CN110264058A - A kind of method for early warning and system of the geological disaster based on gas ductwork - Google Patents
A kind of method for early warning and system of the geological disaster based on gas ductwork Download PDFInfo
- Publication number
- CN110264058A CN110264058A CN201910503230.2A CN201910503230A CN110264058A CN 110264058 A CN110264058 A CN 110264058A CN 201910503230 A CN201910503230 A CN 201910503230A CN 110264058 A CN110264058 A CN 110264058A
- Authority
- CN
- China
- Prior art keywords
- pipe network
- network equipment
- data
- information
- geological disaster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 45
- 238000006073 displacement reaction Methods 0.000 claims description 17
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 claims description 12
- 230000006698 induction Effects 0.000 claims description 12
- 229910052744 lithium Inorganic materials 0.000 claims description 12
- 238000004891 communication Methods 0.000 claims description 10
- 238000005070 sampling Methods 0.000 claims description 9
- 238000004146 energy storage Methods 0.000 claims description 3
- HBBGRARXTFLTSG-UHFFFAOYSA-N Lithium ion Chemical compound [Li+] HBBGRARXTFLTSG-UHFFFAOYSA-N 0.000 claims 1
- 229910001416 lithium ion Inorganic materials 0.000 claims 1
- 230000006378 damage Effects 0.000 abstract description 9
- 238000007689 inspection Methods 0.000 abstract description 4
- 208000027418 Wounds and injury Diseases 0.000 abstract description 2
- 208000014674 injury Diseases 0.000 abstract description 2
- 230000035484 reaction time Effects 0.000 abstract description 2
- 239000007789 gas Substances 0.000 description 36
- 238000010276 construction Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 7
- 230000008569 process Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000008439 repair process Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000001556 precipitation Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 230000008054 signal transmission Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000007418 data mining Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 230000009131 signaling function Effects 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/02—Alarms for ensuring the safety of persons
- G08B21/10—Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B31/00—Predictive alarm systems characterised by extrapolation or other computation using updated historic data
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Emergency Management (AREA)
- Databases & Information Systems (AREA)
- Marketing (AREA)
- General Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Mechanical Engineering (AREA)
- Remote Sensing (AREA)
- Health & Medical Sciences (AREA)
- Computer Security & Cryptography (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses the method for early warning and system of a kind of geological disaster based on gas ductwork comprising: the location information of each pipe network equipment in pipe network is obtained based on generalized information system, and establishes pipe network equipment figure layer according to the positional information;The data information for acquiring each pipe network equipment in the pipe network is compared, to determine whether there is the first pipe network equipment to break down with the collected each data information of previous moment according to each data information is collected;When there are the first pipe network equipment, generates warning information and map to the warning information in the pipe network equipment figure layer, to show the warning information by the pipe network equipment figure layer.The present invention can be in the degree and position for knowing that geological disaster occurs at the first time in the case where not having to staff to scene inspection, and actively take measures on customs clearance, reduce the later period to the extent of injury of conduit running to reach.Shorten administrative staff to the reaction time of geological disaster, improves the treatment effeciency of geological disaster.
Description
Technical field
The present invention relates to the meteorological-geological disasters early warning fields of gas distribution system, gas network, in particular to a kind of to be based on gas ductwork
Geological disaster method for early warning and system.
Background technique
City gas high pressure pipe network is built distinguishing feature and is carried out around urban periphal defence.Urban periphal defence location massif, soil
Slope is more, therefore pipeline network construction is also to intert to advance between massif and slight slope.It is continuous with gas ductwork urbanization process
It promotes, the geological conditions and environmental information of safe and reasonable are gas ductwork design, the important evidence of planning, construction, operation, transformation
With basic guarantee.Geological conditions also will affect later period pipe network fortune other than influencing the construction investment budget of gas ductwork engineering
The investment of row, the human and material resources of maintenance and repair and financial resources.
Natural geologic hazard is such as: earthquake, mud-rock flow, ground fissure, avalanche, landslide geological disaster generation, give fuel gas conduit
The safe operation in road brings significant damage.Various high pressures, sub-high pressure and fecder system network facility include gas pipeline, valve chamber, field
It equipment and the infrastructure such as stands, distributional region is wide, and it is large number of, independent early warning monitoring is carried out to each region and generally requires to expend
A large amount of manpower and material resources.City remote districts are typically in since pipe network is laid with location, and massif, slight slope are more, tradition
Geological disaster irregularly also results in the work of pipe network line walking and is unable to efficient periodic development.Especially for ultimate attainment weather
Caused by the natural calamities such as earthwork avalanche, mud-rock flow be even more to be prejudged in advance by effective means, can not be accurately comprehensive
Various meteorological disasters are monitored to the influence degree of gas ductwork, timely and effectively various geological disasters can not be taken strong
The precautionary measures reduce the casualty loss to pipe safety operation to the maximum extent.
In addition to this, with the construction of the other infrastructure in city, man made geologic hazard such as third party's construction (building
Construction, network of rivers construction, power grid construction etc.) destruction to gas ductwork, it is also in a kind of state that can not be prejudged.Although to combustion
The relevant regulation of construction permits has been carried out in gas pipe network location locating ground a certain range, but has also been not excluded for third party and is constructing
When, subjectivity or the objectively human damage caused by gas ductwork.
Thus the prior art could be improved and improve.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the deficiencies of the prior art, provide a kind of based on gas ductwork
The method for early warning and system of geological disaster, with solve in the prior art traditional geological disaster and man made geologic hazard to city gas
The problem of pipe network damages.
In order to solve the above-mentioned technical problem, the technical solution adopted in the present invention is as follows:
A kind of method for early warning of the geological disaster based on gas ductwork comprising:
The location information of each pipe network equipment in pipe network is obtained based on generalized information system, and establishes pipe network equipment according to the positional information
Figure layer;
Acquire the data information of each pipe network equipment in the pipe network, wherein the data information includes displacement data and stress
Data;
It is compared according to each data information is collected with the collected each data information of previous moment, to determine whether there is hair
First pipe network equipment of raw failure;
When there are the first pipe network equipment, generates warning information and maps to the warning information in the pipe network equipment figure layer,
To show the warning information by the pipe network equipment figure layer.
The method for early warning of the geological disaster based on gas ductwork, further includes:
Collected each data information is mapped in the pipe network equipment figure layer, to show institute by the pipe network equipment figure layer
State each data information.
The method for early warning of the geological disaster based on gas ductwork, wherein it is described when there are the first pipe network equipment, it produces
Raw warning information maps to the warning information in the pipe network equipment figure layer, to show institute by the pipe network equipment figure layer
Warning information is stated to specifically include:
It is described to generate warning information when there are the first pipe network equipment, and be warning information division pipe network risk class;
The pipe network risk class is mapped in the pipe network equipment figure layer, described in being shown by the pipe network equipment figure layer
Warning information.
The method for early warning of the geological disaster based on gas ductwork, wherein each pipe network is set in the acquisition pipe network
Standby data information, wherein the data information includes displacement data and stress data specifically:
The data information of each pipe network equipment in the pipe network is acquired by the data sampling sensor being mounted in induction stake,
In, the data information includes displacement data and stress data.
The method for early warning of the geological disaster based on gas ductwork, wherein the data sampling sensor specifically includes:
Buried section and instruction section, wherein buried section is connected with instruction section;
The instruction section is provided with color and instruction stake;
The instruction stake is equipped with lithium ionic cell module.
The method for early warning of the geological disaster based on gas ductwork, wherein the lithium ionic cell module specifically includes:
One piece of solar panel and one group of energy-storage lithium battery group, wherein the solar panel is mounted on instruction pillar
To the south;
The lithium battery group connects solar panels, carries out buried.
The method for early warning of the geological disaster based on gas ductwork, wherein the number by being mounted in induction stake
It is specifically included according to the data information that acquisition sensor acquires each pipe network equipment in the pipe network:
It is stored according to the storage unit being embedded into Data acquisition and storage system;
The data of the storage unit storage cover the data of storage early period automatically.
The method for early warning of the geological disaster based on gas ductwork, further includes:
Line attendant is sent by way of short message by early warning thread-data.
A kind of computer readable storage medium, wherein the computer-readable recording medium storage has one or more
Program, one or more of programs can be executed by one or more processor, to realize described in any one as above
Step in the method for early warning of geological disaster based on gas ductwork.
A kind of early warning system of the geological disaster based on gas ductwork, wherein include: that processor, memory and communication are total
Line;The computer-readable program that can be executed by the processor is stored on the memory;
The communication bus realizes the connection communication between processor and memory;
The processor is realized described in any one as above when executing the computer-readable program based on based on gas ductwork
Geological disaster method for early warning in step.
The utility model has the advantages that compared with prior art, the present invention provides a kind of early warning of geological disaster based on gas ductwork
Method and system, which comprises the location information of each pipe network equipment in pipe network is obtained based on generalized information system, and according to described
Location information establishes pipe network equipment figure layer;Acquire the data information of each pipe network equipment in the pipe network, wherein the data information
Including displacement data and stress data;It is carried out according to each data information is collected with the collected each data information of previous moment
Compare, to determine whether there is the first pipe network equipment to break down;When there are the first pipe network equipment, generating warning information will
The warning information maps in the pipe network equipment figure layer, to show the warning information by the pipe network equipment figure layer.
The present invention be able to can know at the first time what geological disaster occurred in the case where not having to staff to scene inspection
Degree and position, and actively take measures on customs clearance, reduce the later period to the extent of injury of conduit running to reach.Shorten administrative staff
To the reaction time of geological disaster, the treatment effeciency of geological disaster is improved.
Detailed description of the invention
Fig. 1 is a kind of process of the method for early warning preferred embodiment of the geological disaster based on gas ductwork provided by the invention
Figure.
Fig. 2 is the structure principle chart of device preferred embodiment provided by the invention.
Specific embodiment
The present invention provides the method for early warning and system of a kind of geological disaster based on gas ductwork, to make mesh of the invention
, technical solution and effect it is clearer, clear, the present invention is described in more detail as follows in conjunction with drawings and embodiments.
It should be appreciated that described herein, specific examples are only used to explain the present invention, is not intended to limit the present invention.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singular " one " used herein, " one
It is a ", " described " and "the" may also comprise plural form.It is to be further understood that being arranged used in specification of the invention
Diction " comprising " refer to that there are the feature, integer, step, operation, element and/or component, but it is not excluded that in the presence of or addition
Other one or more features, integer, step, operation, element, component and/or their group.It should be understood that when we claim member
Part is " connected " or when " coupled " to another element, it can be directly connected or coupled to other elements, or there may also be
Intermediary element.In addition, " connection " used herein or " coupling " may include being wirelessly connected or wirelessly coupling.It is used herein to arrange
Diction "and/or" includes one or more associated wholes for listing item or any cell and all combinations.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technology art
Language and scientific term), there is meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Should also
Understand, those terms such as defined in the general dictionary, it should be understood that have in the context of the prior art
The consistent meaning of meaning, and unless idealization or meaning too formal otherwise will not be used by specific definitions as here
To explain.
With reference to the accompanying drawing, by the description of the embodiment, further explanation of the contents of the invention are made.
Fig. 1 is please referred to, Fig. 1 is that a kind of method for early warning of the geological disaster based on gas ductwork provided by the invention is preferably real
Apply the flow chart of example.The described method includes:
S100, the location information that each pipe network equipment in pipe network is obtained based on generalized information system, and pipe network is established according to the positional information
Equipment figure layer.
Specifically, the generalized information system mainly positions the pipe network equipment coordinate of prewarning area, and according to pipe network
The coordinate of equipment establishes pipe network equipment figure layer, specifically includes particular geographic location locating in prewarning area and pipe network.This
In embodiment, positioning is carried out to the Network Management Equipment coordinate of prewarning area and is referred to by during pipe-line construction, by each pipeline position
Confidence breath is entered into inside pipe network GIS system, and the position coordinates of each pipeline section can be generated inside pipe network GIS system.Pass through GIS
System obtains occurring the coordinate information in geological disaster region, and establishes pipe network equipment map data mining platform by the coordinate information.Institute
Stating pipe network equipment includes: pipeline body, and pipeline indicates ground pile, valve and valve chamber.
The data information of each pipe network equipment in S200, the acquisition pipe network, wherein the data information includes displacement data
And stress data.
Specifically, certain fix position pipeline, due to geological disaster or damage from third-party, it will cause piping displacement,
Stress variation etc. can be by being mounted on pipeline body or pipeline buries data in the close induction stake of native attached in the present embodiment
After acquiring sensor sensing, the acquisition and storage of displacement data, stress data are carried out.Wherein, described to be mounted on pipeline body
It is a set of independent sender unit that upper or pipeline, which buries the close data sampling sensor of native attached,.The device is divided into buried section and finger
Show section.
Described buried section is directly connected with pipeline body, and buried section is by the sensor collection with different inducing functions
At device, function be can directly incude because geological disaster generate piping displacement, pipe stress variation etc. information.
The instruction section is connected with buried section.It indicates that section is to be coated with the instruction stake of bright-colored and text, makes one
It can be apparent and identify.Lithium ionic cell module is installed in instruction stake, can uninterruptedly give buried section of sensor die
Block power supply.
The lithium ionic cell module, it is characterised in that be by one piece of solar panel and one group of energy-storage lithium battery group group
At.The solar panel is mounted on instruction pillar to the south, sufficiently to receive sunlight on daytime and be converted into
Electric energy is stored in inside lithium battery group.
The lithium battery group is connection solar panels, and progress is buried, and is completely cut off with air and water.To receive process
Solar panel conversion after electric energy and by electric energy store for sender unit use.
It is described be mounted on pipeline body or pipeline to bury the close data sampling sensor of native attached be a set of independent signal
Emitter, the device have both induction of signal function and signal transmission function.
The induction of signal function is realized by the signal induction module of installation on a sensor, can be with induction tube
Road change in displacement, pipe stress variation.
The signal transmission function is realized by the signal emission module of installation on a sensor, can be to backstage
Become with certain frequency and rate transmission about the geological environment of prewarning area position, precipitation, precipitation intensity, intensity of lightning
Change information.
Further, the data sampling sensor by being mounted in induction stake acquires each pipe network equipment in the pipe network
Data information specifically include:
It is stored according to the storage unit being embedded into Data acquisition and storage system;
The data of the storage unit storage cover the data of storage early period automatically.
Specifically, the storage is stored by the storage unit being embedded into Data acquisition and storage system.
The storage unit can store the data of certain year according to demand, and more than after the several years, subsequent data will be covered automatically
Cover the data of storage early period.The data of storage are transferred on the director server of backstage by certain frequency and time interval.
The data transmission module is the dependency number by Data acquisition and storage system acquisition and storage prewarning area
According to rear, transferred data to by transmitting software in data transmission module by the data cable being mounted on along pipe network
On the director server of backstage.
Further, the data transmission module further includes showing early warning after the programming software effect by certain function
Field data is sent in line attendant's hand by way of short message.
S300, basis collect each data information and are compared with the collected each data information of previous moment, with determination
With the presence or absence of the first pipe network equipment to break down.
S400, when there are the first pipe network equipment, generate warning information and the warning information is mapped into the pipe network set
In standby figure layer, to show the warning information by the pipe network equipment figure layer.
It is described when there are the first pipe network equipment in the present embodiment, it generates warning information and maps to the warning information
In the pipe network equipment figure layer, to show that the warning information specifically includes by the pipe network equipment figure layer:
S401, described when there are the first pipe network equipment, generation warning information, and be described pre- according to data geological disaster model
Alert information divides pipe network risk class;
S402, the pipe network risk class is mapped in the pipe network equipment figure layer, with aobvious by the pipe network equipment figure layer
Show the warning information.
Specifically, the data geological disaster model is on the data basis analyzed before, to different type
Geological disaster divided and modeled.By the foundation of model, the anti-disaster degree and classification for pushing away prewarning area, and by model
Obtained result and actual field situation comparative analysis.Finally obtain reasonable, scientific conduit running regional geohazardss prevention
With analysis result.The present invention establishes the gas ductwork geo-hazard early-warning model of profession, by being associated with pipe network GIS system, is formed
For the fine early warning of pipe network operation control.Disaster destructive power is effectively reduced, contributes to form targetedly prevention of geological disaster
Measure specification reduces the destruction because of geological disaster to pipeline.
Further, described that pipe network risk class is divided for the warning information according to data geological disaster model, it is main
Function be by the data on the sensor being connected with pipeline section that is collected into, be compared with the data in previous database and
Geological disaster model compares to obtain pipeline section risk class, according to different stage and disaster property, takes different maintenance and repairs
Scheme, at hand or the geological disaster that may arrive prevents.
Further, described to map to the pipe network risk class in the pipe network equipment figure layer, to pass through the pipe network
Equipment figure layer shows the warning information specifically: is handled by data correlation, by the ground of the prewarning area in conduit running region
Matter hazard model is associated with pipe network equipment figure layer, is established the pipe network equipment in geological disaster region and is shown to pipeline network GIS and puts down
On the figure of tableland.In conjunction with the intensity of combating a natural disaster of geology disaster loss grade and pipe network equipment, pipe network early warning result is generated and by taking precautions against natural calamities, subtracting
Calamity early warning system publication scrolling information is intuitively shown.This improves to the pre- of gas ductwork region geological disaster
Alert control degree improves gas company to the management level of pipe network, emergency resources waste, reasonable distribution emergency people is effectively reduced
Power, material resources and financial resources.
Further, method described in the present embodiment further include: collected each data information is mapped into the pipe network and is set
In standby figure layer, to show each data information by the pipe network equipment figure layer.The present invention passes through collected each data
On information MAP to pipe network equipment figure layer, the geological environment element of pipe network region can be grasped in real time, meanwhile, it is managed for the later period
It nets running maintenance and repair and Information base, reasonable distribution human and material resources and financial resources investment, ultimate guarantee people's lives matter is provided
Measure the raising of safety and stability.
Further embodiment of this invention is said by taking landslide buried pipes caused by certain pipeline section is because of continuing precipitation as an example below
It is bright.Geological disaster to be connected with certain underground piping incudes stake.Entire geological disaster induction stake is connected with underground gas pipeline
It connects, including solar panel and data sampling sensor.When geological disaster occurs (such as mud-rock flow, earthquake), it will cause
Side slope is collapsed or is displaced, and at this time by induction process as shown in Figure 1, is incuded the data sampling sensor in stake and is sensed outside
It, can at the first time will be on correlation signal transmission to background manager or the recipient of related patrol officer after the destruction response on boundary
On, allow to know the generation of geological disaster at the first time and correlation is taken to speedily carry out rescue work emergency repair measure.Detailed process is as follows:
If certain side slope location is because of continuous rainfall, landslide is caused, underground gas pipeline is buried and produces displacement.At this point,
The displacement sensor being connected with pipeline body can perceive the generation of displacement, and collect and be transferred to backstage always displacement data
On server.
In the present embodiment, background system according to be transmitted back to come data information at once based on pipe network GIS system, establish
The specific co-ordinate position information of geological disaster generation area, and establish and obtain pipe network equipment map data mining platform.
In the present embodiment, according to prewarning area historical data, data when by generation disaster tentatively obtain calamity in contrast
The disaster loss grade information of position occurs for evil.
In the present embodiment, implement the monitoring such as prewarning area and respective perimeter pipe network, valve, valve chamber, while disaster occurring
The early warning response of appropriate level is issued in region, and is assembled man power and material and carried out inspection inspection to disaster region, assesses calamity in time
The consequence grade that evil occurs.
In the present embodiment, after obtaining the danger classes in disaster region, takes immediate steps and carry out repairing repairing work accordingly
Make, such as buried pipes are combed, are resumed work to generation displacement pipeline, if necessary according to assessment result to disaster area
The equipment such as domain periphery valve carry out flow adjusting or closing, reduce occurring into any for unknown danger.
In the present embodiment, after the repairing rescue for completing disaster region, related data is input to data management backstage
Center, first is that enriching the data-base content of geological disaster;Second is that establishing this geological disaster model.Main purpose is later ground
It learns complete data and supports in matter disaster alarm risk recognition and analysis work Ti Ke.
The present invention also provides a kind of devices, as shown in Figure 2 comprising at least one processor (processor) 20;It is aobvious
Display screen 21;And memory (memory) 22, it can also include communication interface (Communications Interface) 23 Hes
Bus 24.Wherein, processor 20, display screen 21, memory 22 and communication interface 23 can be completed mutual by bus 24
Communication.Display screen 21 is set as preset user in display initial setting mode and guides interface.Communication interface 23 can transmit letter
Breath.Processor 20 can call the logical order in memory 22, to execute the method in above-described embodiment.
In addition, the logical order in above-mentioned memory 22 can be realized and as only by way of SFU software functional unit
Vertical product when selling or using, can store in a computer readable storage medium.
Memory 22 is used as a kind of computer readable storage medium, and it is executable to may be configured as storage software program, computer
Program, such as the corresponding program instruction of method or module in the embodiment of the present disclosure.Processor 30 is stored in memory by operation
Software program, instruction or module in 22, thereby executing functional application and data processing, i.e. side in realization above-described embodiment
Method.
Memory 22 may include storing program area and storage data area, wherein storing program area can storage program area, extremely
Application program needed for a few function;Storage data area, which can be stored, uses created data etc. according to terminal device.This
Outside, memory 22 may include high-speed random access memory, can also include nonvolatile memory.For example, USB flash disk, movement
Hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory,
RAM), a variety of media that can store program code such as magnetic or disk, are also possible to transitory memory medium.
The present invention also provides a kind of computer readable storage medium, the computer-readable recording medium storage has one
Or multiple programs, one or more of programs can be executed by one or more processor, to realize above-described embodiment
Step in the method for early warning of the geological disaster based on gas ductwork.
In addition, a plurality of instruction processing unit in above-mentioned terminal device and storage medium loads and the detailed process executed exists
It has been described in detail in the above method, has just no longer stated one by one herein.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (10)
1. a kind of method for early warning of the geological disaster based on gas ductwork, characterized in that it comprises:
The location information of each pipe network equipment in pipe network is obtained based on generalized information system, and establishes pipe network equipment according to the positional information
Figure layer;
Acquire the data information of each pipe network equipment in the pipe network, wherein the data information includes displacement data and stress
Data;
It is compared according to each data information is collected with the collected each data information of previous moment, to determine whether there is hair
First pipe network equipment of raw failure;
When there are the first pipe network equipment, generates warning information and maps to the warning information in the pipe network equipment figure layer,
To show the warning information by the pipe network equipment figure layer.
2. the method for early warning of the geological disaster based on gas ductwork according to claim 1, which is characterized in that further include:
Collected each data information is mapped in the pipe network equipment figure layer, to show institute by the pipe network equipment figure layer
State each data information.
3. the method for early warning of the geological disaster based on gas ductwork according to claim 1, which is characterized in that described to exist
When the first pipe network equipment, generates warning information and map to the warning information in the pipe network equipment figure layer, by described
Pipe network equipment figure layer shows that the warning information specifically includes:
It is described to generate warning information when there are the first pipe network equipment, and be warning information division pipe network risk class;
The pipe network risk class is mapped in the pipe network equipment figure layer, described in being shown by the pipe network equipment figure layer
Warning information.
4. the method for early warning of the geological disaster based on gas ductwork according to claim 1, which is characterized in that the acquisition institute
State the data information of each pipe network equipment in pipe network, wherein the data information includes displacement data and stress data specifically:
The data information of each pipe network equipment in the pipe network is acquired by the data sampling sensor being mounted in induction stake,
In, the data information includes displacement data and stress data.
5. the method for early warning of the geological disaster based on gas ductwork according to claim 4, which is characterized in that the data are adopted
Collection sensor specifically includes:
Buried section and instruction section, wherein buried section is connected with instruction section;
The instruction section is provided with color and instruction stake;
The instruction stake is equipped with lithium ionic cell module.
6. the method for early warning of the geological disaster based on gas ductwork according to claim 5, which is characterized in that the lithium ion
Battery module specifically includes:
One piece of solar panel and one group of energy-storage lithium battery group, wherein the solar panel is mounted on instruction pillar
To the south;
The lithium battery group connects solar panels, carries out buried.
