CN110241830A - A kind of backfilling apparatus and earth-filling method - Google Patents

A kind of backfilling apparatus and earth-filling method Download PDF

Info

Publication number
CN110241830A
CN110241830A CN201910654624.8A CN201910654624A CN110241830A CN 110241830 A CN110241830 A CN 110241830A CN 201910654624 A CN201910654624 A CN 201910654624A CN 110241830 A CN110241830 A CN 110241830A
Authority
CN
China
Prior art keywords
stress
conehead
backfill
plate
transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910654624.8A
Other languages
Chinese (zh)
Inventor
高建伟
李国栋
孙艳杰
孙华斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910654624.8A priority Critical patent/CN110241830A/en
Publication of CN110241830A publication Critical patent/CN110241830A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/96Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
    • E02F3/967Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements of compacting-type tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of backfilling apparatus, including the stress transfer conehead being fixedly connected in excavator on quartering hammer conehead, the bottom of the stress transfer conehead is fixedly connected with stress plate, and the stress plate is vertical with the stress transfer conehead holding, and stress spring is equipped between the stress transfer conehead and stress plate;The backfilling apparatus can be mounted on the quartering hammer conehead of excavator, it drives the stress plate of the backfilling apparatus that vibration occurs by excavator to tamp backfill material, it can effectively ensure that the backfill effect in backfill hole, simultaneously during backfill, backfill material can be pushed into backfill hole by the backfilling apparatus, compacting and push-in are integrated, and are saved the time of backfill and the use equipment of backfill, have been saved the manpower and financial resources of backfill.

Description

A kind of backfilling apparatus and earth-filling method
Technical field
The present invention relates to backfill hole backfill technical field more particularly to a kind of backfilling apparatus and earth-filling method.
Background technique
It saves by the Qinghai of representative, Gansu, Shaanxi, Shanxi etc. of loess geology, is washed away by rainwash greatly, by underground water Naughty sky have a far reaching influence, and the goaf range of artificial mineral products operation has the formation of sinkhole.
Overboard cavity form is varied, and internal structure is complicated and changeable, in conventional process operation process, mainly uses superficial After cutting is excavated, with the steady binder roller-compaction backfill of water.Or injecting treatment is taken to hole region, after reaching consolidation, have Certain enabling capabilities.To provide load transmitting, play the role of load.
The backfill of conventional method inorganic binder: within the scope of earth's surface 3m, according to processing area, carrying out preparatory grooving, Then inorganic binder is selected, is mixed and stirred by machinery, the filling materials such as rendzinas, soil cement, gravelly soil are formed.Determine pine paving system After number, layered rolling is carried out;
Feature: processing depth is insufficient, disturbs greatly to periphery, and inorganic bond material unit price is high.Compacting equipment can not effectively be made Industry.
Conventional method slip casting backfill:
According to backfill range, high-volume mixing cement grout supplements the cavity of sinkhole using high-pressure slip-casting and concrete Position;
Feature: as back-filling way, being backfilled, two media using interface zone, can not effectively be bonded and is integrally formed, backfill Material cost is high, and cost is big, and backfill quality is extremely difficult to require.As concealment engineering, can not control effectively;
Traditional treatment method, there are processing to be not thorough, and fills processing material construction height, slip casting contraction distortion is big, disposes generation Valence is big, and deep layer location can not fill, and big machinery can not operate control, and compactness not can guarantee, and hidden danger risk continues to increase The problems such as.
Summary of the invention
In order to overcome the disadvantages of the above prior art, the object of the present invention is to provide one kind can install on board a dredger, Plate is hammered into shape by stress transfer to stress, it is closely knit to squeeze the backfilling apparatus and earth-filling method for expanding cavity point by layered vibration.
In order to achieve the above objectives, the present invention uses following technical scheme, a kind of backfilling apparatus, including is fixedly connected on excavation The bottom of stress transfer conehead in machine on quartering hammer conehead, the stress transfer conehead is fixedly connected with stress plate, and this is answered Power plate is vertical with the stress transfer conehead holding, and stress spring is equipped between the stress transfer conehead and stress plate.
Conically shaped is welded in the middle part of the stress plate, the stress transfer conehead is inserted into conically shaped and extends to cone In stress spring in shape cylinder, and the stress spring is fixedly connected with stress plate, and upper end and the excavator of the conically shaped pass through Wirerope is fixedly connected.
The quartering hammer conehead is fixedly connected with stress transfer conehead by connecting anchor ear.
The stress plate is equipped with multiple air holes, and multiple air hole is evenly distributed on the surrounding of conically shaped.
The tup of the stress transfer conehead is inserted into stress spring, and the upper end of the stress spring is stuck in stress transfer The upper end of conehead.
The lower end of the stress plate is fixed with the column vertical with stress plate.
The lower end of the stress plate is fixedly connected with triangle conehead.
The lower end surface of the stress plate is fixedly connected with arc conehead.
A kind of earth-filling method, follows the steps below:
Step 1: the backfill material for being used to fill out sinkhole is poured into construction site by dumper;
Step 2: the soil body is elapsed to backfill position by the stress transfer conehead of excavator end, then passes through stress The stress plate of transmitting conehead connection carries out layering to the backfill material in backfill hole and hits reality, up and down poor position compacting;Make to backfill in hole The compactness of backfill material reaches 95%;
Step 3: in the case where the later period is by flood season and rainfall larger situation, road pavement backfill point is investigated, if any hair Heavy situation is given birth to, continues to be backfilling and compacted, until backfilling surface without ponding and pavement strength hardly happens variation.
In the step 2 when being tamped to backfill material, according to upper offline position movement acting, left and right overlap joint, overlapped points Spacing is tamped in blossom type and taking exercises.
The beneficial effects of the present invention are: driving quartering hammer conehead will be high by anchor ear using digger engine power It can stress hammer connection.High-strength stress hammer uses integral solder, after downward contact medium, by with spring conehead, by stress transfer Plate is hammered into shape to stress, and by layered vibration, empty point is expanded in closely knit extruding, and the hydraulic stress issued parallel is pressed down against, and makes loose The soil body reaches dense state;
Stress transfer steel plate with connect conehead, using 2cm steel plate gapless weld, with quartering hammer conehead connecting portion, Shockproof disconnected spring is set.During preventing high energy stress transfer, other than slipping, at stress steel plate and conehead, symmetrically It welds relieving ring and dropping situations is prevented by the plug-in hanging point to quartering hammer end of safety rope.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the present invention is backfilling apparatus;
Fig. 2 is stress plate attachment structure schematic diagram in the present invention;
Fig. 3 is the structural schematic diagram of figure quartering hammer conehead and stress transfer conehead in the present invention;
Fig. 4 is the structural schematic diagram of stress plate in the present invention;
Fig. 5 is the overlooking structure diagram of stress plate in the present invention;
Fig. 6 is the structural schematic diagram in the present invention with column;
Fig. 7 is the structural schematic diagram in the present invention with triangle conehead;
Fig. 8 is the structural schematic diagram in the present invention with arc conehead.
Specific embodiment
The present invention is described in detail below with reference to the accompanying drawings and embodiments.
In the description of the present invention, it is to be understood that, term " center ", "upper", "lower", "front", "rear", " left side ", The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on the figure Orientation or positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Term " first ", " second " be used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply Ground includes one or more of the features;In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or It is more than two.
Embodiment 1
A kind of backfilling apparatus as depicted in figs. 1 and 2, including the stress being fixedly connected in excavator 6 on quartering hammer conehead 7 Conehead 3 is transmitted, the bottom of the stress transfer conehead 3 is fixedly connected with stress plate 4, and the stress plate 4 and the stress transfer Conehead 3 is kept vertically, and stress spring 5 is equipped between the stress transfer conehead 3 and stress plate 4.The device is pacified when in use On the quartering hammer conehead of the excavator, driving power, when being backfilled, the digging are provided by the excavator Pick machine drives the promotion of stress transfer conehead 3 to be deposited into backfill material and is pushed into backfill hole, then drives stress transfer head=conehead It is vibrated, which drives attraction plates that corresponding vibration occurs during vibration, backfills hole to entering In backfill material tamped, ensure that backfill hole be able to carry out effective backfill, and ensure that backfill hole will not occur under Heavy situation, the compression spring 5 can guarantee effectively rise when stress transfer conehead drives pressure plare to be vibrated To the effect of buffering, and then the case where avoid stress plate and backfill material when colliding, stress plate is caused to be damaged.
Further, in order to facilitate the connection between stress plate 4 and stress transfer conehead 3, stress plate 4 as described in Figure 4 Middle part is welded with conically shaped 401, and the stress transfer conehead 3 is inserted into conically shaped 401 and extends to answering in conically shaped 401 In power spring 5, and the stress spring 5 is fixedly connected with stress plate 4, and the upper end of the conically shaped 401 and excavator 6 pass through steel wire Rope 1 is fixedly connected.During installation, compression spring is encased in the cylinder of the conically shaped and stress plate that are welded as a whole, then will The stress transfer conehead is inserted into the conically shaped, and is inserted into the tup of stress transfer conehead 3 in stress spring 5, and The upper end of stress spring 5 is set to be stuck in the upper end of stress transfer conehead 3.Then the upper end of conically shaped 401 and excavator are passed through into steel Cord is fixedly connected, and is particularly fixed with circular cylinder on the top of the conically shaped 401, the radius of the circular cylinder Identical as the radius of conically shaped upper end, when in use, the excavator drives stress transfer conehead 3 to be rotated, the stress Transmitting conehead drives compressed spring to be rotated, and stress plate is vibrated under its drive at this time, carries out compacting vibration to backfill material It is dynamic.
Further, in order to facilitate the connection between quartering hammer conehead and stress transfer tup 3, quartering hammer as described in Figure 3 Conehead 7 is fixedly connected with stress transfer conehead 3 by connecting anchor ear 8.Connection when, by the lower end of the quartering hammer conehead 7 with The upper end of stress transfer conehead 3 is aligned, then will connect anchor ear hoop the quartering hammer conehead 7 and stress transfer conehead 3 it Between, the tie rod of connection anchor ear is then pulled, the quartering hammer conehead 7 is fixedly connected with stress transfer conehead 3.
Further, it when being tamped by stress plate to backfill hole, since there is air or water in backfill material, is answering When power plate is tamped, air or water in backfill material are extruded, and certain reaction force can be generated to stress plate, leads to stress Plate is equipped with multiple air holes 402 to the compacting power of backfill material to solve this purpose stress plate 4 as described in Figure 5, and multiple Stomata 402 is evenly distributed on the surrounding of conically shaped 401.The air hole can effectively ensure that stress plate push when, air energy It is enough effectively to pass through air hole, reduce the stress that stress plate uses.It is symmetrically welded at stress steel plate and conehead described simultaneously Relieving ring prevents dropping situations by the plug-in hanging point to quartering hammer end of safety rope.
Embodiment 2
According to different soil properties, disposal options are replaced, replace stress transfer mode.
Section such as uniform in soft geology and soil property, the impact mode for directlying adopt stress plate as shown in Figure 1 are tamped.
Embodiment 3
On the basis of embodiment 1, it in horsestone uneven strata, can use under stress plate 4 as shown in Figure 7 End face is fixedly connected with arc conehead 11 and tamps to horsestone uneven strata, guarantees the solidity of compacting.
Embodiment 4
On the basis of embodiment 1, when sticky soil property throwing medium is squeezed and become silted up, the lower end of stress plate 4 as shown in Figure 8 is fixed Be connected with triangle conehead 10, by triangle conehead 10 can effectively to mud soil property when effectively squeezed, guarantee The compacting of mud soil property.
Embodiment 5
On the basis of embodiment 1, when being disposed for deep level holes body, as the lower end of Fig. 6 stress plate 4 is fixed with and stress The vertical column of plate 4, the column carry out stress transfer, dispose soft geology to deep layer;Guarantee the filler energy in deep level holes It is enough to be completely compacted.
The course of work is, using digger engine rated power, to drive quartering hammer conehead, and by anchor ear, connection is whole The stress transfer conehead of welding, by the steel plate of stress transfer to media contact, by layered vibration, cavity is expanded in closely knit extruding Point, makes loose earth reach dense state.
Stress transfer steel plate with connect conehead, using 2cm steel plate gapless weld, with quartering hammer conehead connecting portion, Shockproof disconnected spring is set.
During preventing high energy stress transfer, other than slipping, at stress steel plate and conehead, it is symmetrically welded insurance Ring prevents dropping situations by the plug-in hanging point to quartering hammer end of safety rope.
A kind of earth-filling method, follows the steps below:
Step 1: the backfill material for being used to fill out sinkhole is poured into construction site by dumper;
Step 2: the soil body is elapsed to backfill position by the stress transfer conehead 3 of excavator end, then passes through stress The stress plate that transmitting conehead 3 connects carries out layering to the backfill material in backfill hole and hits reality, up and down poor position compacting;Make to backfill in hole The compactness of backfill material reaches 95%;
Step 3: in the case where the later period is by flood season and rainfall larger situation, road pavement backfill point is investigated, if any hair Heavy situation is given birth to, continues to be backfilling and compacted, until backfilling surface without ponding and pavement strength hardly happens variation.
In the step 2 when being tamped to backfill material, according to upper offline position movement acting, left and right overlap joint, overlapped points Spacing is tamped in blossom type and taking exercises.
Earth's surface originates to 30m the sinkhole for vertically handling depth, including shallow-layer goaf, the backfill of 2m or more strip footing, City planting ductwork existing structure body nearby backfills, without being limited by topography variation.
Uniform geology section, is handled using board-like tup.Uneven geology section uses, and spherical conehead is handled.It is broken Stone soil and the gravel soil body, are handled using bevel-type tup.Backfill is expanded to coffin pit or inclined gallery, using vibration rod is adjusted, is carried out Processing.
Using the original state soil body, conehead is placed on backfill medium by machinery operator, is pushed in the soil body to cavity, is reached Acting end is placed at the top of the backfill soil body by 50cm or so, is carried out acting and is hit reality.Reach pre-control index to settling amount and deflection When, next layer of backfill operation can be carried out.
Feature: overturning traditional processing method, not by regional impact, backfills in the treatment process of paragraph position, utilizes original state The soil body while save the cost, can use compactness and deformation quantity, and two-way index carry out compacting control.
Above embodiments are only to of the invention for example, do not constitute the limitation to protection scope of the present invention, Within the same or similar design of all and present invention all belongs to the scope of protection of the present invention.

Claims (10)

1. a kind of backfilling apparatus, which is characterized in that including the stress being fixedly connected in excavator (6) on quartering hammer conehead (7) Transmit conehead (3), the bottom of the stress transfer conehead (3) is fixedly connected with stress plate (4), and the stress plate (4) with it is described Stress transfer conehead (3) keeps vertical, is equipped with stress spring (5) between the stress transfer conehead (3) and stress plate (4).
2. a kind of backfilling apparatus according to claim 1, which is characterized in that be welded with taper in the middle part of the stress plate (4) Cylinder (401), the stress transfer conehead (3) are inserted into conically shaped (401) and extend to the stress spring in conically shaped (401) (5) in, and the stress spring (5) is fixedly connected with stress plate (4), and upper end and the excavator (6) of the conically shaped (401) pass through Wirerope (1) is fixedly connected.
3. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the quartering hammer conehead (7) and stress transfer Conehead (3) is fixedly connected by connecting anchor ear (8).
4. a kind of backfilling apparatus according to claim 2, which is characterized in that the stress plate (4) is equipped with multiple air holes (402), and multiple air hole (402) is evenly distributed on the surroundings of conically shaped (401).
5. a kind of backfilling apparatus according to claim 1, which is characterized in that the tup of the stress transfer conehead (3) is inserted into To in stress spring (5), and the upper end of the stress spring (5) is stuck in the upper end of stress transfer conehead (3).
6. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end of the stress plate (4) is fixed with The column (9) vertical with stress plate (4).
7. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end of the stress plate (4) is fixedly connected There are triangle conehead (10).
8. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end surface of the stress plate (4) is fixed to be connected It is connected to arc conehead (11).
9. a kind of earth-filling method, which is characterized in that follow the steps below:
Step 1: the backfill material for being used to fill out sinkhole is poured into construction site by dumper;
Step 2: the soil body is elapsed to backfill position by the stress transfer conehead (3) of excavator end, is then passed by stress The stress plate for passing conehead (3) connection carries out layering to the backfill material in backfill hole and hits reality, up and down poor position compacting;Make to backfill in hole The compactness of backfill material reaches 95%;
Step 3: in the case where the later period is by flood season and rainfall larger situation, road pavement backfill point is investigated, if any under generation Heavy situation continues to be backfilling and compacted, until backfilling surface without ponding and pavement strength hardly happens variation.
10. a kind of earth-filling method according to claim 9, which is characterized in that carried out in the step 2 to backfill material When compacting, according to upper offline position movement acting, left and right overlap joint, overlapped points spacing is tamped in blossom type and taking exercises.
CN201910654624.8A 2019-07-19 2019-07-19 A kind of backfilling apparatus and earth-filling method Pending CN110241830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910654624.8A CN110241830A (en) 2019-07-19 2019-07-19 A kind of backfilling apparatus and earth-filling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910654624.8A CN110241830A (en) 2019-07-19 2019-07-19 A kind of backfilling apparatus and earth-filling method

Publications (1)

Publication Number Publication Date
CN110241830A true CN110241830A (en) 2019-09-17

Family

ID=67892901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910654624.8A Pending CN110241830A (en) 2019-07-19 2019-07-19 A kind of backfilling apparatus and earth-filling method

Country Status (1)

Country Link
CN (1) CN110241830A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778959A (en) * 2020-05-28 2020-10-16 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030095366A (en) * 2003-07-18 2003-12-18 남인근 Apparatus for tramping road
KR20040053943A (en) * 2002-12-16 2004-06-25 박광업 Breaker tool for an excavator and ground hardening process using the same
CN101906774A (en) * 2010-08-06 2010-12-08 左天德 Hammerblow tamper of excavator
CN103603334A (en) * 2013-06-03 2014-02-26 罗朝钦 Foundation soil punning method
CN106522195A (en) * 2016-12-07 2017-03-22 国家电网公司 Tamping hammer
CN109826263A (en) * 2019-01-24 2019-05-31 中建新疆建工(集团)有限公司 A kind of groove excavator tamping unit
CN210238473U (en) * 2019-07-19 2020-04-03 高建伟 Backfill device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040053943A (en) * 2002-12-16 2004-06-25 박광업 Breaker tool for an excavator and ground hardening process using the same
KR20030095366A (en) * 2003-07-18 2003-12-18 남인근 Apparatus for tramping road
CN101906774A (en) * 2010-08-06 2010-12-08 左天德 Hammerblow tamper of excavator
CN103603334A (en) * 2013-06-03 2014-02-26 罗朝钦 Foundation soil punning method
CN106522195A (en) * 2016-12-07 2017-03-22 国家电网公司 Tamping hammer
CN109826263A (en) * 2019-01-24 2019-05-31 中建新疆建工(集团)有限公司 A kind of groove excavator tamping unit
CN210238473U (en) * 2019-07-19 2020-04-03 高建伟 Backfill device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘本学;郝飞;张志峰;冯忠绪;: "高速液压夯实机动力学模型试验", 长安大学学报(自然科学版), no. 01, pages 99 - 102 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778959A (en) * 2020-05-28 2020-10-16 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil
CN111778959B (en) * 2020-05-28 2021-11-30 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil

Similar Documents

Publication Publication Date Title
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN105714773A (en) Foundation treatment method
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN114517472B (en) Construction method of carrier pile
CN104264655A (en) Preformed hole deep-layer underwater tamping method
CN105113478A (en) Dynamic compaction treatment method of deep foundation displacement
CN102400462A (en) Secondary pressure grouting small pile construction process in seismic strengthening treatment of foundation
CN202220341U (en) Support structure for foundation pit in sludge
CN110241830A (en) A kind of backfilling apparatus and earth-filling method
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN210238473U (en) Backfill device
CN103603334A (en) Foundation soil punning method
CN104895078A (en) Precast pile construction method focusing on end bearing force
CN212452578U (en) Road shoulder and soil slope protection tamping device
CN110004908B (en) Deep ramming pipe and construction method thereof
CN110528572B (en) Method for repairing retaining wall with inclination trend in decompression mode
CN211057836U (en) Cushion cap foundation backfill structure
CN208604589U (en) A kind of novel rammer compacter for three back backfills
CN112144516A (en) Construction method of concrete pile
CN1364961A (en) Foundation reinforcing mode
CN1326033A (en) Soil compacting method and its special machine and tool
CN104153356A (en) Concrete pile construction equipment and method
CN204225079U (en) Low-frequency high-amplitude multifunctional table back of the body compacting facility
CN212742499U (en) Tamping foot of high-speed tamping machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Gao Jianwei

Inventor after: Yan Zhichang

Inventor after: Li Guodong

Inventor after: Sun Yanjie

Inventor after: Sun Huabin

Inventor after: Wei Fangxiao

Inventor after: Li Jun

Inventor after: Niu Hongwu

Inventor after: Bian Yongning

Inventor after: Liang Yumao

Inventor before: Gao Jianwei

Inventor before: Li Guodong

Inventor before: Sun Yanjie

Inventor before: Sun Huabin