CN110221132A - The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage - Google Patents

The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage Download PDF

Info

Publication number
CN110221132A
CN110221132A CN201910525440.1A CN201910525440A CN110221132A CN 110221132 A CN110221132 A CN 110221132A CN 201910525440 A CN201910525440 A CN 201910525440A CN 110221132 A CN110221132 A CN 110221132A
Authority
CN
China
Prior art keywords
phase
electrification
tension apparatus
shortage
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910525440.1A
Other languages
Chinese (zh)
Inventor
张爱军
王爱华
李学良
计一鸣
田磊
徐颖
陈金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910525440.1A priority Critical patent/CN110221132A/en
Publication of CN110221132A publication Critical patent/CN110221132A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/16Measuring asymmetry of polyphase networks

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The application is provided with a kind of specific method of electrification investigation high-tension apparatus phase shortage.Original application method that the technical program passes through change nuclear phase instrument, during being applied to electrification investigation high-tension apparatus phase shortage, by the display result for reading display instrument, can fast and easily judge a certain phase whether phase shortage, compared to existing technologies, in electrification, can quickly and effectively and easily judge high-tension apparatus whether phase shortage, be suitable for promote the use of.

Description

The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage
Technical field
The present disclosure relates generally to power supply technique fields, and in particular to the method and nuclear phase instrument of electrification investigation high-tension apparatus phase shortage New application.
Background technique
In high-power mechanical-electrical equipment running process, because power supply grid phase load is uneven, certain phase excess load fortune is often had It carries and causes phase voltage power down suddenly, can not only damage alternating current generator in this way, also electric-control system can be made out of control, equipment is caused to damage It is bad, and keep goods in process appearance unqualified also due to control is out of control, or even scrap, bring unnecessary economic damage It loses.
It is detected for the non-full-phase state to high-power mechanical-electrical equipment, the operating method of the prior art are as follows: need first set It is standby to have a power failure, by D.C. resistance test is mutually carried out, troubleshooting is carried out by resistance, the malfunction elimination time is long, operation It is cumbersome, it is unfavorable for power supply reliability, it would be highly desirable to improve.
Summary of the invention
In view of drawbacks described above in the prior art or deficiency, it is intended to provide one kind compared to existing technologies, is charging In the case of, can quickly and effectively and easily judge high-tension apparatus whether phase shortage electrification investigation high-tension apparatus phase shortage method
In a first aspect, a kind of method of electrification investigation high-tension apparatus phase shortage, includes the following steps: two contacts of nuclear phase instrument Contact is connected with two insulating bars respectively;By two contact contacts respectively with the contact at any phase both ends of high-voltage circuitbreaker;Read nuclear phase The display result of instrument display instrument: if showing phase difference, judge the phase phase shortage;If display judges the phase without phase difference Non- phase shortage.
Second aspect, nuclear phase instrument are used to charge the application of investigation high-tension apparatus phase shortage.
In conclusion the application is provided with a kind of specific method of electrification investigation high-tension apparatus phase shortage.The technical program is logical The original application method for changing nuclear phase instrument is crossed, it is aobvious by reading during being applied to electrification investigation high-tension apparatus phase shortage Show the display of instrument as a result, can fast and easily judge whether phase shortage is charging feelings compared to existing technologies to a certain phase Under condition, can quickly and effectively and easily judge high-tension apparatus whether phase shortage, be suitable for promote the use of.
Specific embodiment
The application is described in further detail below with reference to embodiment.It is understood that tool described herein Body embodiment is used only for explaining related invention, rather than the restriction to the invention.
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below in conjunction with embodiment.
The purpose of actual use of existing nuclear phase instrument is for judging the phase difference between two-phase, and specifically used method is as follows It is shown:
Assuming that certain line is A phase, one of contact contact X is placed in A phase, another contact contact Y is placed on separately In one phase, such as 120 ° of display, then it is then negative phase sequence, this mutually should be that explanation, which is positive phase sequence, this mutually should be " B ", such as 240 ° of display “C”。
In summary, the actual use of nuclear phase instrument is for appraising and deciding the phase sequence between items.
But the method for electrification investigation high-tension apparatus phase shortage provided in the present embodiment, but change the reality of nuclear phase instrument Border application method, principle are:
Belong to resistance element in view of high-voltage switch gear, it should phase by switching the voltage at a certain phase both ends under normal condition It is identical, phase difference is not present.
When open-phase fault occurs for high-voltage switch gear, because there are load circuits for tail end of switch, and breakpoint is often switched Between have electric arc generation, cause failure phase both end voltage phase to be changed, therefore a certain phase both end voltage of test can be passed through Phase difference, to judge whether this mutually breaks down.
Based on above-mentioned working principle, provide that there are as below methods:
Particularly provideed in the present embodiment it is a kind of electrification investigation high-tension apparatus phase shortage method, include the following steps: by Two contact contacts of nuclear phase instrument are connected with two insulating bars respectively;By two contact contacts respectively with any phase both ends of high-voltage circuitbreaker Contact;It reads the display result of nuclear phase instrument display instrument: if showing phase difference, judging the phase phase shortage;If display is without phase Difference then judges the non-phase shortage of the phase.
By the method for mutually carrying out D.C. resistance test and carrying out troubleshooting by resistance in compared to the prior art For, method provided in the present embodiment can carry out hot line job, open-phase fault is judged quick and precisely using phasing tester, one The secondary open-phase fault processing time greatly reduces, and reduces operating procedure, save human and material resources financial resources.
Based on the above embodiment, the specific embodiment provided in the present embodiment can also particularly provide a kind of nuclear phase Instrument is used to charge the application of investigation high-tension apparatus phase shortage.
Above description is only the preferred embodiment of the application and the explanation to institute's application technology principle.Those skilled in the art Member is it should be appreciated that invention scope involved in the application, however it is not limited to technology made of the specific combination of above-mentioned technical characteristic Scheme, while should also cover in the case where not departing from the inventive concept, it is carried out by above-mentioned technical characteristic or its equivalent feature Any combination and the other technical solutions formed.Such as features described above and (but being not limited to) disclosed herein have it is similar The technical characteristic of function is replaced mutually and the technical solution that is formed.

Claims (2)

1. a kind of method of electrification investigation high-tension apparatus phase shortage, characterized by the following steps:
Two contact contacts of nuclear phase instrument are connected with two insulating bars respectively;
By two contact contacts respectively with the contact at any phase both ends of high-voltage circuitbreaker;
Read the display result of nuclear phase instrument display instrument:
If showing phase difference, the phase phase shortage is judged;
If display judges the non-phase shortage of the phase without phase difference.
2. the application that nuclear phase instrument is used to charge investigation high-tension apparatus phase shortage.
CN201910525440.1A 2019-06-18 2019-06-18 The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage Pending CN110221132A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910525440.1A CN110221132A (en) 2019-06-18 2019-06-18 The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910525440.1A CN110221132A (en) 2019-06-18 2019-06-18 The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage

Publications (1)

Publication Number Publication Date
CN110221132A true CN110221132A (en) 2019-09-10

Family

ID=67817619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910525440.1A Pending CN110221132A (en) 2019-06-18 2019-06-18 The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage

Country Status (1)

Country Link
CN (1) CN110221132A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221872A (en) * 1990-01-29 1991-09-30 Matsushita Electric Ind Co Ltd Voltage sensor
CN201281753Y (en) * 2008-10-16 2009-07-29 绥化电业局 Nuclear phase lever
CN201583601U (en) * 2009-12-28 2010-09-15 江苏省电力公司苏州供电公司 High-low voltage comprehensive phase sequence and phase position instrument
CN201918800U (en) * 2010-07-10 2011-08-03 陈家斌 High-voltage open-phase remote alarming device for 10KV-20KV transformer
CN103399216A (en) * 2013-07-31 2013-11-20 襄垣县树元电器有限公司 Remote monitoring and alarming device for high-voltage phase lack of transformer
CN105021891A (en) * 2015-08-03 2015-11-04 国家电网公司 Power distribution network base station type nuclear phase apparatus
CN204882727U (en) * 2015-04-30 2015-12-16 深圳市嘉力电气技术有限公司 Scarce phase sequence detection circuit that reaches mutually of three -phase input voltage
US20180149691A1 (en) * 2015-06-16 2018-05-31 General Electric Technology Gmbh Methods and systems for open-phase detection in power transformers

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221872A (en) * 1990-01-29 1991-09-30 Matsushita Electric Ind Co Ltd Voltage sensor
CN201281753Y (en) * 2008-10-16 2009-07-29 绥化电业局 Nuclear phase lever
CN201583601U (en) * 2009-12-28 2010-09-15 江苏省电力公司苏州供电公司 High-low voltage comprehensive phase sequence and phase position instrument
CN201918800U (en) * 2010-07-10 2011-08-03 陈家斌 High-voltage open-phase remote alarming device for 10KV-20KV transformer
CN103399216A (en) * 2013-07-31 2013-11-20 襄垣县树元电器有限公司 Remote monitoring and alarming device for high-voltage phase lack of transformer
CN204882727U (en) * 2015-04-30 2015-12-16 深圳市嘉力电气技术有限公司 Scarce phase sequence detection circuit that reaches mutually of three -phase input voltage
US20180149691A1 (en) * 2015-06-16 2018-05-31 General Electric Technology Gmbh Methods and systems for open-phase detection in power transformers
CN105021891A (en) * 2015-08-03 2015-11-04 国家电网公司 Power distribution network base station type nuclear phase apparatus

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中华人民共和国铁道部: "《高速铁路电力线路维修岗位》", 28 February 2012, 中国铁道出版社 *
北京电力公司: "《输电线路标准化作业操作导则》", 30 April 2007, 中国电力出版社 *
周鸣 等: "35kv Dy11 变压器高压侧单相缺相运行分析", 《电力与能源》 *
曹志安: "《煤矿机电及运输岗位实操教材》", 30 June 2015, 中国矿业大学出版 *

Similar Documents

Publication Publication Date Title
JP6190059B2 (en) Uninterruptible power system
US11081903B2 (en) Protection methods and switches in uninterruptible power supply systems
JP5059197B2 (en) Selection switch device, power supply device using the same, and switching method thereof
CN106464001B (en) Uninterrupted power supply
CN103843227B (en) Ups mechanical transfer relay arc mitigation
JP5651508B2 (en) Inrush current suppression device
JP5030894B2 (en) Uninterruptible testing equipment for circuit breakers for wiring
CN203456872U (en) Protection circuit for power supply of three-phase power source
CN110221132A (en) The method and nuclear phase instrument new application of electrification investigation high-tension apparatus phase shortage
CN110118929B (en) Testing device and testing method for cut-off equipment
KR20170122005A (en) Short-circuit testing device
KR101367611B1 (en) Power distribution system
US20200358280A1 (en) Dc circuit breaker
CN210465619U (en) Direct-current high-voltage high-breaking testing device
JP2018181599A (en) Dc cutoff device
US11855438B2 (en) Multi-circuit DC breaking system
JP5662229B2 (en) Transformer device for movement
Hardi et al. Testing of contactors under voltage sag and non-sinusoidal voltage conditions
JP7458333B2 (en) Uninterruptible power switching device, test equipment for uninterruptible power switching device
US20230187925A1 (en) Electrical protection systems and methods having improved selectivity
CN211826442U (en) Fault current fusing element state detection device
JP2017208873A (en) On-vehicle battery system
Egorov et al. Specifics of automatic switches commutation testing
KR101780554B1 (en) Energy Storage System Equipped with Emergency Power Function and Its Reclosing Method
JPH027831A (en) Protective circuit for inverter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910