CN110195727A - It is a kind of for executing the pull rod air valve switch of pneumatic element - Google Patents

It is a kind of for executing the pull rod air valve switch of pneumatic element Download PDF

Info

Publication number
CN110195727A
CN110195727A CN201910613385.1A CN201910613385A CN110195727A CN 110195727 A CN110195727 A CN 110195727A CN 201910613385 A CN201910613385 A CN 201910613385A CN 110195727 A CN110195727 A CN 110195727A
Authority
CN
China
Prior art keywords
pull rod
sealing
air valve
pneumatic element
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910613385.1A
Other languages
Chinese (zh)
Other versions
CN110195727B (en
Inventor
翁阿雨
林清福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUHUAN YIYOU ELECTRONICS Co Ltd
Original Assignee
YUHUAN YIYOU ELECTRONICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUHUAN YIYOU ELECTRONICS Co Ltd filed Critical YUHUAN YIYOU ELECTRONICS Co Ltd
Priority to CN201910613385.1A priority Critical patent/CN110195727B/en
Publication of CN110195727A publication Critical patent/CN110195727A/en
Application granted granted Critical
Publication of CN110195727B publication Critical patent/CN110195727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D05SEWING; EMBROIDERING; TUFTING
    • D05BSEWING
    • D05B65/00Devices for severing the needle or lower thread
    • DTEXTILES; PAPER
    • D05SEWING; EMBROIDERING; TUFTING
    • D05BSEWING
    • D05B69/00Driving-gear; Control devices
    • D05B69/08Fluid drives, e.g. pneumatic
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B13/00Details of servomotor systems ; Valves for servomotor systems
    • F15B13/02Fluid distribution or supply devices characterised by their adaptation to the control of servomotors
    • F15B13/06Fluid distribution or supply devices characterised by their adaptation to the control of servomotors for use with two or more servomotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K11/00Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves
    • F16K11/10Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit
    • F16K11/14Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit operated by one actuating member, e.g. a handle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/44Mechanical actuating means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/44Mechanical actuating means
    • F16K31/62Pedals or like operating members, e.g. actuated by knee or hip

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Multiple-Way Valves (AREA)

Abstract

It is a kind of for executing the pull rod air valve switch of pneumatic element, including fixing seat, the fixed link being connected with fixing seat, side wall is equipped with a mounting groove on the left of the fixing seat;The fixing seat upper surface is equipped with a upper slide opening to connect with mounting groove, and fixing seat lower surface is equipped with a lower slide opening coaxial with upper slide opening;A matched pull rod is equipped in the mounting groove;The pull rod upper end is pierced by upwards outside supreme slide opening, and pull rod lower end is pierced by downwards to outside lower slide opening;The pull rod is equipped with a upper fixing sleeve for being located at fixing seat upper surface, and pull rod is equipped with a middle fixing sleeve being located in mounting groove, and pull rod is equipped with one and is located at and the lower fixing sleeve below fixing seat.Pull rod air valve switch for executing pneumatic element of the invention just can operate air valve switch, guarantee working efficiency, and can control multiple execution pneumatic elements without going to operate by hand.

Description

It is a kind of for executing the pull rod air valve switch of pneumatic element
Technical field
It is especially a kind of for executing the pull rod air valve switch of pneumatic element the present invention relates to a kind of air valve switch.
Background technique
Air valve switch is a kind of for controlling the device for executing pneumatic element air inlet or outlet, when execution pneumatic element and gas When source is connected, gas source then can be always towards conveying high-pressure gas in execution pneumatic element, and air valve switch then can be to conveying It is truncated to the high pressure gas executed in pneumatic element, when high pressure gas is truncated, executes pneumatic element and reset, work as high pressure When gas is delivered in execution pneumatic element, pneumatic element actuation is executed, therefore air valve switch can be dynamic to pneumatic element is executed It is controlled, in actual use, executes pneumatic element and be usually used on the cutting facility of sewing machine, it is pneumatic first when executing When part actuation, the cutter of cutting facility can then be cut the end of a thread, but traditional air valve switch then needs to be pulled outwardly by hand Dynamic mode just can be carried out operation, and when cutting the end of a thread, then need the personnel of sewing with the hands to be pressed on cloth, if wherein one Hand goes to pull air valve switch, and cloth uneven situation easily occurs, the end of a thread is caused to shift, and the quality for causing the end of a thread cropped is not It is good, and this pulling mode, cause sewing personnel to need to stop sewing action and could operate to air valve switch, serious shadow Ring sewing efficiency.
Traditional air valve switch can only control execution pneumatic element corresponding thereto, can only play the effect of single control Fruit then needs that other air valve switch are in addition arranged, causes if needing to control two or more execution pneumatic element Increased costs, and when starting multiple execution pneumatic elements, then it needs to control multiple air valve switch, not only seems extremely onerous, And as device quantity becomes more, the probability that equipment goes wrong can then become larger, and influence the service performance of equipment.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of for executing the pull rod air valve switch of pneumatic element, it is not necessarily to It goes to operate by hand, just air valve switch can be operated, guarantee working efficiency, and the pneumatic member of multiple execution can be controlled Part.
The present invention solves the technical solution that above-mentioned technical problem uses are as follows:
The present invention discloses a kind of for executing the pull rod air valve switch of pneumatic element, is connected including fixing seat, with fixing seat Fixed link, it is characterised in that: side wall is equipped with a mounting groove on the left of the fixing seat;The fixing seat upper surface is equipped with one and installation The upper slide opening that slot connects, fixing seat lower surface are equipped with a lower slide opening coaxial with upper slide opening;Be equipped in the mounting groove one with Its pull rod to match;The pull rod upper end is pierced by upwards outside supreme slide opening, and pull rod lower end is pierced by downwards to outside lower slide opening;It is described Pull rod is equipped with a upper fixing sleeve for being located at fixing seat upper surface, and pull rod is equipped with a middle fixing sleeve being located in mounting groove, draws Bar is equipped with one and is located at and the lower fixing sleeve below fixing seat;On the upside of the middle fixing sleeve and mounting groove between cell wall, middle fixation Upper spring, lower spring are respectively equipped on the downside of set and mounting groove between side wall, upper spring and lower spring are all sheathed on outside pull rod;It is described The top and lower part of fixing seat right sidewall are equipped with mutually symmetrical gas valve starter;The gas valve starter includes being set to Inflator in fixing seat right sidewall, upside inflator nozzle right side are hinged with what a upper surface fitted with upper fixing sleeve lower surface Pressing piece, downside inflator nozzle lower section are equipped with an extruding seat being fixed on pull rod, and lower fixing sleeve, which is located at, to be squeezed above seat;It is described Gas valve starter includes exhaust plug, and upside exhaust plug is pierced by upside gas valve starter upwards and presses under pressing piece Surface, downside exhaust plug, which is pierced by downwards downside gas valve starter and is pressed on, squeezes seat upper surface.
The first mounting base is equipped in the inflator nozzle, bottom is equipped with second to match with the first mounting base in inflator cylinder Mounting base;First mounting base is equipped with a movable span, is equipped with the exhaust chamber to connect with movable span in the first mounting base; Exhaust chamber's diameter is greater than movable bore dia, and a limited step is formed between exhaust chamber and movable span;The exhaust valve Core is set in movable span, and exhaust plug one end stretches in exhaust chamber and is equipped with a stop collar to match with limited step; One is equipped in second mounting base to supply gas chamber, the second mounting base one end end face opposite with exhaust plug equipped with one with supply gas The injection well that chamber connects;A sealing column is equipped in the exhaust chamber, sealing column diameter is less than bore dia of supplying gas;It is described close Envelope column lower end stretches in plenum room by injection well and is equipped with a sealing plate, and sealing board diameter is greater than bore dia of supplying gas;Institute It states and is equipped with the first resetting apparatus between exhaust plug and the second mounting base, the second resetting apparatus is arranged with outside sealing column;The row The gas valve core one end end face opposite with sealing column is equipped with a gas vent;The exhaust plug is pierced by one end of movable span and is equipped with one The venthole to connect with gas vent;The gas vent one end aperture opposite with sealing column is equipped with a seal groove, and seal groove is straight Diameter is greater than sealing column diameter;A seal receptacle is equipped in the seal groove;What the seal receptacle connected equipped with one with gas vent Venthole, ventilation bore dia are less than sealing column diameter;There is activity spacing between the seal receptacle and sealing column;Outside the inflator The gas source connector to connect equipped with one with chamber of supplying gas, inflator are externally provided with the execution pneumatic element that one connects with exhaust chamber and connect Head.
A detent step is formed between the stop collar and exhaust plug;First resetting apparatus includes being set to the second peace Fill the detent ring on seat one end end face opposite with exhaust plug;The first bullet is equipped between second mounting base and exhaust plug Spring;First spring one end is stuck on detent step, and the first spring other end is stuck in outside detent ring;Second resetting apparatus Annular groove including being set to the sealing column one end outer wall opposite with exhaust plug;It is equipped in the annular groove and matches with it Circlip;Second spring is equipped between the circlip and the second mounting base, second spring is sheathed on outside sealing column.
It is connected between the sealing column and sealing plate by rotary table sealing;The rotary table sealing diameter is from sealing column Gradually it is incremented by towards sealing plate direction.
The pressing piece left end is U-shaped, and pressing piece itself forms a U-type groove, and pull rod is stuck in U-type groove.
Fixed set, middle fixing sleeve are all equipped with several the first screw holes being circularly and evenly distributed on lower fixing sleeve;Institute It states and is bolted with matched first screw in the first screw hole, the first screw end is pressed on pull rod.
The extruding seat side is equipped with the second screw hole;Second screw hole is bolted with matched second screw, the Two-screw end is pressed on pull rod.
The outer wall of first mounting base and the second mounting base is all equipped with a caulking groove in a ring;Be equipped in the caulking groove with Its O-ring to match.
A sealing ring is all arranged with outside the exhaust plug and rotary table sealing;It is close that the exhaust plug outer wall is equipped with first Step is sealed, movable span inner wall is equipped with the second sealed step being located at right above the first sealed step, is sheathed on outside exhaust plug Sealing ring is between the first sealed step and the second sealed step.
The fixing seat right sidewall is equipped with an arc groove to match with inflator;The arc groove cell wall is equipped with Several card holes to connect with mounting groove;Card hole lower part side side wall is equipped with a snap-gauge, has between snap-gauge and card hole hole wall There is inlay card spacing;The snap-gauge side opposite with card hole hole wall is equipped with the card slot that one is in arcuation;The inflator outer wall is equipped with The corresponding connecting plate in several card hole positions;The connecting plate passes through inlay card spacing and extends a pressure to fit with snap-gauge Plate, it is L-shaped between pressing plate and connecting plate;The connecting plate is equipped with an arc convex to match with card slot.
The beneficial effects of the present invention are:
It compared with prior art, can be by pull rod control using the pull rod air valve switch for executing pneumatic element of structure of the invention Gas valve starter processed, when pull rod moves up, can open downside air valve opening and closing dress to control the actuation for executing pneumatic element It sets, when pull rod moves down, upside gas valve starter can be opened, and upside gas valve starter and downside gas valve starter Two different execution pneumatic elements can be connected, therefore the movement of pull rod can control opening for two execution pneumatic elements simultaneously Control cost is effectively reduced, and with the reduction of component it is not necessary that corresponding air valve switch is in addition arranged in closed state, can be effective Error rate is reduced, service performance is enabled to be protected, and the movement of pull rod just can control by foot, be operated without both hands, When staff is in sewing work, both hands can be always ensured that the smooth of cloth, thus guarantee the location of the end of a thread, Once executing pneumatic element to open, the cutting facility for being performed pneumatic element control can accurately be wiped out the end of a thread, guarantee to cut Line mass, and during the entire process of trimming, it rests without staff, Zhi Xu foot participates in, to guarantee working efficiency.
Detailed description of the invention
Fig. 1 is the sectional view of pull rod air valve switch of the present invention for executing pneumatic element;
Fig. 2 is the sectional view of the part of pull rod air valve switch of the present invention for executing pneumatic element;
Fig. 3 is the perspective view of pull rod air valve switch of the present invention for executing pneumatic element;
Fig. 4 is the structural schematic diagram of pull rod air valve switch of the present invention for executing pneumatic element;
Fig. 5 is the enlarged drawing in the portion A of Fig. 4.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments:
Please refer to Fig. 1 to Fig. 5, the present invention provide it is a kind of for executing the pull rod air valve switch of pneumatic element, including fixing seat 1, The fixed link 2 being connected with fixing seat 1, the 1 left side side wall of fixing seat are equipped with a mounting groove 3;1 upper surface of fixing seat is set There is a upper slide opening 4 to connect with mounting groove 3,1 lower surface of fixing seat is equipped with a lower slide opening 5 coaxial with upper slide opening 4;The peace A matched pull rod 6 is equipped in tankage 3;6 upper end of pull rod is pierced by upwards outside supreme slide opening 4, and 6 lower end of pull rod is downward It is pierced by outside lower slide opening 5;The pull rod 6 is equipped with a upper fixing sleeve 7 for being located at 1 upper surface of fixing seat, and pull rod 6 is equipped with one In the middle fixing sleeve 8 in mounting groove 3, pull rod 6 is equipped with one and is located at and the lower fixing sleeve 9 below fixing seat 1;The middle fixing sleeve Upper spring 10, lower spring are respectively equipped between 8 and 3 upside cell wall of mounting groove, between 3 downside side wall of middle fixing sleeve 8 and mounting groove 11, upper spring 10 and lower spring 11 are all sheathed on outside pull rod 6;The top and lower part of 1 right sidewall of fixing seat are equipped with each other Symmetrical gas valve starter;The gas valve starter includes the inflator 12 in 1 right sidewall of fixing seat, upside inflator The pressing piece 13 that a upper surface and upper 7 lower surface of fixing sleeve fit, 12 nozzle of downside inflator lower section are hinged on the right side of 12 nozzles It is fixed on extruding seat 14 on pull rod 6 equipped with one, lower fixing sleeve 9, which is located at, squeezes 14 top of seat;The gas valve starter includes Exhaust plug 15, upside exhaust plug 15 are pierced by upside gas valve starter upwards and press on 13 lower surface of pressing piece, downside Exhaust plug 15, which is pierced by downwards downside gas valve starter and is pressed on, squeezes 14 upper surface of seat.
The first mounting base 16 is equipped in 12 nozzle of inflator, 12 interior bottoms of inflator are equipped with and 16 phase of the first mounting base The second mounting base 17 matched;First mounting base 16 is equipped with a movable span 18, is equipped in the first mounting base 16 and movable span 18 exhaust chamber 19 to connect;19 diameter of exhaust chamber is greater than 18 diameter of movable span, exhaust chamber 19 and movable span 18 Between form a limited step 20;The exhaust plug 15 is set in movable span 18, and 15 one end of exhaust plug stretches to discharge chamber In room 19 and it is equipped with a stop collar 21 to match with limited step 20;One is equipped in second mounting base 17 to supply gas chamber 22, the second mounting base 17 one end end face opposite with exhaust plug 15 is equipped with an injection well 23 to connect with chamber 22 of supplying gas; A sealing column 24 is equipped in the exhaust chamber 19,24 diameter of sealing column is less than 23 diameter of injection well;24 lower end of sealing column It is stretched to by injection well 23 and supplies gas in chamber 22 and be equipped with a sealing plate 25,25 diameter of sealing plate is greater than 23 diameter of injection well; It is equipped with the first resetting apparatus between the exhaust plug 15 and the second mounting base 17, the second reset dress is arranged with outside sealing column 24 It sets;The exhaust plug 15 one end end face opposite with sealing column 24 is equipped with a gas vent 26;The exhaust plug 15 be pierced by One end of movable span 18 is equipped with a venthole 27 to connect with gas vent 26;The gas vent 26 it is opposite with sealing column 24 one Stomidium mouth is equipped with a seal groove 28, and 28 diameter of seal groove is greater than 24 diameter of sealing column;A seal receptacle is equipped in the seal groove 28 29;The seal receptacle 29 is equipped with a venthole 30 to connect with gas vent 26, and it is straight that 30 diameter of venthole is less than sealing column 24 Diameter;There is activity spacing 31 between the seal receptacle 29 and sealing column 24;The inflator 12 is externally provided with one and 22 phase of chamber of supplying gas The gas source connector 32 of perforation, inflator 12 are externally provided with an execution pneumatic element connector 33 to connect with exhaust chamber 19.
A detent step 34 is formed between the stop collar 21 and exhaust plug 15;First resetting apparatus includes being set to Detent ring 35 on second mounting base 17 one end end face opposite with exhaust plug 15;Second mounting base 17 and exhaust plug The first spring 36 is equipped between 15;Described first spring, 36 one end is stuck on detent step 34, and 36 other end of the first spring is stuck in Outside detent ring 35;Second resetting apparatus includes set on the annular recessed of one end outer wall opposite with exhaust plug 15 of sealing column 24 Slot 37;Matched circlip 38 is equipped in the annular groove 37;It is equipped between the circlip 38 and the second mounting base 17 Second spring 39, second spring 39 are sheathed on outside sealing column 24.
It is connected between the sealing column 24 and sealing plate 25 by rotary table sealing 40;40 diameter of rotary table sealing Gradually it is incremented by from sealing column 24 towards 25 direction of sealing plate.
13 left end of pressing piece is U-shaped, and pressing piece 13 itself forms a U-type groove 41, and pull rod 6 is stuck in U-type groove 41.
Fixed set 7, middle fixing sleeve 8 are all equipped with several the first screw holes being circularly and evenly distributed on lower fixing sleeve 9 42;Matched first screw 43 is bolted in first screw hole 42,43 end of the first screw is pressed on pull rod 6.
14 side of extruding seat is equipped with the second screw hole 44;Second screw hole 44 is bolted with matched second spiral shell Silk 45,45 end of the second screw is pressed on pull rod 6.
The outer wall of first mounting base 16 and the second mounting base 17 is all equipped with a caulking groove 46 in a ring;The caulking groove 46 It is interior to be equipped with matched O-ring 47.
A sealing ring 48 is all arranged with outside the exhaust plug 15 and rotary table sealing 40;15 outer wall of exhaust plug is set There is the first sealed step 49,18 inner wall of movable span is equipped with the second sealed step 50 being located at right above the first sealed step 49, set Sealing ring 48 outside exhaust plug 15 is between the first sealed step 49 and the second sealed step 50.
1 right sidewall of fixing seat is equipped with an arc groove 51 to match with inflator 12;51 slot of arc groove Wall is equipped with several card holes 52 to connect with mounting groove 3;The 52 lower part side side wall of card hole is equipped with a snap-gauge 53, snap-gauge 53 There is inlay card spacing 54 between 52 hole wall of card hole;The snap-gauge 53 side opposite with 52 hole wall of card hole is equipped with one in arcuation Card slot 55;12 outer wall of inflator is equipped with the corresponding connecting plate 56 in several 52 positions of card hole;The connecting plate 56 passes through card Embedding spacing 54 simultaneously extends a pressing plate 57 to fit with snap-gauge 53, L-shaped between pressing plate 57 and connecting plate 56;The connecting plate 56 are equipped with an arc convex 58 to match with card slot 55.
Application method of the invention is as follows:
Before using pull rod air valve switch, hose can be first passed through, gas source connector 32 is connected with gas source, pneumatic element will be executed Connector 33 is connected with pneumatic element is executed, and fixing seat 1 is then fixed on sewing device or other equipment by fixed link 2 On, and staff can be foot-operated hinged one of 6 lower end of pull rod, is displaced pull rod by trampling foot-operated mode, passes through foot After controlling the movement of pull rod 6, it just can vacate both hands and do other things, therefore only need to just can control pull rod using originally idle foot Air valve switch will not cause any interference to original work, to guarantee working efficiency.
When trampling foot-operated, pull rod 6 can then be moved down along the track of upper slide opening 4 and lower slide opening 5, and upper fixing sleeve 7 With middle fixing sleeve 8 all be set to pull rod 6 on, upper fixing sleeve 7 moves down therewith with middle fixing sleeve 8, when fixing sleeve 8 moves down in the middle, in consolidate Surely set 8 can then squeeze lower spring 11, and when upper fixing sleeve 7 moves down, upper fixing sleeve 7 then can downwards be carried out pressing piece 13 It squeezes, pressing piece 13 is rotated down centered on itself hinge joint and is squeezed to the exhaust plug 15 to fit with it at this time Pressure, when the pressing of the depressed part 13 of exhaust plug 15, exhaust plug 15 then can be in retraction to movable span 18 and towards discharge chamber It is moved in room 19, the activity spacing 31 between exhaust plug 15 and sealing column 24 gradually becomes smaller this moment, and final seal receptacle 29 then can It is pressed on 24 end face of sealing column, 24 end face of sealing column, which can then cover the venthole 30 on seal receptacle 29, to be sealed, exhaust chamber 19 can not be connected by activity spacing 31, venthole 30 and gas vent 26, as exhaust plug 15 continues towards exhaust plug It is moved in 15, seal receptacle 29 can then squeeze sealing column 24, make sealing column 24 towards moving in chamber 22 of supplying gas, due to close It seals 24 diameter of column and is less than 23 diameter of injection well, 25 diameter of sealing plate is greater than 23 diameter of injection well, therefore when sealing column 24 is goed deep into extremely When supplying gas in chamber 22, sealing plate 25, which no longer covers injection well 23, to be sealed, and exhaust chamber 19 passes through injection well 23 and plenum Room 22 connects, and gas source connector 32 is connected by hose with gas source, and the high pressure gas of gas source riddles chamber of supplying gas always In 22, when exhaust chamber 19 penetrates through each other with chamber 22 of supplying gas, high pressure gas can then enter exhaust chamber 19 at the first time It is interior, it then into executing in pneumatic element connector 33, and under the conveying of hose, enters and executes in pneumatic element, when holding It, then can be to the execution accurate actuation of pneumatic element when entering appropriate high pressure gas in row pneumatic element.
When exhaust plug 15 is mobile towards 1 direction of the second fixing seat, the first spring 36 is compressed, when sealing column 24 towards It supplies gas when moving in chamber 22, second spring 39 is compressed, and is if desired closed when executing pneumatic element, need to only be unclamped and be articulated with drawing 6 lower end of bar is ridden, and when pull rod 6 loses external force, the elastic force that compressed lower spring 11 generates can then be such that pull rod resets, The first spring 36 then can be such that exhaust plug 15 resets by the elastic force that compression generates at the same time, and second spring 39 is generated by compression Elastic force can then be such that sealing column 24 resets, and when sealing column 24 resets, the sealing plate 25 of 24 end of sealing column is again by injection well 23 Masking sealing, exhaust chamber 19 no longer penetrates through each other with chamber 22 of supplying gas, when the reset of exhaust plug 15, exhaust plug 15 with it is close Seal has activity spacing 31 again between column 24, the venthole 30 on the no longer plug for seal seat 29 of sealing column 24, exhaust chamber 19 It can then be connected by activity spacing 31, venthole 30 and gas vent 26, executing the gas inside pneumatic element can then pass through Hose, which enters, to be executed in pneumatic element connector 33, and exhaust chamber 19, activity spacing 31, the entrance of venthole 30 are then passed sequentially through Into gas vent 26, finally it is discharged outside to from venthole 27, when executing the gas in pneumatic element can smoothly be discharged, Just it is able to achieve the reset for executing pneumatic element.
When pressing piece 13 moves down pressing by upper fixing sleeve 7, it can be realized and be executed pneumatically by the gas valve starter of upside Element opens or closes, when pull rod 6 drives extruding seat 14 to move up the progress of exhaust plug 15 to the gas valve starter of downside When extruding, the actuation for executing pneumatic element can be controlled by the gas valve starter of downside, and downside air valve opening and closing dress The control principle set is consistent with the above-mentioned control principle of upside gas valve starter, if wanting to realize moving up for pull rod, need to only lead to Crossing foot just can be realized foot-operated upper lift.
In summary it is found that the present invention can control gas valve starter by pull rod 6, pneumatic element is executed to control Actuation can open downside gas valve starter when pull rod 6 moves up, and when pull rod moves down, can open upside air valve opening and closing Device, and upside gas valve starter and downside gas valve starter the execution pneumatic element that can to connect two different, therefore The movement of pull rod can control the open/close states of two execution pneumatic elements simultaneously, it is not necessary that corresponding air valve switch is in addition arranged, Control cost is effectively reduced, and with the reduction of component, error rate can be effectively reduced, service performance is enabled to be protected, and draws The movement of bar 6 just can control by foot, be operated without both hands, when staff is in sewing work, both hands energy It is enough always ensured that the smooth of cloth, to guarantee the location of the end of a thread, is opened once executing pneumatic element, be performed pneumatic member The cutting facility of part control can accurately wipe out the end of a thread, guarantee trimming quality, and during the entire process of trimming, it is not necessarily to work Personnel are rested, and Zhi Xu foot participates in, to guarantee working efficiency.
In actual use, upside gas valve starter can be installed independently with downside gas valve starter, It can install simultaneously, be suitable for different operating conditions.
It is connected between sealing column 24 and sealing plate 25 by rotary table sealing 40,40 diameter of rotary table sealing is from sealing column 24 are gradually incremented by towards 25 direction of sealing plate, and the sealing in face and face can be transformed into line and line by the presence of rotary table sealing 40 Sealing can more quickly open injection well 23 when sealing column 24 is mobile, guarantee ventilation efficiency, to guarantee high pressure gas energy It is enough to be entered in exhaust chamber 19 from chamber 22 of supplying gas at the first time, it quickly opens and executes pneumatic element, guarantee to open efficiency.
13 left end of pressing piece is U-shaped, and pressing piece 13 itself forms U-type groove 41, and pull rod 6 is stuck in U-type groove 41, pull rod 6 Presence can play guiding role, guarantee that pressing piece 13 can be stable moves down, avoid the occurrence of the pressing piece 13 of lateral deviation by by Press the situation for causing 13 service life of pressing piece shorter.
Upper fixing sleeve 7, middle fixing sleeve 8 are all equipped with several the first screw holes 42 being circularly and evenly distributed on lower fixing sleeve 9, Matched first screw 43 is bolted in first screw hole 42,43 end of the first screw is pressed on pull rod 6, this fixation Mode is conducive to upper fixing sleeve 7, middle fixing sleeve 8, lower fixing sleeve 9, is convenient for replacing and repair.
It squeezing 14 side of seat and is equipped with the second screw hole 44, the second screw hole 44 is bolted with matched second screw 45, the 45 end of two-screw is pressed on pull rod 6, and this fixed form is conducive to squeeze the dismounting of seat, is convenient for replacing or be repaired.
The outer wall of first mounting base 16 and the second mounting base 17 is all equipped with caulking groove 46 in a ring, be equipped in caulking groove 46 and its The O-ring 47 to match, the presence of O-ring 47 can effectively improve between 12 inner wall of the first mounting base 16 and inflator, the second peace Fill the leakproofness between seat 17 and 12 inner wall of inflator.
Sealing ring 48 is all arranged with outside exhaust plug 15 and rotary table sealing 40,15 outer wall of exhaust plug is equipped with the first sealing Step 49,18 inner wall of movable span are equipped with the second sealed step 50 being located at right above the first sealed step 49, are sheathed on exhaust valve Sealing ring 48 outside core 15 is sheathed on close outside exhaust plug 15 between the first sealed step 49 and the second sealed step 50 The case where seal 48 can effectively improve the leakproofness between exhaust plug 15 and movable span 18, avoid the occurrence of gas leakage, and first Sealed step 49 and the presence of the second sealed step 50 can limit the sealing ring 48 being sheathed on outside exhaust plug 15, keep away Exempt from the sealing ring 48 being set to outside exhaust plug 15 with mobile the case where being detached from of exhaust plug 15, and it is close to be sheathed on rotary table Sealing ring 48 outside envelope portion 40 can not only play the effect of abrasionproof, avoid sealing plate 25 and the wall surface outside 23 aperture of injection well long There is the situation that abrasion causes leakproofness bad in phase friction, and can further increase close between sealing plate 25 and injection well 23 Feng Xing.
1 right sidewall of fixing seat is equipped with an arc groove 51 to match with inflator 12, and 51 cell wall of arc groove is equipped with Several card holes 52 to connect with mounting groove 3,52 lower part side side wall of card hole are equipped with a snap-gauge 53, snap-gauge 53 and 52 hole wall of card hole Between there is inlay card spacing 54, the side opposite with 52 hole wall of card hole of snap-gauge 53 be equipped with one in arcuation card slot 55, outside inflator 12 Wall is equipped with the corresponding connecting plate 56 in several 52 positions of card hole, and connecting plate 56 passes through inlay card spacing 54 and extends and snap-gauge 53 The pressing plate 57 to fit, L-shaped between pressing plate 57 and connecting plate 56, it is convex that connecting plate 56 is equipped with the arc to match with card slot 55 58, when needing to dismantling between fixing seat 1 and inflator 12 are played, inflator 12 need to be only held and pass through external force towards 52 top of card hole It moves up, arc convex 58 will slide out to outside card slot 55 along the cambered surface of card slot 55, and pressing plate 57 is no longer mutually tight with snap-gauge 53 at this time Patch, at the vacancy position of card hole 52, does not have any part and limits connecting plate 56 or pressing plate 57, staff can Easily connecting plate 56 is separated with pressing plate 57 from card hole 52, the fast quick-detach between fixing seat 1 and inflator 12 is realized, is conducive to The replacement or maintenance of gas valve starter.

Claims (10)

1. a kind of for executing the pull rod air valve switch of pneumatic element, including fixing seat, the fixed link being connected with fixing seat, Be characterized in that: side wall is equipped with a mounting groove on the left of the fixing seat;The fixing seat upper surface is equipped with one and connects with mounting groove Upper slide opening, fixing seat lower surface be equipped with a lower slide opening coaxial with upper slide opening;One is equipped in the mounting groove to match with it Pull rod;The pull rod upper end is pierced by upwards outside supreme slide opening, and pull rod lower end is pierced by downwards to outside lower slide opening;It is set on the pull rod There is a upper fixing sleeve for being located at fixing seat upper surface, pull rod is equipped with a middle fixing sleeve being located in mounting groove, and pull rod is equipped with One is located at and the lower fixing sleeve below fixing seat;On the upside of the middle fixing sleeve and mounting groove between cell wall, middle fixing sleeve and installation Upper spring, lower spring are respectively equipped on the downside of slot between side wall, upper spring and lower spring are all sheathed on outside pull rod;The fixing seat is right The top and lower part of side side wall are equipped with mutually symmetrical gas valve starter;The gas valve starter includes being set to the fixing seat right side Inflator on the side wall of side, upside inflator nozzle right side are hinged with the pressing piece that a upper surface and upper fixing sleeve lower surface fit, An extruding seat being fixed on pull rod is equipped with below the inflator nozzle of downside, lower fixing sleeve, which is located at, to be squeezed above seat;The air valve opens Closing device includes exhaust plug, and upside exhaust plug is pierced by upside gas valve starter upwards and presses on pressing piece lower surface, Downside exhaust plug, which is pierced by downwards downside gas valve starter and is pressed on, squeezes seat upper surface.
2. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: the gas The first mounting base is equipped in cylinder nozzle, bottom is equipped with the second mounting base to match with the first mounting base in inflator cylinder;Described One mounting base is equipped with a movable span, is equipped with the exhaust chamber to connect with movable span in the first mounting base;The exhaust chamber Diameter is greater than movable bore dia, and a limited step is formed between exhaust chamber and movable span;The exhaust plug is set to movable span Interior, exhaust plug one end stretches in exhaust chamber and is equipped with a stop collar to match with limited step;Second installation It is equipped with one in seat to supply gas chamber, the second mounting base one end end face opposite with exhaust plug is equipped with one and supplies gas what chamber connected Injection well;A sealing column is equipped in the exhaust chamber, sealing column diameter is less than bore dia of supplying gas;The sealing column lower end passes through Injection well stretches in plenum room and is equipped with a sealing plate, and sealing board diameter is greater than bore dia of supplying gas;The exhaust plug with It is equipped with the first resetting apparatus between second mounting base, the second resetting apparatus is arranged with outside sealing column;The exhaust plug and sealing The opposite one end end face of column is equipped with a gas vent;The exhaust plug is pierced by one end of movable span and mutually passes through equipped with one with gas vent Logical venthole;The gas vent one end aperture opposite with sealing column is equipped with a seal groove, and seal groove diameter is greater than sealing column Diameter;A seal receptacle is equipped in the seal groove;The seal receptacle is equipped with a venthole to connect with gas vent, venthole Diameter is less than sealing column diameter;There is activity spacing between the seal receptacle and sealing column;The inflator be externally provided with one with supply gas The gas source connector that chamber connects, inflator are externally provided with an execution pneumatic element connector to connect with exhaust chamber.
3. according to claim 2 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: the limit A detent step is formed between position ring and exhaust plug;First resetting apparatus includes being set to the second mounting base and exhaust plug Detent ring on opposite one end end face;The first spring is equipped between second mounting base and exhaust plug;First bullet Spring one end is stuck on detent step, and the first spring other end is stuck in outside detent ring;Second resetting apparatus includes being set to sealing The annular groove of the column one end outer wall opposite with exhaust plug;Matched circlip is equipped in the annular groove;It is described Second spring is equipped between circlip and the second mounting base, second spring is sheathed on outside sealing column.
4. according to claim 2 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: described close It is connected between Feng Zhuyu sealing plate by rotary table sealing;The rotary table sealing diameter is from sealing column towards sealing plate direction Gradually it is incremented by.
5. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: described to press Casting die left end is U-shaped, and pressing piece itself forms a U-type groove, and pull rod is stuck in U-type groove.
6. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: on described Fixing sleeve, middle fixing sleeve are all equipped with several the first screw holes being circularly and evenly distributed on lower fixing sleeve;Spiral shell in first screw hole It is connected to matched first screw, the first screw end is pressed on pull rod.
7. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: described to squeeze Wedge side is equipped with the second screw hole;Second screw hole is bolted with matched second screw, and the second screw end compresses On pull rod.
8. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: described The outer wall of one mounting base and the second mounting base is all equipped with a caulking groove in a ring;It is equipped in the caulking groove matched O-shaped Circle.
9. according to claim 4 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: the row A sealing ring is all arranged with outside gas valve core and rotary table sealing;The exhaust plug outer wall is equipped with the first sealed step, movable span Inner wall is equipped with the second sealed step being located at right above the first sealed step, and the sealing ring being sheathed on outside exhaust plug is located at first Between sealed step and the second sealed step.
10. according to claim 1 a kind of for executing the pull rod air valve switch of pneumatic element, it is characterised in that: described Fixing seat right sidewall is equipped with an arc groove to match with inflator;The arc groove cell wall is equipped with several and mounting groove The card hole to connect;Card hole lower part side side wall is equipped with a snap-gauge, has inlay card spacing between snap-gauge and card hole hole wall;Institute State the card slot that the snap-gauge side opposite with card hole hole wall is equipped with one in arcuation;The inflator outer wall is equipped with several card hole positions phase Corresponding connecting plate;The connecting plate passes through inlay card spacing and extends a pressing plate to fit with snap-gauge, pressing plate and connecting plate Between it is L-shaped;The connecting plate is equipped with an arc convex to match with card slot.
CN201910613385.1A 2019-07-09 2019-07-09 Pull rod air valve switch for executing pneumatic element Active CN110195727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910613385.1A CN110195727B (en) 2019-07-09 2019-07-09 Pull rod air valve switch for executing pneumatic element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910613385.1A CN110195727B (en) 2019-07-09 2019-07-09 Pull rod air valve switch for executing pneumatic element

Publications (2)

Publication Number Publication Date
CN110195727A true CN110195727A (en) 2019-09-03
CN110195727B CN110195727B (en) 2024-04-26

Family

ID=67756047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910613385.1A Active CN110195727B (en) 2019-07-09 2019-07-09 Pull rod air valve switch for executing pneumatic element

Country Status (1)

Country Link
CN (1) CN110195727B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100723A (en) * 2014-07-24 2014-10-15 开平市英卫卫浴有限公司 Ceramic-free lifting angle valve device
WO2016163238A1 (en) * 2015-04-09 2016-10-13 Kyb-Ys株式会社 Control valve and fluid pressure control device with same
CN107940031A (en) * 2017-12-30 2018-04-20 淄博大力矿山机械有限公司 A kind of pneumatic loading machine manipulates valve
CN208816721U (en) * 2018-09-25 2019-05-03 玉环县珠港铜业有限公司 A kind of gate valve with locking functions
CN210265319U (en) * 2019-07-09 2020-04-07 玉环奕友电子有限公司 Pull rod air valve switch for executing pneumatic element

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100723A (en) * 2014-07-24 2014-10-15 开平市英卫卫浴有限公司 Ceramic-free lifting angle valve device
WO2016163238A1 (en) * 2015-04-09 2016-10-13 Kyb-Ys株式会社 Control valve and fluid pressure control device with same
CN107940031A (en) * 2017-12-30 2018-04-20 淄博大力矿山机械有限公司 A kind of pneumatic loading machine manipulates valve
CN208816721U (en) * 2018-09-25 2019-05-03 玉环县珠港铜业有限公司 A kind of gate valve with locking functions
CN210265319U (en) * 2019-07-09 2020-04-07 玉环奕友电子有限公司 Pull rod air valve switch for executing pneumatic element

Also Published As

Publication number Publication date
CN110195727B (en) 2024-04-26

Similar Documents

Publication Publication Date Title
CN102012348A (en) Lamp bulb compression resistance testing fixture
CN110195727A (en) It is a kind of for executing the pull rod air valve switch of pneumatic element
CN201077165Y (en) Automatic discharge unit for punch press
CN108906357A (en) A kind of method of coal mining machine roller pressure stabilizing nozzle and pressure stabilizing water spray
KR101030754B1 (en) Valve apparatus for portable bottle charged with oxygen
CN208853046U (en) Coal mining machine roller pressure stabilizing nozzle
CN210265319U (en) Pull rod air valve switch for executing pneumatic element
CN207333860U (en) Second depressurized fast-connecting type pressure regulator valve
CN206676595U (en) A kind of spray gun with auxiliary flow
CN209875984U (en) Sealing combination device
CN210770512U (en) Piston type selector valve
CN2928137Y (en) Air sucking supply valve
CN108043636A (en) A kind of Environmental Safety spray-painting plant
CN210998517U (en) Air source switch control device of pneumatic nail gun
CN208248643U (en) A kind of culture presevation ampoul tube closing device
CN209579811U (en) A kind of die-cutting machine sheet hole waste discharge apparatus
US20220145870A1 (en) Hand grip mechanism, drive mechanism, and air pump
CN107131057A (en) Operation and maintenance method of gas turbine energy recycling system
CN202708279U (en) Bottle head valve for fire-fighting equipment
CN107246478B (en) Operation and maintenance method of lift valve for gas turbine
CN210973838U (en) Coaxial double-tube filling device
CN106595987A (en) Workpiece pressure test sealing structure
CN205236249U (en) High pressure cleaner closes rifle arrester( -tor)
CN208535399U (en) A kind of changeable Double-drinking-water band
CN219943354U (en) Disinfectant watering can

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant