CN110209132A CN201910478126.2A CN201910478126A CN110209132A CN 110209132 A CN110209132 A CN 110209132A CN 201910478126 A CN201910478126 A CN 201910478126A CN 110209132 A CN110209132 A CN 110209132A
Authority
CN
China
Prior art keywords
data
production plan
wms
production
mes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910478126.2A
Other languages
Chinese (zh)
Inventor
罗中会
刘宗生
吴志伟
李博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Gree Intelligent Equipment Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201910478126.2A priority Critical patent/CN110209132A/en
Publication of CN110209132A publication Critical patent/CN110209132A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4185Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
    • G05B19/4186Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication by protocol, e.g. MAP, TOP
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/08Protocols for interworking; Protocol conversion
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Computer Security & Cryptography (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a production data processing method and device in a production manufacturing system. The production data processing method in the production manufacturing system comprises the following steps: determining production plan data of goods in a preset time period by using a Manufacturing Execution System (MES), wherein the production plan data carries the quantity of the goods expected to be produced in the preset time period; determining a data transmission protocol between the MES and the warehouse management system WMS; transmitting the production plan data to the WMS based on the data transmission protocol, wherein the WMS stores the goods produced within the predetermined period of time based on the received production plan data. The invention solves the technical problem that the manufacturing execution system MES system and the warehouse management system WMS do not have data interfaces in the related technology, so that the manufacturing execution system MES system and the warehouse management system WMS cannot communicate with each other, and the production efficiency is low.

Description

Production data processing method and device in manufacturing system
Technical field
The present invention relates to intelligent storage control technology fields, in particular to the production in a kind of manufacturing system Data processing method and device.
Background technique
In the manufacturing of scale, in order to enable each production procedure can dock up.Manufacture can generally be utilized The planning that execution system MES or Warehouse Management System are produced.However, certain time may be stored in MES In the case where (for example, same day) data to be produced, and storage control system WMS does not know the harvest plan on the same day then, if Want to confirm when WMS receives the cargo that receives whether be same day plan harvest data.It has generally had been acknowledged and has worked as in MES After the cargo data of its planned production, need to be manually entered this it is estimated receive data into WMS system, when needing to spend very long Between.In addition, artificial input data is also easier mistake occur.
There is no data-interface for the above-mentioned system of Manufacturing Executive System MES in the related technology and Warehouse Management System WMS, draws Communication can not be carried out by rising between Manufacturing Executive System MES system and Warehouse Management System WMS cause production efficiency is relatively low to ask Topic, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides the production data processing methods and device in a kind of manufacturing system, at least to solve Certainly Manufacturing Executive System MES system and Warehouse Management System WMS do not have data-interface in the related technology, cause manufacturing execution system The technical problem that communication causes production efficiency relatively low can not be carried out between MES system and Warehouse Management System WMS.
According to an aspect of an embodiment of the present invention, the creation data processing side in a kind of manufacturing system is provided Method, comprising: the production plan data of cargo in predetermined amount of time are determined using Manufacturing Executive System MES, wherein the production meter Draw the quantity of goods that estimated production in the predetermined amount of time is carried in data;Determine the MES and Warehouse Management System WMS Between Data Transport Protocol;The production plan data are transferred to the WMS by transport protocol based on the data, wherein The WMS stores the cargo produced in the predetermined amount of time based on the production plan data received.
Optionally it is determined that the Data Transport Protocol between the MES and the WMS comprises determining that terminal where the MES First terminal information and the WMS where terminal second terminal information;Based on the first terminal information and described Second terminal information determines the address information in the Data Transport Protocol;Determine the data type of the production plan data; The Data Transport Protocol is determined based on the address information and the data type.
Optionally, it includes: to described that the production plan data are transferred to the WMS by transport protocol based on the data Production plan data are packaged, and obtain the corresponding data packet of the production plan data;By in the Data Transport Protocol Destination address corresponding destination path the data packet is sent in the WMS.
Optionally, the production plan data are packaged, obtain the corresponding data packet packet of the production plan data It includes: determining the corresponding data length of the production plan data;Length is production plan data addition based on the data Frame head and postamble obtain the corresponding data frame of the production plan data;Determine that the data frame is the production plan data Corresponding data packet.
Optionally, the production plan data are packaged, obtain the corresponding data packet of the production plan data also It include: that length, the frame head and the postamble determine check code based on the data;The check code is encapsulated in the number According in frame, to obtain the corresponding data packet of the production plan data.
Optionally, after the production plan data are transferred to the WMS by transport protocol based on the data, the life Produce the production data processing method in manufacture system further include: obtain the storage message of the WMS feedback, wherein the storage The quantity of goods of actual storage in the WMS is carried in message;It is true based on the storage message and the production plan data The fixed production plan whether completed in the predetermined amount of time.
Another aspect according to an embodiment of the present invention, additionally provides at the creation data in a kind of manufacturing system Manage device, comprising: the first determination unit, by being determined using Manufacturing Executive System MES in predetermined amount of time based on the production of cargo Draw data, wherein the quantity of goods of estimated production in the predetermined amount of time is carried in the production plan data;Second really Order member, for determining the Data Transport Protocol between the MES and Warehouse Management System WMS;Transmission unit, for being based on institute It states Data Transport Protocol and the production plan data is transferred to the WMS, wherein the WMS is based on the life received Planning data is produced to store the cargo produced in the predetermined amount of time.
Optionally, second determination unit includes: the first determining module, for terminal where determining the MES The second terminal information of one end message and the place WMS terminal;Second determining module, for being based on the first terminal Information and the second terminal information determine the address information in the Data Transport Protocol;Third determining module, for true The data type of the fixed production plan data;4th determining module, for being based on the address information and the data class Type determines the Data Transport Protocol.
Optionally, the transmission unit includes: package module, for being packaged to the production plan data, is obtained The corresponding data packet of the production plan data;Sending module, for passing through the destination address pair in the Data Transport Protocol The data packet is sent in the WMS by the destination path answered.
Optionally, the package module includes: the first determining submodule, for determining that the production plan data are corresponding Data length;First acquisition submodule is that the production plan data add frame head and postamble for length based on the data, Obtain the corresponding data frame of the production plan data;Second determines submodule, for determining that the data frame is the production The corresponding data packet of planning data.
Optionally, the package module further include: third determines submodule, for length, the frame based on the data Head and the postamble determine check code;Second acquisition submodule, for the check code to be encapsulated in the data frame, with Obtain the corresponding data packet of the production plan data.
Optionally, the creation data processing unit in the manufacturing system further include: acquiring unit, for being based on institute It states after the production plan data are transferred to the WMS by Data Transport Protocol, obtains the storage message of the WMS feedback, Wherein, the quantity of goods of actual storage in the WMS is carried in the storage message;Third determination unit, for based on described Storage message and the production plan data determine whether to complete the production plan in the predetermined amount of time.
Another aspect according to an embodiment of the present invention, additionally provides a kind of storage medium, the storage medium includes The program of storage, wherein described program execute it is any one of above-mentioned described in manufacturing system in creation data processing Method.
Another aspect according to an embodiment of the present invention, additionally provides a kind of processor, the processor is for running Program, wherein described program run when execute it is any one of above-mentioned described in manufacturing system in creation data processing Method.
In embodiments of the present invention, the production plan number of cargo in predetermined amount of time is determined using Manufacturing Executive System MES According to, wherein the quantity of goods of estimated production in predetermined amount of time is carried in production plan data;And determine that MES and storage are managed Data Transport Protocol between reason system WMS;And production plan data are transferred to by WMS based on Data Transport Protocol, wherein The mode that WMS stores the cargo produced in predetermined amount of time based on the production plan data received, through the invention The production data processing method in manufacturing system that embodiment provides, determines number between MES and Warehouse Management System WMS It is whole raising has been reached so as to realize the purpose being directly transmitted to production plan data by MES in WMS according to transport protocol The technical effect of the efficiency of a manufacturing system, and then solve Manufacturing Executive System MES system in the related technology and storage Management system WMS does not have data-interface, causes not carrying out between Manufacturing Executive System MES system and Warehouse Management System WMS Communicate the technical problem for causing production efficiency relatively low.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the production data processing method in manufacturing system according to an embodiment of the present invention;
Fig. 2 is the schematic diagram of the creation data processing unit in manufacturing system according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
Embodiment 1
According to embodiments of the present invention, the method for providing the production data processing method in a kind of manufacturing system is implemented Example, it should be noted that step shown in the flowchart of the accompanying drawings can be in the calculating of such as a group of computer-executable instructions It is executed in machine system, although also, logical order is shown in flow charts, and it in some cases, can be to be different from Sequence herein executes shown or described step.
Fig. 1 is the flow chart of the production data processing method in manufacturing system according to an embodiment of the present invention, such as Fig. 1 Shown, the production data processing method in the manufacturing system includes the following steps:
Step S102 determines the production plan data of cargo in predetermined amount of time using Manufacturing Executive System MES, wherein The quantity of goods of estimated production in predetermined amount of time is carried in production plan data.
It, can be based on the production that the factors such as material, personnel, production equipment produce certain time in enterprise manufactures It draws.Then, it is produced using factors such as existing material, personnel, production equipments according to preparatory production plan.
Wherein, the production plan for making certain time here, which can be, passes through MES.
Step S104 determines the Data Transport Protocol between MES and Warehouse Management System WMS.
In this embodiment, after MES has made production plan based on material, personnel and production equipment etc., it will do it life It produces.Under the control of MES, after the production for completing predetermined amount of time, the cargo of production can be stored.At this time, it may be necessary to store in a warehouse The management of management system WMS progress cargo.In order to enable WMS can carry out effective and reasonable management to the cargo of production and deposit Storage, needs to obtain the production plan data of cargo in predetermined amount of time, and based on the production plan data to the cargo produced It is stored.Wherein, it needs for production plan data to be input in WMS to obtain production plan data in WMS.However, phase In the technology of pass, due to there is no data-interface between MES and WMS, the transmission of data can not be directly carried out, personnel is needed to manually enter Production plan data are into WMS;However, not only efficiency is relatively low for this mode, but also it is easy error.In the embodiment of the present invention In, in order to enable efficiently carry out the transmission of production plan data between MES and WMS, MES and Warehouse Management System WMS it Between determine Data Transport Protocol, production plan data are directly transmitted in WMS by MES so as to realize.
Production plan data are transferred to WMS based on Data Transport Protocol by step S106, wherein WMS is based on receiving Production plan data store the cargo produced in predetermined amount of time.
Through the above steps, it can use the production plan number that Manufacturing Executive System MES determines cargo in predetermined amount of time According to, wherein the quantity of goods of estimated production in predetermined amount of time is carried in production plan data;Determine MES and warehousing management Data Transport Protocol between system WMS;Production plan data are transferred to WMS based on Data Transport Protocol, wherein WMS base The cargo produced in predetermined amount of time is stored in the production plan data received.It is carrying out in the related technology relatively When data between MES and WMS are transmitted, need personnel that the production plan data got from the end MES are entered manually into WMS In, it is easy to appear mistake, and speed is slow, so that the efficiency in entire manufacturing system is lower.Implement in the present invention In example, Data Transport Protocol is determined between MES and Warehouse Management System WMS, it is so as to realize that production plan data are straight The purpose being transmitted in WMS by MES is connect, has reached the technical effect of the efficiency of the entire manufacturing system of raising, and then solve Manufacturing Executive System MES system and Warehouse Management System WMS do not have data-interface in the related technology, cause manufacturing execution system The technical problem that communication causes production efficiency relatively low can not be carried out between MES system and Warehouse Management System WMS.
In step S104, determine that the Data Transport Protocol between MES and WMS may include: terminal where determining MES The second terminal information of first terminal information and the place WMS terminal;It is true based on first terminal information and second terminal information Determine the address information in Data Transport Protocol;Determine the data type of production plan data;Based on address information and data class Type determines Data Transport Protocol.In this embodiment it is possible to by obtain MES where terminal device facility information and The facility information of terminal device where WMS determines the destination address and source address of the transmission of the data packet in transport protocol.
In step s 106, production plan data are transferred to WMS based on Data Transport Protocol includes: to production plan number According to being packaged, the corresponding data packet of production plan data is obtained;Pass through the corresponding mesh of destination address in Data Transport Protocol Mark path is sent data packets in WMS.
In an alternative embodiment, production plan data are packaged, obtain the corresponding number of production plan data It may include: the corresponding data length of determining production plan data according to packet;It is that production planning data adds frame based on data length Head and postamble, obtain the corresponding data frame of production plan data;Determine data frame for the corresponding data packet of production planning data.
In addition, being packaged to production plan data, the corresponding data packet of production plan data is obtained further include: based on number Check code is determined according to length, frame head and postamble;In a data frame by check code encapsulation, corresponding to obtain production plan data Data packet.
It in an alternative embodiment, should after production plan data are transferred to WMS based on Data Transport Protocol Production data processing method in manufacturing system can also include: to obtain the storage message of WMS feedback, wherein storage disappears The quantity of goods of actual storage in WMS is carried in breath;Determine whether to complete based on storage message and production plan data predetermined Production plan in period.In this embodiment it is possible to practical in the planned production quantity being intended in creation data and WMS The quantity of the cargo of storage is compared, to determine whether the production plan in predetermined amount of time is completed.In addition, in the embodiment In, in the corresponding data packet of storage message, source address is the end message of terminal where WMS;Destination address is terminal where MES End message, so as to realize storage message by the transmission between WMS to MES.
Embodiment 2
Another aspect according to an embodiment of the present invention, additionally provides a kind of for executing the life in manufacturing system The Installation practice of data processing method is produced, Fig. 2 is at the creation data in manufacturing system according to an embodiment of the present invention The schematic diagram for managing device, as shown in Fig. 2, the creation data processing unit in the manufacturing system includes: the first determination unit 21, the second determination unit 23 and transmission unit 25.The creation data processing unit in the manufacturing system is carried out below It is described in detail.
Wherein, the first determination unit 21, for determining the production of cargo in predetermined amount of time using Manufacturing Executive System MES Planning data, wherein the quantity of goods of estimated production in predetermined amount of time is carried in production plan data.
Second determination unit 23, for determining the Data Transport Protocol between MES and Warehouse Management System WMS.
Transmission unit 25, for production plan data to be transferred to WMS based on Data Transport Protocol, wherein WMS is based on connecing The production plan data received store the cargo produced in predetermined amount of time.
Herein it should be noted that above-mentioned first determination unit 21, the second determination unit 23 and transmission unit 25 are corresponding Step S102 to S106 in embodiment 1, above-mentioned module is identical as example and application scenarios that corresponding step is realized, but It is not limited to the above embodiments 1 disclosure of that.It should be noted that above-mentioned module can be such as a part of of device It is executed in the computer system of a group of computer-executable instructions.
From the foregoing, it will be observed that can use the first determination unit in the above embodiment of the present invention and utilize Manufacturing Executive System MES Determine the production plan data of cargo in predetermined amount of time, wherein carry in production plan data estimated in predetermined amount of time The quantity of goods of production;And the Data Transport Protocol between MES and Warehouse Management System WMS is determined using the second determination unit; And Data Transport Protocol is based on using transmission unit, production plan data are transferred to WMS, wherein WMS is based on receiving Production plan data store the cargo produced in predetermined amount of time.It is carrying out between MES and WMS in the related technology relatively Data transmission when, need personnel that the production plan data got from the end MES are entered manually into WMS, be easy to appear mistake Accidentally, and speed is slow, so that the efficiency in entire manufacturing system is lower.In embodiments of the present invention, in MES and storehouse It stores up and determines Data Transport Protocol between management system WMS, be directly transmitted to production plan data by MES so as to realize Purpose in WMS, has reached the technical effect of the efficiency of the entire manufacturing system of raising, and then solves and make in the related technology Making execution system MES system and Warehouse Management System WMS does not have data-interface, causes Manufacturing Executive System MES system and storage The technical problem that communication causes production efficiency relatively low can not be carried out between management system WMS.
In an alternative embodiment, above-mentioned second determination unit may include: the first determining module, for determining The second terminal information of the first terminal information of terminal where MES and the place WMS terminal;Second determining module, for being based on First terminal information and second terminal information determine the address information in Data Transport Protocol;Third determining module, for true Determine the data type of production plan data;4th determining module, for determining that data pass based on address information and data type Defeated agreement.
In an alternative embodiment, above-mentioned transmission unit may include: package module, for production plan data It is packaged, obtains the corresponding data packet of production plan data;Sending module, for passing through the destination in Data Transport Protocol The corresponding destination path in location is sent data packets in WMS.
In an alternative embodiment, above-mentioned package module may include: the first determining submodule, for determining production The corresponding data length of planning data;First acquisition submodule, for being that production planning data adds frame head based on data length And postamble, obtain the corresponding data frame of production plan data;Second determines submodule, for determining data frame for production quota According to corresponding data packet.
In an alternative embodiment, above-mentioned package module can also include: that third determines submodule, for based on number Check code is determined according to length, frame head and postamble;Second acquisition submodule, for encapsulating in a data frame check code, to obtain To the corresponding data packet of production plan data.
In an alternative embodiment, the creation data processing unit in the manufacturing system can also include: to obtain Unit is taken, the storage for after production plan data are transferred to WMS based on Data Transport Protocol, obtaining WMS feedback disappears Breath, wherein the quantity of goods of actual storage in WMS is carried in storage message;Third determination unit, for based on storage message with And production plan data determine whether to complete the production plan in predetermined amount of time.
Embodiment 3
Another aspect according to an embodiment of the present invention, additionally provides a kind of storage medium, and storage medium includes storage Program, wherein program executes the production data processing method in any one of above-mentioned manufacturing system.
Embodiment 4
Another aspect according to an embodiment of the present invention additionally provides a kind of processor, and processor is used to run program, Wherein, the production data processing method in any one of above-mentioned manufacturing system is executed when program is run.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (10)

1. the production data processing method in a kind of manufacturing system characterized by comprising
The production plan data of cargo in predetermined amount of time are determined using Manufacturing Executive System MES, wherein the production plan number The quantity of goods of estimated production in the predetermined amount of time is carried in;
Determine the Data Transport Protocol between the MES and Warehouse Management System WMS;
The production plan data are transferred to the WMS by transport protocol based on the data, wherein the WMS is based on receiving To the production plan data cargo produced in the predetermined amount of time is stored.
2. the method according to claim 1, wherein determining that the data between the MES and WMS transmit association View includes:
The second terminal information of the first terminal information of terminal where determining the MES and the place WMS terminal;
The address information in the Data Transport Protocol is determined based on the first terminal information and the second terminal information;
Determine the data type of the production plan data;
The Data Transport Protocol is determined based on the address information and the data type.
3. according to the method described in claim 2, it is characterized in that, transport protocol is by the production plan number based on the data Include: according to the WMS is transferred to
The production plan data are packaged, the corresponding data packet of the production plan data is obtained;
The data packet is sent to the WMS by the destination address corresponding destination path in the Data Transport Protocol In.
4. according to the method described in claim 3, obtaining described it is characterized in that, be packaged to the production plan data The corresponding data packet of production plan data includes:
Determine the corresponding data length of the production plan data;
Length is that the production plan data add frame head and postamble based on the data, and it is corresponding to obtain the production plan data Data frame;
Determine that the data frame is the corresponding data packet of the production plan data.
5. according to the method described in claim 4, obtaining described it is characterized in that, be packaged to the production plan data The corresponding data packet of production plan data further include:
Length, the frame head and the postamble determine check code based on the data;
The check code is encapsulated in the data frame, to obtain the corresponding data packet of the production plan data.
6. the method according to any one of claims 1 to 5, which is characterized in that incited somebody to action in transport protocol based on the data The production plan data are transferred to after the WMS, further includes:
Obtain the storage message of the WMS feedback, wherein the cargo of actual storage in the WMS is carried in the storage message Quantity;
Determine whether to complete based on the production in the predetermined amount of time by the storage message and the production plan data It draws.
7. the creation data processing unit in a kind of manufacturing system characterized by comprising
First determination unit, for determining the production plan data of cargo in predetermined amount of time using Manufacturing Executive System MES, In, the quantity of goods of estimated production in the predetermined amount of time is carried in the production plan data;
Second determination unit, for determining the Data Transport Protocol between the MES and Warehouse Management System WMS;
The production plan data are transferred to the WMS for transport protocol based on the data, wherein institute by transmission unit WMS is stated to store the cargo produced in the predetermined amount of time based on the production plan data received.
8. device according to claim 7, which is characterized in that second determination unit includes:
First determining module, for terminal where the first terminal information of terminal where determining the MES and the WMS Two end messages;
Second determining module, for determining that the data are transmitted based on the first terminal information and the second terminal information Address information in agreement;
Third determining module, for determining the data type of the production plan data;
4th determining module, for determining the Data Transport Protocol based on the address information and the data type.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution Benefit require any one of 1 to 6 described in production data processing method in manufacturing system.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 6 described in production data processing method in manufacturing system.
CN201910478126.2A 2019-06-03 2019-06-03 Production data processing method and device in production manufacturing system Pending CN110209132A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910478126.2A CN110209132A (en) 2019-06-03 2019-06-03 Production data processing method and device in production manufacturing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910478126.2A CN110209132A (en) 2019-06-03 2019-06-03 Production data processing method and device in production manufacturing system

Publications (1)

Publication Number Publication Date
CN110209132A true CN110209132A (en) 2019-09-06

Family

ID=67790495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910478126.2A Pending CN110209132A (en) 2019-06-03 2019-06-03 Production data processing method and device in production manufacturing system

Country Status (1)

Country Link
CN (1) CN110209132A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110658770A (en) * 2019-10-22 2020-01-07 深圳市芝麻自动化科技有限公司 SAP manufacturing execution system data processing interface driving method
CN111626557A (en) * 2020-04-18 2020-09-04 青岛奥利普自动化控制***有限公司 Data processing method and equipment
CN111626474A (en) * 2020-04-18 2020-09-04 青岛奥利普自动化控制***有限公司 Data processing method and equipment based on manufacturing MES system
CN111815234A (en) * 2020-06-29 2020-10-23 长沙格力暖通制冷设备有限公司 Delivery system and delivery method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103457748A (en) * 2013-08-20 2013-12-18 北京华胜天成科技股份有限公司 Data transmission method, system and device
CN107544448A (en) * 2017-09-28 2018-01-05 浙江中烟工业有限责任公司 A kind of logistics system and its method of pipe tobacco error protection
KR20190003214A (en) * 2017-06-30 2019-01-09 주식회사 한비세트론 Warehouse Management System using smart glasses having bar code or QR code scan function and capable of communicating with RFID reader
CN109685320A (en) * 2018-11-28 2019-04-26 长春北方化工灌装设备股份有限公司 MES system deposits the integrated management method of information and automation equipment to three-dimensional Kuku

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103457748A (en) * 2013-08-20 2013-12-18 北京华胜天成科技股份有限公司 Data transmission method, system and device
KR20190003214A (en) * 2017-06-30 2019-01-09 주식회사 한비세트론 Warehouse Management System using smart glasses having bar code or QR code scan function and capable of communicating with RFID reader
CN107544448A (en) * 2017-09-28 2018-01-05 浙江中烟工业有限责任公司 A kind of logistics system and its method of pipe tobacco error protection
CN109685320A (en) * 2018-11-28 2019-04-26 长春北方化工灌装设备股份有限公司 MES system deposits the integrated management method of information and automation equipment to three-dimensional Kuku

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈彦彬: "《数据通信与计算机网络》", 31 August 2018, 西安电子科技大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110658770A (en) * 2019-10-22 2020-01-07 深圳市芝麻自动化科技有限公司 SAP manufacturing execution system data processing interface driving method
CN111626557A (en) * 2020-04-18 2020-09-04 青岛奥利普自动化控制***有限公司 Data processing method and equipment
CN111626474A (en) * 2020-04-18 2020-09-04 青岛奥利普自动化控制***有限公司 Data processing method and equipment based on manufacturing MES system
CN111815234A (en) * 2020-06-29 2020-10-23 长沙格力暖通制冷设备有限公司 Delivery system and delivery method

Similar Documents

Publication Publication Date Title
CN110209132A (en) Production data processing method and device in production manufacturing system
CN112003703B (en) Method and device for transmitting authenticatable message across chains
CN104601592B (en) A kind of method and access device for accessing cloud service
CN109359924A (en) Logistics subregion picking method, device, terminal, system and storage medium based on robot
CN106874361B (en) Data processing method and device applied to customs declaration
CN107113232A (en) The method and apparatus that NFV manages layout
CN106850402A (en) The transmission method and device of message
CN106874325B (en) Data query method and device
CN104202334B (en) A kind of method and device for establishing network connection
CN106161256B (en) A kind of processing method and processing device of Border Gateway Protocol (BGP) routing
CN104322011A (en) Connectivity service orchestrator
CN109829726A (en) A kind of drug information management method and system based on block chain
CN103458004B (en) Internet of things equipment CAMEL-Subscription-Information variation and equipment
CN107194628A (en) The method and device of request is alloted in processing
CN110351286A (en) Link flood attack detects response mechanism in a kind of software defined network
CN107438833A (en) A kind of data-updating method, device, system and server
CN105100002B (en) The operating method and device of attribute
CN103688498A (en) Methods and network elements operable to specify and determine complete sets of link state messages for link state routing protocols
CN109194565A (en) A kind of message read states reminding method and device
CN109728992A (en) Method, apparatus, storage medium and the electronic device in distribution forwarding domain
CN102707974A (en) POS (Point Of Sale) terminal program package downloading method and system
CN108874805A (en) The treating method and apparatus of data
CN104363257B (en) A kind of user interface data method for refreshing and equipment
CN104536926B (en) The control method and device of serial equipment
CN107086960B (en) Message transmission method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906