CN110262975A - Test data management method, device, equipment and computer readable storage medium - Google Patents
Test data management method, device, equipment and computer readable storage medium Download PDFInfo
- Publication number
- CN110262975A CN110262975A CN201910541964.XA CN201910541964A CN110262975A CN 110262975 A CN110262975 A CN 110262975A CN 201910541964 A CN201910541964 A CN 201910541964A CN 110262975 A CN110262975 A CN 110262975A
- Authority
- CN
- China
- Prior art keywords
- data
- test
- test data
- slicer
- operation system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
- G06F11/3688—Test management for test execution, e.g. scheduling of test suites
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The present invention relates to financial technology fields, and disclose a kind of test data management method, this method comprises: when the batch task execution for detecting operation system present lot is completed, the test data of the present lot is grabbed from the database of the operation system, and obtains the batch identification of the present lot;The test data is associated with the batch identification, to generate the data slicer of the present lot;By the data slicer it is associated with preset test case after save.The invention also discloses a kind of test data managing device, equipment and a kind of computer readable storage mediums.The present invention solves existing version iteration test or regression test needs to make time cost and human cost caused by counting again and expends more technical problem.
Description
Technical field
The present invention relates to financial technology (Fintech) technical field more particularly to test data management method, device, set
Standby and computer readable storage medium.
Background technique
With the development of computer technology, more and more technology (big data, distribution, block chain Blockchain, people
Work intelligence etc.) it applies in financial field, traditional financial industry gradually changes to financial technology (Fintech), but due to finance
The safety of industry, requirement of real-time, also to technology, more stringent requirements are proposed.
In current financial field, the update of operation system, iteration require to carry out automatic test, and so-called automation is surveyed
Examination, be regulation described in test case is executed automatically step by step, and will execute obtained actual result and expected result into
Row compares, so that it is determined that whether the update of operation system, iteration reach expected process.Existing automatic testing process are as follows:
Setup test use-case first, and executable batch plan is formulated according to test case, the same day is then executed according to batch plan
Batch obtains the data of a certain data shape, later, is verified according to the data under the data shape to test case.
However under financial scenario, business datum has the data shape under life cycle complexity and each life cycle
Different feature, after the completion of the test case verifying of last batch, batch rolls backward automatically, and data shape will change therewith
Become, current test data is caused to be discarded automatically, it is not reusable, when subsequent progress version iteration test or regression test,
The data of test can only reconfigure, and more time cost and human cost can be expended by making number again.
Summary of the invention
It is a primary object of the present invention to propose a kind of test data management method, device, equipment and computer-readable deposit
Storage media, it is intended to solve existing version iteration test or regression test needs to make time cost and manpower caused by number again
The more technical problem of cost consumption.
To achieve the above object, the present invention provides a kind of test data management method, the test data management method packet
Include following steps:
When the batch task execution for detecting operation system present lot is completed, from the database of the operation system
The test data of the present lot is grabbed, and obtains the batch identification of the present lot;
The test data is associated with the batch identification, to generate the data slicer of the present lot;
By the data slicer it is associated with preset test case after save.
Preferably, the step of test data that the present lot is grabbed from the database of operation system packet
It includes:
According to preset data shape and/or data type, grabbed from the database of the operation system described current
The test data of batch, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
Preferably, it is described by the data slicer it is associated with preset test case after save the step of include:
Obtain the required test data indicated in preset test case;
Using the data slicer comprising the required test data as target data be sliced, by the target data slice with
The test case is associated;
Save the incidence relation between the target data slice and the test case.
Preferably, the step of incidence relation saved between target data slice and the test case it
Afterwards, further includes:
When receive based on the incidence relation modification instruction when, according to the modification instruct to the incidence relation into
Row modification.
Preferably, the test data management method further include:
When receiving data convert instruction, the data slicer is written into the database of the operation system.
Preferably, the batch identification includes lot date, the test data management method further include:
When receiving data slicer inquiry instruction, according to the lot date in the data slicer of preservation, will save
The data slicer carry out arrangement and show;
When the details for receiving the data slicer triggering based on display check instruction, show in the data slicer
Test data.
In addition, to achieve the above object, the present invention also provides a kind of test data managing device, the test data management
Device includes:
Handling module, for when detect operation system present lot batch task execution complete when, from the business
The test data of the present lot is grabbed in the database of system, and obtains the batch identification of the present lot;
Generation module, for the test data is associated with the batch identification, to generate the present lot
Data slicer;
Relating module, for by the data slicer it is associated with preset test case after save.
Preferably, the handling module is also used to:
According to preset data shape and/or data type, grabbed from the database of the operation system described current
The test data of batch, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
Preferably, the relating module is also used to:
Obtain the required test data indicated in preset test case;
Using the data slicer comprising the required test data as target data be sliced, by the target data slice with
The test case is associated;
Save the incidence relation between the target data slice and the test case.
Preferably, the test data managing device further include:
Modified module, for when receive based on the incidence relation modification instruction when, according to the modification instruct pair
The incidence relation is modified.
Preferably, the test data managing device further include:
Recovery module, for when receiving data convert instruction, the data slicer to be written to the operation system
Database in.
Preferably, the batch identification includes lot date, the test data managing device further include:
Display module, for when receiving data slicer inquiry instruction, according to batch in the data slicer of preservation
The data slicer of preservation is carried out arrangement and shown by the secondary date;When receive based on display the data slicer triggering
When details check instruction, the test data in the data slicer is shown.
In addition, to achieve the above object, the present invention also provides a kind of test data management equipment, the test data management
Equipment includes: memory, processor and is stored in the test data pipe that can be run on the memory and on the processor
Program is managed, the test data management program realizes test data management method as described above when being executed by the processor
Step.
In addition, to achieve the above object, it is described computer-readable the present invention also provides a kind of computer readable storage medium
Test data management program is stored on storage medium, the test data management program realizes institute as above when being executed by processor
The step of test data management method stated.
The present invention is when the batch task execution for detecting operation system present lot is completed, from the number of the operation system
According to grabbing the test data of the present lot in library, and obtain the batch identification of the present lot;By the test data
It is associated with the batch identification, to generate the data slicer of the present lot;By the data slicer and preset test
It is saved after use-case is associated.In this way, it realizes and the test data of present lot is automatically grabbed and saved, when
When subsequent progress version iteration test or regression test, the test data of the preservation can be multiplexed without making number again, thus
Avoid time cost caused by making number again and human cost consumption.
Detailed description of the invention
Fig. 1 is the device structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of test data management method first embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
As shown in Figure 1, Fig. 1 is the device structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
Test data management equipment of the embodiment of the present invention can be the equipment such as PC machine, server.
As shown in Figure 1, the test data management equipment may include: processor 1001, such as CPU, network interface 1004,
User interface 1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is for realizing between these components
Connection communication.User interface 1003 may include display screen (Display), input unit such as keyboard (Keyboard), optional
User interface 1003 can also include standard wireline interface and wireless interface.Network interface 1004 optionally may include standard
Wireline interface, wireless interface (such as WI-FI interface).Memory 1005 can be high speed RAM memory, be also possible to stable
Memory (non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned
The storage device of processor 1001.
It will be understood by those skilled in the art that device structure shown in Fig. 1 does not constitute the restriction to equipment, can wrap
It includes than illustrating more or fewer components, perhaps combines certain components or different component layouts.
As shown in Figure 1, as may include that operating system, network are logical in a kind of memory 1005 of computer storage medium
Believe module, Subscriber Interface Module SIM and test data management program.
In equipment shown in Fig. 1, network interface 1004 is mainly used for connecting background server, carries out with background server
Data communication;User interface 1003 is mainly used for connecting client (user terminal), carries out data communication with client;And processor
1001 can be used for calling the test data management program stored in memory 1005, and execute following test data management methods
Operation in embodiment.
Based on above-mentioned hardware configuration, test data management method embodiment of the present invention is proposed.
It is the flow diagram of test data management method first embodiment of the present invention, the test number referring to Fig. 2, Fig. 2
Include: according to management method
Step S10, when the batch task execution for detecting operation system present lot is completed, from the operation system
The test data of the present lot is grabbed in database, and obtains the batch identification of the present lot;
In the present embodiment, operation system can be the business system of the financial institutions such as bank, securities broker company, insurance company
System, operation system is used to handle the savings of user, the various financial business such as transfer accounts, provide a loan, investing, and generates corresponding business number
According in the background data base for being stored in operation system.
To guarantee that operation system operates normally, operation system is updated every time, iteration requires to carry out automatic test.
Existing automatic testing process are as follows: setup test use-case first, test case refer to working out for some special objective
One group of test input, the explanation for executing condition and expected results, to test some Program path or to verify whether meet certain
A particular demands;Then, executable batch plan is formulated according to test case, batch plan refers to reach test use
The set of the batch task executed required for execution condition in example, batch may include multiple batches, each batch in the works
In include several batch tasks;Operation system batch executes task of batch is corresponded to by scheduling system pull-up, executes in batch
Before getting up, on-line transaction request can be initiated to operation system by an automatic test platform, prepare batch transaction, so
Batch task is executed after starting batch afterwards, to generate test data required for test case, automation case is executed and completes
Verifying to data.
Under financial scenario, business datum has the data shape under life cycle complexity and each life cycle different
It is the characteristics of sample, subsequent automatic to enable operation system to be multiplexed into the data for executing the various forms generated when batch plan
Change in test, the present embodiment proposes a kind of test data management method.The present embodiment test data management method is applied to test
Data management apparatus, which docks with the operation system in test environment, for holding to operation system
The test data generated when row batch plan is grabbed and is saved, wherein test environment refers to complete software test work
Make necessary to computer hardware, software, the network equipment, historical data general name.
During testing environment execution automatic test, test data management equipment can star a detection journey
Sequence is measured in real time with the batch implementation of the plan to operation system.Wherein, batch plan can be as unit of day, industry
The every light of business system has dispatched the race batch of same day batch task execution after cutting, detect the batch task execution of operation system present lot
The mode of completion can be with are as follows: judges whether operation system generates and cuts day, cut i.e. switching system date to next day day, if generating day
It cuts, then determines that the batch task execution of present lot is completed.
When the batch task execution for detecting operation system present lot is completed, according to pre-defined rule, from operation system
Database in grab the test data of present lot, and obtain the batch identification of present lot, wherein batch identification can be
One of lot date, number, title or a variety of combinations.
In one embodiment, the step of the test data of the present lot is grabbed from the database of the operation system
It suddenly may include: to be worked as described in crawl from the database of the operation system according to preset data shape and/or data type
The test data of preceding batch, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
In the present embodiment, it is illustrated by loan data of test data, the Life cycle of loan data refers to
The whole process that loan is paid off from making loans to providing a loan, which includes several stages, for example normally refunds, is 1 month overdue, overdue
3 months etc., and data shape is just used to indicate the data stage locating in preset Life cycle, for example data shape can
To include data, overdue 1 month data, overdue 3 months data etc. in normal stage of refunding;And data type may include
Debt should be gone back, gone back debt, interest etc..When it is implemented, such as preset data shape is overdue 1 month data, then from
The overdue 1 month loan data of present lot is grabbed in the database of operation system, for another example, preset data type is interest number
According to then from all interest data grabbed in the database of operation system in present lot.
Step S20, the test data is associated with the batch identification, it is cut with generating the data of the present lot
Piece;
It is in the step, the above-mentioned test data grabbed is associated with batch identification, to generate the number of present lot
According to slice, which can regard that with batch identification be the executable data comprising various data shapes indexed as
Static set.
Step S30, by the data slicer it is associated with preset test case after save.
In the present embodiment, after generating data slicer, by the data slicer it is associated with preset test case after protect
It deposits.Specifically, a unique number or title can be set in each test case, and data slicer is being associated with test case
When, it need to only be associated with the number or title of test case.
Further, step S30 may include: the required test data for obtaining and indicating in preset test case;It will
Data slicer comprising the required test data is sliced as target data, and target data slice is used with the test
Example is associated;Save the incidence relation between the target data slice and the test case.
Due to each test case, wherein test data needed for the test case all can be indicated, therefore, available pre-
If test case in indicate required test data, then using the data slicer comprising required test data as target data
The target data is sliced associated with the test case by slice.It should be noted that in actual test, a data slicer
It can be used by multiple test cases, such as current there are three test case 1,2,3, the test data needed for them is cut-off
June 30, overdue 1 month loan data, then can cut June 30 according to the data that overdue 1 month loan data generates
Piece is respectively associated with the test case 1,2,3.After data slicer is associated with preset test case, by pass between the two
Connection relationship is saved.
When subsequent progress version iteration test or regression test, institute's data to be tested in test case can be direct
It is obtained according to above-mentioned incidence relation, to realize the multiplexing of test data.
Further, the step of incidence relation saved between target data slice and the test case it
It afterwards, can also include: to be instructed according to the modification to the association when receiving the modification instruction based on the incidence relation
Relationship is modified.
In the present embodiment, test data management equipment can by the incidence relation between data slicer and test case into
Row visualizes, in order to which administrative staff check, meanwhile, test data management equipment can receive the base of administrative staff's triggering
It is instructed in the modification of incidence relation, to modify to the incidence relation, which includes but is not limited to increase, delete and test
The associated data slicer of use-case.
By providing to the manual maintenance of the incidence relation between data slicer and test case, can make data slicer with
Incidence relation between test case is more accurate and meets actual test demand.
In the present embodiment, when the batch task execution for detecting operation system present lot is completed, from the business
The test data of the present lot is grabbed in the database of system, and obtains the batch identification of the present lot;It will be described
Test data is associated with the batch identification, to generate the data slicer of the present lot;By the data slicer and in advance
If test case it is associated after save.In this way, it realizes and automatically grabs the test data of present lot
And preservation can be multiplexed the test data of the preservation without again when subsequent progress version iteration test or regression test
Number is made, so as to avoid time cost caused by number and human cost consumption is made again.
Further, it is based on test data management method first embodiment of the present invention, proposes test data management of the present invention
Method second embodiment.
In the present embodiment, the test data management method can also include: and incite somebody to action when receiving data convert instruction
The data slicer is written into the database of the operation system.
Specifically, data convert instruction can be data slicer is associated with preset test case and after saving
Automatic trigger is also possible to artificially trigger, or the triggering in the data acquisition request for receiving operation system, when receiving
When data convert instructs, the data slicer of the present lot grabbed is written to the number of operation system test data management equipment
According in library, to realize the reduction of test data, when subsequent progress version iteration test or regression test, operation system can basis
Executive plan, the data directly read in the data slicer saved in database execute test, it is thus achieved that test data
Multiplexing.
Further, batch identification includes lot date, and the test data management method can also include: to work as to receive
When data slicer inquiry instruction, according to the lot date in the data slicer of preservation, by the data slicer of preservation into
Row arrangement display;When the details for receiving the data slicer triggering based on display check instruction, show that the data are cut
Test data in piece.
In the present embodiment, test data management equipment can be when receiving data slicer inquiry instruction, according to data
The data slicer of preservation from the distant to the near or from the near to the distant according to the date is carried out arrangement and shown by the lot date in slice, so as to
It is checked in administrative staff, meanwhile, the details that test data management equipment can receive administrative staff's triggering check instruction, with detailed
Show the test data in each data slicer.
Function is visualized by providing data slicer, so that the management service of data slicer is more clear, intuitively, it is full
Foot is to the checking of data slicer, maintenance needs.
The present invention also provides a kind of test data managing devices.The test data managing device includes:
Handling module, for when detect operation system present lot batch task execution complete when, from the business
The test data of the present lot is grabbed in the database of system, and obtains the batch identification of the present lot;
Generation module, for the test data is associated with the batch identification, to generate the present lot
Data slicer;
Relating module, for by the data slicer it is associated with preset test case after save.
Further, the handling module is also used to:
According to preset data shape and/or data type, grabbed from the database of the operation system described current
The test data of batch, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
Further, the relating module is also used to:
Obtain the required test data indicated in preset test case;
Using the data slicer comprising the required test data as target data be sliced, by the target data slice with
The test case is associated;
Save the incidence relation between the target data slice and the test case.
Further, the test data managing device further include:
Modified module, for when receive based on the incidence relation modification instruction when, according to the modification instruct pair
The incidence relation is modified.
Further, the test data managing device further include:
Recovery module, for when receiving data convert instruction, the data slicer to be written to the operation system
Database in.
Further, the batch identification includes lot date, the test data managing device further include:
Display module, for when receiving data slicer inquiry instruction, according to batch in the data slicer of preservation
The data slicer of preservation is carried out arrangement and shown by the secondary date;When receive based on display the data slicer triggering
When details check instruction, the test data in the data slicer is shown.
Method performed by above-mentioned each program module can refer to each embodiment of test data management method of the present invention, herein
It repeats no more.
The present invention also provides a kind of computer readable storage mediums.
Test data management program, the test data management program are stored on computer readable storage medium of the present invention
The step of test data management method as described above is realized when being executed by processor.
Wherein, the test data management program run on the processor, which is performed realized method, can refer to this
The each embodiment of invention test data management method, details are not described herein again.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that terminal device (it can be mobile phone,
Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (14)
1. a kind of test data management method, which is characterized in that described method includes following steps:
When the batch task execution for detecting operation system present lot is completed, grabbed from the database of the operation system
The test data of the present lot, and obtain the batch identification of the present lot;
The test data is associated with the batch identification, to generate the data slicer of the present lot;
By the data slicer it is associated with preset test case after save.
2. test data management method as described in claim 1, which is characterized in that the database from the operation system
The step of test data of the middle crawl present lot includes:
According to preset data shape and/or data type, the present lot is grabbed from the database of the operation system
Test data, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
3. test data management method as described in claim 1, which is characterized in that it is described by the data slicer with it is preset
The step of preservation, includes: after test case is associated
Obtain the required test data indicated in preset test case;
Using the data slicer comprising the required test data as target data be sliced, by the target data slice with it is described
Test case is associated;
Save the incidence relation between the target data slice and the test case.
4. test data management method as claimed in claim 3, which is characterized in that it is described save target data slice with
After the step of incidence relation between the test case, further includes:
When receiving the modification instruction based on the incidence relation, the incidence relation is repaired according to modification instruction
Change.
5. test data management method according to any one of claims 1 to 4, which is characterized in that the test data pipe
Reason method further include:
When receiving data convert instruction, the data slicer is written into the database of the operation system.
6. test data management method according to any one of claims 1 to 4, which is characterized in that the batch identification packet
Include lot date, the test data management method further include:
When receiving data slicer inquiry instruction, according to the lot date in the data slicer of preservation, by the institute of preservation
It states data slicer and carries out arrangement and show;
When the details for receiving the data slicer triggering based on display check instruction, the survey in the data slicer is shown
Try data.
7. a kind of test data managing device, which is characterized in that the test data managing device includes:
Handling module, for when detect operation system present lot batch task execution complete when, from the operation system
Database in grab the test data of the present lot, and obtain the batch identification of the present lot;
Generation module, for the test data is associated with the batch identification, to generate the data of the present lot
Slice;
Relating module, for by the data slicer it is associated with preset test case after save.
8. test data managing device as claimed in claim 7, which is characterized in that the handling module is also used to:
According to preset data shape and/or data type, the present lot is grabbed from the database of the operation system
Test data, wherein the data shape is used to indicate the stage that data are locating in preset Life cycle.
9. test data managing device as claimed in claim 7, which is characterized in that the relating module is also used to:
Obtain the required test data indicated in preset test case;
Using the data slicer comprising the required test data as target data be sliced, by the target data slice with it is described
Test case is associated;
Save the incidence relation between the target data slice and the test case.
10. test data managing device as claimed in claim 9, which is characterized in that the test data managing device is also wrapped
It includes:
Modified module, for being instructed to described according to the modification when receiving the modification instruction based on the incidence relation
Incidence relation is modified.
11. the test data managing device as described in any one of claim 7 to 10, which is characterized in that the test data
Managing device further include:
Recovery module, for when receiving data convert instruction, the data slicer to be written to the number of the operation system
According in library.
12. the test data managing device as described in any one of claim 7 to 10, which is characterized in that the batch identification
Including lot date, the test data managing device further include:
Display module, for when receiving data slicer inquiry instruction, according to the batch day in the data slicer of preservation
The data slicer of preservation is carried out arrangement and shown by the phase;When the details for receiving the data slicer triggering based on display
When checking instruction, the test data in the data slicer is shown.
13. a kind of test data management equipment, which is characterized in that the test data management equipment includes: memory, processor
And it is stored in the test data management program that can be run on the memory and on the processor, the test data management
It realizes when program is executed by the processor such as the step of test data management method described in any one of claims 1 to 6.
14. a kind of computer readable storage medium, which is characterized in that be stored with test number on the computer readable storage medium
According to management program, realize when the test data management program is executed by processor as described in any one of claims 1 to 6
The step of test data management method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541964.XA CN110262975A (en) | 2019-06-20 | 2019-06-20 | Test data management method, device, equipment and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541964.XA CN110262975A (en) | 2019-06-20 | 2019-06-20 | Test data management method, device, equipment and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110262975A true CN110262975A (en) | 2019-09-20 |
Family
ID=67920208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910541964.XA Pending CN110262975A (en) | 2019-06-20 | 2019-06-20 | Test data management method, device, equipment and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110262975A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111078545A (en) * | 2019-12-05 | 2020-04-28 | 贝壳技术有限公司 | Method and system for automatically generating test data |
CN111143396A (en) * | 2019-12-04 | 2020-05-12 | 深圳市智微智能软件开发有限公司 | High-voltage test data management method and system |
CN112527909A (en) * | 2020-12-24 | 2021-03-19 | 东软睿驰汽车技术(沈阳)有限公司 | Data slice processing method and device and related products |
CN112650688A (en) * | 2020-12-30 | 2021-04-13 | 深圳前海微众银行股份有限公司 | Automated regression testing method, associated device and computer program product |
CN113220579A (en) * | 2021-05-18 | 2021-08-06 | 京东科技控股股份有限公司 | Method, device, equipment and storage medium for processing stock test data |
-
2019
- 2019-06-20 CN CN201910541964.XA patent/CN110262975A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111143396A (en) * | 2019-12-04 | 2020-05-12 | 深圳市智微智能软件开发有限公司 | High-voltage test data management method and system |
CN111078545A (en) * | 2019-12-05 | 2020-04-28 | 贝壳技术有限公司 | Method and system for automatically generating test data |
CN112527909A (en) * | 2020-12-24 | 2021-03-19 | 东软睿驰汽车技术(沈阳)有限公司 | Data slice processing method and device and related products |
CN112650688A (en) * | 2020-12-30 | 2021-04-13 | 深圳前海微众银行股份有限公司 | Automated regression testing method, associated device and computer program product |
CN112650688B (en) * | 2020-12-30 | 2024-06-14 | 深圳前海微众银行股份有限公司 | Automated regression testing method, associated device and computer program product |
CN113220579A (en) * | 2021-05-18 | 2021-08-06 | 京东科技控股股份有限公司 | Method, device, equipment and storage medium for processing stock test data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110262975A (en) | Test data management method, device, equipment and computer readable storage medium | |
EP2778929B1 (en) | Test script generation system | |
US8005706B1 (en) | Method for identifying risks for dependent projects based on an enhanced telecom operations map | |
US10785128B1 (en) | System, apparatus and method for deploying infrastructure to the cloud | |
CN107220892B (en) | Intelligent preprocessing tool and method applied to massive P2P network loan financial data | |
US20110066890A1 (en) | System and method for analyzing alternatives in test plans | |
US8341591B1 (en) | Method and software tool for real-time optioning in a software development pipeline | |
US20130144679A1 (en) | Simulation and Visualization for Project Planning and Management | |
CN110399303B (en) | Method for preparing test data, data preparation device and electronic equipment | |
US7328134B1 (en) | Enterprise integration test tool | |
CN111400011B (en) | Real-time task scheduling method, system, equipment and readable storage medium | |
CN106874483A (en) | A kind of device and method of the patterned quality of data evaluation and test based on big data technology | |
CN108491254A (en) | A kind of dispatching method and device of data warehouse | |
CN112488652A (en) | Work order auditing method, system, terminal and storage medium | |
US11232019B1 (en) | Machine learning based test coverage in a production environment | |
CN116466959A (en) | Deployment method and device of micro-service system, readable storage medium and electronic equipment | |
CN112445787A (en) | Data auditing method and system based on real-time service | |
US20090169008A1 (en) | System and method for tracking testing of software modification projects from a wireless mobile device | |
CN111865673A (en) | Automatic fault management method, device and system | |
CN115840560A (en) | Management system for software development process | |
CN112419052B (en) | Transaction testing method, device, electronic equipment and readable storage medium | |
CN115016321A (en) | Hardware-in-loop automatic testing method, device and system | |
CN114693116A (en) | Method and device for detecting code review validity and electronic equipment | |
CN110674197A (en) | Visual configuration and capture system for business operation | |
US11513819B2 (en) | Machine learning based impact analysis in a next-release quality assurance environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |