CN110290028A - A kind of the data safety system safety testing device and method of distributed storage - Google Patents

A kind of the data safety system safety testing device and method of distributed storage Download PDF

Info

Publication number
CN110290028A
CN110290028A CN201910645904.2A CN201910645904A CN110290028A CN 110290028 A CN110290028 A CN 110290028A CN 201910645904 A CN201910645904 A CN 201910645904A CN 110290028 A CN110290028 A CN 110290028A
Authority
CN
China
Prior art keywords
test
optical fiber
power
unit
main control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910645904.2A
Other languages
Chinese (zh)
Other versions
CN110290028B (en
Inventor
王安
王振东
黄贤强
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JINGYI QIANGYUAN TECHNOLOGY Co Ltd
Original Assignee
BEIJING JINGYI QIANGYUAN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JINGYI QIANGYUAN TECHNOLOGY Co Ltd filed Critical BEIJING JINGYI QIANGYUAN TECHNOLOGY Co Ltd
Priority to CN201910645904.2A priority Critical patent/CN110290028B/en
Publication of CN110290028A publication Critical patent/CN110290028A/en
Application granted granted Critical
Publication of CN110290028B publication Critical patent/CN110290028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11CSTATIC STORES
    • G11C29/00Checking stores for correct operation ; Subsequent repair; Testing stores during standby or offline operation
    • G11C29/56External testing equipment for static stores, e.g. automatic test equipment [ATE]; Interfaces therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1097Protocols in which an application is distributed across nodes in the network for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Structure Of Telephone Exchanges (AREA)

Abstract

The present invention relates to the data safety system safety testing devices and method of a kind of distributed storage, it include: the test power input unit being connect with electric main and the test power output unit being connect with multiple distributed storage devices, and the test optical fiber input unit being connect with interchanger and the test optical fiber output unit being connect with distributed storage device, test power input unit is connected with test power output unit by power on-off device, it is connected between test optical fiber input unit and test optical fiber output unit by optical fiber plug-in and pull-out device, power on-off device and optical fiber plug-in and pull-out device are connect with wired or wireless remote controler.The present invention is disconnected in the way of remote control in the physics of operation room far-end operation power supply and optical fiber, it can be that the plug movement such as optical fiber and power cable is automatically performed in 10 microseconds to longer range in time interval, it is applicable not only to quick operating test scene, and the scene for being suitable for being tested for critical value.

Description

A kind of the data safety system safety testing device and method of distributed storage
Technical field
The present invention relates to the data safety system safety testing devices and method of a kind of distributed storage, are a kind of protection departments of computer science The safety detection device and method of system are a kind of test devices and method for Information Security.
Background technique
In the work of distributed storage cluster, (such as node power supply failure, optical patchcord abjection are disconnected due to various reasons for meeting Deng) cause wherein some node or certain several node that can not connect with other nodes, so as to lead to data safety grade Not Xia Jiang, data lost contact or loss of data.Traditional test method needs tester ceaselessly to travel to and fro between equipment room and behaviour Between work, repeat the operation and step that plug optical fiber and power cable.It can not in a few seconds quickly additionally, due to tester Travel to and fro between equipment room and operation room, therefore much need to carry out quick operating test scene, use traditional test method It is unable to complete.
Summary of the invention
In order to overcome the problems of the prior art, the invention proposes a kind of data safety system safety testing devices of distributed storage And method.The device and method need automatic plug optical fiber according to test by optical fiber control unit, and automatically record and It is interacted with automatic test center and is automatically performed test optical fiber.
The object of the present invention is achieved like this: a kind of data safety system safety testing device of distributed storage, comprising: with friendship The test power input unit of stream city electrical connection and the test power output unit being connect with multiple distributed storage devices, and The test optical fiber input unit being connect with interchanger and the test optical fiber output unit being connect with distributed storage device, it is described Test power input unit and test power output unit are connected by power on-off device, the test optical fiber input unit and It is connected between test optical fiber output unit by optical fiber plug-in and pull-out device, the power on-off device and optical fiber plug-in and pull-out device and wired or nothing The remote controler of line connects.
Further, the test power input unit at least two groups of electric main input terminals, the test electricity Source output unit includes at least two groups, every group of at least two AC mains sockets.
Further, the power supply is connected between the electric main input terminal and each AC mains socket On-off device, the power on-off device are mechanical relay or solid-state relay.
Further, the test optical fiber input unit and test optical fiber output unit be respectively provided at least two groups, it is every At least two external optical patchcord sockets of group.
Further, each input, output of the test optical fiber input unit and test optical fiber output unit are external The corresponding installation up and down of optical patchcord socket, each corresponding input export electronic optical fiber are arranged between external optical patchcord socket Plug-in and pull-out device.
Further, the electronic optical fiber plug-in and pull-out device includes: rack-mount motor and adapter, the electricity Machine drives shift fork, and the shift fork stirs plugging member, and the plugging member is connect with optical patchcord plug, with the optical patchcord The optical patchcord socket that plug matches is direct or indirect to be fixedly connected with bracket.
Further, the remote controler is wired or wireless network controller, comprising: main control unit, the master control Unit and interactive unit, power conversion unit, data storage cell, network unit, optical fiber plug unit, on/off unit connect It connects.
Further, the interactive unit includes touch screen.
Further, described each unit is mounted in rectangular housing, the touch screen and each electric main electricity Supply socket is mounted in same panel, and the external optical patchcord socket installation of each group is on the side panels.
A kind of the step of Information Security test method of the distributed storage using above-mentioned apparatus, the described method, is such as Under:
Step 1, it connects: network unit is connect with automatic test center and multiple tested distributed storage devices, by test electricity Source input unit, test power output unit are connected on the power input of electric main Yu each distributed storage device Between end, optical fiber input unit will be tested, test optical fiber output unit is connected on interchanger and each distributed storage device Between optical fiber input port;
Step 2, initialize: automatic test center sends initialization command to main control unit, and main control unit is inserted to each optical fiber It pulls out device and sends whole bind commands, the optical patchcord plug of whole optical fiber plugs is inserted into corresponding optical patchcord socket, complete At optical fiber connecting moves;Main control unit sends whole bind commands to each power on-off device, and power on-off device is all closed, complete At power supply connecting moves;
Step 3, obtain test configurations information: main control unit sends initialization to automatic test center and completes order;Automation Test center sends this test configurations information, the quantity including distributed storage device to main control unit, and each distribution is deposited 10,000,000,000 optic modules and power module for storing up equipment are inserted with each power supply for testing power input unit, test power output unit The number and corresponding relationship of seat, and each optical patchcord plug of test optical fiber input unit, test optical fiber output unit are inserted The number and corresponding relationship of seat;
Step 4, store this test configurations information: main control unit sends this test configurations information to data storage cell, number Configuration information is stored in memory according to storage unit;
Step 5, receive test command: main control unit sends data to automatic test center and saves success command, and automation is surveyed Examination center sends test assignment to main control unit;Test assignment is divided into 3 seed types: conventional testing procedures, QuickTest solution With critical point testing scheme;The conventional testing procedures include but is not limited to: each optical fiber link and power chain is sequentially opened Road and timing;QuickTest solution includes but is not limited to: 100ms is quickly connected after optical fiber link is all off, power link is handed over For disconnection 50ms;Critical point testing scheme includes but is not limited to: 20GB file is written to storage, disconnects all electricity after write-in immediately Source link;
Step 6, starting test: the instruction that main control unit is sent according to automatic test center, from data storage cell lookup pair 10,000,000,000 optic modules answered, corresponding optical fiber plug element number and power module and test power input unit, test power supply The number of each power outlet of output unit sends operational order to corresponding optical fiber plug-in and pull-out device and power on-off device respectively, And timing is carried out as needed;
Step 7, obtain test data: main control unit obtains distributed storage by network unit every specified time interval RAID group state, cluster state, OSD state, carry state, NAS share state, whether read-write, read-write delay time letter It ceases, whether the data in test distributed storage are complete and can be correctly read and be written.
Step 8, judge: main control unit judges whether termination timing according to the information obtained from distributed storage, if Then main control unit terminates "Yes" later to automatic test center transmission data integrity, data safety attribute and clocking information, If "No" is connected to the test assignment that a new round is sent at automatic test center to main control unit, step 5 is returned to.
The beneficial effect comprise that: the present invention is in the way of remote control in operation room far-end operation power supply and optical fiber Physics disconnect, to test whether storage equipment data for storing in the case where power supply disconnects and optical cable disconnects lose.It is described Method can time interval be 10 microseconds to longer range in be automatically performed plug optical fiber and power cable etc. act, root The action script set is executed according to test case, and fast quick-action is carried out according to the change of distributed storage company-data or state Make, is applicable not only to quick operating test scene, and the scene for being suitable for being tested for critical value.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural principle block diagram of one described device of the embodiment of the present invention;
Fig. 2 is that the embodiment of the present invention five, the optical patchcord socket arrangement of six described devices and electronic optical fiber plug-in and pull-out device structure are shown It is intended to;
Fig. 3 is that the embodiment of the present invention five, the optical patchcord socket arrangement of six described devices and electronic optical fiber plug-in and pull-out device structure are shown It is intended to, is the A direction view in Fig. 2;
Fig. 4 is the structural principle block diagram of seven described device of the embodiment of the present invention;
Fig. 5 is the appearance schematic diagram of nine described device of the embodiment of the present invention;
Fig. 6 is the side panel schematic diagram of nine described device of the embodiment of the present invention, be in Fig. 3 B to C direction view in Fig. 5.
Specific embodiment
Embodiment one:
The present embodiment is a kind of data safety system safety testing device of distributed storage, as shown in Figure 1.The present embodiment includes: and hands over The test power input unit of stream city electrical connection and store the test power output units that connect of equipment with multiple, and with exchange The test optical fiber input unit of machine connection and the test optical fiber output unit being connect with distributed storage device, the test electricity Source input unit is connected with test power output unit by power on-off device, the test optical fiber input unit and test light Connected between fine output unit by electronic optical fiber plug-in and pull-out device, the power on-off device and electronic optical fiber plug-in and pull-out device and it is wired or Wireless remote controler connection.
The basic ideas of the present embodiment are: in the equipment room for placing storage equipment, the on-off system of power supply and optical fiber is set, In the way of remote control the physics of operation room far-end operation power supply and optical fiber disconnect, with test storage equipment power supply disconnect and Whether the data that optical cable stores in the case where disconnecting lose.Therefore, the present embodiment is mainly led to by the on/off and optical fiber that are remotely controlled It is disconnected to constitute.
The effect of test power input unit is connection electric main, that is, connects 220 volts of alternating currents or other alternating currents electricity Net outlet.It can connect 220 volts of AC power sources, multiple 220 volts of AC power sources inputs also can be set, it is different to test Power grid difference between AC mains.
The effect of test power output unit is the power input of connection storage equipment, and multiple power supplys can be set and insert Seat is directly inserted in the attaching plug for storing equipment on these sockets, eliminates the trouble of wiring.Power outlet can be grouped and set It sets, each group power outlet exports from different electric main power grids connect respectively.
Since the present embodiment described device is connected between the outlet of electric main power grid and storage equipment, test power supply is defeated The disconnection and connection for entering unit and testing between power output unit can play the disconnection and connection for storing equipment power supply.Cause This present embodiment is provided with power on-off device between test power input unit and test power output unit.Power on-off device Circuit physical can be made to disconnect, that is, attaching plug is come out of the socket, cut off the power.
To realize that physics disconnects, power on-off device is preferably this most ancient power supply shutter means of mechanical relay.It removes Except mechanical relay, solid-state relay can also be used, or even a kind of ancient electronic electric brake can also be used, but this The reaction speed of electronic electric brake is slower, is not suitable for doing the test of power supply flash.
In addition to power supply disconnects, another the important interface for storing equipment is data input and output, i.e. the connection of optical cable.For Realize that the physics of optical cable disconnects, the present embodiment uses electronic optical cable plug-in and pull-out device.
Electronic optical cable plug-in and pull-out device generates physical displacement using motor or electromagnet (electromagnetic coil), drags inserting for optical patchcord Head movement realizes that optical patchcord plug inserts or pull out the movement of optical patchcord socket.
For convenience of connection optical cable, the present embodiment is provided with test optical fiber input unit and test optical fiber output unit.Two Unit is all respectively provided with multiple groups, every group of multiple mutual corresponding optical patchcord socket.Since the present embodiment described device is string It is associated between interchanger and storage equipment, when test, the optical cable of interchanger (or memory) can be pulled up, be inserted in the present apparatus On, then be inserted in the present apparatus with an other optical cable, the other end is inserted on memory (or interchanger), and wiring is very convenient.
The remote controler can be wired or wireless network controller, letter also can be used there are many form Single rf receiver and transmitter or infrared controller controls power on-off device and the plug of electronic optical fiber with the simple action of switch Device into and out movement.WI-FI can be used in network-control or the wireless communication mode of extended formatting connects, and wired company It connects, can use cable, such as the optical cable or Ethernet of connection.
It can connect an automatic test center using network controller wirelessly or non-wirelessly, using this with test The automatic test center of program automatically issues various on-off and plug signal, and automatically record test process and test knot Fruit.This automatic test center, which can be, specially to be designed, and can also buy off-the-shelf on the market.
Embodiment two:
The present embodiment is the improvement of embodiment one, is refinement of the embodiment one about test power input unit.The present embodiment institute The test power input unit stated at least two groups of electric main input terminals, the test power output unit include at least two Group, every group of at least two AC mains sockets.
Test power input unit at least two groups of electric main input terminals are meant that: the present embodiment described device is at least Two electric main inputs are accessed, can connect different AC mains sockets, respectively to test different outlets Electric main situation, such as power surge, power supply disturbance.Generally there are two types of shapes for the input of the electric main of electric appliance or electronic equipment Formula, one is lead-out wire is directly used, one is setting Special alternating-current mains power socket, there is power supply line the end of a thread, line tail to insert Head.
The how many a power outlets of power output unit setting are tested in the present embodiment can cut off how many storages of test The power supply of equipment.Test power output unit includes that at least two groups, every group of at least two AC mains sockets are meant that: Multiple power outlets are set, these power outlets are divided into several groups, respectively correspond multiple devices.Such as 6 sockets of setting, every 3 A socket is one group.
Embodiment three:
The present embodiment is the improvement of above-described embodiment, is refinement of the above-described embodiment about power on-off device.Described in the present embodiment Electric main input terminal and each AC mains socket between connect the power on-off device, the on/off Device is mechanical relay or solid-state relay.
Power on-off device described in the present embodiment be in order to by it is multiple storage equipment dumps, therefore, an on-off Device corresponds to a power outlet.On-off device is mainly relay, this equipment that can disconnect power supply physics.Relay can be with It is mechanical relay or solid-state relay.When using mechanical relay, disconnecting with the time interval of closure is 10 milliseconds ~ nothing Limit, when using solid-state relay, disconnecting with the time interval of closure is 10 microseconds ~ unlimited.It therefore can mould using solid-state relay The case where being encountered in the true production scene such as quasi- power supply flash.Opening and closing contact on relay and the electricity on distributed storage device Source module is connected with electric main (220V alternating current), to complete the control action of the on/off of distributed storage.By In there may be short-circuit behaviors in make and break process, so that 220V alternating current is reversely poured into remote controler (surge), remote controler is caused to burn It ruins.To avoid this phenomenon, photoelectrical coupler can be set between relay and remote controler, when surge generates, make to exchange Reverse impact in alternating current is converted into thermal energy in the luminous energy that photoelectrical coupler generates, and photoelectrical coupler is burnt, to avoid damaging Bad remote controler.
Example IV:
The present embodiment is the improvement of above-described embodiment, is above-described embodiment about test optical fiber input unit and test optical fiber output The refinement of unit.Test optical fiber input unit described in the present embodiment and test optical fiber output unit be respectively provided at least two groups, Every group of at least two external optical patchcord sockets.
Test optical fiber input unit described in the present embodiment and test optical fiber output unit are respectively provided at least two groups, every group At least two external optical patchcord sockets are meant that: multiple optical patchcord sockets are arranged in test optical fiber input unit, by these Optical patchcord socket is divided into several groups, and 12 optical patchcord sockets are such as arranged, this 12 optical patchcord sockets are divided into 3 groups, every group 4 optical patchcord sockets.
The optical patchcord socket number for testing optical fiber output unit and the optical patchcord socket for testing optical fiber input unit are It is identical, and correspond.That is being surveyed if test optical fiber input unit is provided with 12 optical patchcord sockets Examination optical fiber output unit is also provided with 12 optical patchcord sockets, this 12 optical patchcord sockets is also divided into 3 groups, every group of 4 light Fine wire jumper socket.
Embodiment five:
The present embodiment is the improvement of above-described embodiment, is above-described embodiment about test optical fiber input unit and test optical fiber output The refinement of unit.Each input, the output of test optical fiber input unit described in the present embodiment and test optical fiber output unit are outer Connect the corresponding installation of about 1 optical patchcord socket, each corresponding input exports electronic light is arranged between external optical patchcord socket Fine plug-in and pull-out device 2, as shown in Figure 2,3.
The setting of the present embodiment is primarily to convenient for identifying and connecting optical cable.The infrared optical fiber for testing optical fiber input unit is jumped The upper row that line may be mounted at shell side panel 302 (is i.e. mounted on the infrared optical fiber jumper wire plug of a row on panel in Fig. 3 101), and optical patchcord socket that next row then installs test optical fiber output unit (is i.e. mounted on the outer of panel next row in Fig. 3 Optical patchcord plug 102), as long as on the contrary, the corresponding optical patchcord socket of two units corresponds.Upper and lower two Optical patchcord optical cable 4 links together, and realizes the effect of the optical cable plug (physics disconnection) of disengaging.
Equally, electronic optical fiber plug-in and pull-out device may be mounted on the optical patchcord socket of test optical fiber input unit, can also be with It is mounted on the optical patchcord socket of test optical fiber output unit, electronic optical fiber plug-in and pull-out device may be mounted at row's light in other words On fine wire jumper socket, also it may be mounted on next row optical patchcord socket.
Embodiment six:
The present embodiment is the improvement of above-described embodiment, is refinement of the above-described embodiment about electronic optical fiber plug-in and pull-out device.The present embodiment The electronic optical fiber plug-in and pull-out device includes: the motor 202 being mounted on bracket 201, and the motor drives shift fork 204, described Shift fork stir plugging member 205, the plugging member is connect with inner fiber jumper wire plug 206 and adapter 203, with the interior light The inner fiber wire jumper socket 207 that fine jumper wire plug matches is direct or indirect to be fixedly connected with bracket, as shown in Figure 2,3.
The working principle of the present embodiment is: (referring to the direction in Fig. 3), shift fork rotates counterclockwise when motor rotates counterclockwise, Shift fork is stirred plugging member and is moved right, and drives adapter and inner fiber jumper wire plug to move right together, inner fiber wire jumper is inserted Head is extracted from inner fiber wire jumper socket;When motor rotates clockwise, shift fork is rotated clockwise, and shift fork is stirred plugging member and transported to the left It is dynamic, it drives adapter and inner fiber jumper wire plug to move downward together, inner fiber jumper wire plug is inserted into inner fiber wire jumper socket In, i.e. the difference movement that can realize optical patchcord clockwise or counterclockwise of control motor.
It should be noted that drawing in Fig. 3 is a kind of double-line electric plug-in and pull-out device, i.e., two optical cables can be plugged simultaneously.This The design of sample can test more optical cables simultaneously, improve work efficiency.
The bracket be strip, all parts of electronic optical fiber plug-in and pull-out device it is all rack-mount or with bracket be according to Support, bracket is fixed on cabinet, and inner fiber socket is also secured on cabinet, therefore, is equivalent to bracket and inner fiber socket is solid Surely it links together.
Motor is fixedly mounted on bracket.Motor should use the slowspeed machine of large torque and have retarder, so that poor It is the motion stability of other optical patchcord, strong.Motor and retarder can buy ready-made integral product.
The shift fork being mounted on motor (retarder) pivot, it is small to be typically designed as the big one end in one end, is meeting sufficient intensity It is required that realizing lightweight simultaneously.Shift fork and plugging member can be connected by a hinge (as shown in Figure 3), but be connected by a hinge, and insert Pulling out part just should be that elastic material is constituted.Because shift fork is circular motion, and plugging member is the movement to move along a straight line between the two Track is different, can generate movement interference.But due to this movement interference very little, plugging member uses elastic material Movement interference is avoided to destroy.Hinge can also not be used between shift fork and plugging member, shift fork is dialled only by long hole on plugging member Dynamic plugging member, the problem of design is the separation that may cause in structure in this way, it is also necessary to have other stabilizing members to cooperate ability It realizes, this will make complicated integral structure.
The recess of optical fiber cable placed, the size of recess and the diameter matches of optical cable are arranged in adapter.If electronic plug-in and pull-out device is set Meter is single line plug, then a recess only need to be arranged on adapter, plug if it is two-wire, then will be simultaneously on adapter Two recess of row's setting.The matching of the Multiple Types optical patchcords such as recess on adapter and LC, LX, SC, ST is connect, therefore can To be completed at the same time the test job of Multiple Type optical patchcord.
Plugging member extract movement distance, within optical patchcord socket without completely extract inner fiber jumper wire plug be limited, If all extracted, being kept completely separate for plug and socket will result in, again insertable into just difficult.Therefore, it is necessary to plugging member It is limited, to guarantee that inner fiber jumper wire plug slides in interior optical patchcord socket always, the limit method packet that can be used It includes but is not limited to: increasing using the motor with rotational angle limits device, using stepper motor or for plugging member, shift fork Individual limiting device.
Embodiment seven:
The present embodiment is the improvement of above-described embodiment, is refinement of the above-described embodiment about remote controler.It is distant described in the present embodiment Controlling device is wired or wireless network controller, comprising: main control unit, the main control unit and interactive unit, electrical power conversion list Member, data storage cell, network unit, optical fiber plug unit, the connection of on/off unit, as shown in Figure 4.
The assignment instructions that the main control unit is issued for tester or automatic test center, detection distribution are deposited It stores up RAID group state, cluster state, OSD state, carry state, NAS and shares state, whether read-write, read-write delay time etc. Information, issues operational order to electronic optical fiber plug-in and pull-out device and power on-off device, is written and reads to data storage cell and matches confidence Breath shows data and information, the instruction that response test personnel issue to tester by interactive unit.
The interactive unit shows test data, storage state, current to tester by display screen or touch screen The information such as test content, testing progress, and the operational order of tester is received, such as pause test continues test, terminates and survey Examination, and the operation for allowing tester to manually control electronic optical fiber plug-in and pull-out device and power on-off device.
The power conversion unit is used to electric main (220V) being converted to each unit required voltage standard (12V).For the power supply for meeting relay in electronic optical fiber plug-in and pull-out device and power on-off device, the output electricity of power conversion unit Stream should be calculated as follows:
,
Wherein:I Master controlFor the rated current of main control unit,I MotorFor the rated current of single motor,I RelayFor the volume of single relay Constant current, a are the number of motors of configuration, for the quantity for needing all 10,000,000,000 fiber optic network modules of node of distributed storage to be tested The sum of, b is the relay quantity of configuration, for the sum of the quantity for needing all node power modules of distributed storage to be tested,ηFor Transfer efficiency,ωFor redundancy factor,IFor the output electric current for needing to select power module.
Citing: when three Node distribution formulas of testing store equipment, each node possesses 4 10,000,000,000 fiber optic network modules, each Node possesses 2 power modules, then a=12, b=6, due to:I Master control=2A, I Motor=120mA,I Relay=300mA, transfer efficiency 95%, Redundancy factor 1.2, then:
,
Therefore the output electric current of power conversion unit should be greater than 6.62A
The data storage cell is for saving each 10,000,000,000 optic module of node of detected distributed storage and power supply The corresponding relationship of the optical patchcord and power supply line of module and test optical fiber input unit and test power output unit.Memory It can be memory ram, SD card, TF card or FLASH chip.
The network unit is used to connect distributed storage collection by 100,000,000/gigabit Ethernet or wireless Wi-Fi mode Group and automatic test center.Automatic test center sends main control unit by network unit for each step test operation. Main control unit obtains the state and information of distributed storage by network unit.
Embodiment eight:
The present embodiment is the improvement of above-described embodiment, is refinement of the above-described embodiment about interactive unit.Described in the present embodiment Interactive unit includes touch screen.
The touch screen can be set on panel, so that tester reads and operates, display resolution can be with It is 800 × 480, or the display screen of more preferable resolution ratio.
Embodiment nine:
The present embodiment is the improvement of above-described embodiment, is refinement of the above-described embodiment about described device shape.The present embodiment institute The each unit stated is mounted in rectangular housing 3, and the touch screen 5 and each AC mains the end of a thread socket 6 are mounted on In same panel 301, the external optical patchcord socket of each group is installed on the side panels, as shown in Figure 5,6.
Test device is formed a molding product by the present embodiment, is mounted within a box, and tester is convenient for It is connected on distributed storage device, and carries out the multiple business access of simulation distribution formula storage by remote controler or touch screen Scene (NAS, BLOCK, OBJECT) records the information such as state, numerical value and the time interval in test process.
The end of a thread plug of AC mains can be set in the biggish panel of box, as test power output unit Output end, and the line tail plug of AC mains can be set in a lesser panel, as test power input unit Input terminal.
For convenience of the plug of optical patchcord, external optical patchcord socket is mounted obliquely on side panel by the present embodiment, As shown in Figure 3.
Embodiment ten:
A kind of Information Security test method of the distributed storage using above-described embodiment described device.The step of the method It is rapid as follows:
Step 1, it connects: network unit is connect with automatic test center and multiple tested distributed storage devices, by test electricity Source input unit, test power output unit are connected on the power input of electric main Yu each distributed storage device Between end, optical fiber input unit will be tested, test optical fiber output unit is connected on interchanger and each distributed storage device Between optical fiber input port.
The connection of network unit and automatic test center and multiple tested distributed storage devices can by ethernet line, Or it is connected by wireless Wi-Fi or other modes.Network unit and tested distributed storage device are by the connection of Ethernet The connection of the mobile sms service of network unit and tested distributed storage device, and test optical fiber output unit and deposited with distribution The connection of storage equipment is then the connection by optical fiber and 10,000,000,000 network interfaces.
Step 2, initialize: automatic test center sends initialization command to main control unit, and main control unit is to each light Fine plug-in and pull-out device sends whole bind commands, and the optical patchcord plug of whole optical fiber plug-in and pull-out devices is inserted into corresponding optical patchcord socket In, complete optical fiber connecting moves;Main control unit sends whole bind commands to each power on-off device, and power on-off device all closes It closes, completes power supply connecting moves.
The process of initialization is exactly that it is intact instead of state to be represented device link for all measurement circuit whole connection.At this time The preparation of distributed storage device can be carried out, the service work of apparatus of the present invention can also be carried out.
Step 3, obtain test configurations information: main control unit sends initialization to automatic test center and completes order;From Dong Hua test center sends this test configurations information, the quantity including distributed storage device, each distribution to main control unit Formula stores 10,000,000,000 optic modules of equipment and each electricity of power module and test power input unit, test power output unit The number and corresponding relationship of supply socket, and each optical patchcord of test optical fiber input unit, test optical fiber output unit are inserted The number and corresponding relationship of connector.
In the state that link is intact, each link is numbered, to test each link in testing.
Step 4, store this test configurations information: main control unit sends this test configurations letter to data storage cell Configuration information is stored in memory by breath, data storage cell.
Memory stores the number of each link, to identify during the test.
Step 5, receive test command: main control unit sends data to automatic test center and saves success command, automatically Change test center and sends test assignment to main control unit;Test assignment is divided into 3 seed types: conventional testing procedures, quickly test Scheme and critical point testing scheme;The conventional testing procedures include but is not limited to: each optical fiber link and electricity is sequentially opened Source link and timing;QuickTest solution includes but is not limited to: optical fiber link it is all off after 100ms quickly connect, power chain Road alternately disconnects 50ms;Critical point testing scheme includes but is not limited to: 20GB file is written to storage, disconnects institute after write-in immediately There is power link.
Testing scheme, which can according to need, to be adjusted, can be in specific test process for above three scheme Two or three schemes are combined, realize more tests.
Step 6, starting test: the instruction that main control unit is sent according to automatic test center is looked into from data storage cell Look for corresponding 10,000,000,000 optic module, corresponding optical fiber plug element number and power module and test power input unit, test The number of each power outlet of power output unit sends operation to corresponding optical fiber plug-in and pull-out device and power on-off device respectively and refers to It enables, and carries out timing as needed.
Main control unit issues instruction according to determining testing scheme, implements the on-off of power supply and the plug of optical fiber.In on-off The storing data of storage equipment is tested and recorded in swapping process.
Step 7, obtain test data: main control unit obtains distributed storage by network unit every specified time interval RAID group state, cluster state, OSD state, carry state NAS share state, it is whether read-write, read-write delay time letter It ceases, whether the data in test distributed storage are complete and can be correctly read and be written.
These test datas are analyzed, to understand whether the state of distributed storage device meets wanting for work It asks.
Step 8, judge: main control unit judges whether termination timing according to the information obtained from distributed storage, if Then main control unit terminates "Yes" later to automatic test center transmission data integrity, data safety attribute and clocking information, If "No" is connected to the test assignment that a new round is sent at automatic test center to main control unit, step 5 is returned to.
This step really terminates, only if the result of sensory test is not enough satisfied with or needs to test sundry item, According to testing scheme, or changes testing scheme and continue to test.
Finally it should be noted that being only used to illustrate the technical scheme of the present invention and not to limit it above, although referring to preferable cloth The scheme of setting describes the invention in detail, those skilled in the art should understand that, it can be to technology of the invention Scheme (such as the chip used of device, the connection type of various circuits, sequencing of step etc.) modify or Person's equivalent replacement, without departing from the spirit and scope of the technical solution of the present invention.

Claims (10)

1. a kind of data safety system safety testing device of distributed storage characterized by comprising the test being connect with electric main Power input unit and the test power output unit being connect with multiple distributed storage devices, and the survey being connect with interchanger Examination optical fiber input unit and the test optical fiber output unit being connect with distributed storage device, the test power input unit It is connected with test power output unit by power on-off device, the test optical fiber input unit and test optical fiber output unit Between connected by optical fiber plug-in and pull-out device, the power on-off device and optical fiber plug-in and pull-out device are connect with wired or wireless remote controler.
2. test device according to claim 1, which is characterized in that at least two groups of the test power input unit Electric main input terminal, the test power output unit include that at least two groups, every group of at least two AC mains are inserted Seat.
3. the apparatus of claim 2, which is characterized in that the electric main input terminal and each electric main electricity The power on-off device is connected between supply socket, the power on-off device is mechanical relay or solid-state relay.
4. device according to claim 3, which is characterized in that the test optical fiber input unit and test optical fiber output Unit is respectively provided at least two groups, every group of at least two external optical patchcord sockets.
5. device according to claim 4, which is characterized in that the test optical fiber input unit and test optical fiber output Each input of unit exports the corresponding installation up and down of external optical patchcord socket, and each corresponding input exports external optical fiber jump Electronic optical fiber plug-in and pull-out device is set between line socket.
6. device according to claim 5, which is characterized in that the electronic optical fiber plug-in and pull-out device includes: to be mounted on bracket On motor and adapter, the motor drives shift fork, and the shift fork stirs plugging member, and the plugging member and optical fiber are jumped Line plug connection, with the optical patchcord socket of optical patchcord plug matching being fixedly connected with bracket directly or indirectly.
7. device described in one of -6 according to claim 1, which is characterized in that the remote controler is wired or wireless network control Device processed, comprising: main control unit, the main control unit and interactive unit, power conversion unit, data storage cell, network list Member, optical fiber plug unit, the connection of on/off unit.
8. device according to claim 7, which is characterized in that the interactive unit includes touch screen.
9. device according to claim 8, which is characterized in that described each unit is mounted in rectangular housing, described Touch screen and each AC mains socket be mounted in same panel, each group external optical patchcord socket installation On the side panels.
10. a kind of Information Security test method of the distributed storage using claim 9 described device, which is characterized in that The step of described method, is as follows:
Step 1, it connects: network unit is connect with automatic test center and multiple tested distributed storage devices, by test electricity Source input unit, test power output unit are connected on the power input of electric main Yu each distributed storage device Between end, optical fiber input unit will be tested, test optical fiber output unit is connected on interchanger and each distributed storage device Between optical fiber input port;
Step 2, initialize: automatic test center sends initialization command to main control unit, and main control unit is inserted to each optical fiber It pulling out device and sends whole bind commands, the optical patchcord plug of whole optical fiber plug-in and pull-out devices is inserted into corresponding optical patchcord socket, Complete optical fiber connecting moves;Main control unit sends whole bind commands to each power on-off device, and power on-off device is all closed, Complete power supply connecting moves;
Step 3, obtain test configurations information: main control unit sends initialization to automatic test center and completes order;Automation Test center sends this test configurations information, the quantity including distributed storage device to main control unit, and each distribution is deposited 10,000,000,000 optic modules and power module for storing up equipment are inserted with each power supply for testing power input unit, test power output unit The number and corresponding relationship of seat, and each optical patchcord plug of test optical fiber input unit, test optical fiber output unit are inserted The number and corresponding relationship of seat;
Step 4, store this test configurations information: main control unit sends this test configurations information to data storage cell, number Configuration information is stored in memory according to storage unit;
Step 5, receive test command: main control unit sends data to automatic test center and saves success command, and automation is surveyed Examination center sends test assignment to main control unit;Test assignment is divided into 3 seed types: conventional testing procedures, QuickTest solution With critical point testing scheme;The conventional testing procedures include but is not limited to: each optical fiber link and power chain is sequentially opened Road and timing;QuickTest solution includes but is not limited to: 100ms is quickly connected after optical fiber link is all off, power link is handed over For disconnection 50ms;Critical point testing scheme includes but is not limited to: 20GB file is written to storage, disconnects all electricity after write-in immediately Source link;
Step 6, starting test: the instruction that main control unit is sent according to automatic test center, from data storage cell lookup pair 10,000,000,000 optic modules answered, corresponding optical fiber plug element number and power module and test power input unit, test power supply The number of each power outlet of output unit sends operational order to corresponding optical fiber plug-in and pull-out device and power on-off device respectively, And timing is carried out as needed;
Step 7, obtain test data: main control unit obtains distributed storage by network unit every specified time interval RAID group state, cluster state, OSD state, carry state, NAS share state, whether read-write, read-write delay time letter It ceases, whether the data in test distributed storage are complete and can be correctly read and be written;
Step 8, judge: main control unit judges whether to terminate timing according to the information obtained from distributed storage, if "Yes" Main control unit sends data integrity, data safety attribute and clocking information to automatic test center, terminates later, if "No" is connected to the test assignment that a new round is sent at automatic test center to main control unit, then returns to step 5.
CN201910645904.2A 2019-07-17 2019-07-17 Distributed storage data security testing method Active CN110290028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910645904.2A CN110290028B (en) 2019-07-17 2019-07-17 Distributed storage data security testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910645904.2A CN110290028B (en) 2019-07-17 2019-07-17 Distributed storage data security testing method

Publications (2)

Publication Number Publication Date
CN110290028A true CN110290028A (en) 2019-09-27
CN110290028B CN110290028B (en) 2024-07-16

Family

ID=68023201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910645904.2A Active CN110290028B (en) 2019-07-17 2019-07-17 Distributed storage data security testing method

Country Status (1)

Country Link
CN (1) CN110290028B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111935116A (en) * 2020-07-30 2020-11-13 安徽华速达电子科技有限公司 Intelligent optical network unit file loading method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090324179A1 (en) * 2008-06-30 2009-12-31 Verizon Corporate Services Group Inc. System and method for providing large scale, automated, fiber-optic, cross-connection
JP2011008652A (en) * 2009-06-29 2011-01-13 Hitachi Ltd Power link system between devices
CN203149313U (en) * 2013-03-12 2013-08-21 中兴通讯股份有限公司 Automatic optical fiber plugging and extracting apparatus
WO2018017544A1 (en) * 2016-07-18 2018-01-25 Commscope Technologies Llc Systems and methods for high capacity power delivery to remote nodes
CN109507571A (en) * 2018-12-25 2019-03-22 京信通信***(中国)有限公司 A kind of test device and test macro
CN209748581U (en) * 2019-07-17 2019-12-06 北京精一强远科技有限公司 Data security testing arrangement of distributed storage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090324179A1 (en) * 2008-06-30 2009-12-31 Verizon Corporate Services Group Inc. System and method for providing large scale, automated, fiber-optic, cross-connection
JP2011008652A (en) * 2009-06-29 2011-01-13 Hitachi Ltd Power link system between devices
CN203149313U (en) * 2013-03-12 2013-08-21 中兴通讯股份有限公司 Automatic optical fiber plugging and extracting apparatus
WO2018017544A1 (en) * 2016-07-18 2018-01-25 Commscope Technologies Llc Systems and methods for high capacity power delivery to remote nodes
CN109507571A (en) * 2018-12-25 2019-03-22 京信通信***(中国)有限公司 A kind of test device and test macro
CN209748581U (en) * 2019-07-17 2019-12-06 北京精一强远科技有限公司 Data security testing arrangement of distributed storage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
雷艇;: "基于Proe的某种光纤连接器的夹持机构的设计", 时代汽车, no. 08, pages 46 - 47 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111935116A (en) * 2020-07-30 2020-11-13 安徽华速达电子科技有限公司 Intelligent optical network unit file loading method
CN111935116B (en) * 2020-07-30 2023-04-14 安徽华速达电子科技有限公司 Method for loading files of intelligent optical network unit

Also Published As

Publication number Publication date
CN110290028B (en) 2024-07-16

Similar Documents

Publication Publication Date Title
CN106655513B (en) A kind of type feeder automation test system on the spot
CN102047514B (en) Distribution system and method
CN100520705C (en) LED display screen remote management method and system
CN112347612B (en) Modeling method and system for physical loop of secondary system of direct-current converter station
CN107741563B (en) Test platform suitable for relay protection device
CN104168520A (en) Optical line selection equipment and method used for remotely controlling optical communication equipment
CN110299041A (en) A kind of Intelligent power distribution terminal and communication O&M integration practical training system and method
CN110290028A (en) A kind of the data safety system safety testing device and method of distributed storage
CN107664730A (en) A kind of distribution network automated end terminal connecting line detection device
CN209748581U (en) Data security testing arrangement of distributed storage
CN103618563B (en) Remote digital signal wire distribution system
CN109375056A (en) Distribution broken string is grounded live test loop and fault simulation platform and test method
CN103491459B (en) Electronic wiring frame system
CN112213592A (en) Distributed terminal double-loop network self-healing transfer detection system and method thereof
CN102710025A (en) Power system communication device and method
CN105843217B (en) Intelligent substation measure and control device joins latching logic off-line verification system and method
CN202649791U (en) Intelligent monitoring system of contact network switch
CN211856644U (en) Analog switch circuit based on distribution automation terminal test
CN113629879A (en) Portable SV/GOOSE common-network maintenance isolation device and method
CN212412438U (en) Multi-loop intelligent control circuit, multi-loop intelligent control terminal and power distribution cabinet
CN208746274U (en) A kind of Portable aircraft wheel load simulator
CN107920230A (en) Video monitoring image secondary-confirmation system and method
CN108767780B (en) Intelligent home comprehensive wiring system
CN207623477U (en) Test platform suitable for protective relaying device
CN210075840U (en) Cabinet, cabinet group and monitoring equipment thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant