CN110258796A - Connecting device for middle corridor and modules on two sides of steel structure building - Google Patents

Connecting device for middle corridor and modules on two sides of steel structure building Download PDF

Info

Publication number
CN110258796A
CN110258796A CN201910566270.1A CN201910566270A CN110258796A CN 110258796 A CN110258796 A CN 110258796A CN 201910566270 A CN201910566270 A CN 201910566270A CN 110258796 A CN110258796 A CN 110258796A
Authority
CN
China
Prior art keywords
corridor
module
bolt hole
connector
bottom beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910566270.1A
Other languages
Chinese (zh)
Inventor
冮明姝
杨洁
汪吉青
张旭
张术东
付海军
韩仕超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201910566270.1A priority Critical patent/CN110258796A/en
Publication of CN110258796A publication Critical patent/CN110258796A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2466Details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2487Portico type structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connecting device of a middle corridor and two side modules of a steel structure building, which comprises a plurality of functional modules A, a plurality of functional modules B, a corridor cantilever bottom beam, a horizontal connecting piece and a vertical connecting piece. The floorbar of the cantilever corridor bottom plate adopts channel steel, the tail end of the cantilever beam is connected with the other side functional module by adopting a connecting piece, the connecting piece is used for welding a vertical rib plate on the basis of the traditional connecting plate, a bolt hole is drilled on the vertical rib plate, the cantilever beam is connected with the tail end of the cantilever beam of the corridor by using a bolt, the connection is reliable, the force transfer is clear, and the level and the vertical connection of all the functional modules are operated and completed in the corridor space.

Description

A kind of attachment device in steel building centre corridor and two sides module
Technical field
The invention belongs to steel structure modularization technical field of buildings, it is related to corridor and two side forms among a kind of steel building The attachment device and construction method of block.
Background technique
Modularization steel building is a kind of highly integrated assembled architecture being made of multiple modules, has assembly rate Height, environmentally protective, the advantages that construction speed is fast.Each module is made of four columns, eight beam, and be prefabricated in the factory completion, can individually at For room.It is function room for two sides, centre is the architectural composition in corridor, such as office, dormitory, hotel, apartment place, mould Block steel building is widely used, and practicability is good.Currently, the way of realization in corridor such as Fig. 1, arrangement form are common For module segmentation at function and two, corridor part, it is all by bottom beam, top beam that the component composition of corridor section and general module is identical It is formed with four corner posts, when connecting with another functional module, section need to be completed in inside modules top plate and bottom plate reserving hole The horizontal connection and vertical connection of module are realized in point installation.
The shortcomings that prior art includes:
1, there are bottom plate, top plate and pillar in corridor space, component is more, increases cost;
2, generally there is equipment installation laying at the top of corridor, space top bottom twice beam keeps the lower headroom of script more oppressive;
3, the connecting node of module is needed in module bottom plate and top reserved opening, and scene blocks again, reduces assembly rate, Constructing operation is difficult.
Summary of the invention
The object of the present invention is to provide the connection methods in a kind of intermediate corridor and two sides module, solve material in the prior art Material investment is more, cost is high, uses function limitation, the relevant issues such as constructing operation difficulty.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of attachment device in steel building centre corridor and two sides module, including multiple functional module A, multiple functions Module B, corridor overhanging bottom beam, horizontal connector and vertical connections, the Cantilever Beams are set between two functional modules, In the skirt member of multiple functional module A bottom beam overhang by strong weld and corridor be fixedly connected, the multiple functional module B in the other side are logical It crosses horizontal and vertical connector and is fixedly connected with the functional module B that corridor overhangs bottom beam and adjacent upper and lower, left and right;Described two Block horizontal connector is symmetrically welded at vertical connections arranged on left and right sides, is welded in horizontal connector for localization function module B Upper and lower positioning pin and connector horizontal steel plate bolt hole for bolt fixed function module B, on vertical connections respectively It is formed with and overhangs bottom beam bolt for the corner fittings bolt hole of fixed function module B and the corridor for fixing corridor overhanging bottom beam Hole.
Moreover, the end carriage of upper and lower two functional modules B is fixedly connected by the horizontal steel plate bolt hole by bolt, The corner fittings of left and right two functional modules B is fixedly connected by corner fittings bolt hole by bolt.
Moreover, the corridor overhangs the preparatory drilling in bottom beam end and overhangs the fixed company of bottom beam bolt hole by bolt and corridor It connects.
Moreover, be formed in advance respectively can holding locating pin for bottom corner piece and angle supporting device in the upper and lower adjacent two functional modules B Hole location.
Moreover, being prefabricated on the end carriage of the upper and lower layer function module B compatible with horizontal steel plate bolt hole prefabricated Hole.
The construction method that a kind of steel building centre corridor is connect with two sides module, includes the following steps:
(1) corridor is overhang bottom beam and modules A to weld to form composite module in factory, use is made in overhanging bottom beam end in advance In the prefabricated bolt hole with corridor overhanging bottom beam bolt hole;
(2) by the angle supporting device of the other side functional module B bottom corner piece and lower layer functional module B adjacent with corridor in advance in work Factory makes for bolt hole compatible with corner fittings bolt hole, can be made into slotted hole, drilling size and bolt phase for convenience of connection Matching;
(3) the horizontal connector and vertical connections of connecting node are made, and it is fixed to weld upper and lower module in horizontal connector Position pin, connector horizontal steel plate bolt hole processed, for connecting the end carriage of upper and lower module, vertical connections with module B bottom corner piece With angle supporting device position of opening corner fittings bolt hole, prefabricated bolt hole corresponding position corridor overhanging bottom beam spiral shell is opened with corridor overhanging bottom beam Two pieces of horizontal connectors are symmetrically welded on vertical connections by keyhole, form connector;
(4) after lower module is installed, connector is placed on angle supporting device by lower positioning pin, lifts upper layer module B, by positioning pin on the hole location of the bottom corner piece of upper layer module B alignment connector, with bolt by the pre-manufactured hole of the end carriage of module B and company The pre-manufactured hole on connector horizontal steel plate bolt hole and lower layer's end carriage on fitting is connected with, and then lifts composite module, The corridor of the bolt hole for overhanging bottom beam and vertical connections overhanging bottom beam bolt hole is connected with, corridor and adjacent mould are completed The horizontal connection of block and vertical connection.
Advantages of the present invention and economic effect are:
1, the technical scheme adopted by the invention is that choosing the strong welds such as one of functional module and corridor floor, cancel Two pillars and corridor top plate of corridor end, use upper layer corridor floor as the top plate in this layer of corridor.Overhang corridor floor Bottom beam uses channel steel, and the end of Cantilever Beams is connected when connecting with other side functional module using connector, and connector is in tradition Connecting plate on the basis of weld vertical floor, beat bolt hole on vertical floor, be connected with the Cantilever Beams end in corridor with bolt, Connection is reliable, and power transmission is clear, operates the horizontal and vertical connection of all functional modules all in corridor space and completes.
