CN110258508A - A kind of new and old ground-connecting-wall T-joint structure node and construction method - Google Patents

A kind of new and old ground-connecting-wall T-joint structure node and construction method Download PDF

Info

Publication number
CN110258508A
CN110258508A CN201910627600.3A CN201910627600A CN110258508A CN 110258508 A CN110258508 A CN 110258508A CN 201910627600 A CN201910627600 A CN 201910627600A CN 110258508 A CN110258508 A CN 110258508A
Authority
CN
China
Prior art keywords
shackle plate
wall
ground
new
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910627600.3A
Other languages
Chinese (zh)
Other versions
CN110258508B (en
Inventor
肖策
王龙
张轩
焦岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201910627600.3A priority Critical patent/CN110258508B/en
Publication of CN110258508A publication Critical patent/CN110258508A/en
Application granted granted Critical
Publication of CN110258508B publication Critical patent/CN110258508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention provides a kind of new and old ground-connecting-wall T-joint structure node and construction method, wherein new ground-connecting-wall is equipped with the first shackle plate, the second shackle plate, passes through connecting rod connection between the first shackle plate and the second shackle plate;Existing ground-connecting-wall is equipped with third shackle plate, the 4th shackle plate, is connected between third shackle plate and the 4th shackle plate by connecting rod;Adjusting rod is equipped between second shackle plate and the 4th shackle plate, adjusting rod includes hollow setting internal thread round steel pipe and therewith compatible two screw rods, second shackle plate is equipped with casing compatible with screw rod with the 4th shackle plate, screw rod one end is threadedly coupled with round steel pipe, the other end and casing connection;Round steel pipe is detachably connected with the first shackle plate, third shackle plate by reinforcing rod respectively, new and old ground-connecting-wall is reinforced using the device of the invention while new ground-connecting-wall excavates, guarantees the strength and stability of structure entirety, the configuration of the present invention is simple, effect is good, is suitble to promote the use of.

Description

A kind of new and old ground-connecting-wall T-joint structure node and construction method
Technical field
The invention belongs to foundation pit supporting construction technical field of construction, more particularly, to a kind of new and old ground-connecting-wall T-joint knot Structure node and construction method.
Background technique
As China's economy constantly develops, urban underground space is quickly grown in recent years, and especially subway construction becomes The effective measures of traffic pressure are alleviated in each big city, and the mating building in some undergrounds of subway is also more and more.In process of construction, Often according to the actual situation or by various conditionalities, mating building cannot carry out simultaneously with subway construction, thus in deep basal pit When supporting construction, there are problems that supporting when new and old foundation pit difference.When building similar engineering, by the conditions shadow such as construction site Ring, how many designs use ground-connecting-wall pattern foundation pit supporting structure mode, ground-connecting-wall support technology China after decades of development, technology is New ground-connecting-wall and existing ground-connecting-wall joint structure node way how are handled well under the premise of not constructing simultaneously through quite maturation It is particularly important, therefore, study a kind of new ground-connecting-wall and the existing new ground-connecting-wall of ground-connecting-wall joint structure node guarantee with existing even Stability between wall is current technical problems to be solved.
Summary of the invention
The present invention has made improvements in view of the above-mentioned problems of the prior art, i.e., the present invention provides a kind of new and old ground-connecting-wall fourth Word joint structure node and construction method solve the technology that can not be combined closely between new ground-connecting-wall and existing ground-connecting-wall and ask Topic, strengthens the structural stability between new ground-connecting-wall and existing ground-connecting-wall.
In order to solve the above technical problem, the present invention provides a kind of new and old ground-connecting-wall T-joint structure nodes, wherein institute New ground-connecting-wall is stated equipped with the first shackle plate, the second shackle plate, passes through connection between first shackle plate and the second shackle plate Bar connection;
The existing ground-connecting-wall is equipped with third shackle plate, the 4th shackle plate, the third shackle plate and the 4th shackle plate Between pass through connecting rod connect;
Adjusting rod is equipped between second shackle plate and the 4th shackle plate, the adjusting rod includes hollow equipped with internal screw thread Round steel pipe and compatible two screw rods therewith, second shackle plate be equipped with the 4th shackle plate and mutually fitted with the screw rod The casing matched, described screw rod one end are threadedly coupled with the round steel pipe, and the other end is connect with described sleeve pipe;
The round steel pipe is detachably connected with the first shackle plate, third shackle plate by reinforcing rod respectively.
Preferably, first shackle plate, the second shackle plate, third shackle plate, the 4th shackle plate and ground-connecting-wall pass through swollen Swollen bolt is fixedly connected.
Preferably, nut is fixed on the screw rod.
Preferably, it is equipped with fixing piece among the round steel pipe, the reinforcing rod is detachably connected with the fixing piece.
Preferably, first shackle plate, the second shackle plate, third shackle plate, the 4th shackle plate are located at sustained height.
The invention also discloses a kind of construction method, steps are as follows:
Step 1: in ground-connecting-wall digging process, the aperture on new ground-connecting-wall and existing ground-connecting-wall will be hung with expansion bolt Otic placode is fixed on ground-connecting-wall, and connecting rod, reinforcing rod, casing, screw rod and round steel pipe are assembled into new and old ground-connecting-wall T-shaped and connect Header structure node;
Step 2: screw rod is rotated using die nut, so that screw rod one end withstands in casing and keeps certain prestressing force.
Preferably, after step 2, with electric welding by shackle plate, connecting rod, reinforcing rod, casing, screw rod and round steel pipe Junction is welded, the intensity of reinforcement structure entirety.
Preferably, the new and old ground-connecting-wall T-joint structure node of multiple groups is installed between new ground-connecting-wall and existing ground-connecting-wall.
Through the above technical solutions, by screw thread between round steel pipe and screw rod will be separately fixed at new ground-connecting-wall with it is existing Shackle plate on ground-connecting-wall links together, and keeps certain prestressing force, and entire joint structure is welded into one by welding Body, so that new ground-connecting-wall and existing ground-connecting-wall form an overall structure, globality, stability are reinforced.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of new and old ground-connecting-wall T-joint structure node of the embodiment of the present invention;
Fig. 2 is that a kind of adjusting rod of new and old ground-connecting-wall T-joint structure node of the embodiment of the present invention is connect with shackle plate Structural schematic diagram;
Fig. 3 is a kind of top view of the shackle plate of new and old ground-connecting-wall T-joint structure node of the embodiment of the present invention;
In figure:
10, existing ground-connecting-wall 11, third shackle plate 12, the 4th shackle plate
20, new ground-connecting-wall 21, the first shackle plate 22, the second shackle plate
3, connecting rod 40, adjusting rod 41, round steel pipe
42, screw rod 43, casing 44, nut
5, reinforcing rod 6, expansion bolt
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
As shown in Figure 1 to Figure 3, the present invention provides a kind of new and old ground-connecting-wall T-joint structure node, including new ground-connecting-wall 20 and existing ground-connecting-wall 10, wherein 20 are fixed with the first shackle plate 21, the second shackle plate 22, the first lifting lug on new ground-connecting-wall It is connected between plate 21 and the second shackle plate 22 by connecting rod 3;
Existing ground-connecting-wall 10 is equipped with third shackle plate 11, the 4th shackle plate 12, third shackle plate 11 and the 4th shackle plate It is connected between 12 by connecting rod 3;
Adjusting rod 40 is equipped between second shackle plate 22 and the 4th shackle plate 12, adjusting rod 40 includes hollow equipped with internal screw thread Round steel pipe 41 and compatible two screw rods 42, two screw rods 42 are threadedly coupled with the both ends of round steel pipe 41 respectively therewith, Two shackle plates 22 are equipped with casing 43 compatible with screw rod 42 with the 4th shackle plate 12, and the other end of screw rod 42 gos deep into casing 43 It is interior and withstand on 43 interior bottom portion of casing;
Round steel pipe 41 is detachably connected with the first shackle plate 21, third shackle plate 11 by reinforcing rod 5 respectively.
A kind of preferred scheme, the first shackle plate 21, the second shackle plate 22, third shackle plate 11, the 4th shackle plate 12 with Ground-connecting-wall is fixedly connected by expansion bolt 6.
A kind of preferred scheme is fixed with nut 44, further preferred scheme on screw rod 42, and nut 44 is welded on screw rod On 42.
A kind of preferred scheme is equipped with fixing piece among round steel pipe 41, and reinforcing rod 5 is detachably connected with the fixing piece, Preferably, fixing piece is the fixing piece by through-hole, is bolted with reinforcing rod;Preferably, between fixing piece and reinforcing rod 5 It is connected by pin key;Preferably, it is connected by a snap between fixing piece and reinforcing rod 5.It should be noted that being detachably connected not It is only limited to be bolted, pin key connection and snap connection, other forms can realize that the connection structure of dismantling connection is also this hair The range of bright protection, wherein be bolted, pin key connection and structure type those skilled in the art for snapping connection can be to it Specific structure understanding is clear, and the present invention is not specifically described it.
A kind of preferred scheme, the first shackle plate 21, the second shackle plate 22, third shackle plate 11, the 4th shackle plate 12 In sustained height.
The invention also discloses a kind of construction methods, comprising steps of
Step 1: in ground-connecting-wall digging process, expansion bolt is used in the aperture on new ground-connecting-wall 20 and existing ground-connecting-wall 10 6 are fixed on shackle plate on ground-connecting-wall, connecting rod 3, reinforcing rod 5, casing 43, screw rod 42 and round steel pipe 41 are assembled into new and old Ground-connecting-wall T-joint structure node;
Step 2: screw rod 42 is rotated using die nut, so that 42 one end of screw rod withstands in casing 43 and keeps centainly Prestressing force.
Preferred a kind of scheme, after step 2, with electric welding by shackle plate, connecting rod 3, reinforcing rod 5, casing 43, screw rod 42 and the junction of round steel pipe 41 welded, the intensity of reinforcement structure entirety.
A kind of preferred scheme, installs the new and old ground-connecting-wall T-joint of multiple groups between new ground-connecting-wall 20 and existing ground-connecting-wall 10 Structure node.Preferably, the every excavation certain depth of new ground-connecting-wall installs one group of new and old ground-connecting-wall T-joint structure node.
Through the above technical solutions, new ground-connecting-wall 20 will be separately fixed at by the screw thread between round steel pipe 41 and screw rod 42 Shackle plate on existing ground-connecting-wall 10 links together, and keeps certain prestressing force, further by welding whole knot Structure is integrally welded, so that new ground-connecting-wall and existing ground-connecting-wall form an overall structure, globality, stability are added By force, the configuration of the present invention is simple, at low cost, the effect played is fine, is suitble to promote the use of.

Claims (8)

1. a kind of new and old ground-connecting-wall T-joint structure node, including new ground-connecting-wall and existing ground-connecting-wall, which is characterized in that described New ground-connecting-wall is equipped with the first shackle plate, the second shackle plate, passes through connecting rod between first shackle plate and the second shackle plate Connection;
The existing ground-connecting-wall is equipped with third shackle plate, the 4th shackle plate, between the third shackle plate and the 4th shackle plate It is connected by connecting rod;
Adjusting rod is equipped between second shackle plate and the 4th shackle plate, the adjusting rod includes that the hollow internal thread that sets is justified Steel pipe and therewith compatible two screw rods, second shackle plate are equipped with compatible with the screw rod with the 4th shackle plate Casing, described screw rod one end are threadedly coupled with the round steel pipe, and the other end is connect with described sleeve pipe;
The round steel pipe is detachably connected with the first shackle plate, third shackle plate by reinforcing rod respectively.
2. a kind of new and old ground-connecting-wall T-joint structure node according to claim 1, which is characterized in that described first hangs Otic placode, the second shackle plate, third shackle plate, the 4th shackle plate are fixedly connected with ground-connecting-wall by expansion bolt.
3. a kind of new and old ground-connecting-wall T-joint structure node according to claim 1, which is characterized in that on the screw rod It is fixed with nut.
4. a kind of new and old ground-connecting-wall T-joint structure node according to claim 1, which is characterized in that the round steel pipe Centre is equipped with fixing piece, and the reinforcing rod is detachably connected with the fixing piece.
5. a kind of new and old ground-connecting-wall T-joint structure node according to claim 1, which is characterized in that described first hangs Otic placode, the second shackle plate, third shackle plate, the 4th shackle plate are located at sustained height.
6. a kind of use a kind of new and old ground-connecting-wall T-joint structure node described in any one of claim 1 to 5 claim Construction method, which is characterized in that comprising steps of
Step 1: in ground-connecting-wall digging process, the aperture on new ground-connecting-wall and existing ground-connecting-wall, with expansion bolt by shackle plate It is fixed on ground-connecting-wall, connecting rod, reinforcing rod, casing, screw rod and round steel pipe is assembled into new and old ground-connecting-wall T-joint knot Structure node;
Step 2: screw rod is rotated using die nut, so that screw rod one end withstands in casing and keeps certain prestressing force.
7. construction method according to claim 6, which is characterized in that after step 2, with electric welding by shackle plate, connection Bar, reinforcing rod, casing, screw rod and round steel pipe junction welded, the intensity of reinforcement structure entirety.
8. construction method according to claim 6, which is characterized in that install multiple groups between new ground-connecting-wall and existing ground-connecting-wall New and old ground-connecting-wall T-joint structure node.
CN201910627600.3A 2019-07-12 2019-07-12 T-joint structural joint of new and old diaphragm wall and construction method Active CN110258508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910627600.3A CN110258508B (en) 2019-07-12 2019-07-12 T-joint structural joint of new and old diaphragm wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910627600.3A CN110258508B (en) 2019-07-12 2019-07-12 T-joint structural joint of new and old diaphragm wall and construction method

Publications (2)

Publication Number Publication Date
CN110258508A true CN110258508A (en) 2019-09-20
CN110258508B CN110258508B (en) 2024-07-02

Family

ID=67925780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910627600.3A Active CN110258508B (en) 2019-07-12 2019-07-12 T-joint structural joint of new and old diaphragm wall and construction method

Country Status (1)

Country Link
CN (1) CN110258508B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112030A (en) * 2004-10-12 2006-04-27 Taisei Corp Diaphragm wall
KR20110124852A (en) * 2010-05-12 2011-11-18 (주)신평 Earth anchor
CN103437366A (en) * 2013-08-19 2013-12-11 浙江博雷重型机床制造有限公司 Prestress loading device connecting part
KR20140063339A (en) * 2012-11-16 2014-05-27 청원화학 주식회사 Shear anchor for joing new and old concrete and method for joining new and old concrete
CN104294828A (en) * 2014-10-29 2015-01-21 浙江博雷重型机床制造有限公司 Supporting structure of foundation pit
CN206607594U (en) * 2017-03-22 2017-11-03 江西工业工程职业技术学院 The structure with oblique member of construction
CN107587501A (en) * 2017-09-12 2018-01-16 中铁第四勘察设计院集团有限公司 A kind of new and old ground-connecting-wall T connector structure and its construction method
CN207597398U (en) * 2017-11-04 2018-07-10 广州金辉建设集团有限公司 Foundation pit supporting construction
CN109056744A (en) * 2018-09-03 2018-12-21 东华理工大学 A kind of the fixation device and its application method of building foundation pit supporting mechanism
CN210459181U (en) * 2019-07-12 2020-05-05 中冶天工集团有限公司 New and old ground is wall T joint design node even

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112030A (en) * 2004-10-12 2006-04-27 Taisei Corp Diaphragm wall
KR20110124852A (en) * 2010-05-12 2011-11-18 (주)신평 Earth anchor
KR20140063339A (en) * 2012-11-16 2014-05-27 청원화학 주식회사 Shear anchor for joing new and old concrete and method for joining new and old concrete
CN103437366A (en) * 2013-08-19 2013-12-11 浙江博雷重型机床制造有限公司 Prestress loading device connecting part
CN104294828A (en) * 2014-10-29 2015-01-21 浙江博雷重型机床制造有限公司 Supporting structure of foundation pit
CN206607594U (en) * 2017-03-22 2017-11-03 江西工业工程职业技术学院 The structure with oblique member of construction
CN107587501A (en) * 2017-09-12 2018-01-16 中铁第四勘察设计院集团有限公司 A kind of new and old ground-connecting-wall T connector structure and its construction method
CN207597398U (en) * 2017-11-04 2018-07-10 广州金辉建设集团有限公司 Foundation pit supporting construction
CN109056744A (en) * 2018-09-03 2018-12-21 东华理工大学 A kind of the fixation device and its application method of building foundation pit supporting mechanism
CN210459181U (en) * 2019-07-12 2020-05-05 中冶天工集团有限公司 New and old ground is wall T joint design node even

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴碧桥;: "地下连续墙围护壁结构地下室工程综合施工技术", 建筑技术, no. 12, pages 908 - 911 *

Also Published As

Publication number Publication date
CN110258508B (en) 2024-07-02

Similar Documents

Publication Publication Date Title
CN110004832B (en) Large-span cantilever truss type bent cap bracket system and construction method
CN108412128A (en) A kind of connection structure of steel core concrete column
CN209369031U (en) A kind of assembled steel reinforced concrete frame node attachment device
CN205421912U (en) Dish knot formula supports support body double flute steel joist and plays secondary support body system
CN106703292A (en) Prefabricated concrete column of assembly strip steel connector and construction method thereof
CN108035241A (en) Assembled steel-concrete composite bridge and construction process thereof
CN110258508A (en) A kind of new and old ground-connecting-wall T-joint structure node and construction method
CN219261047U (en) Retractable manual hole digging pile assembly type retaining wall supporting structure
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN210459181U (en) New and old ground is wall T joint design node even
CN207620109U (en) A kind of assembled steel reinforced concrete frame dry type connecting node
CN217028931U (en) Steel pipe concrete support assembly
CN206599917U (en) A kind of precast concrete column of assembled with steel fastener
CN212835355U (en) Steel structure of concrete pipe pile body
CN212104034U (en) Prefabricated combined underground continuous wall
CN212026270U (en) Foundation ditch assembled H shaped steel braced system
CN110439108B (en) Super high-rise building core tube beam column structure and construction method thereof
CN215330942U (en) Variable cross-section steel pipe forked support column
CN110847056A (en) Cantilever pull rod assembly type triangular bracket and construction method thereof
CN211200926U (en) Barrel-shaped PC component with hole
CN220725365U (en) Simple connector for section steel concrete beam and concrete column
CN220376210U (en) Auxiliary device for tower crane wall attachment
CN204940523U (en) A kind of curved surface net frame four crutch mounting structure
CN214459549U (en) Steel-concrete combined bridge
CN215563394U (en) Symmetrical multi-stay-cable intersection upper node of large-span cable-stayed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant