CN110241913A CN201910485500.1A CN201910485500A CN110241913A CN 110241913 A CN110241913 A CN 110241913A CN 201910485500 A CN201910485500 A CN 201910485500A CN 110241913 A CN110241913 A CN 110241913A
Authority
CN
China
Prior art keywords
ball
lower edge
screwed
installation
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910485500.1A
Other languages
Chinese (zh)
Inventor
夏思阳
朱玛
郭魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Yusheng Engineering Construction Consulting Co Ltd
Original Assignee
Guizhou Yusheng Engineering Construction Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Yusheng Engineering Construction Consulting Co Ltd filed Critical Guizhou Yusheng Engineering Construction Consulting Co Ltd
Priority to CN201910485500.1A priority Critical patent/CN110241913A/en
Publication of CN110241913A publication Critical patent/CN110241913A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction methods of space grid structure engineering, more particularly to the realm of building construction, step 1, to net rack support orientation axis, the specification of support anchor bolt, position, the position of bearing surface top plate, absolute altitude, levelness are checked, underproof workpiece is rejected, and the incongruent part of flatness absolute altitude is leveled up using steel plate;Step 2 welds the material after passed examination, carries out pulling experiment to the Workpiece structure after welding, rejects underproof workpiece in pulling experiment, it is identified and is classified according to the function of different workpieces.The construction method of space grid structure of the invention is regular, great deal of nodes is identical with shape, the size of rod piece, and the method utilized in installation is identical, easy to produce, product quality is high, and on-site consolidation is easy, speed of application can be improved, structure occupied space is smaller, can more efficiently use space, and the spatial stability of entire rack system can be greatly increased using this installation method.

Description

A kind of construction method of space grid structure engineering
Technical field
The present invention relates to the realm of building construction, it is more particularly related to which a kind of space grid structure engineering is applied Work method.
Background technique
With the development of the social economy, people are increasing to activity space demand, space grid structure application is also more next Wider, the development of technology is also higher and higher therewith, requires also to be increasingly stringenter to construction and Supervision Technology.
The space structure that grid structure is linked according to certain grid configuration by node by plurality of rods part.With sky Between the advantages that stress is small, light-weight, rigidity is big, anti-seismic performance is good;It can be used as gymnasium, cinema, show room, Waiting Lounge, body Educate the roof system of the buildings such as a grandstand canopy, hangar, two-way Large Column Spacing workshop.
But existing space net rack construction method is excessively cumbersome, due to great deal of nodes and rod piece during being constructed Presence so that speed of application is low, the occupancy of structure space is also big, influences the normal progress of engineering.
Summary of the invention
In order to overcome the drawbacks described above of the prior art, the embodiment of the present invention provides a kind of applying for space grid structure engineering Work method, construction method is regular, and great deal of nodes is identical with shape, the size of rod piece, and the method utilized in installation is identical, Easy to produce, product quality is high, and on-site consolidation is easy, and speed of application can be improved, structure occupied space is smaller, can more efficiently use Space can greatly increase the spatial stability of entire rack system using this installation method.
To achieve the above object, the invention provides the following technical scheme: a kind of construction method of space grid structure engineering, Specifically comprise the following steps:
Step 1, to net rack support orientation axis, the specification of support anchor bolt, position, the position of bearing surface top plate, absolute altitude, Levelness is checked, underproof workpiece is rejected, and the incongruent part of flatness absolute altitude is leveled up using steel plate;
Step 2 welds the material after passed examination, carries out pulling experiment to the Workpiece structure after welding, rejects Underproof workpiece in pulling experiment is identified and classifies to it according to the function of different workpieces, by sorted workpiece into Row is packaged packaging, transport to construction site;
Step 3 determines space grid structure in the position of construction site, along the outer of space net rack according to construction drawing Multiple foundation bases are successively built in side and the outer wall direction for being parallel to space net rack, and in foundation base upper support frame platform;
Step 4 after positioning to grid structure, net rack support and supporting structure is fixed, according to wire frame shape In connection lining out, scribing line coaxial line is overlapped, and must level connecting plate with horizontal ruler when connecting plate positions;
Workpiece after welding packaging is opened, first installs to the rack band on reference line, measure after installation by step 5 It examines, adjusts deviation, rack installation is carried out after adjustment;
Step 5 installs rod piece, and during the installation process, rod piece should not have inital bending, must not force in place and school Just, compression bar position must not have member bending phenomenon;
Step 6 carries out the installation of lower edge plane grid, first spells lower edge rack, by first across support install it is in place, it is multiple Capital axis, center line and absolute altitude are carved, and to modifying in place of error, then installs first across a lower boom, bolt sphere, group At fore-and-aft plane grid, using supporting rack platform adjustment lower edge ball in advance for height;
Step 7 sequences interim fulcrum, guarantees the depth of parallelism of lower edge ball, is required, should be looked on interim fulcrum according to pre- arch Bottom of slope out, installation first across secondary bar and wind up ball, according to the junior unit of two web member of a ball it is in place after, be screwed into lower edge ball, It is fixed;
Step 8, installation first across top boom, control rack size, check rack, size of mesh opening, check that rack is vertical To size and rack rise size, the high and low position by adjusting interim fulcrum controls the size of rack;
Step 9 carries out inverted triangle grid installation of winding up, checks lower boom screw thread, and be screwed into after clearing up screw hole and spiral shell button, First party grid is formed, first node bolt sphere is screwed into, lower edge first across a lower boom is also filled from lower edge first simultaneously Grid closing;
Step 10 installs inverted triangle centrum, three bar junior unit of a ball is hung in scene, two braces are supported on lower edge ball On, top boom is tensed above, and top boom is made gradually close to the mounted ball that winds up, to be screwed into, brace is then screwed into lower edge It in ball, tightens, another brace is idle;
Step 11 continues to install lower edge ball and bar, a bar is screwed into original lower edge bolt ball, and a ball is in a pre-installation Edge connect with another brace and is screwed into, and lateral lower boom is installed into position, and both ends are respectively screwed into ball, composition the second grid of lower edge closing;
Step 12 is installed above-mentioned one ball of process Installation, three bar inverted triangle cone, is installed between two inverted triangle centrums vertical It to top boom, is allowed to be connected, iterative method, one group of inverted triangle cone of every installation then installs a longitudinal top boom, top boom Both ends are screwed into bolt sphere, so that tennis is winded up and are also formed the square grid of enclosed shape, form a series of indulge after being gradually installed to support To inverted triangle rack;
Step 13 installs lower edge positive triangle grid, installs lower edge ball and bar is twisted a bar using one rod type of a ball Enter in carrier setting bolt ball, lateral lower boom be installed, so that ball and bar is formed closing quad mesh, then side diagonal web member is installed, Single pole is in place, after being screwed into, installs other side diagonal web member, and both sides are screwed into lower edge ball and the ball that winds up, and completes positive triangle and bores grid, until Complete the installation of rack.
In a preferred embodiment, at least weld bond should be taken total sampling number of the structure welding workpiece to non-destructive testing Several 20%.
In a preferred embodiment, in the step 8, top boom is screwed into depth not and influences entire rack knot The lower amount of deflection of structure.
In a preferred embodiment, in the step 13, the form of two bar of a ball can also be used, specially Lower edge ball installs composition closing quad mesh with two lower booms are mutually perpendicular to simultaneously.
Technical effect and advantage of the invention:
1, by net rack support orientation axis, the specification of support anchor bolt, position, the position of bearing surface top plate, absolute altitude, water Pingdu adjusts after being detected, and then installs to lower edge rack, web member and the rack that winds up, and good integrity, stability is good, empty Between rigidity it is big, can effectively bear non-symmetrical load, load and dynamic load, and there is preferable anti-seismic performance;
2, the construction method of the space grid structure in the present invention is regular, shape, the size phase of great deal of nodes and rod piece Together, and in installation the method utilized is identical, easy to produce, and product quality is high, and on-site consolidation is easy, and speed of application can be improved, and ties Structure occupied space is smaller, can more efficiently use space, and the sky of entire rack system can be greatly increased using this installation method Between stability.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
Embodiment 1
A kind of construction method of space grid structure engineering, specifically comprises the following steps:
Step 1, to net rack support orientation axis, the specification of support anchor bolt, position, the position of bearing surface top plate, absolute altitude, Levelness is checked, underproof workpiece is rejected, and the incongruent part of flatness absolute altitude is leveled up using steel plate;
Step 2 welds the material after passed examination, carries out pulling experiment to the Workpiece structure after welding, rejects Underproof workpiece in pulling experiment is identified and classifies to it according to the function of different workpieces, by sorted workpiece into Row is packaged packaging, transport to construction site;
Step 3 determines space grid structure in the position of construction site, along the outer of space net rack according to construction drawing Multiple foundation bases are successively built in side and the outer wall direction for being parallel to space net rack, and in foundation base upper support frame platform;
Step 4 after positioning to grid structure, net rack support and supporting structure is fixed, according to wire frame shape In connection lining out, scribing line coaxial line is overlapped, and must level connecting plate with horizontal ruler when connecting plate positions;
Workpiece after welding packaging is opened, first installs to the rack band on reference line, measure after installation by step 5 It examines, adjusts deviation, rack installation is carried out after adjustment;
Step 5 installs rod piece, and during the installation process, rod piece should not have inital bending, must not force in place and school Just, compression bar position must not have member bending phenomenon;
Step 6 carries out the installation of lower edge plane grid, first spells lower edge rack, by first across support install it is in place, it is multiple Capital axis, center line and absolute altitude are carved, and to modifying in place of error, then installs first across a lower boom, bolt sphere, group At fore-and-aft plane grid, using supporting rack platform adjustment lower edge ball in advance for height;
Step 7 sequences interim fulcrum, guarantees the depth of parallelism of lower edge ball, is required, should be looked on interim fulcrum according to pre- arch Bottom of slope out, installation first across secondary bar and wind up ball, according to the junior unit of two web member of a ball it is in place after, be screwed into lower edge ball, It is fixed;
Step 8, installation first across top boom, control rack size, check rack, size of mesh opening, check that rack is vertical To size and rack rise size, the high and low position by adjusting interim fulcrum controls the size of rack;
Step 9 carries out inverted triangle grid installation of winding up, checks lower boom screw thread, and be screwed into after clearing up screw hole and spiral shell button, First party grid is formed, first node bolt sphere is screwed into, lower edge first across a lower boom is also filled from lower edge first simultaneously Grid closing;
Step 10 installs inverted triangle centrum, three bar junior unit of a ball is hung in scene, two braces are supported on lower edge ball On, top boom is tensed above, and top boom is made gradually close to the mounted ball that winds up, to be screwed into, brace is then screwed into lower edge It in ball, tightens, another brace is idle;
Step 11 continues to install lower edge ball and bar, a bar is screwed into original lower edge bolt ball, and a ball is in a pre-installation Edge connect with another brace and is screwed into, and lateral lower boom is installed into position, and both ends are respectively screwed into ball, composition the second grid of lower edge closing;
Step 12 is installed above-mentioned one ball of process Installation, three bar inverted triangle cone, is installed between two inverted triangle centrums vertical It to top boom, is allowed to be connected, iterative method, one group of inverted triangle cone of every installation then installs a longitudinal top boom, top boom Both ends are screwed into bolt sphere, so that tennis is winded up and are also formed the square grid of enclosed shape, form a series of indulge after being gradually installed to support To inverted triangle rack;
Step 13 installs lower edge positive triangle grid, installs lower edge ball and bar is twisted a bar using one rod type of a ball Enter in carrier setting bolt ball, lateral lower boom be installed, so that ball and bar is formed closing quad mesh, then side diagonal web member is installed, Single pole is in place, after being screwed into, installs other side diagonal web member, and both sides are screwed into lower edge ball and the ball that winds up, and completes positive triangle and bores grid, until Complete the installation of rack.
The construction method of above-mentioned a kind of space grid structure engineering, to structure welding workpiece to the sampling number of non-destructive testing The 20% of totalnumber of welding should at least be taken.
Embodiment 2
Unlike embodiment, in the step 13, the form of two bar of a ball, specially lower edge ball can also be used Composition closing quad mesh is installed simultaneously with two lower booms are mutually perpendicular to, specifically:
Inverted triangle centrum is installed, three bar junior unit of a ball is hung in into scene, two braces are supported on lower edge ball, above Top boom is tensed, top boom is made gradually close to the mounted ball that winds up, to be screwed into, then brace is screwed into lower edge ball, is twisted Tightly, another brace is idle;
Continue lower edge ball and bar, a bar are installed and be screwed into original lower edge bolt ball, ball edge in a pre-installation is and another Brace connection is screwed into, and lateral lower boom is installed into position, and both ends are respectively screwed into ball, composition the second grid of lower edge closing;
Above-mentioned one ball of process Installation, three bar inverted triangle cone is installed, longitudinal top boom is installed between two inverted triangle centrums, It is allowed to be connected, iterative method, one group of inverted triangle cone of every installation then installs a longitudinal top boom, top boom both ends spiral shell Bolt ball is screwed into, and so that tennis is winded up and is also formed the square grid of enclosed shape, forms a series of longitudinal inverted triangles after being gradually installed to support Rack;
Lower edge positive triangle grid is installed, lower edge ball and bar are installed, using the form of two bar of a ball, lower edge ball be mutually perpendicular to Two lower booms install composition closing quad mesh simultaneously, then install side diagonal web member, and single pole is in place, and after being screwed into, installation is another Side diagonal web member, both sides are screwed into lower edge ball and the ball that winds up, and complete positive triangle and bore grid, until completing the installation of rack.
Embodiment 3
On the basis of the above embodiments, further, in the step 8, being screwed into depth not and influencing for top boom is entire The lower amount of deflection of grid structure;
Rod piece is installed, during the installation process, rod piece there should not be inital bending, must not force in place and correction, compression bar Position must not have member bending phenomenon;
Carry out the installation of lower edge plane grid, first spell lower edge rack, by first across support install in place, carve capital axis again Line, center line and absolute altitude, and to modifying in place of error, first is then installed across a lower boom, bolt sphere, is formed longitudinal flat Surface grids, using supporting rack platform adjustment lower edge ball in advance for height;
Interim fulcrum is sequenced, guarantees the depth of parallelism of lower edge ball, is required according to pre- arch, bottom of slope should be found out on interim fulcrum, Installation first across secondary bar and wind up ball, according to the junior unit of two web member of a ball it is in place after, be screwed into, fix with lower edge ball, pacify Fill first across top boom, control rack size, top boom is screwed into depth not and influences the lower amount of deflection of entire grid structure;
Installation first across top boom, control rack size, check rack, size of mesh opening, check rack longitudinal size With rack rise size, the high and low position by adjusting interim fulcrum controls the size of rack.
The construction method of space grid structure in the present invention is regular, and great deal of nodes is identical with shape, the size of rod piece, And the method utilized in installation is identical, easy to produce, product quality is high, and on-site consolidation is easy, and speed of application can be improved, structure accounts for It is smaller with space, space can be more efficiently used, the space that can greatly increase entire rack system using this installation method is steady It is qualitative.
The several points that should finally illustrate are: firstly, in the description of the present application, it should be noted that unless otherwise prescribed and It limits, term " installation ", " connected ", " connection " shall be understood in a broad sense, can be mechanical connection or electrical connection, be also possible to two Connection inside element, can be directly connected, and "upper", "lower", "left", "right" etc. are only used for indicating relative positional relationship, when The absolute position for being described object changes, then relative positional relationship may change;
Last: the foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, all in the present invention Spirit and principle within, any modification, equivalent replacement, improvement and so on, should be included in protection scope of the present invention it It is interior.

Claims (4)

1. a kind of construction method of space grid structure engineering, which is characterized in that specifically comprise the following steps:
Step 1, to net rack support orientation axis, the specification of support anchor bolt, position, the position of bearing surface top plate, absolute altitude, level Degree is checked, underproof workpiece is rejected, and the incongruent part of flatness absolute altitude is leveled up using steel plate;
Step 2 welds the material after passed examination, carries out pulling experiment to the Workpiece structure after welding, rejects pulling force Underproof workpiece in experiment is identified and classifies to it according to the function of different workpieces, sorted workpiece is beaten Packet packaging, transport to construction site;
Step 3, according to construction drawing determine space grid structure in the position of construction site, along space net rack outside and Multiple foundation bases are successively built in the outer wall direction for being parallel to space net rack, and in foundation base upper support frame platform;
After positioning to grid structure, net rack support and supporting structure are fixed for step 4, according to wire frame shape even Lining out is connect, scribing line coaxial line is overlapped, and must level connecting plate with horizontal ruler when connecting plate positions;
Workpiece after welding packaging is opened, first installs to the rack band on reference line, inspection is measured after installation by step 5 It tests, adjusts deviation, rack installation is carried out after adjustment;
Step 5 installs rod piece, and during the installation process, rod piece should not have inital bending, must not force in place and correction, pressure Bar portion position must not have member bending phenomenon;
Step 6 carries out the installation of lower edge plane grid, first spells lower edge rack, by first across support install in place, carve column again Apical axis line, center line and absolute altitude, and to modifying in place of error, first is then installed across a lower boom, bolt sphere, and composition is vertical To plane grid, using supporting rack platform adjustment lower edge ball in advance for height;
Step 7 sequences interim fulcrum, guarantees the depth of parallelism of lower edge ball, is required according to pre- arch, should find out slope on interim fulcrum Bottom, installation first across secondary bar and wind up ball, according to the junior unit of two web member of a ball it is in place after, be screwed into, fix with lower edge ball;
Step 8, installation first across top boom, control rack size, check rack, size of mesh opening, check rack longitudinal ruler Very little and rack rise size passes through the size for adjusting the high and low position control rack of interim fulcrum;
Step 9 carries out inverted triangle grid installation of winding up, checks lower boom screw thread, and be screwed into after clearing up screw hole and spiral shell button, simultaneously From lower edge first across a lower boom is also filled, first party grid is formed, first node bolt sphere is screwed into, the first grid of lower edge Closing;
Step 10 installs inverted triangle centrum, three bar junior unit of a ball is hung in scene, two braces are supported on lower edge ball, Top tenses top boom, and top boom is made gradually close to the mounted ball that winds up, to be screwed into, brace is then screwed into lower edge ball It is interior, it tightens, another brace is idle;
Step 11 continues to install lower edge ball and bar, a bar being screwed into original lower edge bolt ball, ball edge in a pre-installation, It connect and is screwed into another brace, lateral lower boom is installed into position, and both ends are respectively screwed into ball, composition the second grid of lower edge closing;
Step 12 is installed above-mentioned one ball of process Installation, three bar inverted triangle cone, is installed on longitudinal direction between two inverted triangle centrums Chord member is allowed to be connected, iterative method, and one group of inverted triangle cone of every installation then installs a longitudinal top boom, top boom both ends It is screwed into bolt sphere, so that tennis is winded up and also form the square grid of enclosed shape, be gradually installed to after support and form a series of longitudinal directions and fall Triangular grid structure;
Step 13 installs lower edge positive triangle grid, installs lower edge ball and bar using one rod type of a ball and one bar is screwed into branch In seat bolt ball, lateral lower boom is installed, so that ball and bar is formed closing quad mesh, then side diagonal web member, single pole is installed In place, after being screwed into, other side diagonal web member is installed, both sides are screwed into lower edge ball and the ball that winds up, and complete positive triangle and bore grid, until completing The installation of rack.
2. a kind of construction method of space grid structure engineering according to claim 1, it is characterised in that: to structure welding Workpiece should at least take the 20% of totalnumber of welding to the sampling number of non-destructive testing.
3. a kind of construction method of space grid structure engineering according to claim 1, it is characterised in that: the step 8 In, top boom is screwed into depth not and influences the lower amount of deflection of entire grid structure.
4. a kind of construction method of space grid structure engineering according to claim 1, it is characterised in that: the step 10 In three, the form of two bar of a ball can also be used, specially lower edge ball installs composition envelope with two lower booms are mutually perpendicular to simultaneously Close quad mesh.
CN201910485500.1A 2019-06-05 2019-06-05 A kind of construction method of space grid structure engineering Pending CN110241913A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910485500.1A CN110241913A (en) 2019-06-05 2019-06-05 A kind of construction method of space grid structure engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910485500.1A CN110241913A (en) 2019-06-05 2019-06-05 A kind of construction method of space grid structure engineering

Publications (1)

Publication Number Publication Date
CN110241913A true CN110241913A (en) 2019-09-17

Family

ID=67886131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910485500.1A Pending CN110241913A (en) 2019-06-05 2019-06-05 A kind of construction method of space grid structure engineering

Country Status (1)

Country Link
CN (1) CN110241913A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456454A (en) * 2020-04-22 2020-07-28 山西五建集团有限公司 Steel net rack construction method
CN113123609A (en) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 Method for mounting steel structure dome net rack with two low ends and high middle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN103628570A (en) * 2013-11-05 2014-03-12 陕西建工机械施工集团有限公司 Installation method for welding ball node grid structure
CN104452963A (en) * 2014-11-02 2015-03-25 中国水利水电第四工程局有限公司 A method for manufacturing and constructing steel truss key component
CN105442701A (en) * 2015-12-10 2016-03-30 上海市机械施工集团有限公司 Space truss structure and construction method thereof
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN103628570A (en) * 2013-11-05 2014-03-12 陕西建工机械施工集团有限公司 Installation method for welding ball node grid structure
CN104452963A (en) * 2014-11-02 2015-03-25 中国水利水电第四工程局有限公司 A method for manufacturing and constructing steel truss key component
CN105442701A (en) * 2015-12-10 2016-03-30 上海市机械施工集团有限公司 Space truss structure and construction method thereof
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
北京建工集团总公司编: "《建筑分项工程施工工艺标准》", 30 June 1997 *
叶新平,钟海清主编;湖南省第六工程公司编: "《土木建筑工程施工工艺标准》", 31 July 2006 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456454A (en) * 2020-04-22 2020-07-28 山西五建集团有限公司 Steel net rack construction method
CN113123609A (en) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 Method for mounting steel structure dome net rack with two low ends and high middle

Similar Documents

Publication Publication Date Title
CN108678257B (en) Large-angle inclined roof steel structure and construction method thereof
PT92006B (en) PROCESS FOR THE REALIZATION OF A METALLIC STRUCTURE IN PARTICULAR FOR A COVER AND STRUCTURE CARRIED OUT BY THIS PROCESS
CN101255749B (en) Rectangle plane net shell structure and rectangle plane string supporting dome
CN110241913A (en) A kind of construction method of space grid structure engineering
CN113123469A (en) Method for constructing complex curved surface modeling roof grid structure
WO2022253310A1 (en) High-altitude rotating construction method for large venue steel canopy
CN102330470B (en) Single-layer prestressing frame structure
CN111218987A (en) Bearing type net rack construction method
CN102235030B (en) Extra-large-span cross-section-variable pre-stressed normally placed evacuating quadrangular pyramid space grid and manufacturing method thereof
US20180363288A1 (en) Structural frame for high-rise building and high-rise building
CN115680181B (en) Material-saving and wind-resistant cable-membrane structure building and construction method thereof
CN109763660B (en) Construction method of double-ball nested net rack
CN115341653B (en) Steep gentle slope radian abrupt change multi-curved-surface steel reticulated shell building structure and construction process thereof
CN114961282B (en) Single-layer latticed shell structure streamer construction method with middle cylinder column
CN210828010U (en) Honeycomb single-strut cable dome structure
CN114837483A (en) High-low span portal steel frame building structure and construction process thereof
CN206034637U (en) Steel space frame ball joint point is reserved and is overhauld packway steel bearing
Ikago et al. Design of prestressed roof structure suspended from tubular steel towers
CN110344531B (en) Coherent space steel pipe truss structure with hidden gold top and construction method thereof
CN115236186B (en) Space K-type inclined column grid internal lateral irrigation test device and detection method
CN216276393U (en) Diagonal ceiling structure for large-scale stand
CN216195382U (en) A vestibule structure for high-rise building
CN108035441A (en) The double-deck dislocation truss and its construction method of a kind of building structure
CN220888277U (en) Prestressed oblique-pulling large overhanging glass landscape platform
CN109868724B (en) Double-fold-line bridge span assembly for cable stiffening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190917