CN110206288A - A kind of Detachable anchor device formula construction method of suspending scaffold - Google Patents

A kind of Detachable anchor device formula construction method of suspending scaffold Download PDF

Info

Publication number
CN110206288A
CN110206288A CN201910461035.8A CN201910461035A CN110206288A CN 110206288 A CN110206288 A CN 110206288A CN 201910461035 A CN201910461035 A CN 201910461035A CN 110206288 A CN110206288 A CN 110206288A
Authority
CN
China
Prior art keywords
steel plate
bolt
anchor device
detachable anchor
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910461035.8A
Other languages
Chinese (zh)
Inventor
叶胜军
秦玉欢
尹川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910461035.8A priority Critical patent/CN110206288A/en
Publication of CN110206288A publication Critical patent/CN110206288A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of Detachable anchor device formula construction method of suspending scaffold, by making Detachable anchor device, it is fixed on support shuttering, wait pour concrete, and after concrete reaches setting intensity, start that overhanging type steel beam is installed, then section steel beam is accurately positioned, utilize Detachable anchor device pressing plate, fashioned iron is securely fixed, frame body is carried out again to set up, scaffolding height is no more than 20 meters, in frame body demolishing process, first remove frame body, unclamp anchor nut, remove pressing plate, hang away fashioned iron, four screw rods are touched downwards with hard object afterwards, then pre-embedded device can remove completely, after centralized collection cleaning, it is used in turn.

Description

A kind of Detachable anchor device formula construction method of suspending scaffold
Technical field
The present invention relates to building engineering field more particularly to a kind of Detachable anchor device formula construction method of suspending scaffold.
Background technique
In recent years, increasing with urban architecture, the form of scaffold is also in diversified development trend, and is overhang Scaffold holds that job area is big, save material, low cost, set up simple and convenient, safe and reliable and obtain extensive with it It uses.For traditional suspension scaffold using steel pipe as supporting device, stability is poor, and suspension scaffold is all made of fashioned iron as branch in recent years It holds, the fixation way of cantilever section steel beam is different, and it is most of to use traditional round steel lantern ring, requirement is typically not capable of when bending, Construction is inconvenient and stability is poor, and waste is big, and cost input is more, and this method overhangs foot hand using novel dismountable anchor formula Frame, anchor is detachable, is used in turn, and no waste, input cost is larger, but average unit cost is low after turnover, and safety Can be strong, ensure that the safety in utilization of outrigger, with good economic efficiency and social benefit have good popularization and use valence Value.
Summary of the invention
The present invention uses a kind of novel dismountable anchor formula construction method of suspending scaffold, and anchor is detachable, It is used in turn, no waste, input cost is larger, but average unit cost is low after turnover, and security performance is strong, has ensured the use of outrigger Safety.
To achieve the goals above, present invention employs following technical solutions:
A kind of Detachable anchor device formula construction method of suspending scaffold is installed solid by making Detachable anchor device It is scheduled on support shuttering, wait pour concrete, and after concrete reaches setting intensity, starts that overhanging type steel beam is installed, then Section steel beam is accurately positioned, using Detachable anchor device pressing plate, fashioned iron is securely fixed, then carries out frame body and sets up, is set up Height is no more than 20 meters, in frame body demolishing process, first removes frame body, unclamps anchor nut, remove pressing plate, hang away type Steel touches downwards four screw rods with hard object afterwards, then pre-embedded device can remove completely, after centralized collection cleaning, is used in turn.
Preferably, the Detachable anchor device is made of bottom steel plate, high-strength bolt, pvc pipe, pressing plate, in bottom steel plate It drills, high-strength bolt is successively welded on the steel plate, pvc pipe set is inserted on bolt, and top adds two at four angular distance sideline 50mm Corresponding two are bolted by block pressur plate and nut respectively.
Preferably, described to tear anchor fabrication processing open are as follows: steel plate is chosen, cutting → bolt processing → scribing line drills → welding → polishing, japanning, key points for operation are as follows:
Step 1: steel plate is chosen, cutting
1) steel plate materials select Q235 steel, and phosphorus content is moderate, and comprehensive performance is preferable, the property such as intensity, plasticity and welding Can preferably it be cooperated;
2) for bottom plate size using square, size dimension is 250~300mm, and steel plate thickness is 12~16mm, top The pressing plate of setting uses rectangle, and size dimension is long 250~300mm × wide 100mm × 12~16mm of thickness;
3) cutting of steel plate is crossed positioning in advance, is guaranteed that steel plate edge line is smooth, straight, after the completion of cutting, is used angle grinder The flash of steel plate surrounding is polished smooth, steel plate quadrangle is polished into radiussed, prevents that accidental wound hand occurs when installation;
Step 2: bolt is processed
1) shank of bolt uses Q235 round steel processing and fabricating, and diameter is 16~18mm, and bolt length is controlled in 400~450mm, Screw thread effective length is 100~150mm;
2) nut uses stiffnut, and the height of nut is 3mm higher than normal nut, and place is quenched as bolt Reason, every set need four nuts;
3) by screw thread process, quenching treatment, intensity, hardness, wearability, fatigue strength and toughness are improved, Product quality has been effectively ensured in the fixed special processing and fabricating of producer in this processing method;
Step 3: scribing line drilling
1) gather away from crossing at the 50mm of sideline along bottom steel plate surrounding and hand at 4 points, be bolt lower weld point;Top steel plate edge Long side is placed in the middle, away from crossing at short side line 50mm, gathers and hands over two o'clock, be connected and fixed a little for bolts and nuts;
2) it being drilled using drilling machine to steel plate, the big 4mm of aperture ratio shank of bolt, pore-forming needs accurate positioning, and it is indeformable, guarantee Molded appearance quality;
Step 4: welding
The hole being drilled on shank of bolt insertion bottom steel plate, surrounding respectively stay the gap of 2mm, notice that the indwelling in gap is uniform, Bolt is positioned and postpones perpendicular to bottom steel plate, and first spot welding is fixed, and confirmation position is correct and perpendicular to bottom steel plate, just starts Welding;
Step 5: polishing, japanning
1) after the completion of welding, the weldering spot etc. of protrusion polishes flat the bottom of device with angle grinder, to guarantee anchoring dress It is smooth, straight to set installation;
2) japanning: after the completion of device polishing, in time removing dust, and brushing antirust paint is arranged the paint of profession by paint class Work applies, when brushing on the vertical plane, from bottom to top, finally together from top to bottom.
Preferably, installing and fixing method of the Detachable anchor device on support shuttering:
The surrounding of steel plate in bottom nails on the useless template item of 30mm wide, and the template item that gives up is close to bottom edges of plate, bottom After Interal fixation is good, upper PVC plastic pipe is covered on bolt, it is ensured that floorslab concrete is isolated with bolt;
30mm is relaxed on the plastic film in the steel plate upper cover of bottom, every side, is pressed in the beneath of useless template item, it is ensured that floor coagulation Soil is isolated with bottom steel plate;Or the brushing release agent on the steel plate of bottom, bottom steel plate is isolated with floorslab concrete.
Preferably, after the completion of fixed to Detachable anchor device, casting concrete, after floorslab concrete final set Overhanging type steel is installed, after the completion of fashioned iron is arranged, a 400mm long flitch is placed on top, is subsequently mounted pressing plate, tightens in advance manually Nut screws up with a wrench securely after two pressure plates all manually tighten;
Pressing plate should be controlled in installation process and is in level, takes measures to prevent from tilting, and guarantee pre-embedded device reasonable stress;
Then, top frame body is set up, anchor is removed after Practical Completion, recycles.
Compared with prior art, the present invention provides a kind of Detachable anchor device formula construction method of suspending scaffold, have Below the utility model has the advantages that
Anchor is detachable, is used in turn, and no waste, input cost is larger, but average unit cost is low after turnover, and safety Performance is strong, has ensured the safety in utilization of outrigger.
Detailed description of the invention
Fig. 1 is the Detachable anchor device in a kind of Detachable anchor device formula construction method of suspending scaffold proposed by the present invention Mounting structure schematic diagram;
Fig. 2 is the bottom steel plate structure in a kind of Detachable anchor device formula construction method of suspending scaffold proposed by the present invention Schematic diagram.
Fig. 3 is the pressure plate structure signal in a kind of Detachable anchor device formula construction method of suspending scaffold proposed by the present invention Figure.
In figure: 1, bottom steel plate, 2, pvc pipe, 3, high-strength bolt, 4, nut, 5, pressing plate, 6, concrete, 7, fashioned iron, 8, wood Side.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
Referring to Fig.1-3, a kind of Detachable anchor device formula construction method of suspending scaffold, by making Detachable anchor device, It is fixed on support shuttering, wait pour concrete 6, and after concrete 6 reaches setting intensity, starts installation overhanging 7 beam of fashioned iron is then accurately positioned 7 beam of fashioned iron, and using Detachable anchor device pressing plate 5, fashioned iron 7 is securely fixed, then into Row frame body is set up, and scaffolding height is no more than 20 meters, in frame body demolishing process, is first removed frame body, is unclamped anchor nut 4, Remove pressing plate 5, hang away fashioned iron 7, touches four screw rods downwards with hard object afterwards, then pre-embedded device can remove completely, centralized collection After cleaning, it is used in turn.
Preferably, the Detachable anchor device is made of bottom steel plate 1, high-strength bolt 3, pvc pipe 2, pressing plate 5, in bottom It drills, high-strength bolt 3 is successively welded on the steel plate, 2 sets of pvc pipe are inserted on bolt, top at 1 four angular distance sideline 50mm of steel plate Two pressure plates 5 and nut 4 are added, are respectively bolted corresponding two.
Preferably, described to tear anchor fabrication processing open are as follows: steel plate is chosen, cutting → bolt processing → scribing line drills → welding → polishing, japanning, key points for operation are as follows:
Step 1: steel plate is chosen, cutting
1) steel plate materials select Q235 steel, and phosphorus content is moderate, and comprehensive performance is preferable, the property such as intensity, plasticity and welding Can preferably it be cooperated;
2) for 1 size of bottom steel plate using square, size dimension is 250~300mm, and steel plate thickness is 12~16mm, top The pressing plate 5 of portion's setting uses rectangle, and size dimension is long 250~300mm × wide 100mm × 12~16mm of thickness;
3) cutting of steel plate is crossed positioning in advance, is guaranteed that steel plate edge line is smooth, straight, after the completion of cutting, is used angle grinder The flash of steel plate surrounding is polished smooth, steel plate quadrangle is polished into radiussed, prevents that accidental wound hand occurs when installation;
Step 2: bolt is processed
1) shank of bolt uses Q235 round steel processing and fabricating, and diameter is 16~18mm, and bolt length is controlled in 400~450mm, Screw thread effective length is 100~150mm;
2) nut uses stiffnut, and the height of nut is 3mm higher than normal nut, and place is quenched as bolt Reason, every set need four nuts;
3) by screw thread process, quenching treatment, intensity, hardness, wearability, fatigue strength and toughness are improved, Product quality has been effectively ensured in the fixed special processing and fabricating of producer in this processing method;
Step 3: scribing line drilling
1) gather away from crossing at the 50mm of sideline along 1 surrounding of bottom steel plate and hand at 4 points, be bolt lower weld point;Top steel plate It is placed in the middle along long side, away from crossing at short side line 50mm, gathers and hand over two o'clock, be connected and fixed a little for bolts and nuts 4;
2) it being drilled using drilling machine to steel plate, the big 4mm of aperture ratio shank of bolt, pore-forming needs accurate positioning, and it is indeformable, guarantee Molded appearance quality;
Step 4: welding
The hole being drilled on shank of bolt insertion bottom steel plate 1, surrounding respectively stay the gap of 2mm, notice that the indwelling in gap is uniform, Bolt is positioned and postpones perpendicular to bottom steel plate 1, and first spot welding is fixed, and confirmation position is correct and perpendicular to bottom steel plate 1, just opens Beginning welding;
Step 5: polishing, japanning
1) after the completion of welding, the weldering spot etc. of protrusion polishes flat the bottom of device with angle grinder, to guarantee anchoring dress It is smooth, straight to set installation;
2) japanning: after the completion of device polishing, in time removing dust, and brushing antirust paint is arranged the paint of profession by paint class Work applies, when brushing on the vertical plane, from bottom to top, finally together from top to bottom.
Preferably, installing and fixing method of the Detachable anchor device on support shuttering:
The surrounding of steel plate 1 in bottom nails on the useless template item of 30mm wide, and the template item that gives up is close to the edge of bottom steel plate 1, bottom After portion's steel plate 1 fixes, upper PVC plastic pipe is covered on bolt, it is ensured that floorslab concrete 6 is isolated with bolt;
Plastic film is covered on bottom steel plate 1,30mm is relaxed on every side, is pressed in the beneath of useless template item, it is ensured that floor is mixed Solidifying soil 6 is isolated with bottom steel plate 1;Or the brushing release agent on bottom steel plate 1, bottom steel plate 1 is isolated with floorslab concrete 6.
Preferably, after the completion of fixed to Detachable anchor device, casting concrete 6, after 6 final set of floorslab concrete, i.e., Mountable overhanging type steel 7 after the completion of fashioned iron 7 is arranged, places a 400mm long flitch 8 on top, is subsequently mounted pressing plate 5, pre- manually Nut 4 is first tightened, after two pressure plates 5 all manually tighten, is screwed up with a wrench securely;
Pressing plate 5 should be controlled in installation process and is in level, takes measures to prevent from tilting, and guarantee pre-embedded device reasonable stress;
Then, top frame body is set up, anchor is removed after Practical Completion, recycles.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of Detachable anchor device formula construction method of suspending scaffold, which is characterized in that, will by making Detachable anchor device It is fixed on support shuttering, wait pour concrete, and after concrete reaches setting intensity, starts to install overhanging type steel Beam is then accurately positioned section steel beam, and using Detachable anchor device pressing plate, fashioned iron is securely fixed, then carries out frame body and take If scaffolding height is no more than 20 meters, in frame body demolishing process, frame body is first removed, anchor nut is unclamped, removes pressing plate, It hangs away fashioned iron, touches four screw rods downwards with hard object afterwards, then pre-embedded device can remove completely, after centralized collection cleaning, turnover It uses.
2. a kind of Detachable anchor device formula construction method of suspending scaffold according to claim 1, which is characterized in that described Detachable anchor device is made of bottom steel plate, high-strength bolt, pvc pipe, pressing plate, in bottom steel plate quadrangle far from brill at the 50mm of sideline Hole successively welds high-strength bolt on the steel plate, and pvc pipe set is inserted on bolt, and top adds two pressure plates and nut, respectively will Corresponding two are bolted.
3. a kind of Detachable anchor device formula construction method of suspending scaffold according to claim 2, which is characterized in that described Tear anchor fabrication processing open are as follows: steel plate selection, cutting → bolt processing → scribing line drilling → welding → polishing, japanning, Its key points for operation is as follows:
Step 1: steel plate is chosen, cutting
1) steel plate materials select Q235 steel, and phosphorus content is moderate, and comprehensive performance is preferable, and the performances such as intensity, plasticity and welding obtain To preferable cooperation;
2) for bottom plate size using square, size dimension is 250~300mm, and steel plate thickness is 12~16mm, top setting Pressing plate use rectangle, size dimension is long 250~300mm × wide 100mm × 12~16mm of thickness;
3) cutting of steel plate is crossed positioning in advance, guarantees that steel plate edge line is smooth, straight, after the completion of cutting, with angle grinder by steel The flash of plate surrounding polishes smooth, and steel plate quadrangle is polished into radiussed, prevents that accidental wound hand occurs when installation;
Step 2: bolt is processed
1) shank of bolt uses Q235 round steel processing and fabricating, and diameter is 16~18mm, and bolt length is controlled in 400~450mm, screw thread Effective length is 100~150mm;
2) nut uses stiffnut, and the height of nut is 3mm higher than normal nut, and processing is quenched as bolt, often Set needs four nuts;
3) by screw thread process, quenching treatment, intensity, hardness, wearability, fatigue strength and toughness are improved, this adds Product quality has been effectively ensured in the fixed special processing and fabricating of producer in work mode;
Step 3: scribing line drilling
1) gather away from crossing at the 50mm of sideline along bottom steel plate surrounding and hand at 4 points, be bolt lower weld point;Top steel plate is along long side Between two parties, away from crossing at short side line 50mm, gather and hand over two o'clock, be connected and fixed a little for bolts and nuts;
2) it being drilled using drilling machine to steel plate, the big 4mm of aperture ratio shank of bolt, pore-forming needs accurate positioning, and it is indeformable, guarantee molding Presentation quality;
Step 4: welding
The hole being drilled on shank of bolt insertion bottom steel plate, surrounding respectively stay the gap of 2mm, notice that the indwelling in gap will uniformly, bolt It perpendicular to bottom steel plate, is positioned and postpones, first spot welding is fixed, and confirmation position is correct and perpendicular to bottom steel plate, just starts welding;
Step 5: polishing, japanning
1) after the completion of welding, the weldering spot etc. of protrusion polishes flat the bottom of device with angle grinder, to guarantee that anchor is pacified It fills smooth, straight;
2) japanning: after the completion of device polishing, dust is removed in time, brushing antirust paint arranges the painter of profession to apply by paint class It applies, when brushing on the vertical plane, from bottom to top, finally together from top to bottom.
4. a kind of Detachable anchor device formula construction method of suspending scaffold according to claim 2, which is characterized in that removable Installation of the anchor on support shuttering is fixed:
The surrounding of steel plate in bottom nails on the useless template item of 30mm wide, and the template item that gives up is close to bottom edges of plate, bottom steel plate After fixing, upper PVC plastic pipe is covered on bolt, it is ensured that floorslab concrete is isolated with bolt;
30mm is relaxed on the plastic film in the steel plate upper cover of bottom, every side, is pressed in the beneath of useless template item, it is ensured that floorslab concrete with The isolation of bottom steel plate;Or the brushing release agent on the steel plate of bottom, bottom steel plate is isolated with floorslab concrete.
5. a kind of Detachable anchor device formula construction method of suspending scaffold according to claim 4, which is characterized in that right After the completion of Detachable anchor device is fixed, casting concrete, after floorslab concrete final set, i.e., mountable overhanging type steel, fashioned iron cloth After the completion of setting, a 400mm long flitch is placed on top, pressing plate is subsequently mounted, tightens nut in advance manually, to two pressure plates whole After manually tightening, screw up with a wrench securely;
Pressing plate should be controlled in installation process and is in level, takes measures to prevent from tilting, and guarantee pre-embedded device reasonable stress;
Then, top frame body is set up, anchor is removed after Practical Completion, recycles.
CN201910461035.8A 2019-05-30 2019-05-30 A kind of Detachable anchor device formula construction method of suspending scaffold Pending CN110206288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910461035.8A CN110206288A (en) 2019-05-30 2019-05-30 A kind of Detachable anchor device formula construction method of suspending scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910461035.8A CN110206288A (en) 2019-05-30 2019-05-30 A kind of Detachable anchor device formula construction method of suspending scaffold

Publications (1)

Publication Number Publication Date
CN110206288A true CN110206288A (en) 2019-09-06

Family

ID=67789473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910461035.8A Pending CN110206288A (en) 2019-05-30 2019-05-30 A kind of Detachable anchor device formula construction method of suspending scaffold

Country Status (1)

Country Link
CN (1) CN110206288A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877723A (en) * 2020-06-24 2020-11-03 东阳市伟欣悬挑设备有限公司 Anti-vibration cantilever frame of split type connection anchoring superimposed sheet
CN115075530A (en) * 2022-07-01 2022-09-20 中亿丰建设集团股份有限公司 Cantilever structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587638A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Steel girder anchoring device of overhanging scaffold
CN102650157A (en) * 2012-04-24 2012-08-29 中天建设集团有限公司 Detachable anchor device for cantilever section steel beam
CN204571266U (en) * 2015-03-11 2015-08-19 中铁上海工程局集团有限公司 A kind of anchor structure for builder's jack i iron
CN204960289U (en) * 2015-09-12 2016-01-13 中建三局集团有限公司 Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN206616842U (en) * 2017-02-17 2017-11-07 中国二十冶集团有限公司 Recyclable pre-embedded bolt for builder's jack

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587638A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Steel girder anchoring device of overhanging scaffold
CN102650157A (en) * 2012-04-24 2012-08-29 中天建设集团有限公司 Detachable anchor device for cantilever section steel beam
CN204571266U (en) * 2015-03-11 2015-08-19 中铁上海工程局集团有限公司 A kind of anchor structure for builder's jack i iron
CN204960289U (en) * 2015-09-12 2016-01-13 中建三局集团有限公司 Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN206616842U (en) * 2017-02-17 2017-11-07 中国二十冶集团有限公司 Recyclable pre-embedded bolt for builder's jack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877723A (en) * 2020-06-24 2020-11-03 东阳市伟欣悬挑设备有限公司 Anti-vibration cantilever frame of split type connection anchoring superimposed sheet
CN115075530A (en) * 2022-07-01 2022-09-20 中亿丰建设集团股份有限公司 Cantilever structure and construction method thereof
CN115075530B (en) * 2022-07-01 2024-03-22 中亿丰建设集团股份有限公司 Cantilever structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110206288A (en) A kind of Detachable anchor device formula construction method of suspending scaffold
CN107762139B (en) Cast-in-place concrete haunch wall aluminium alloy chamfering formwork supporting adn fixing device and method
CN101603340A (en) Installation process for autoclaved lightweight concrete board partition wall
CN110397291A (en) A kind of fast placing box-shaped spatula tool
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN205894646U (en) Quick detachable pre -buried device of scaffold frame of encorbelmenting
CN209799317U (en) Can have enough to meet need use pre-buried ring of scaffold frame of encorbelmenting
CN204492180U (en) A kind of cast-in-place board-like stair construction joint assembled template device
CN207999071U (en) A kind of wall column root concrete capping tools
CN203701564U (en) Anchoring fixing piece for cantilever scaffold
CN214615580U (en) Adjustable concave type support protection tool
CN212762665U (en) Grinding device for machining radiator
CN204676875U (en) For the removable shaped steel anchor ring of builder's jack
CN203080926U (en) Reserved hole device of concrete floor slab
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN208202513U (en) A kind of overhanging I-steel security hardening structure
CN102322146A (en) Method for processing connecting beam construction joint of shearing wall structure
CN108517974A (en) A kind of fixing means for the vertical built-in fitting of wallboard
CN205935231U (en) A embedded ring structure for reinforcing cantilevered member
CN102650157A (en) Detachable anchor device for cantilever section steel beam
CN109577557A (en) The bar frame of concrete slab
CN207296186U (en) Suspension type adjustable steel bar split heads
CN221118782U (en) Quick-dismantling type recoverable aluminum template diagonal bracing support fixing embedded part installing and detaching kit
CN208840647U (en) Machine tool for automatically repairing fastening bolt of building fastener
CN217079119U (en) Novel cantilever frame composite structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication