CN110258513A - A kind of construction method of the diaphram wall through super thick silty sand ground - Google Patents

A kind of construction method of the diaphram wall through super thick silty sand ground Download PDF

Info

Publication number
CN110258513A
CN110258513A CN201910453530.4A CN201910453530A CN110258513A CN 110258513 A CN110258513 A CN 110258513A CN 201910453530 A CN201910453530 A CN 201910453530A CN 110258513 A CN110258513 A CN 110258513A
Authority
CN
China
Prior art keywords
slot
connector
grooving
wall
conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910453530.4A
Other languages
Chinese (zh)
Inventor
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sui Shi Civil Polytron Technologies Inc
Original Assignee
Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Sui Shi Civil Polytron Technologies Inc filed Critical Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority to CN201910453530.4A priority Critical patent/CN110258513A/en
Publication of CN110258513A publication Critical patent/CN110258513A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of construction method of diaphram wall through super thick silty sand ground, the present invention is specifically includes the following steps: S1, construction of guide wall, S2, grooving and clear slot, S3, connector construction, S4, steel reinforcement cage installation, S5, concreting, the present invention relates to Diaphragm Wall fields.This runs through the construction method of the diaphram wall of super thick silty sand ground, mud is conveyed in grooving, it can prevent underground water from leaking into slot, unit groove jump point excavation section by section, utilize non-box cut section self-forming support construction, it can prevent cell wall soil layer from collapsing, connector slot can make connector positioning more acurrate, and convenient for fixing, cell wall and slot bottom are detected and cleared up before launching connector, it can prevent from encountering barrier in connector launch process, influence construction progress, accelerate speed of application, the flow-stopping plate being arranged when placing connector can prevent in concrete seepage flow to next unit slot, under the influence of a unit groove construct, practicability is higher.

Description

A kind of construction method of the diaphram wall through super thick silty sand ground
Technical field
The present invention relates to Diaphragm Wall field, specially a kind of diaphram wall through super thick silty sand ground is applied Work method.
Background technique
Diaphram wall is that foundation engineering uses a kind of trench machine on the ground, along all side axis of deep excavation project Line excavates out a long and narrow deep trouth under the conditions of mud off, after clear slot, steel reinforcement cage is hung in slot, then uses tremie method Underwater concreting with tremie method builds up a unit groove section, so carries out paragraph by paragraph, builds up continuous reinforced concrete wall together in underground Wall, as intercept water, antiseepage, load-bearing, water-retaining structure, lead the reinforced concrete structure that wall is usually perfused on the spot, main function is: Guarantee the geometric dimension and shape of diaphram wall design;Part mud is holded, guarantees liquid level stabilizing when trenching construction;It bears to dig The load of groove mechanical protects notch Tu Bi not destroy, and the benchmark as installation framework of steel reinforcement.
When the soil layer of slotting position is super thick silty sand ground, the construction method of current diaphram wall is in work progress In cell wall can not be protected in time, it is easy to cause cell wall soil layer to collapse, influence the duration, reduce speed of application, in addition exist In concreting process, concrete can be leaked out to and not poured in unit groove, when carrying out the construction of next unit slot, be needed to infiltration Concrete out is cleared up, and is reduced working efficiency, and waste of resource, is increased cost.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of construction parties of diaphram wall through super thick silty sand ground Method, solving in time to protect cell wall, and cell wall easily collapses, and influence the duration, speed of application is reduced, in concreting In the process, the problem of concrete can be leaked out to and not poured in unit groove, be not easily cleaned, and waste of resource, increase cost.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of ground through super thick silty sand ground The construction method of lower diaphragm wall, specifically includes the following steps:
S1, construction of guide wall: arrangement grooving place first makes levelling of the land no-sundries, and positioned, determines guide groove position It sets, then during grooving, conveys mud into slot in grooving, then wiretie bracket into guide groove is excavated with chute forming machine, And template is set up among Steel bar rack, then casting concrete, makes concrete wrap Steel bar rack, will after concrete formation Template is dismantled, and stull is arranged, and this completes the constructions for leading wall;
S2, grooving and clear slot: carrying out grooving using chute forming machine, and each unit groove jump point formula excavation section by section finally again will Slot section is dug through, and during grooving, supplements mud into slot in grooving, the mud and extra mud after the completion of grooving, to slot bottom It is cleared up;
S3, connector construction: connector slot is dug in slot bottom, is then first checked in the position for needing to launch connector, is removed Connector abutting slot section is slowly put to slot bottom, and is cleaned with water between connector and cell wall by the barrier of cell wall or slot bottom, then The groove extended downwardly is opened up in cell wall and the nearest place of joint location, and flow-stopping plate is set in groove, and makes to keep off One side of the flowing plate far from groove is in contact with the surface of connector, and this completes connector placements;
S4, steel reinforcement cage installation: cell wall both sides set up vertically and horizontally lifting truss on the ground, and the steel reinforcement cage made is vertical It slings, it is made to be directed at cell wall, slow sinking to slot bottom, then at the top of steel reinforcement cage, bracket is hung in setting, and withdraws lifting truss, Complete the installation of steel reinforcement cage;
S5, concreting: mud is first filled into slot, and conduit is installed, concreting is then carried out, with coagulation While native liquid level rises, conduit is mentioned upwards, after the completion of pouring work, dismantles conduit immediately and pour frame.
Preferably, each unit groove in the step S1, grooving segmentation is no more than 3, grooving process slurry coat method liquid Face, which should be higher than that, leads wall bottom surface 5m.
Preferably, mud should store for 24 hours after the completion of preparation in the step S1 and step S2, to the abundant water of mud materials Changing rear can be used.
Preferably, in the step S4 truss main reinforcement preferably use HRB335 grades or HRB400 grades of reinforcing bars, bar diameter it is unsuitable It should remake or modify if the steel reinforcement cage that being displaced, loosening or snap occur in steel reinforcement cage tie point must not enter slot less than 20mm It is good.
Preferably, in the step S5 when slot segment length is not more than 6m, slot section concrete preferably uses two conduits simultaneously It pours, when slot segment length is greater than 6m, slot section concrete preferably uses three conduits while pouring.
Preferably, conduit bottom is apart from the hanging about 30cm-50cm of slot bottom in the step S5, and when conduit is installed should be noted that and connect Head is completely embedded, and each connector join should be added with sealing ring, to prevent conduit gas leakage leak.
Preferably, when just starting to be poured in the step S5, guarantee that the buried depth of conduit is greater than 50cm, poured in subsequent During building, control depth of tremie dismantles conduit between 1.5m-3.0m, and according to the buried depth situation of conduit in real time.
(3) beneficial effect
The present invention provides a kind of construction methods of diaphram wall through super thick silty sand ground.Have compared with prior art It is standby following the utility model has the advantages that
(1), field should be made by arranging grooving place first through the construction method of the diaphram wall of super thick silty sand ground The smooth no-sundries in ground, and positioned, it determines guide groove position, then uses chute forming machine into excavation guide groove, during grooving, side grooving While convey mud into slot, then wiretie bracket, and template is set up among Steel bar rack, then casting concrete, makes Concrete wraps Steel bar rack, template is dismantled after concrete formation, and stull is arranged, the specific gravity of mud than water weight, it Underground water can be suppressed in slot to leak into slot, the soil body of cell wall is not made to collapse, while mud also can be steady by the weight of itself Determine the cell wall soil body, mud can also form mudcake retaining wall, prevent underground water from leaking into slot, and prevent cell wall sandy soil from falling off.
It (2), should be through the construction method of the diaphram wall of super thick silty sand ground, by the way that each unit groove jump point formula to be segmented It excavates, finally slot section is dug through again, during grooving, supplements mud into slot in grooving, the silt after the completion of grooving, to slot bottom Mud and extra mud are cleared up, unit groove jump point excavation section by section, using non-box cut section self-forming support construction, and side grooving Side conveys mud, forms retaining wall on cell wall, can effectively prevent landslip of the sides of the trench during grooving
It (3), should be through the construction method of the diaphram wall of super thick silty sand ground, by digging connector slot in slot bottom, then First checked in the position for needing to launch connector, remove the barrier of cell wall or slot bottom, by connector abutting slot section slowly put to Slot bottom opens up the groove extended downwardly in cell wall and the nearest place of joint location, and flow-stopping plate is arranged in groove, Slot bottom digs connector slot, and connector positioning can be made more acurrate, and convenient for fixing, examines before launching connector to cell wall and slot bottom It surveys and clears up, can prevent from encountering barrier in connector launch process, influence construction progress, accelerate speed of application, place connector When the flow-stopping plate that is arranged can prevent in concrete seepage flow to next unit slot, under the influence of a unit groove construct, practicability is higher.
Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Fig. 2 is the top view of groove structure of the present invention.
In figure: 1 connector, 2 grooves, 3 flow-stopping plates.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of technical solution referring to FIG. 1-2: a kind of underground through super thick silty sand ground is continuous The construction method of wall, specifically includes the following steps:
S1, construction of guide wall: arrangement grooving place first makes levelling of the land no-sundries, and positioned, determines guide groove position It sets, then during grooving, conveys mud into slot in grooving, then wiretie bracket into guide groove is excavated with chute forming machine, And template is set up among Steel bar rack, then casting concrete, the design strength grade of concrete not preferably less than C20 leads wall Bottom surface should not be arranged on recent fill, and buried depth is not preferably less than 1.5m, and concrete is made to wrap Steel bar rack, concrete formation Template is dismantled afterwards, and stull is set, stull can play a supporting role before leading wall concrete setting, and this completes lead The construction of wall;
S2, grooving and clear slot: carrying out grooving using chute forming machine, and each unit groove jump point formula excavation section by section finally again will Slot section is dug through, and during grooving, supplements mud into slot in grooving, mud be by bentonite, carboxymethyl cellulose, soda ash, The raw materials such as siderochrome wooden calcium sulfonate cooperate according to a certain percentage, and suspension made of adding water and stirring, after the completion of grooving, to slot bottom Mud and extra mud cleared up;
S3, connector 1 are constructed: being dug 1 slot of connector in slot bottom, then first checked in the position for needing to launch connector 1, clearly Except cell wall or the barrier of slot bottom, the abutting slot section of connector 1 is slowly put to slot bottom, and is cleaned with water between connector 1 and cell wall, Then the groove extended downwardly 2 is opened up in cell wall and the nearest place in 1 position of connector, and flow-stopping plate is set in groove 2 3, and one side of the flow-stopping plate 3 far from groove 2 is made to be in contact with the surface of connector 1, this completes the placements of connector 1;
S4, steel reinforcement cage installation: cell wall both sides set up vertically and horizontally lifting truss on the ground, and the steel reinforcement cage made is vertical It slings, it is made to be directed at cell wall, slow sinking to slot bottom, then at the top of steel reinforcement cage, bracket is hung in setting, and withdraws lifting truss, Complete the installation of steel reinforcement cage;
S5, concreting: mud is first filled into slot, and conduit is installed, concreting is then carried out, with coagulation While native liquid level rises, conduit is mentioned upwards, after the completion of pouring work, dismantles conduit immediately and pour frame.
In the present invention, each unit groove in step S1, grooving segmentation is no more than 3, grooving process slurry coat method liquid level It should be higher than that and lead wall bottom surface 5m.
In the present invention, step S1, mud should carry out trial and indoor performance test, simulated mud in step S2 and step S5 It should be determined by test, should store after the completion of preparation for 24 hours, can be used to the abundant aquation rear of mud materials.
In the present invention, truss main reinforcement preferably uses HRB335 grades or HRB400 grades of reinforcing bars in step S4, and bar diameter is unsuitable small It should remake or modify if the steel reinforcement cage that being displaced, loosening or snap occur in steel reinforcement cage tie point must not enter slot in 20mm It is good.
In the present invention, in step S5 when slot segment length is not more than 6m, slot section concrete preferably uses two conduits while pouring It builds, when slot segment length is greater than 6m, slot section concrete preferably uses three conduits while pouring.
In the present invention, conduit bottom is apart from the hanging about 30cm-50cm of slot bottom in step S5, and when conduit is installed should be noted that connector 1 is completely embedded, and each 1 join of connector should be added with sealing ring, to prevent conduit gas leakage leak.
In the present invention, when just starting to be poured in step S5, guarantees that the buried depth of conduit is greater than 50cm, poured in subsequent In the process, control depth of tremie dismantles conduit between 1.5m-3.0m, and according to the buried depth situation of conduit in real time.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of construction method of the diaphram wall through super thick silty sand ground, it is characterised in that: specifically includes the following steps:
S1, construction of guide wall: arrangement grooving place first makes levelling of the land no-sundries, and positioned, determines guide groove position, so During grooving, mud is conveyed into slot in grooving, then wiretie bracket into guide groove is excavated with chute forming machine afterwards, and Template is set up among Steel bar rack, then casting concrete, concrete is made to wrap Steel bar rack, by template after concrete formation It dismantles, and stull is set, this completes the constructions for leading wall;
S2, grooving and clear slot: grooving is carried out using chute forming machine, by each unit groove jump point formula excavation section by section, finally again by slot section It digs through, during grooving, supplements mud into slot in grooving, after the completion of grooving, mud and extra mud to slot bottom are carried out Cleaning;
S3, connector (1) construction: digging connector (1) slot in slot bottom, then first checked in the position for needing to launch connector (1), The barrier for removing cell wall or slot bottom slowly puts connector (1) abutting slot section to slot bottom, and between connector (1) and cell wall into Row is cleaned with water, then opens up the groove extended downwardly (2) in cell wall and the nearest place in connector (1) position, and in groove (2) Interior setting flow-stopping plate (3), and flow-stopping plate (3) is made to be in contact far from the one side of groove (2) with the surface of connector (1), it is thus complete It is placed at connector (1);
S4, steel reinforcement cage installation: cell wall both sides set up vertically and horizontally lifting truss on the ground, and the steel reinforcement cage made vertically is hung It rises, so that it is directed at cell wall, slow sinking to slot bottom, then bracket is hung in setting at the top of steel reinforcement cage, and withdraws lifting truss, complete At the installation of steel reinforcement cage;
S5, concreting: mud is first filled into slot, and conduit is installed, concreting is then carried out, with concrete liquid While position rises, conduit is mentioned upwards, after the completion of pouring work, dismantles conduit immediately and pour frame.
2. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: Each unit groove in the step S1, grooving are segmented no more than 3, and grooving process slurry coat method liquid level, which should be higher than that, leads wall bottom surface 5m。
3. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: Mud should store for 24 hours after the completion of preparation in the step S1, step S2 and step S5, can after the abundant aquation of mud materials It uses.
4. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: Truss main reinforcement preferably uses HRB335 grades or HRB400 grades of reinforcing bars in the step S4, and bar diameter is not preferably less than 20mm, if reinforcing bar The steel reinforcement cage that being displaced, loosening or snap occur in cage tie point must not enter slot, should remake or modify and is intact.
5. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: In the step S5 when slot segment length is not more than 6m, slot section concrete preferably uses two conduits while pouring, and slot segment length is big When 6m, slot section concrete preferably uses three conduits while pouring.
6. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: Conduit bottom is apart from the hanging about 30cm-50cm of slot bottom in the step S5, and when conduit is installed should be noted that the connection of connector (1) is tight Close, each connector (1) join should be added with sealing ring, to prevent conduit gas leakage leak.
7. a kind of construction method of diaphram wall through super thick silty sand ground according to claim 1, it is characterised in that: When just starting to be poured in the step S5, guarantee that the buried depth of conduit is greater than 50cm, in subsequent casting process, control is led Pipe buried depth dismantles conduit between 1.5m-3.0m, and according to the buried depth situation of conduit in real time.
CN201910453530.4A 2019-05-28 2019-05-28 A kind of construction method of the diaphram wall through super thick silty sand ground Pending CN110258513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910453530.4A CN110258513A (en) 2019-05-28 2019-05-28 A kind of construction method of the diaphram wall through super thick silty sand ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910453530.4A CN110258513A (en) 2019-05-28 2019-05-28 A kind of construction method of the diaphram wall through super thick silty sand ground

Publications (1)

Publication Number Publication Date
CN110258513A true CN110258513A (en) 2019-09-20

Family

ID=67915764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910453530.4A Pending CN110258513A (en) 2019-05-28 2019-05-28 A kind of construction method of the diaphram wall through super thick silty sand ground

Country Status (1)

Country Link
CN (1) CN110258513A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519637A (en) * 2020-04-10 2020-08-11 深圳市工勘岩土集团有限公司 Grooving comprehensive construction method for pipeline underground diaphragm wall
CN113216153A (en) * 2021-05-20 2021-08-06 南京工业大学 Automatic high-pressure water jet device suitable for underground continuous wall excavation and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125396Y (en) * 2007-11-05 2008-10-01 上海市第二市政工程有限公司 Underground continuous wall water stop joint device
CN101608447A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of cross steel plate water-stopping joint continuous concrete wall and joint construction method thereof
CN104612179B (en) * 2014-12-31 2017-03-29 上海市机械施工集团有限公司 Through the construction method of the diaphram wall of super thick silty sand ground

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125396Y (en) * 2007-11-05 2008-10-01 上海市第二市政工程有限公司 Underground continuous wall water stop joint device
CN101608447A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of cross steel plate water-stopping joint continuous concrete wall and joint construction method thereof
CN104612179B (en) * 2014-12-31 2017-03-29 上海市机械施工集团有限公司 Through the construction method of the diaphram wall of super thick silty sand ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519637A (en) * 2020-04-10 2020-08-11 深圳市工勘岩土集团有限公司 Grooving comprehensive construction method for pipeline underground diaphragm wall
CN111519637B (en) * 2020-04-10 2021-12-24 深圳市工勘基础工程有限公司 Grooving comprehensive construction method for pipeline underground diaphragm wall
CN113216153A (en) * 2021-05-20 2021-08-06 南京工业大学 Automatic high-pressure water jet device suitable for underground continuous wall excavation and construction method

Similar Documents

Publication Publication Date Title
CN102691294B (en) Construction method of underground continuous wall
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN110528501A (en) High rich water faces sea area diaphragm wall and connects sealing device
CN109056701A (en) Diaphram wall seam is anti-to stream construction method
CN110258513A (en) A kind of construction method of the diaphram wall through super thick silty sand ground
CN109723089A (en) Protect structure and method in a kind of high-tension electricity pipe culvert original place
CN113174988A (en) Double-wall concrete open caisson structure and construction method
CN107956220A (en) A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN212641468U (en) Pit-in-pit rapid construction structure
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN101319501B (en) Construction method of deep foundation ditch
CN211312489U (en) High rich water faces sea area diaphragm wall and connects sealing device
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN110528500A (en) Water stopping method for continuous wall joint in high-water-rich coastal area
CN216475087U (en) Prefabricated earth-retaining plate with earth-receiving function
CN115162347A (en) Deep foundation pit pipe network construction process
CN110130398A (en) A kind of piping lane system and its construction method that multistage support is combined with main structure
CN209923943U (en) Piping lane open cut foundation ditch lateral wall crosses retaining structure of branch pipe ditch
CN104790430B (en) Construction method of underground continuous wall
CN209162798U (en) The anti-by-pass means of underground continuous wall connector
CN109653193B (en) Reverse construction method for underground continuous wall
CN202298601U (en) Structure of joint section of prefabricated H-shaped underground diaphragm wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920