7. the method for early warning of the geological disaster based on gas ductwork according to claim 4, which is characterized in that described to pass through peace
The data information that data sampling sensor in induction stake acquires each pipe network equipment in the pipe network specifically includes:
It is stored according to the storage unit being embedded into Data acquisition and storage system;
The data of the storage unit storage cover the data of storage early period automatically.
8. the method for early warning of the geological disaster based on gas ductwork according to claim 1, which is characterized in that further include:
Line attendant is sent by way of short message by early warning thread-data.
9. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage have one or
Multiple programs, one or more of programs can be executed by one or more processor, to realize such as claim 1~8
Step in the method for early warning of geological disaster described in any one based on gas ductwork.
10. a kind of early warning system of the geological disaster based on gas ductwork characterized by comprising processor, memory and logical
Believe bus;The computer-readable program that can be executed by the processor is stored on the memory;
The communication bus realizes the connection communication between processor and memory;
Realized when the processor executes the computer-readable program as described in claim 1~8 any one based on base
Step in the method for early warning of the geological disaster of gas ductwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910503230.2A CN110264058A (en) | 2019-06-11 | 2019-06-11 | A kind of method for early warning and system of the geological disaster based on gas ductwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910503230.2A CN110264058A (en) | 2019-06-11 | 2019-06-11 | A kind of method for early warning and system of the geological disaster based on gas ductwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110264058A true CN110264058A (en) | 2019-09-20 |
Family
ID=67917640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910503230.2A Pending CN110264058A (en) | 2019-06-11 | 2019-06-11 | A kind of method for early warning and system of the geological disaster based on gas ductwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110264058A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114708704A (en) * | 2022-04-02 | 2022-07-05 | 国家石油天然气管网集团有限公司 | Pipeline geological disaster monitoring and early warning system, method, device, equipment and medium |
CN114882679A (en) * | 2022-04-01 | 2022-08-09 | 深圳市燃气集团股份有限公司 | Hook machine monitoring and early warning method, device, terminal and storage medium |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020149487A1 (en) * | 2001-03-02 | 2002-10-17 | Harvey Haines | In-ground pipeline monitoring |
CN102354431A (en) * | 2011-08-06 | 2012-02-15 | 河北省第一测绘院 | Monitoring and prewarning system and method for geological disasters |
CN202153258U (en) * | 2011-08-06 | 2012-02-29 | 河北省第一测绘院 | Geological disaster monitoring and early warning system |
CN103687079A (en) * | 2013-08-09 | 2014-03-26 | 机械科学研究总院 | An underground pipe network wireless monitoring positioning system |
CN104933829A (en) * | 2015-05-19 | 2015-09-23 | 重庆大学 | Method for constructing geological disaster prediction and early-warning system |
CN105843140A (en) * | 2016-03-22 | 2016-08-10 | 韦醒妃 | Underground pipeline monitoring system for oil exploitation |
CN205541302U (en) * | 2016-01-18 | 2016-08-31 | 耿翀 | Control and early warning system are synthesized to geological disasters hidden danger point power supply in succession based on WEBGIS |
CN107063515A (en) * | 2017-03-10 | 2017-08-18 | 中石化石油工程技术服务有限公司 | The stake of integrated form pipeline stress monitoring |
CN207650940U (en) * | 2017-12-20 | 2018-07-24 | 西安维度石油科技工程有限公司 | A kind of warning band based on built-in fiber |
CN108961688A (en) * | 2018-07-13 | 2018-12-07 | 福建特力惠信息科技股份有限公司 | A kind of big data support under Geological Hazards Monitoring and method for early warning |
CN109858126A (en) * | 2019-01-23 | 2019-06-07 | 北京市燃气集团有限责任公司 | Pipeline network of fuel gas in city safety monitoring method for early warning and system based on settlement monitoring |
-
2019
- 2019-06-11 CN CN201910503230.2A patent/CN110264058A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020149487A1 (en) * | 2001-03-02 | 2002-10-17 | Harvey Haines | In-ground pipeline monitoring |
CN102354431A (en) * | 2011-08-06 | 2012-02-15 | 河北省第一测绘院 | Monitoring and prewarning system and method for geological disasters |
CN202153258U (en) * | 2011-08-06 | 2012-02-29 | 河北省第一测绘院 | Geological disaster monitoring and early warning system |
CN103687079A (en) * | 2013-08-09 | 2014-03-26 | 机械科学研究总院 | An underground pipe network wireless monitoring positioning system |
CN104933829A (en) * | 2015-05-19 | 2015-09-23 | 重庆大学 | Method for constructing geological disaster prediction and early-warning system |
CN205541302U (en) * | 2016-01-18 | 2016-08-31 | 耿翀 | Control and early warning system are synthesized to geological disasters hidden danger point power supply in succession based on WEBGIS |
CN105843140A (en) * | 2016-03-22 | 2016-08-10 | 韦醒妃 | Underground pipeline monitoring system for oil exploitation |
CN107063515A (en) * | 2017-03-10 | 2017-08-18 | 中石化石油工程技术服务有限公司 | The stake of integrated form pipeline stress monitoring |
CN207650940U (en) * | 2017-12-20 | 2018-07-24 | 西安维度石油科技工程有限公司 | A kind of warning band based on built-in fiber |
CN108961688A (en) * | 2018-07-13 | 2018-12-07 | 福建特力惠信息科技股份有限公司 | A kind of big data support under Geological Hazards Monitoring and method for early warning |
CN109858126A (en) * | 2019-01-23 | 2019-06-07 | 北京市燃气集团有限责任公司 | Pipeline network of fuel gas in city safety monitoring method for early warning and system based on settlement monitoring |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114882679A (en) * | 2022-04-01 | 2022-08-09 | 深圳市燃气集团股份有限公司 | Hook machine monitoring and early warning method, device, terminal and storage medium |
CN114708704A (en) * | 2022-04-02 | 2022-07-05 | 国家石油天然气管网集团有限公司 | Pipeline geological disaster monitoring and early warning system, method, device, equipment and medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114399210B (en) | Geological disaster emergency management and decision system, method and readable storage medium | |
CN108681781B (en) | Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology | |
Li et al. | Methodologies of safety risk control for China’s metro construction based on BIM | |
CN107817744B (en) | Communal facility safety monitoring system | |
Guo et al. | Risk identification of third-party damage on oil and gas pipelines through the Bayesian network | |
RU2680652C2 (en) | Method of integrated environmental monitoring | |
CN111536429B (en) | Decision fusion-based oil and gas pipeline early warning system and method | |
CN107610421A (en) | A kind of geo-hazard early-warning analysis system and method | |
Thompson et al. | Quantifying the influence of previously burned areas on suppression effectiveness and avoided exposure: a case study of the Las Conchas Fire | |
CN107808263B (en) | Nuclear power station multi-risk comprehensive evaluation system and method based on information fusion | |
CN110858334A (en) | Road safety assessment method and device and road safety early warning system | |
CN111864898B (en) | Three-dimensional information system based on power transmission online monitoring data and control method thereof | |
CN114155129B (en) | Atmospheric environment tracing and evaluating method and system based on industrial park | |
CN111696310B (en) | Air-space-ground three-dimensional safety risk prevention and control system and prevention and control method for gas pipe network | |
CN109345148A (en) | Natural gas line and the intelligent diagnosing method of station process unit security risk identification | |
CN107292989A (en) | High-voltage power transmission inspection system based on 3DGIS technology | |
CN103244186B (en) | Identification and the tracking and early warning system of evolution is bred based on coal and gas prominent | |
CN112215458A (en) | Disaster analysis method and electronic device | |
CN106251032A (en) | A kind of Earthquake-landslide disaster Disaster rapid evaluation method | |
CN110264058A (en) | A kind of method for early warning and system of the geological disaster based on gas ductwork | |
CN115585403A (en) | Safety early warning system for monitoring buried natural gas pipeline in multiple dimensions | |
CN116523312A (en) | Smart city data management method and system | |
CN112460492A (en) | Toughness-evaluation-based collaborative toughness-enhanced gas safety control device | |
CN116386281A (en) | Landslide hazard hidden danger remote sensing early warning system and method | |
CN107545373A (en) | A kind of municipal information analysis and security evaluation management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |