CN110258445A - 多功能海堤体系 - Google Patents
多功能海堤体系 Download PDFInfo
- Publication number
- CN110258445A CN110258445A CN201910665084.3A CN201910665084A CN110258445A CN 110258445 A CN110258445 A CN 110258445A CN 201910665084 A CN201910665084 A CN 201910665084A CN 110258445 A CN110258445 A CN 110258445A
- Authority
- CN
- China
- Prior art keywords
- sea wall
- main sea
- beach
- dike
- longitudinal dike
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 238000009434 installation Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 8
- 230000012010 growth Effects 0.000 abstract description 5
- 238000013016 damping Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 3
- 239000013049 sediment Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008635 plant growth Effects 0.000 description 1
- 238000009991 scouring Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
多功能海堤体系,包括:主海堤、顺坝、格坝和保滩促淤区,顺坝平行设于主海堤的防浪侧,格坝与主海堤和顺坝中间垂直连接,保滩促淤区设于主海堤、顺坝和格坝中间。其中,保滩促淤区包括:滩涂、水生植物和底栖生物。本发明与传统技术相比,通过主海堤的防浪侧增设顺坝和格坝,可以有效削弱波浪,减小作用在主海堤结构上的波浪荷载,减弱水体挟沙能力,阻止泥沙回流,促进泥沙在主海堤前滩的落淤,从而保护主海堤基础不被侵蚀和冲刷,起到保滩促淤的作用,堤前淤积的泥沙增强主海堤的抗滑稳定性,提高稳定安全系数,为水生植被、底栖生物以及鸟类提供生长栖息场所,改善周边生态环境,提高生态效益,大型水生植物的生长也起到一定的消浪作用。
Description
技术领域
本发明涉及水力工程/水运工程,具体涉及多功能海堤体系。
背景技术
海堤是抵御海浪侵袭,保护堤后建筑的重要水工结构。传统技术中,海堤通常仅考虑后方陆域防护功能,平面布置简单,结构功能单一,且生态效应差。单结构海堤堤前滩地若保护不力,长期被海浪和水流冲刷作用易被侵蚀冲深,最终造成堤脚淘空,甚至造成海堤失稳破坏。且海堤堤前滩地基本为光滩,缺乏生态性。
为了解决上述问题,我们做出了一系列改进。
发明内容
本发明的目的在于,提供多功能海堤体系,以克服现有技术所存在的上述缺点和不足。
多功能海堤体系,包括:主海堤、顺坝、格坝和保滩促淤区,所述顺坝平行设于主海堤的防浪侧,所述格坝与主海堤和顺坝中间垂直连接,所述保滩促淤区设于主海堤、顺坝和格坝中间;
其中,所述保滩促淤区包括:滩涂、水生植物和底栖生物,所述滩涂设于保滩促淤区底部,所述水生植物和底栖生物设于滩涂内。
进一步,所述主海堤的防洪标准为50年~200年。
进一步,所述顺坝与主海堤之间的距离为0.5倍波长~1.5倍波长。
进一步,所述顺坝的防洪标准为25年~50年。
进一步,所述格坝的安装间隔距离为500m~1000m。
进一步,所述格坝的防洪标准为25年~50年。
本发明的有益效果:
本发明与传统技术相比,通过主海堤的防浪侧增设顺坝和格坝,可以有效削弱波浪,减小作用在主海堤结构上的波浪荷载,也可以减弱水体挟沙能力,阻止泥沙回流,促进泥沙在主海堤前滩的落淤,从而保护主海堤基础不被侵蚀和冲刷,起到保滩促淤的作用,同时堤前淤积的泥沙可以增强主海堤的抗滑稳定性,提高稳定安全系数,也可作为水生植被、底栖生物以及鸟类提供生长栖息场所,从而改善周边生态环境,提高生态效益,并且大型水生植物的生长也起到一定的消浪作用。
附图说明:
图1为本发明的结构示意图。
图2为本发明的纵向剖面图。
图3为本发明的横向剖面图。
附图标记:
主海堤100、顺坝200、格坝300、保滩促淤区400、滩涂410、水生植物420和底栖生物430。
具体实施方式
以下结合具体实施例,对本发明作进步说明。应理解,以下实施例仅用于说明本发明而非用于限定本发明的范围。
实施例1
图1为本发明的结构示意图。图2为本发明的纵向剖面图。图3为本发明的横向剖面图
如图1、图2和图3所示,多功能海堤体系,包括:主海堤100、顺坝200、格坝300和保滩促淤区400,顺坝200平行设于主海堤100的防浪侧,格坝300与主海堤100和顺坝200中间垂直连接,保滩促淤区400设于主海堤100、顺坝200和格坝300中间;
其中,保滩促淤区400包括:滩涂410、水生植物420和底栖生物430,滩涂410设于保滩促淤区400底部,水生植物420和底栖生物430设于滩涂410内。
主海堤100的防洪标准为50年~200年。
顺坝200与主海堤100之间的距离为0.5倍波长~1.5倍波长。
顺坝200的防洪标准为25年~50年。
格坝300的安装间隔距离为500m~1000m。
格坝300的防洪标准为25年~50年。
本发明的工作原理是,将传统水工建筑物进行了组合设计形成多功能海堤体系,并确定了合理的设计参数指标,充分发挥各部分的功能,该发明经工程实践检验,效果显著,可应用于围垦圈围、海岸防护等工程。
海堤体系从波浪和潮流两个方面入手。顺坝200位于海堤前方,直接承受外来波浪作用。波浪经过顺坝200可消减20%~40%,有效减小作用在主海堤100结构上的波浪荷载,同时波浪速度降低,减弱水体挟沙能力。形成了相对封闭的空间,阻止泥沙回流,促进泥沙在主海堤100前滩的落淤。格坝300位于主海堤100侧方,可有效截断沿堤流。沿堤水流受格坝阻隔,可有效截断沿堤流无法持续淘刷堤脚。顺坝200和格坝300形成体系综合保护主海堤100基础不被侵蚀和冲刷,起到保滩促淤的作用。同时,主海堤100前淤积的泥沙作为有利压载,可增强主海堤100的抗滑稳定性,提高稳定安全系数;另外,自然淤高积的滩涂410也可为水生植被、底栖生物以及鸟类提供生长栖息场所,从而改善周边生态环境,具有积极的生态效益。而且同时,大型水生植物的生长本身也具有一定的消浪作用,反过来又增强了消浪弱流的效果。
参照相关的设计及施工规范建造主海堤100,防洪标准取为50年到200年。在主海堤100防浪侧建造顺坝200,顺坝200轴线平行于主海堤100轴线,两者的距离需介于0.5倍波长到1.5倍波长之间;顺坝200的防洪标准取为25年到50年,堤顶高程在平均高水位附近。顺坝200与主海堤100之间建造格坝300,格坝300之间两两间距在500m到1000m之间,防洪标准仍取为25年到50年,坝顶高程介于平均高水位与平均水位之间。顺坝200不但可以起到一定的导流作用,还可以有助于消减向岸方向的波浪,还可以起到一定的导流作用,保护后侧主海堤100,并阻止泥沙回流,促进淤积。
以上对本发明的具体实施方式进行了说明,但本发明并不以此为限,只要不脱离本发明的宗旨,本发明还可以有各种变化。
Claims (6)
1.多功能海堤体系,其特征在于,包括:主海堤(100)、顺坝(200)、格坝(300)和保滩促淤区(400),所述顺坝(200)平行设于主海堤(100)的防浪侧,所述格坝(300)与主海堤(100)和顺坝(200)中间垂直连接,所述保滩促淤区(400)设于主海堤(100)、顺坝(200)和格坝(300)中间;
其中,所述保滩促淤区(400)包括:滩涂(410)、水生植物(420)和底栖生物(430),所述滩涂(410)设于保滩促淤区(400)底部,所述水生植物(420)和底栖生物(430)设于滩涂(410)内。
2.根据权利要求1所述的多功能海堤体系,其特征在于:所述主海堤(100)的防洪标准为50年~200年。
3.根据权利要求1所述的多功能海堤体系,其特征在于:所述顺坝(200)与主海堤(100)之间的距离为0.5倍波长~1.5倍波长。
4.根据权利要求1或3所述的多功能海堤体系,其特征在于:所述顺坝(200)的防洪标准为25年~50年。
5.根据权利要求1所述的多功能海堤体系,其特征在于:所述格坝(300)的安装间隔距离为500m~1000m。
6.根据权利要求1或5所述的多功能海堤体系,其特征在于:所述格坝(300)的防洪标准为25年~50年。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910665084.3A CN110258445A (zh) | 2019-07-23 | 2019-07-23 | 多功能海堤体系 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910665084.3A CN110258445A (zh) | 2019-07-23 | 2019-07-23 | 多功能海堤体系 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258445A true CN110258445A (zh) | 2019-09-20 |
Family
ID=67927821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910665084.3A Withdrawn CN110258445A (zh) | 2019-07-23 | 2019-07-23 | 多功能海堤体系 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258445A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110679228A (zh) * | 2019-11-06 | 2020-01-14 | 中交上海航道勘察设计研究院有限公司 | 一种海堤前沿滩涂湿地及其恢复方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001032229A (ja) * | 1999-07-26 | 2001-02-06 | Shinichiro Hayashi | 海岸の土地造成方法 |
JP2007146535A (ja) * | 2005-11-29 | 2007-06-14 | Port & Airport Research Institute | 干潟防波堤 |
JP2009039098A (ja) * | 2007-07-13 | 2009-02-26 | Nippo Kagaku Kk | 環境改善用材料、沿岸域における環境修復材料、人工干潟、人工干潟造成方法、土層改善材料、農作物栽培土壌、農作物栽培土壌造成方法、および、農作物生産方法 |
KR101039658B1 (ko) * | 2011-01-12 | 2011-06-08 | (주)에코원 | 해안사구 생태복원 구조 |
JP2014001539A (ja) * | 2012-06-18 | 2014-01-09 | Penta Ocean Construction Co Ltd | 人工干潟構造および人工干潟の補修方法 |
CN106223274A (zh) * | 2016-08-17 | 2016-12-14 | 奉化市吉奇水产生态养殖场 | 海洋滩涂蓄水塘防冲防漏溢水坝 |
CN109626581A (zh) * | 2018-12-18 | 2019-04-16 | 中交上海航道勘察设计研究院有限公司 | 一种吹填粉沙和细沙构造人工湿地的方法 |
CN109723029A (zh) * | 2018-12-18 | 2019-05-07 | 中交上海航道勘察设计研究院有限公司 | 一种半开敞式吹填淤泥滩涂及其造滩方法 |
CN110016887A (zh) * | 2019-04-30 | 2019-07-16 | 中交上海航道勘察设计研究院有限公司 | 一种营造水生态***生境的筑堤方法 |
CN210561974U (zh) * | 2019-07-23 | 2020-05-19 | 中交上海航道勘察设计研究院有限公司 | 一种多功能海堤体系 |
-
2019
- 2019-07-23 CN CN201910665084.3A patent/CN110258445A/zh not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001032229A (ja) * | 1999-07-26 | 2001-02-06 | Shinichiro Hayashi | 海岸の土地造成方法 |
JP2007146535A (ja) * | 2005-11-29 | 2007-06-14 | Port & Airport Research Institute | 干潟防波堤 |
JP2009039098A (ja) * | 2007-07-13 | 2009-02-26 | Nippo Kagaku Kk | 環境改善用材料、沿岸域における環境修復材料、人工干潟、人工干潟造成方法、土層改善材料、農作物栽培土壌、農作物栽培土壌造成方法、および、農作物生産方法 |
KR101039658B1 (ko) * | 2011-01-12 | 2011-06-08 | (주)에코원 | 해안사구 생태복원 구조 |
JP2014001539A (ja) * | 2012-06-18 | 2014-01-09 | Penta Ocean Construction Co Ltd | 人工干潟構造および人工干潟の補修方法 |
CN106223274A (zh) * | 2016-08-17 | 2016-12-14 | 奉化市吉奇水产生态养殖场 | 海洋滩涂蓄水塘防冲防漏溢水坝 |
CN109626581A (zh) * | 2018-12-18 | 2019-04-16 | 中交上海航道勘察设计研究院有限公司 | 一种吹填粉沙和细沙构造人工湿地的方法 |
CN109723029A (zh) * | 2018-12-18 | 2019-05-07 | 中交上海航道勘察设计研究院有限公司 | 一种半开敞式吹填淤泥滩涂及其造滩方法 |
CN110016887A (zh) * | 2019-04-30 | 2019-07-16 | 中交上海航道勘察设计研究院有限公司 | 一种营造水生态***生境的筑堤方法 |
CN210561974U (zh) * | 2019-07-23 | 2020-05-19 | 中交上海航道勘察设计研究院有限公司 | 一种多功能海堤体系 |
Non-Patent Citations (1)
Title |
---|
杨文渊等: "道路施工工程师手册", 人民交通出版社, pages: 214 - 215 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110679228A (zh) * | 2019-11-06 | 2020-01-14 | 中交上海航道勘察设计研究院有限公司 | 一种海堤前沿滩涂湿地及其恢复方法 |
CN110679228B (zh) * | 2019-11-06 | 2022-05-03 | 中交上海航道勘察设计研究院有限公司 | 一种海堤前沿滩涂湿地及其恢复方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102605743A (zh) | 带分段分离式挡墙的生态护岸 | |
CN103898867A (zh) | 一种用于内河航道整治的不接岸丁坝 | |
CN110258445A (zh) | 多功能海堤体系 | |
Uda et al. | Beach erosion downcoast of Pengambengan fishing port in western part of Bali Island | |
CN105804006A (zh) | 一种兼顾景观的岸滩防护结构 | |
CN205776073U (zh) | 一种兼顾景观的岸滩防护结构 | |
JP2009114636A (ja) | 消波構造物 | |
CN201362839Y (zh) | 内河可升降式护岸结构 | |
KR102025654B1 (ko) | 잠제형 해중림 어초 | |
CN101476306B (zh) | 内河浮式护岸结构 | |
CN210561974U (zh) | 一种多功能海堤体系 | |
El-Sharnouby et al. | Behavior of shore protection structures in Alexandria, Egypt, during the storm of December 2010 | |
CN207260063U (zh) | 多功能生态海堤架构体系 | |
JP2006193981A (ja) | 漂砂制御構造物 | |
CN201785728U (zh) | 具有防淤、减小堤头口门处横流的防沙堤 | |
CN204919479U (zh) | 用于护面的混凝土人工块体 | |
CN204690683U (zh) | 一种生态壅水型护滩结构 | |
CN107119625A (zh) | 多功能生态海堤架构体系 | |
Soliman et al. | Shoreline changes due to construction of Alexandria submerged breakwater, Egypt | |
CN216864997U (zh) | 一种多级消浪海堤结构 | |
Ben-jing et al. | Research on cooling water source safety measures in water intake engineering of coastal NPP | |
Murali | Coastal Protection Measures for Shoreline of Mumbai: Review and Case Studies | |
RU2327830C2 (ru) | Способ улучшения экологической ситуации вдоль береговой линии водных объектов | |
Taveira Pinto et al. | Environmental aspects of using detached breakwaters for coastal protection purposes | |
KR101857602B1 (ko) | 다기능 소파블록 구조 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190920 |
|
WW01 | Invention patent application withdrawn after publication |