2, the present invention is welded by corridor floor and side module, is also served as the top plate in corridor, is cancelled top plate and the angle in corridor Column reduces the investment of component and material, reduces cost, improves the use space in corridor;Corridor overhangs bottom beam end using company It is connect at fitting and the corner fittings of other side functional module, does not destroy the upholstery finishing of functional module, realize that two sides module adds The allomeric function in intermediate corridor.
Detailed description of the invention
Fig. 1 is traditional corridor component layout drawing;
Fig. 2 is the partial enlargement diagram in the portion A in Fig. 1;
Fig. 3 is the schematic perspective view that two sides functional module of the present invention is connect with intermediate corridor;
Fig. 4 is the planar structure schematic diagram that two sides functional module of the present invention is connect with intermediate corridor;
Fig. 5 is that corridor of the present invention overhangs bottom beam end connecting node detail drawing;
Fig. 6 is the cross-sectional view of the structure of C-C in Fig. 5;
Fig. 7 is the structural scheme of mechanism that functional module A of the present invention overhangs that bottom beam is combined with corridor;
Fig. 8 is the structural schematic diagram of horizontal connector of the present invention and vertical connections;
Fig. 9 is the side view of Fig. 8;
Figure 10 is that corridor overhangs bottom beam and adjacent block is installed node diagram;Horizontal connector and vertical connections
Figure 11 is the cross-sectional view of the structure of the D-D of Figure 10.
In figure: 1, the module in traditional function room and corridor composition;2, traditional function room other side functional module;3, function It can modules A;4, functional module B;5, corridor overhanging bottom beam and functional module B connecting node;6, corridor overhangs bottom beam;7, function mould Block A skirt member;8, functional module B skirt member;9, the bottom end functional module B beam;10, horizontal connector;11, vertical connections;12, Corridor overhangs bottom beam bolt hole;13, positioning pin;14, module column;15, functional module B bottom corner piece;16, functional module B angle supporting device; 17, bolt is connected;18, corner fittings bolt hole;19, connector horizontal steel plate bolt hole.
Specific embodiment
For that can further appreciate that the contents of the present invention, feature and effect, the following examples are hereby given, and cooperates attached drawing detailed It is described as follows.It should be noted that the present embodiment be it is descriptive, be not restrictive, cannot thus limit guarantor of the invention Protect range.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage Solution is indication or suggestion relative importance.
In addition, the terms such as term "horizontal", "vertical" are not offered as requiring component abswolute level or pendency, but can be slightly Low dip.It is not to indicate that the structure has been had to if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical" It is complete horizontal, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
A kind of attachment device in steel building centre corridor and two sides module, including multiple functional module A, multiple functions Module B, corridor overhanging bottom beam, horizontal connector and vertical connections, the Cantilever Beams are set between two functional modules, In the skirt member of multiple functional module A bottom beam overhang by strong weld and corridor be fixedly connected, the multiple functional module B in the other side are logical It crosses horizontal and vertical connector and is fixedly connected with the functional module B that corridor overhangs bottom beam and adjacent upper and lower, left and right;Described two Block horizontal connector is symmetrically welded at vertical connections arranged on left and right sides, is welded in horizontal connector for localization function module B Upper and lower positioning pin and connector horizontal steel plate bolt hole for bolt fixed function module B, on vertical connections respectively It is formed with and overhangs bottom beam bolt for the corner fittings bolt hole of fixed function module B and the corridor for fixing corridor overhanging bottom beam Hole.
The end carriage of upper and lower two functional modules B is fixedly connected by the horizontal steel plate bolt hole by bolt, corner fittings spiral shell The corner fittings of left and right two functional modules B is fixedly connected by keyhole by bolt.
The preparatory drilling in corridor overhanging bottom beam end is simultaneously fixedly connected by bolt with corridor overhanging bottom beam bolt hole.
In the upper and lower adjacent two functional modules B bottom corner piece and angle supporting device be formed in advance respectively can holding locating pin hole Position.
Pre-manufactured hole compatible with horizontal steel plate bolt hole is prefabricated on the end carriage of the upper and lower layer function module B.
The construction method that a kind of steel building centre corridor is connect with two sides module, includes the following steps:
(1) corridor is overhang bottom beam and modules A to weld to form composite module in factory, use is made in overhanging bottom beam end in advance In the prefabricated bolt hole with corridor overhanging bottom beam bolt hole;
(2) by the angle supporting device of the other side functional module B bottom corner piece and lower layer functional module B adjacent with corridor in advance in work Factory makes for bolt hole compatible with corner fittings bolt hole, can be made into slotted hole, drilling size and bolt phase for convenience of connection Matching;
(3) the horizontal connector and vertical connections of connecting node are made, and it is fixed to weld upper and lower module in horizontal connector Position pin, connector horizontal steel plate bolt hole processed, for connecting the end carriage of upper and lower module, vertical connections with module B bottom corner piece With angle supporting device position of opening corner fittings bolt hole, prefabricated bolt hole corresponding position corridor overhanging bottom beam spiral shell is opened with corridor overhanging bottom beam Two pieces of horizontal connectors are symmetrically welded on vertical connections by keyhole, form connector;
(4) after lower module is installed, connector is placed on angle supporting device by lower positioning pin, lifts upper layer module B, by positioning pin on the hole location of the bottom corner piece of upper layer module B alignment connector, with bolt by the pre-manufactured hole of the end carriage of module B and company The pre-manufactured hole on connector horizontal steel plate bolt hole and lower layer's end carriage on fitting is connected with, and then lifts composite module, The corridor of the bolt hole for overhanging bottom beam and vertical connections overhanging bottom beam bolt hole is connected with, corridor and adjacent mould are completed The horizontal connection of block and vertical connection.

Claims (6)

1. the attachment device in corridor and two sides module among a kind of steel building, it is characterised in that: including multiple functional modules A, multiple functional module B, corridor overhanging bottom beam, horizontal connector and vertical connections, the Cantilever Beams are set to two functions Between module, the skirt member of plurality of functional module A overhangs bottom beam with corridor by strong weld and is fixedly connected, and the other side is multiple Functional module B is fixed by the functional module B that horizontal and vertical connector overhangs bottom beam and adjacent upper and lower, left and right with corridor Connection;Two pieces of horizontal connectors are symmetrically welded at vertical connections arranged on left and right sides, are welded in horizontal connector for fixed The upper and lower positioning pin of bit function module B and connector horizontal steel plate bolt hole for bolt fixed function module B, vertically It is formed respectively on connector and is hanged for the corner fittings bolt hole of fixed function module B and the corridor for fixing corridor overhanging bottom beam Choose bottom beam bolt hole.
2. the attachment device in corridor and two sides module, feature exist among a kind of steel building according to claim 1 In: the end carriage of upper and lower two functional modules B is fixedly connected by the horizontal steel plate bolt hole by bolt, corner fittings bolt hole The corner fittings of left and right two functional modules B is fixedly connected by bolt.
3. the attachment device in corridor and two sides module, feature exist among a kind of steel building according to claim 1 In: the preparatory drilling in corridor overhanging bottom beam end is simultaneously fixedly connected by bolt with corridor overhanging bottom beam bolt hole.
4. the attachment device in corridor and two sides module, feature exist among a kind of steel building according to claim 1 In: in the upper and lower adjacent two functional modules B bottom corner piece and angle supporting device be formed in advance respectively can holding locating pin hole location.
5. the attachment device in corridor and two sides module, feature exist among a kind of steel building according to claim 1 In: pre-manufactured hole compatible with horizontal steel plate bolt hole is prefabricated on the end carriage of the upper and lower layer function module B.
6. the construction method that corridor is connect with two sides module among a kind of steel building, which comprises the steps of:
(1) corridor is overhang bottom beam and modules A to weld to form composite module in factory, overhanging bottom beam end be made in advance for The prefabricated bolt hole of corridor overhanging bottom beam bolt hole;
(2) by the angle supporting device of the other side functional module B bottom corner piece and lower layer functional module B adjacent with corridor in advance in factory's system Bolt hole compatible with corner fittings bolt hole is acted on, can be made into slotted hole for convenience of connection, drilling size matches with bolt;
(3) the horizontal connector and vertical connections of connecting node are made, welds upper and lower module positioning pin in horizontal connector, Connector horizontal steel plate bolt hole processed, for connecting the end carriage of upper and lower module, vertical connections with module B bottom corner piece and apex angle Part position of opening corner fittings bolt hole opens prefabricated bolt hole corresponding position corridor overhanging bottom beam bolt hole with corridor overhanging bottom beam, Two pieces of horizontal connectors are symmetrically welded on vertical connections, connector is formed;
(4) after lower module is installed, connector is placed on angle supporting device by lower positioning pin, lifts upper layer module B, it will Positioning pin on the hole location alignment connector of the bottom corner piece of upper layer module B, with bolt by the pre-manufactured hole and connector of the end carriage of module B On connector horizontal steel plate bolt hole and lower layer's end carriage on pre-manufactured hole be connected with, then lift composite module, will hang The corridor overhanging bottom beam bolt hole of the bolt hole and vertical connections of choosing bottom beam is connected with, and completes corridor and adjacent block Horizontal connection and vertical connection.
CN201910566270.1A 2019-06-27 2019-06-27 Connecting device for middle corridor and modules on two sides of steel structure building Pending CN110258796A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910566270.1A CN110258796A (en) 2019-06-27 2019-06-27 Connecting device for middle corridor and modules on two sides of steel structure building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910566270.1A CN110258796A (en) 2019-06-27 2019-06-27 Connecting device for middle corridor and modules on two sides of steel structure building

Publications (1)

Publication Number Publication Date
CN110258796A true CN110258796A (en) 2019-09-20

Family

ID=67922175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910566270.1A Pending CN110258796A (en) 2019-06-27 2019-06-27 Connecting device for middle corridor and modules on two sides of steel structure building

Country Status (1)

Country Link
CN (1) CN110258796A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718943A (en) * 2021-09-26 2021-11-30 中建三局集团有限公司 Pressure-bearing space easy to combine
CN114182824A (en) * 2021-12-17 2022-03-15 中建集成建筑有限公司 Magnetic suction connecting structure for modular steel structure integrated building and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100805732B1 (en) * 2007-05-16 2008-02-21 주식회사 포스코 Building structure using modular unit
CN105863067A (en) * 2016-03-29 2016-08-17 北京工业大学 Modular low-layer assembling type house system of special-shaped column steel structure
CN106948483A (en) * 2017-04-29 2017-07-14 天津大学 A kind of connecting node applied to modularization steel building
CN106988433A (en) * 2017-04-29 2017-07-28 天津大学 A kind of modular containers build connecting node
CN107288222A (en) * 2017-07-27 2017-10-24 中冶天工集团有限公司 A kind of modular architectural non-corner module level attachment means and connection method
CN109162355A (en) * 2018-09-20 2019-01-08 中冶天工(天津)装备制造有限公司 A kind of assembling type steel structure modularization campsite building construction system
CN211395970U (en) * 2019-06-27 2020-09-01 中冶天工集团有限公司 Connecting device for middle corridor and modules on two sides of steel structure building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100805732B1 (en) * 2007-05-16 2008-02-21 주식회사 포스코 Building structure using modular unit
CN101307620A (en) * 2007-05-16 2008-11-19 浦项产业科学研究院 Building module unit and building structure using same
CN105863067A (en) * 2016-03-29 2016-08-17 北京工业大学 Modular low-layer assembling type house system of special-shaped column steel structure
CN106948483A (en) * 2017-04-29 2017-07-14 天津大学 A kind of connecting node applied to modularization steel building
CN106988433A (en) * 2017-04-29 2017-07-28 天津大学 A kind of modular containers build connecting node
CN107288222A (en) * 2017-07-27 2017-10-24 中冶天工集团有限公司 A kind of modular architectural non-corner module level attachment means and connection method
CN109162355A (en) * 2018-09-20 2019-01-08 中冶天工(天津)装备制造有限公司 A kind of assembling type steel structure modularization campsite building construction system
CN211395970U (en) * 2019-06-27 2020-09-01 中冶天工集团有限公司 Connecting device for middle corridor and modules on two sides of steel structure building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718943A (en) * 2021-09-26 2021-11-30 中建三局集团有限公司 Pressure-bearing space easy to combine
CN114182824A (en) * 2021-12-17 2022-03-15 中建集成建筑有限公司 Magnetic suction connecting structure for modular steel structure integrated building and construction method thereof
CN114182824B (en) * 2021-12-17 2023-03-10 中建集成建筑有限公司 Magnetic suction connecting structure for modular steel structure integrated building and construction method thereof

Similar Documents

Publication Publication Date Title
CN110325691A (en) Modular architectural connector
CN110258796A (en) Connecting device for middle corridor and modules on two sides of steel structure building
CN205189147U (en) Draw -in groove assembled steel -pipe column and girder steel connected node
CN214219960U (en) Novel box house steel wood frame construction
CN106149901A (en) A kind of corner fittings rotating module building connects node
CN107447861A (en) A kind of assembling type steel structure square tube post beam column node connection device with diagonal brace
CN109629677A (en) A kind of connecting node of the modularization steel building using outer sleeve connection
CN204570938U (en) The connected system of building module adjacent cells
CN107882167A (en) The light body plate structure house of quick-assembling
CN107542163A (en) House frame
CN211395970U (en) Connecting device for middle corridor and modules on two sides of steel structure building
CN109838034A (en) It is a kind of for assembling the roof structure in house
CN209179182U (en) Six columns support light-gauge steel section modular architectural structural system
CN114277929A (en) Modular steel structure reverse self-locking column-column connecting node and connecting method
CN109057048B (en) On-site all-bolt cast steel connecting beam column node module applicable to closed section column
CN105952144A (en) Sleeve fastener seat and sleeve fastener screw
CN205907810U (en) House framework
CN108867870A (en) Six columns support light-gauge steel section modular architectural structural system and its method for processing and assembling
CN216276131U (en) Foundation base of ultra-low energy consumption integrated heat preservation assembled multi-storey house
CN106368351B (en) Assembled light steel composite structure house and construction method
CN215907461U (en) Assembled wall body fixed stay device
CN209179184U (en) A kind of two installation position formula nodes of center pillar
CN217537404U (en) Wall unit and prefabricated house structure
CN216836881U (en) Novel fast-assembling platform
CN115627958B (en) Inclined adduction transformation structure suitable for super high-rise building and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination