden Close the degree of urgency of energy resource system synthetic operation;
It is scored at 40 points and the following are safety level, score is early warning grade in 40-60/(including 60 points), and score exists (including 80 points) are urgent grade between 60-80, and score is high-risk grade between 80-100 (including 100 points),
According to the data investigation and analysis to each typical garden, if it is considered herein that test garden hair, it is defeated, in each link There is a certain link to reach high-risk grade (80 points or more), then garden whole synthesis energy resource system synthetic operation degree of urgency reaches high-risk Grade, in the case where each link does not have high-risk grade score: two or more link reaches urgent grade if it exists and score is 70 Point or more, then evaluating garden whole synthesis energy resource system synthetic operation degree of urgency is also high-risk grade, if there is a certain link to reach tight Compel grade, then garden whole synthesis energy resource system synthetic operation degree of urgency reaches urgent grade, does not have high-risk grade and urgent in each link In the case where grade score: two or more link reaches early warning grade if it exists and score is at equal 50 points or more, then it is whole to evaluate garden Body integrated energy system synthetic operation degree of urgency is also urgent grade, if there is a certain link to reach early warning grade, garden whole synthesis Energy resource system synthetic operation degree of urgency belongs to early warning grade, if all links are safety level (40 points or less), garden is integrally comprehensive It closes energy resource system synthetic operation degree of urgency and is in sensitivity level range, each link degree of urgency grading and integrated energy system synthetic operation The relationship garden of degree of urgency grading;
As shown in figure 4, the collaboration of input generation assets utilizes degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and effective The respective score y of three links of electric degree of urgency1, y2, y3, garden integrated energy system synthetic operation degree of urgency decision flow chart takes y1, y2, y3Middle maximum value L=max { y1,y2,y3, minimum value S=min { y1,y2,y3, median M, according in flow chart Sequence judges garden whole synthesis energy resource system synthetic operation degree of urgency.
Present invention is generally directed to a kind of rating models for market-oriented garden energy synthetic operation degree of urgency, are provided by power generation Source collaboration establishes experiment garden using three degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency aspects Grade integrated energy system synthetic operation degree of urgency rating system, index system are divided into level Four, more comprehensively consider and provide electricity for oneself Factory, increment distribution network construction and planning situations such as, secondly according to country or the related regulation of industry in relevant standard content, in conjunction with The practical experience and actual conditions for testing garden operation are used as according to evaluation criterion is formulated, finally select using analytic hierarchy process (AHP) and Weighted mean method is integrated evaluating method, is run with completing the collaboration of garden generation assets using degree of urgency, power transmission and distribution resource coordinating Degree of urgency and the scoring of efficient electricity consumption degree of urgency, and establish the garden based on hair, defeated, three links of electricity consumption degree of urgency scoring event Whole synthesis energy resource system synthetic operation degree of urgency constant current journey really.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency, which comprises the following steps:
S1: establishing standard diagrams system, by generation assets collaboration using degree of urgency, power transmission and distribution resource coordinating run degree of urgency with And efficiently three aspects of electricity consumption degree of urgency establish garden integrated energy system synthetic operation degree of urgency standard diagrams system;
S2: metrics evaluation standard comprising generation assets collaboration runs link using link evaluation criterion, power transmission and distribution resource coordinating Evaluation criterion and efficient electricity consumption link evaluation criterion;
S3: ranking method uses analytic hierarchy process (AHP) and weighted mean method for integrated evaluating method, to complete garden generation assets association It scores with using degree of urgency, power transmission and distribution resource coordinating operation degree of urgency and efficient electricity consumption degree of urgency.
2. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 1, feature exist In: in S1, generation assets collaboration includes horizontal garden power supply confession, power plant for self-supply's construction level using degree of urgency and provides electricity for oneself Factory and user-association degree.
3. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 2, feature exist In: the ability that power supply confession horizontal reverse in garden has answered power supply to meet own power demand, power plant for self-supply's construction level includes certainly Standby power plant's type, power plant for self-supply's capacity and comprehensive energy utilize class power plant for self-supply capacity accounting, power plant for self-supply and user-association degree It has reacted power plant for self-supply, existing enterprise confession ability and planning industrial power plant confesses ability.
4. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 1, feature exist In: in S1, power transmission and distribution resource coordinating operation degree of urgency include garden transmission of electricity resource efficiency, increment distribution network construction it is horizontal, Increment distribution pilot load electricity consumption, increment power distribution network Allocation of Equity ratio and increment power distribution network and main market players's degree of association.
5. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 4, feature exist In: garden transmission of electricity resource efficiency includes transformer maximum load rate and transmission line of electricity maximum load rate, increment distribution network construction water Flat includes increment distribution network voltage grade, increment power distribution network scale, increment power distribution network maximum load rate, and increment distribution pilot is negative Lotus electricity consumption includes increment distribution pilot annual peak load, the estimated growth rate of increment distribution pilot load, the examination of increment distribution Point year electricity consumption and the estimated growth rate of increment distribution pilot year electricity consumption, increment power distribution network Allocation of Equity ratio includes equity Hold unit and main market players's equity accounting, increment power distribution network and main market players's degree of association include main market players's increment power distribution network Degree of possessing.
6. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 1, feature exist In: in S1, efficient electricity consumption degree of urgency includes garden user's basic horizontal, power trade mode and the preferential degree of electricity consumption, garden User's basic horizontal include garden year electricity consumption level, user type and emphasis user power consumption accounting, power trade mode include Emphasis user participates in direct dealing electricity accounting, emphasis user entrusts sale of electricity company purchase of electricity accounting, and the preferential degree of electricity consumption includes Emphasis user enjoys preferential policies electricity accounting, electricity consumption preferential tax revenue degree and the preferential degree of electricity consumption electricity price.
7. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 1, feature exist In: in S2, generation assets collaboration using link evaluation criterion include garden power supply confession is horizontal, power plant for self-supply's construction level with Power plant for self-supply and user-association degree, power transmission and distribution resource coordinating operation link evaluation criterion include garden transmission of electricity resource efficiency, increment Distribution network construction level, increment distribution pilot load electricity consumption and increment power distribution network Allocation of Equity ratio, efficient electricity consumption link are commented Price card standard includes garden user's basic horizontal, power trade mode and the preferential degree of electricity consumption.
8. a kind of rating model for market-oriented garden energy synthetic operation degree of urgency according to claim 1, feature exist In: it in S3, determines index weights and composite rating, can be divided according to hair, defeated, three links of electricity consumption degree of urgency scoring event Analysis obtains the degree of urgency of garden whole synthesis energy resource system synthetic operation.
CN201910472844.9A 2019-05-31 2019-05-31 A kind of rating model for market-oriented garden energy synthetic operation degree of urgency Pending CN110298551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910472844.9A CN110298551A (en) 2019-05-31 2019-05-31 A kind of rating model for market-oriented garden energy synthetic operation degree of urgency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910472844.9A CN110298551A (en) 2019-05-31 2019-05-31 A kind of rating model for market-oriented garden energy synthetic operation degree of urgency

Publications (1)

Publication Number Publication Date
CN110298551A true CN110298551A (en) 2019-10-01

Family

ID=68027383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910472844.9A Pending CN110298551A (en) 2019-05-31 2019-05-31 A kind of rating model for market-oriented garden energy synthetic operation degree of urgency

Country Status (1)

Country Link
CN (1) CN110298551A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191954A (en) * 2020-01-07 2020-05-22 国家电网有限公司 Comprehensive energy technology adaptability evaluation method
CN113762961A (en) * 2021-08-17 2021-12-07 国网山东省电力公司信息通信公司 Trusted intelligent transaction method, system, computer equipment and terminal
CN113807699A (en) * 2021-09-17 2021-12-17 陕西燃气集团新能源发展股份有限公司 Flexible operation evaluation method for power distribution network

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103903058A (en) * 2012-12-26 2014-07-02 中国电力科学研究院 Assessment method of efficient operation of intelligent power distribution network
CN104134166A (en) * 2014-07-30 2014-11-05 国家电网公司 Method for calculating overall coordination indexes of power source, power grid and load
CN104636988A (en) * 2015-02-11 2015-05-20 国家电网公司 Active power distribution network assessment method
CN106127377A (en) * 2016-06-21 2016-11-16 国家电网公司 A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
CN106447533A (en) * 2016-09-14 2017-02-22 国网上海市电力公司 Evaluation method based on urban electric energy safety development indexes
CN107169614A (en) * 2017-07-18 2017-09-15 青岛电力设计院有限公司 A kind of coordination optimization operation method based on source net lotus
CN107609779A (en) * 2017-09-21 2018-01-19 国网上海市电力公司 A kind of comprehensive benefit assessment method of distributed energy management system
CN108537409A (en) * 2018-03-15 2018-09-14 广东电网有限责任公司电网规划研究中心 A kind of industrial park power distribution network collaborative planning method considering multiple-energy-source coupled characteristic
CN109784783A (en) * 2019-03-05 2019-05-21 云南电网有限责任公司 A kind of power grid and power supply coordination assessment method and device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103903058A (en) * 2012-12-26 2014-07-02 中国电力科学研究院 Assessment method of efficient operation of intelligent power distribution network
CN104134166A (en) * 2014-07-30 2014-11-05 国家电网公司 Method for calculating overall coordination indexes of power source, power grid and load
CN104636988A (en) * 2015-02-11 2015-05-20 国家电网公司 Active power distribution network assessment method
CN106127377A (en) * 2016-06-21 2016-11-16 国家电网公司 A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
CN106447533A (en) * 2016-09-14 2017-02-22 国网上海市电力公司 Evaluation method based on urban electric energy safety development indexes
CN107169614A (en) * 2017-07-18 2017-09-15 青岛电力设计院有限公司 A kind of coordination optimization operation method based on source net lotus
CN107609779A (en) * 2017-09-21 2018-01-19 国网上海市电力公司 A kind of comprehensive benefit assessment method of distributed energy management system
CN108537409A (en) * 2018-03-15 2018-09-14 广东电网有限责任公司电网规划研究中心 A kind of industrial park power distribution network collaborative planning method considering multiple-energy-source coupled characteristic
CN109784783A (en) * 2019-03-05 2019-05-21 云南电网有限责任公司 A kind of power grid and power supply coordination assessment method and device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
古吉超,王灵龙,覃玉: "配电网发展协调性综合评价研究", 《电力科学与工程》 *
叶彬: "配电网发展协调性评估", 《电力***及其自动化学报》 *
张坤,季昌国,刘衍平,孙立江: "智能电网下新能源与常规能源协调发展", 《华北电力技术》 *
杜鹏宇: "河北省南部电网"十一五"电网与电源发展协调性分析", 《中小企业管理与科技》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191954A (en) * 2020-01-07 2020-05-22 国家电网有限公司 Comprehensive energy technology adaptability evaluation method
CN113762961A (en) * 2021-08-17 2021-12-07 国网山东省电力公司信息通信公司 Trusted intelligent transaction method, system, computer equipment and terminal
CN113762961B (en) * 2021-08-17 2023-08-11 国网山东省电力公司信息通信公司 Trusted intelligent transaction method, system, computer equipment and terminal
CN113807699A (en) * 2021-09-17 2021-12-17 陕西燃气集团新能源发展股份有限公司 Flexible operation evaluation method for power distribution network

Similar Documents

Publication Publication Date Title
Lee et al. Multi-criteria decision making on strategic selection of wind farms
CN106127377A (en) A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
Jianwei et al. Configuration optimization and benefit allocation model of multi-park integrated energy systems considering electric vehicle charging station to assist services of shared energy storage power station
CN110298551A (en) A kind of rating model for market-oriented garden energy synthetic operation degree of urgency
Zhang et al. Architecture design and demand analysis on application layer of standard system for ubiquitous power Internet of Things
Shinde et al. Agent-based models in electricity markets: A literature review
Wang et al. Research on the evaluation index system of “new energy cloud” operation mode based on CRITIC weighting method and AHP method
Song et al. Peer-to-peer trade and the economy of distributed PV in China
Upreti et al. Challenges of India's power transmission system
Milligan et al. Examination of potential benefits of an energy imbalance market in the western interconnection
WO2022011968A1 (en) Multi-agent investment proportion optimization method and system based on cooperative game
Zatsarinnaya et al. Outlook on the development of smart energy systems
Gitelman et al. Technology entrepreneurship as a factor of sustainable energy in smart cities
CN115170189A (en) Fine pricing method, device, equipment and medium for power industry
Guo et al. Virtual Power Plant Operation Based on Entropy-Weight-Improved Cloud Risk Assessment Model.
Chrysanthopoulos et al. Characterization of new flexible players: Deliverable D3. 2
Zhang et al. The risk of power sales revenue in power retail market based on VAR model
Liu et al. Evaluation method for assessing the auxiliary service transaction mechanism in regional power markets
Zhang et al. Analysis of Assessment of Power Grid Corp Asset Management Based on Set Pair Analysis Model
Li et al. New Energy Cloud Industrial Internet Platform Simulation Analysis Research
Gu et al. Maturity Evaluation of Provincial Green Power Trading Market Based on New Fuzzy Comprehensive Evaluation Method
GONZÁLEZ RUIZ TSO-DSO coordination schemes for flexibility markets
Guo et al. Design and Application of the Full Life Cycle of Electronic Transfer of GIS Platform Operation and Distribution Integrated Distribution Network
da Costa Pinto Repartition Algorithms in Energy Communities
Ghiani et al. Collective Self-Consumption in Smart Buildings: a Case Study of the Lightness Project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191001