CN110205933A - A kind of arch rib of long-span steel arch bridge assembly falsework - Google Patents
A kind of arch rib of long-span steel arch bridge assembly falsework Download PDFInfo
- Publication number
- CN110205933A CN110205933A CN201910026549.0A CN201910026549A CN110205933A CN 110205933 A CN110205933 A CN 110205933A CN 201910026549 A CN201910026549 A CN 201910026549A CN 110205933 A CN110205933 A CN 110205933A
- Authority
- CN
- China
- Prior art keywords
- bridge
- support frame
- arch rib
- column
- upright bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 53
- 239000010959 steel Substances 0.000 title claims abstract description 53
- 238000010276 construction Methods 0.000 claims abstract description 29
- 230000009466 transformation Effects 0.000 claims abstract description 15
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 abstract description 10
- 230000008569 process Effects 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000008901 benefit Effects 0.000 description 7
- 238000006243 chemical reaction Methods 0.000 description 3
- 241000209094 Oryza Species 0.000 description 2
- 235000007164 Oryza sativa Nutrition 0.000 description 2
- 235000021182 hors d'oeuvre Nutrition 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 235000009566 rice Nutrition 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention provides a kind of arch rib of long-span steel arch bridge assembly falseworks, including upright bar and lacing, lacing is welded at left and right sides of column, upright bar is formed with column by the combination of lattice with lacing, the column that upright bar and lacing are composed is provided with 16 groups altogether, and X between column, Y direction is respectively arranged with a pair of suitable bridge and contacts truss to connection truss and direction across bridge, application and production suitable for construction building structure, compared to traditional arch rib assembly support frame, this kind of temporary support construction is completed and in arch rib arching and after stablizing, it is unloaded step by step by jack, separate support frame with arch rib, support frame is finally removed again, it must follow first to fill in support frame demolishing process and tear open afterwards, the principle first torn open is filled afterwards gradually to remove, transformation platform upper end arch rib is connected to jack pair, it can conveniently apply Worker person accurately adjusts the absolute altitude of each segment arch rib, improves the installation accuracy of arch rib.
Description
Technical field
The present invention relates to construction building technical field of structures, specially a kind of arch rib of long-span steel arch bridge assembly is interim
Bracket.
Background technique
With the development of China's cause of modernization, the construction of the large bridges such as domestic all kinds of bridge spanning the seas, river-spanning bridge is got over
Come more, these Longspan Bridges are steel structure bridge mostly, wherein steel arch bridge be used as across existing highway, railway, mountain valley,
The type of bridge in river has obtained a large amount of application.
With emerging in multitude for steel construction arch bridge, various construction methods are also applied therewith, for example cantilever is spelled
Dress method, branch frame in bulk method, stayed knotting method and the assembled method of jacking etc..But for easily just more than the steel construction of hundred meters of spans
Most of construction method is all limited to the factors such as the environment of construction site, place range size for arch bridge.Currently, most widely used
General or using setting up interim transverse girder between arch rib frame, the method for high altitude bulk carries out the installation of arch rib of long-span steel arch bridge, but
It is for many long-span steel arch bridges, span reaches rice up to a hundred, and arch rib weight reaches thousands of tons of, and arch rib rise reaches tens of
Rice, can encounter following point in high altitude bulk:
1, arch rib and stull weight are big, high to the structural bearing force request of temporary support;
2, arch rib rise is higher, its too high Out-of-plane Stability of support frame scaffolding height is difficult to ensure;
3, truss camber, lateral plane degree, absolute altitude, errors of centration are difficult to control.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of arch rib of long-span steel arch bridge assembly falsework, have
Structure is reliable, simple installation, guarantees construction safety, facilitates the advantages that carrying out high accuracy install arch rib solve existing arch rib
The problem that assembly supporting frame construction difficulty is high, structural soundness is poor, arch rib splicing accuracy is not high.
(2) technical solution
To realize reliable above structure, simple installation, guarantee construction safety, facilitating the purpose of carrying out high accuracy install arch rib, this
Invention provides the following technical solutions: a kind of arch rib of long-span steel arch bridge assembly falsework, including upright bar and lacing, described
Lacing is welded at left and right sides of column, and the upright bar is formed with column, the upright bar by the combination of lattice with lacing
The column being composed with lacing is provided with X, Y direction between 16 groups and column altogether and is respectively arranged with a pair of suitable bridge Xiang Lian
It is that truss and direction across bridge contact truss, it is consistent in length to be arranged with multiple groups in the pillar construction that the upright bar is composed with lacing
Node section, between the upright bar node section be welded in bolt it is fixed by way of be fixed, it is oblique right that the lacing passes through
The setting of angular formula is connected and fixed at each node section of upright bar;The suitable bridge contacts truss to connection truss and direction across bridge and leads to
The rectangular frame structure of column-type is crossed, the suitable bridge contacts truss in such a way that bolt docks with direction across bridge to connection truss
It is fixed with upright bar;The column top that the upright bar and lacing are constituted is provided with transformation platform, and the transformation platform is held in the palm by top
Frame crossbeam and top support frame stringer constitute flat surface, and the top support frame crossbeam is along bridge to the upright bar top for being fixed on each column
Portion, the top support frame stringer direction across bridge are fixed on top support frame crossbeam, and top support frame stringer upper end is provided with very heavy
Top is equipped with jack bearing beam, is symmetrically arranged at left and right sides of the jack between the jack and top support frame stringer
A pair of of interim bearing beam of arch rib, direction across bridge is equipped with channel steel, the channel steel and top support frame crossbeam between the top support frame crossbeam
It is fixedly connected in such a way that bolt docks, the channel steel upper surface is equipped with steel mesh piece.
Further advantage, the top support frame crossbeam, top support frame stringer, jack bearing beam and the interim bearing beam of arch rib are equal
For Two bors d's oeuveres or Three kinds of hors d'oeuvres I-steel.
Further advantage, between the column that the upright bar and lacing are constituted by along bridge to contacting truss and direction across bridge contacts
Truss connection, and it is all made of space truss form to the connection that connection truss and direction across bridge contact truss and column along bridge, and
Upright bar, column bottom end are fixedly connected with job location body frame when installation.
Further advantage, the jack structure type are screw jack, and jack upper end and arch rib when installing
Lower surface fits closely.
Further advantage, it is horizontal that the channel steel is uniformly layed in two sides top support frame in such a way that direction across bridge, spacing is 650mm
Lower flange of girder edge position, and channel steel upper surface is fixedly connected with steel mesh piece.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of arch rib of long-span steel arch bridge assembly falsework, have following
The utility model has the advantages that
1, this kind of arch rib of long-span steel arch bridge assembly falsework, is taken with upright bar lacing in work progress fill in the early stage
Column and construction site in bracket install and fix, and all parts such as transformation platform upper end jack are passed through into top support frame
Horizontal, stringer docks fixation with rod end, to complete building for support frame, when carrying out arch rib assembling construction, by every side arch rib
9 segments production are divided to march into the arena, it is by truck crane that the rib-hoisting of each segment is interim to the corresponding arch rib of installed position afterwards
On bearing beam, by being fixed temporarily between the arch rib of each segment and between two sides arch rib and stull by connecting plate to guarantee that it is steady
Fixed, then site operation personnel are finely adjusted by the arch rib absolute altitude of each segment of jack pair, are corrected, then weld arching, complete
It constructs at arch rib in assembly, compared to traditional arch rib assembly support frame, this kind of temporary support construction is completed simultaneously
In arch rib arching and after stablizing, is unloaded step by step by jack, separate support frame with arch rib, finally remove support again
Frame must be followed first to fill and be torn open afterwards in support frame demolishing process, filled the principle first torn open afterwards and gradually removed, be connected to conversion with jack pair
Platform upper end arch rib can facilitate construction personnel accurately to adjust the absolute altitude of each segment arch rib, improve the installation accuracy of arch rib;
2, this kind of arch rib assembly temporary support simultaneously, by the lattice column being made of upright bar and lacing, and its it is vertical
The fixed form of each segment of column decreases while ensure that firm support frame structure, construction safety and construction quality
The investment of large-scale hoisting machinery equipment, reduces construction cost, and the assembly of each segment arch rib, fine tuning, correction, welding and rectifys
The processes such as just operate on the transformation platform on falsework platform, it is ensured that safety saves artificial, falsework conduct
One Auxiliary support not only contributes to the splicing accuracy of control arch rib in this project, also ensures arch rib during the installation process
Overall stability, provide reference for similar engineering;
3 and in the construction process, construction personnel passes through the screw type each segment of jack pair arch rib on transformation platform
When being finely adjusted, guarantees that platform is firm in such a way that channel steel is fixed on top support frame crossbeam, while operating personnel is safe, pass through
The steel mesh piece that there is uniform place mat on channel steel avoids in work progress, and construction material etc. falls between rig bracket crossbeam and applies
Workshop, it has avoided falling object from high altitude and has threatened to construction site staff, further ensured the construction peace of support frame
Entirely.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is side view of the invention;
Fig. 3 is the main view of conversion platform of the present invention;
Fig. 4 is the left view of conversion platform of the present invention.
In figure: 1 upright bar, 2 lacings, 3 contact truss, 6 top support frames to connection truss, 4 transformation platforms, 5 direction across bridge along bridge
Crossbeam, 7 top support frame stringers, 8 jack, 9 jack bearing beams, the interim bearing beam of 10 arch ribs, 11 channel steels, 12 steel mesh pieces.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and described embodiment is only that present invention a part is implemented
Example, instead of all the embodiments.
Please refer to Fig. 1-4, a kind of arch rib of long-span steel arch bridge assembly falsework, including upright bar 1 and lacing 2, institute
It states lacing 2 and is welded in 1 left and right sides of column, the upright bar 1 is formed with column by the combination of lattice with lacing 2, institute
It states upright bar 1 and column that lacing 2 is composed is provided with X, Y direction between 16 groups and column altogether and is respectively arranged with a pair
Truss 5 is contacted to connection truss 3 and direction across bridge along bridge, is arranged in the pillar construction that the upright bar 1 is composed with lacing 2 more
Node section consistent in length is organized, is fixed by way of being welded in bolt and fixing between 1 node section of upright bar, it is described to sew
Item 2 is connected and fixed at each node section of upright bar 1 by the setting of oblique diagonal form;The suitable bridge to connection truss 3 with
Direction across bridge contacts truss 5 by the rectangular frame structure of column-type, and the suitable bridge contacts truss 5 to connection truss 3 and direction across bridge
It is fixed with upright bar 1 in such a way that bolt docks, pass through upright bar 1 in installation process and lacing 2 is in the mounting means of lattice
Construct column, fixation is docked with the body frame that construction site is used for arch rib erection by upright bar 1 in column bottom end, while passing through every group
Upright bar 1 carrys out stacked in multi-layers building stem height with lacing 2 with the dress of taking of sectional type, and passes through direction across bridge and contact truss 5 and Shun Qiao
Every group of column is connected and fixed with the structure of rectangular box formula to connection truss 3;The column top that the upright bar 1 is constituted with lacing 2
End is provided with transformation platform 4, and the transformation platform 4 constitutes flat surface by top support frame crossbeam 6 and top support frame stringer 7, institute
Top support frame crossbeam 6 is stated along bridge to 1 top of upright bar for being fixed on each column, 7 direction across bridge of top support frame stringer is fixed on
On top support frame crossbeam 6,7 upper end of top support frame stringer is provided with jack 8, the jack 8 and top support frame stringer 7
Between be equipped with jack bearing beam 9, the interim bearing beam 10 of a pair of of arch rib, the top are symmetrically arranged at left and right sides of the jack 8
Direction across bridge is equipped with channel steel 11 between portion's yoke crosstie 6, and the channel steel 11 is with top support frame crossbeam 6 in such a way that bolt docks
It is fixedly connected, 11 upper surface of channel steel is equipped with steel mesh piece 12, after dress is taken in column completion, by the top in transformation platform 4
It is fixed at the top of yoke crosstie 6 and upright bar 1, and jack 8 is fixed by top support frame stringer 7 and the interim bearing beam 10 of arch rib, encircle
When rib is installed, by truck crane by the rib-hoisting of each segment to the interim bearing beam 10 of the corresponding arch rib of installed position, incite somebody to action
It is fixed temporarily between the arch rib of each segment and by connecting plate between two sides arch rib and stull to guarantee its stabilization, passes through thousand
Jin pushes up bearing beam 9 to increase the Maximum Contact area of jack 8 Yu lower end top support frame stringer 7, thus when jack 8 is pressurized,
With biggish contact surface by 8 load of jack by the conduction of the pretty space of jack bearing beam 9 to top support frame stringer 7, scene is applied
Worker person can finely tune the arch rib height of each segment on transformation platform 4 by using jack 8, and that completes arch rib takes dress.
In conclusion the top support frame crossbeam 6, top support frame stringer 7, jack bearing beam 9 and the interim bearing beam of arch rib
10 be Two bors d's oeuveres or Three kinds of hors d'oeuvres I-steel, itself I-steel is ensured at light aspect, while with cancelled structure wind resistance
Can be strong, convenient for taking dress the advantages of, support frame structure intensity is improved, while facilitating the installation of support frame.
Between the column that the upright bar 1 and lacing 2 are constituted by along bridge to contacting truss 3 and direction across bridge contacts truss 5 and connects
It connects, and is all made of space truss form to the connection that connection truss 3 and direction across bridge contact truss 5 and column along bridge, and install
When upright bar 1, column bottom end be fixedly connected with job location body frame, between lattice column by along bridge to connection 3 He of truss
Direction across bridge contacts truss 5 and connects, and to guarantee the monolithic stability of transverse girder between arch rib frame, and contacts truss and uses space truss form, makes
It has enough rigidity.
8 structure type of jack is screw jack 8, and 8 upper end of jack and arch rib lower surface are tight when installation
Closely connected conjunction, is arranged jack 8 on top support frame stringer 7, and construction personnel can accurately adjust each segment arch on transformation platform
The absolute altitude of rib improves the installation accuracy of arch rib.
The channel steel 11 is uniformly layed in 6 lower flange of two sides top support frame crossbeam in such a way that direction across bridge, spacing is 650mm
Position, and 11 upper surface of channel steel is fixedly connected with steel mesh piece 12, by setting up for steel mesh piece 12, provides safety to construction personnel
Reliable operation side, while being also avoided that falling object from high altitude threatens to lower section personnel.
The instrument wherein applied in the present invention:
The model JRR-2006 of jack;
1 upright bar used in above-described embodiment, 2 lacings, 3 contact truss, 6 to connection truss, 4 transformation platforms, 5 direction across bridge along bridge
Top support frame crossbeam, 7 top support frame stringers, 8 jack, 9 jack bearing beams, the interim bearing beam of 10 arch ribs, 11 channel steels, 12 steel mesh pieces
It can be bought by market or private customization obtains.
Above-described embodiment is served only for that invention is further explained to specific descriptions of the invention, should not be understood as
Limiting the scope of the present invention, the technician of this field make the present invention according to the content of foregoing invention some non-
The modifications and adaptations of essence are fallen within the scope of protection of the present invention.
Claims (5)
1. a kind of arch rib of long-span steel arch bridge assembly falsework, including upright bar (1) and lacing (2), lacing (2) weldering
It is connected at left and right sides of column (1), it is characterised in that: the upright bar (1) is formed with lacing (2) by the combination of lattice
The column that column, the upright bar (1) and lacing (2) are composed is provided with X between 16 groups and column, Y direction difference altogether
A pair of suitable bridge is provided with to contact truss (5) to connection truss (3) and direction across bridge, what the upright bar (1) was composed with lacing (2)
It is arranged with multiple groups node section consistent in length in pillar construction, is fixed between upright bar (1) node section by being welded in bolt
Mode be fixed, the lacing (2) is connected and fixed on upright bar (1) each node section by the setting of oblique diagonal form
Place;The suitable bridge contacts truss (5) to connection truss (3) and direction across bridge and passes through the rectangular frame structure of column-type, the suitable bridge
It contacts to connection truss (3) with direction across bridge and is fixed by way of truss (5) is docked bolt with upright bar (1);The upright bar (1)
With lacing (2) constitute column top be provided with transformation platform (4), the transformation platform (4) by top support frame crossbeam (6) with
Top support frame stringer (7) constitutes flat surface, and the top support frame crossbeam (6) is pushed up along bridge to the upright bar (1) for being fixed on each column
Portion, top support frame stringer (7) direction across bridge are fixed on top support frame crossbeam (6), and top support frame stringer (7) upper end is set
It is equipped with jack (8), is equipped with jack bearing beam (9) between the jack (8) and top support frame stringer (7), it is described very heavy
It is symmetrically arranged with the interim bearing beam of a pair of of arch rib (10) at left and right sides of top (8), direction across bridge is installed between the top support frame crossbeam (6)
Have channel steel (11), the channel steel (11) is fixedly connected by way of being docked with top support frame crossbeam (6) bolt, the channel steel
(11) upper surface is equipped with steel mesh piece (12).
2. a kind of arch rib of long-span steel arch bridge assembly falsework according to claim 1, it is characterised in that: described
Top support frame crossbeam (6), top support frame stringer (7), jack bearing beam (9) and the interim bearing beam of arch rib (10) are Two bors d's oeuveres or three
Spell I-steel.
3. a kind of arch rib of long-span steel arch bridge assembly falsework according to claim 1, it is characterised in that: described
By being connect along bridge to connection truss (3) and direction across bridge connection truss (5) between the column that upright bar (1) is constituted with lacing (2), and
When being all made of space truss form to the connection that connection truss (3) and direction across bridge contact truss (5) and column along bridge, and installing
Upright bar (1), column bottom end are fixedly connected with job location body frame.
4. a kind of arch rib of long-span steel arch bridge assembly falsework according to claim 1, it is characterised in that: described
Jack (8) structure type is screw jack (8), and jack (8) upper end is fitted closely with arch rib lower surface when installation.
5. a kind of arch rib of long-span steel arch bridge assembly falsework according to claim 1, it is characterised in that: described
Channel steel (11) is uniformly layed in two sides top support frame crossbeam (6) lower flange position in such a way that direction across bridge, spacing is 650mm, and
Channel steel (11) upper surface is fixedly connected with steel mesh piece (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910026549.0A CN110205933A (en) | 2019-01-11 | 2019-01-11 | A kind of arch rib of long-span steel arch bridge assembly falsework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910026549.0A CN110205933A (en) | 2019-01-11 | 2019-01-11 | A kind of arch rib of long-span steel arch bridge assembly falsework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110205933A true CN110205933A (en) | 2019-09-06 |
Family
ID=67784969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910026549.0A Withdrawn CN110205933A (en) | 2019-01-11 | 2019-01-11 | A kind of arch rib of long-span steel arch bridge assembly falsework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110205933A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827574A (en) * | 2020-07-08 | 2020-10-27 | 浙江东南网架股份有限公司 | Construction method of giant inclined truss structure of high-rise building |
CN112323636A (en) * | 2020-10-29 | 2021-02-05 | 中铁一局集团有限公司 | Arch rib support for assembling construction of large-span steel pipe arch bridge |
CN113756203A (en) * | 2021-09-27 | 2021-12-07 | 中铁十九局集团第五工程有限公司 | Bridge construction process |
CN113789712A (en) * | 2021-09-17 | 2021-12-14 | 上海建工一建集团有限公司 | Longitudinal beam and arch rib forming control method of steel arch bridge |
CN114592429A (en) * | 2021-12-23 | 2022-06-07 | 安徽省公路桥梁工程有限公司 | Tied arch bridge arch rib and wind brace auxiliary splicing construction system and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102364012A (en) * | 2011-05-26 | 2012-02-29 | 浙江精工钢结构有限公司 | Method for expanding existing large-span truss |
CN106988224A (en) * | 2017-05-17 | 2017-07-28 | 广州市市政工程机械施工有限公司 | The arch rib installation system and installation method of bridge |
CN107178042A (en) * | 2017-05-31 | 2017-09-19 | 中国二十冶集团有限公司 | A kind of construction method of large span inverted-triangular CFST Arch Bridge steel arch |
CN108867391A (en) * | 2018-07-20 | 2018-11-23 | 中国水利水电第七工程局有限公司 | A kind of construction of tubular arch and paving frame parallel operations construction method |
CN209538044U (en) * | 2019-01-11 | 2019-10-25 | 湖南金海钢结构有限公司 | A kind of arch rib of long-span steel arch bridge assembly falsework |
-
2019
- 2019-01-11 CN CN201910026549.0A patent/CN110205933A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102364012A (en) * | 2011-05-26 | 2012-02-29 | 浙江精工钢结构有限公司 | Method for expanding existing large-span truss |
CN106988224A (en) * | 2017-05-17 | 2017-07-28 | 广州市市政工程机械施工有限公司 | The arch rib installation system and installation method of bridge |
CN107178042A (en) * | 2017-05-31 | 2017-09-19 | 中国二十冶集团有限公司 | A kind of construction method of large span inverted-triangular CFST Arch Bridge steel arch |
CN108867391A (en) * | 2018-07-20 | 2018-11-23 | 中国水利水电第七工程局有限公司 | A kind of construction of tubular arch and paving frame parallel operations construction method |
CN209538044U (en) * | 2019-01-11 | 2019-10-25 | 湖南金海钢结构有限公司 | A kind of arch rib of long-span steel arch bridge assembly falsework |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827574A (en) * | 2020-07-08 | 2020-10-27 | 浙江东南网架股份有限公司 | Construction method of giant inclined truss structure of high-rise building |
CN112323636A (en) * | 2020-10-29 | 2021-02-05 | 中铁一局集团有限公司 | Arch rib support for assembling construction of large-span steel pipe arch bridge |
CN112323636B (en) * | 2020-10-29 | 2022-05-13 | 中铁一局集团有限公司 | Arch rib support for assembling construction of large-span steel pipe arch bridge |
CN113789712A (en) * | 2021-09-17 | 2021-12-14 | 上海建工一建集团有限公司 | Longitudinal beam and arch rib forming control method of steel arch bridge |
CN113789712B (en) * | 2021-09-17 | 2023-10-13 | 上海建工一建集团有限公司 | Longitudinal beam and arch rib forming control method of steel arch bridge |
CN113756203A (en) * | 2021-09-27 | 2021-12-07 | 中铁十九局集团第五工程有限公司 | Bridge construction process |
CN114592429A (en) * | 2021-12-23 | 2022-06-07 | 安徽省公路桥梁工程有限公司 | Tied arch bridge arch rib and wind brace auxiliary splicing construction system and construction method |
CN114592429B (en) * | 2021-12-23 | 2023-12-08 | 安徽省公路桥梁工程有限公司 | Auxiliary splicing construction system and construction method for tied arch bridge arch rib and air bracing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110205933A (en) | A kind of arch rib of long-span steel arch bridge assembly falsework | |
CN107012949B (en) | A kind of method for improving of large-span steel vestibule | |
CN106836498B (en) | Hoisting construction method for steel truss of grand stand roof of super-large span stadium | |
CN103243654B (en) | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method | |
CN102936962A (en) | Construction method of slanting cantilever steel structure supported by temporary steel frame | |
CN111794119B (en) | Temporary supporting system and hoisting method for basket type steel box tie bar arch | |
CN103046754A (en) | Construction method for abutting high-altitude long-span roof pipe trusses by adjustable temporary support | |
CN209538044U (en) | A kind of arch rib of long-span steel arch bridge assembly falsework | |
CN105386411A (en) | Multifunctional portal device of suspension bridge pillar top | |
CN106087765A (en) | High pier pier top Cast-in-place concrete bracket precompressed charger | |
CN108842954A (en) | A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing | |
CN207159827U (en) | No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge | |
CN109653517B (en) | Multidirectional unloading system and construction method for assembling steel corridor by using same | |
CN103147405B (en) | Method for erecting steel girder of cable-stayed bridge with diagonal main trusses | |
CN110905261A (en) | Ultra-large-span closed stock ground structure for multiple material piling and taking machines and construction method thereof | |
CN205205685U (en) | Span wire pier is function portal device at most | |
CN107326812B (en) | Installation and positioning structure for No. 1 plate in No. 0 block of corrugated steel web bridge and operation method | |
CN102877657B (en) | Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method | |
CN208734102U (en) | A kind of large-span truss assembly sliding construction falsework | |
CN105274940B (en) | A kind of bridge arch rib integral installation method | |
CN206337555U (en) | Steel reinforcement cage support and steel reinforcement cage erecting device | |
CN112049253B (en) | Truss body and concrete structure connecting node, truss and method | |
CN205369948U (en) | Lifting device for daylighting top is used for installing | |
CN210658019U (en) | Accurate adjusting and temporary fixing device for verticality of main beam of tied arch bridge with double-layer steel truss beams | |
CN207419287U (en) | A kind of steel construction combined member for being used to replace bridge pad |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190906 |
|
WW01 | Invention patent application withdrawn after publication |