CN110186197A CN201910428142.0A CN201910428142A CN110186197A CN 110186197 A CN110186197 A CN 110186197A CN 201910428142 A CN201910428142 A CN 201910428142A CN 110186197 A CN110186197 A CN 110186197A
Authority
CN
China
Prior art keywords
water
water flow
gas heater
pipeline
sensing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910428142.0A
Other languages
Chinese (zh)
Inventor
郭灵华
谢志辉
邓飞忠
仇明贵
潘叶江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vatti Co Ltd
Original Assignee
Vatti Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vatti Co Ltd filed Critical Vatti Co Ltd
Priority to CN201910428142.0A priority Critical patent/CN110186197A/en
Publication of CN110186197A publication Critical patent/CN110186197A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

The invention discloses a gas water heater, which comprises a water heater shell, a heat exchanger, a water flow pipeline, a water flow induction unit, an electromagnetic cut-off unit, a water pump and a controller, wherein the heat exchanger is arranged in the water heater shell, the water flow pipeline penetrates through the heat exchanger, the water flow induction unit is arranged on the water flow pipeline and is used for detecting water flow, the electromagnetic cut-off unit is positioned on the water flow pipeline to prevent hot water from flowing back, and the controller is used for controlling the water flow induction unit, the electromagnetic cut-off unit and the water pump; the invention also discloses a preheating control method and a pressurization control method of the gas water heater; according to the invention, the electromagnetic stop unit is arranged on the water flow pipeline, so that hot water backflow in the pressurization process is prevented, the pressurization effect is improved, and further, the energy is saved.

Description

Gas heater, preheating control method and supercharging control method using it
Technical field
The invention belongs to gas heater technical fields, and in particular to a kind of gas heater, the warm-up control using it Method and supercharging control method.
Background technique
Zero cold water gas heater can be realized the development trend that hot water plug and play has become water heater industry because of it.
After conventional zero cold water gas heater starting function of increasing pressure, pump operation built in water heater carries out water pressurization, portion Divide hot water to flow through return pipe and be back to water heater, the practical water yield of hot water tap is caused to reduce.In pressurization working condition, Yong Huguan After closing hot water tap, tap water stops entering water heater, but built-in water pump still keeps on the go, and hot water return flow is closed greater than program Machine flow, then water heater is transferred to circulation preheating mode automatically, under this state only when return water temperature reaches program preheating temperature, It can just switch off the pump.The process that hot water tap stalls to water pump is closed from user and consumes excessive combustion gas and electric power, and it is unnecessary to cause Waste.
Summary of the invention
The object of the present invention is to provide a kind of gas heaters, end unit by the way that electromagnetism is arranged on water pipeline, prevent Stop hot water return in pressurization, improves supercharging effect, and then saved the energy.
It is a further object of the present invention to provide a kind of gas heater preheating control methods.
It is a further object of the present invention to provide a kind of gas heater supercharging control methods.
The technical scheme adopted by the invention is that:
A kind of gas heater comprising water heater housing, heat exchanger, water pipeline, water flow sensing unit, electromagnetism are cut Stop element, water pump and controller, the heat exchanger are arranged in water heater housing, and the water pipeline passes through heat exchange Device, the water flow sensing unit are arranged on water pipeline for detecting water flow, and the electromagnetism cut-off unit is located at water flow pipes For preventing hot water return, the controller is equal for controlling water flow sensing unit, electromagnetism cut-off unit and water pump for road.
Preferably, the water pipeline includes inlet pipeline, water return pipeline and main line, described inlet pipeline one end with Water source connection, the other end are connect by water pump with main line, and described water return pipeline one end is connected to main line, the other end and water inlet Piping connection.
Preferably, the water flow sensing unit is arranged on main line for detecting water flow.
Preferably, the electromagnetism cut-off unit is bi-directional electromagnetic shut-off valve, is located on water return pipeline for preventing into water Pipeline and water return pipeline water flow intercommunication.
Preferably, the electromagnetism cut-off unit includes unidirectional electromagnet cut off valve and check valve, the unidirectional electromagnet cut off valve For preventing the water of water return pipeline from flowing into water heater housing on water return pipeline, the check valve, which is located on water return pipeline, to be used In the water inflow water return pipeline for preventing inlet pipeline.
A kind of gas heater preheating control method, applies above-mentioned gas heater, and the preheating control method is specific Are as follows:
Step 1, start the pre- heat function of gas heater, the controller control electromagnetism cut-off unit and water pump are opened;
Step 2, the water flow sensing unit real-time detection water flow, and according to the water flow and preset water flow threshold Whether the relationship control gas heater between value enters preheating mode.
Preferably, in the step 2, judge whether gas heater enters the method for preheating mode, specifically:
When the water flow that the water flow sensing unit detects be greater than preset water flow threshold value when, gas heater into Enter preheating mode;Conversely, water flow sensing unit continues real-time detection water flow.
A kind of gas heater supercharging control method, applies above-mentioned gas heater, and the supercharging control method is specific Are as follows:
Step 11, electromagnetism cut-off unit in the closure state, starts the function of increasing pressure of gas heater;
Step 12, water flow sensing unit real-time detection water flow, and according to the water flow and preset booting water flow Whether the relationship control gas heater between threshold value enters boost mode.
Preferably, in step 12, judge whether gas heater enters the method for boost mode, specifically:
When the water flow that the water flow sensing unit detects is greater than booting water flow threshold value, gas heater enters Boost mode;Conversely, water flow sensing unit continues real-time detection water flow.
Preferably, changing supercharging control method further comprises:
After gas heater enters boost mode, water flow sensing unit real-time detection water flow, when the water flow is small When preset shutdown water flow threshold value, water pump is closed, and completes pressurization;Otherwise maintain boost mode operation.
Compared with prior art, the present invention is in use, be pressurized gas heater by the setting that electromagnetism ends unit Under mode, hot water return is avoided, influences supercharging effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the embodiment of the present invention 1 provides that a kind of gas heater is in warm operation state;
Fig. 2 is that the embodiment of the present invention 1 provides a kind of structural schematic diagram of the gas heater in pressurization working condition;
Fig. 3 is the structural schematic diagram that the embodiment of the present invention 2 provides that a kind of gas heater is in warm operation state;
Fig. 4 is that the embodiment of the present invention 2 provides a kind of structural schematic diagram of the gas heater in pressurization working condition;
Fig. 5 is that the embodiment of the present invention 3 provides a kind of flow chart of gas heater preheating control method;
Fig. 6 is that the embodiment of the present invention 4 provides a kind of flow chart of gas heater supercharging control method.
Appended drawing reference:
1-- water heater housing, 2-- heat exchanger, 3-- water pipeline, 4-- water flow sensing unit, the cut-off of 5-- electromagnetism are single Member, 6-- water pump, 7-- controller, 31-- inlet pipeline, 32-- water return pipeline, 33-- main line, the unidirectional electromagnet cut off valve of 51--, 52-- check valve.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Embodiment 1
The embodiment of the present invention 1 provides a kind of gas heater, as shown in Figs. 1-2 comprising water heater housing 1, heat exchange Device 2, water pipeline 3, water flow sensing unit 4, electromagnetism cut-off unit 5, water pump 6 and controller 7, in which:
Heat exchanger 2 is arranged in water heater housing 1, and water pipeline 3 passes through heat exchanger 2, and water flow sensing unit 4 is arranged For detecting water flow on water pipeline 3, electromagnetism cut-off unit 5 is located on water pipeline 3 for preventing hot water return, controls Device 7 is for controlling water flow sensing unit 4, electromagnetism cut-off unit 5 and water pump 6.
Water pipeline 3 includes inlet pipeline 31, water return pipeline 32 and main line 33, and 31 one end of inlet pipeline and water source connect It connects, the other end is connect by water pump 6 with main line 33, and 32 one end of water return pipeline is connected to main line 33, the other end and water inlet pipe Road 31 connects.
Water flow sensing unit 4 is arranged on main line 33 for detecting water flow.
It is bi-directional electromagnetic shut-off valve that electromagnetism, which ends unit 5, is located on water return pipeline 32 for preventing 31 He of inlet pipeline 32 water flow intercommunication of water return pipeline.
In this embodiment, it is closed state when bi-directional electromagnetic shut-off valve is normally off, i.e. no power, is beaten after energization Open state helps to reduce power consumption.
The course of work:
Using the gas heater of the embodiment when being preheated, start the pre- heat function of gas heater, controller 7 It controls bi-directional electromagnetic shut-off valve and water pump 6 is opened, later, 4 real-time detection water flow of water flow sensing unit, when water flow is greater than water When flow threshold, gas heater enters preheating mode;Conversely, water flow sensing unit 4 continues real-time detection water flow.
Using the gas heater of the embodiment when being pressurized, bi-directional electromagnetic shut-off valve in the closure state, is opened The function of increasing pressure of dynamic gas heater, later, 4 real-time detection water flow of water flow sensing unit, when water flow is greater than booting water flow When measuring threshold value, gas heater enters boost mode;Conversely, water flow sensing unit 4 continues real-time detection water flow;
After gas heater enters boost mode, 4 real-time detection water flow of water flow sensing unit, when water flow is less than in advance If shutdown water flow threshold value when, water pump close, complete pressurization;Otherwise maintain boost mode operation.
Embodiment 2
The embodiment of the present invention 2 provides a kind of gas heater, as shown in Figure 3-4 comprising water heater housing 1, heat exchange Device 2, water pipeline 3, water flow sensing unit 4, electromagnetism cut-off unit 5, water pump 6 and controller 7, wherein
Heat exchanger 2 is arranged in water heater housing 1, and water pipeline 3 passes through heat exchanger 2, and water flow sensing unit 4 is arranged For detecting water flow on water pipeline 3, electromagnetism cut-off unit 5 is located on water pipeline 3 for preventing hot water return, controls Device 7 is for controlling water flow sensing unit 4, electromagnetism cut-off unit 5 and water pump 6.
Water pipeline 3 includes inlet pipeline 31, water return pipeline 32 and main line 33, and 31 one end of inlet pipeline and water source connect It connects, the other end is connect by water pump 6 with main line 33, and 32 one end of water return pipeline is connected to main line 33, the other end and water inlet pipe Road 31 connects.
Water flow sensing unit 4 is arranged on main line 33 for detecting water flow.
It includes unidirectional electromagnet cut off valve 51 and check valve 52 that electromagnetism, which ends unit 5, and unidirectional electromagnet cut off valve 51 is located at return water For preventing the water of water return pipeline 32 from flowing into water heater housing 1 on pipeline 32, check valve 52, which is located on water return pipeline 32, to be used for Prevent the water of inlet pipeline 31 from flowing into water return pipeline 32.
In this embodiment, it is closed state when unidirectional electromagnet cut off valve 51 is normally off, i.e. no power, is after energization Opening state helps to reduce power consumption.
The course of work:
Using the gas heater of the embodiment when being preheated, start the pre- heat function of gas heater, controller 7 It controls unidirectional electromagnet cut off valve 51 and water pump 6 is opened, later, 4 real-time detection water flow of water flow sensing unit, when water flow is greater than When water flow threshold value, gas heater enters preheating mode;Conversely, water flow sensing unit 4 continues real-time detection water flow.
Using the gas heater of the embodiment when being pressurized, unidirectional electromagnet cut off valve 51 in the closure state, Start the function of increasing pressure of gas heater, later, 4 real-time detection water flow of water flow sensing unit, when water flow is greater than booting water When flow threshold, gas heater enters boost mode;Conversely, water flow sensing unit 4 continues real-time detection water flow;
After gas heater enters boost mode, 4 real-time detection water flow of water flow sensing unit, when water flow is less than in advance If shutdown water flow threshold value when, water pump close, complete pressurization;Otherwise maintain boost mode operation.
Embodiment 1 and embodiment 2 further comprise operating display, are provided on operating display for opening pre- hot merit Can preheating function key and function of increasing pressure key for opening function of increasing pressure.
Embodiment 3
The embodiment of the present invention 3 provides a kind of gas heater preheating control method, as shown in figure 5, specifically according to following step It is rapid to implement:
S1 starts the pre- heat function of gas heater;
S2, controller controls electromagnetism cut-off unit 5 and water pump 6 is opened;
S3,4 real-time detection water flow of water flow sensing unit;
S4, when water flow is greater than water flow threshold value, gas heater enters preheating mode;Conversely, water flow sensing unit 4 Continue real-time detection water flow.
After completing preheating, electromagnet cut off valve and water pump are closed.
After the present embodiment starts pre- heat function, controller control pump operation simultaneously opens unidirectional electromagnet cut off valve or two-way Electromagnet cut off valve, when the water flow sensing unit detects that water flow is greater than preset booting flow threshold, then combustion preheater; After completing preheating, controller, which exports water pump, closes pump instruction, and is re-closing off electromagnet cut off valve;It is single in circulation warm It is constantly on state to electromagnet cut off valve or bi-directional electromagnetic shut-off valve, is closed circulation line, it is ensured that normal preheating.
Embodiment 4
The embodiment of the present invention 4 provides a kind of gas heater supercharging control method, as shown in fig. 6, specifically according to following step It is rapid to implement:
S11 starts the function of increasing pressure of gas heater;
S12,4 real-time detection water flow of water flow sensing unit;
S13, when water flow is greater than booting water flow threshold value, gas heater enters boost mode;Conversely, water flow incudes Unit 4 continues real-time detection water flow;
S14, after gas heater enters boost mode, 4 real-time detection water flow of water flow sensing unit, when water flow is small When preset shutdown water flow threshold value, water pump is closed, and completes pressurization;Otherwise maintain boost mode operation.
After the present embodiment opens function of increasing pressure, when water flow sensing unit detection water flow is greater than preset booting flow When threshold value, controller controls pump operation, promotes originally water flow, at this time bi-directional electromagnetic shut-off valve or unidirectional electromagnet cut off valve Still in closed state, prevents hot water return to water heater, promote supercharging effect;In pressure operation state, when user closes hot water Afterwards, tap water stops flow into, and when water flow sensing unit measures water flow less than preset shutdown flow threshold, then controller is to water Pump instruction is closed in pump output, is realized and is quickly closed pump.
More than, it is merely preferred embodiments of the present invention, but scope of protection of the present invention is not limited thereto, it is any In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those familiar with the art, all answers It is included within the scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.

Claims (10)

1. a kind of gas heater, which is characterized in that it include water heater housing (1), heat exchanger (2), water pipeline (3), Water flow sensing unit (4), electromagnetism cut-off unit (5), water pump (6) and controller (7), the heat exchanger (2) are arranged in heat In water heater casing (1), the water pipeline (3) passes through the heat exchanger (2), and the water flow sensing unit (4) is arranged in water For detecting water flow on flow tube road (3), electromagnetism cut-off unit (5) is located on water pipeline (3) to prevent hot water return, The controller (7) is for controlling water flow sensing unit (4), electromagnetism cut-off unit (5) and water pump (6).
2. a kind of gas heater according to claim 1, which is characterized in that the water pipeline (3) includes water inlet pipe Road (31), water return pipeline (32) and main line (33), described inlet pipeline (31) one end are connect with water source, and the other end passes through water Pump (6) is connect with main line (33), and described water return pipeline (32) one end is connected to main line (33), the other end and inlet pipeline (31) it connects.
3. a kind of gas heater according to claim 1 or 2, which is characterized in that electromagnetism cut-off unit (5) is double To electromagnet cut off valve, it is located on water return pipeline (32) for preventing inlet pipeline (31) and water return pipeline (32) water flow intercommunication.
4. a kind of gas heater according to claim 1 or 2, which is characterized in that the electromagnetism ends unit (5) and includes Unidirectional electromagnet cut off valve (51) and check valve (52), the unidirectional electromagnet cut off valve (51) are located on water return pipeline (32) for preventing The water of non-return water lines (32) flows into water heater housing (1), and the check valve (52) is located on water return pipeline (32) for preventing Only the water of inlet pipeline (31) flows into water return pipeline (32).
5. a kind of gas heater according to claim 1 or 2, which is characterized in that water flow sensing unit (4) setting On main line (33).
6. a kind of preheating control method using the described in any item gas heaters of claim 1-5, which is characterized in that this is pre- Heat control method specifically:
Step 1, start the pre- heat function of gas heater, controller (7) control electromagnetism cut-off unit (5) and water pump (6) It opens;
Step 2, water flow sensing unit (4) the real-time detection water flow, and according to the water flow and preset water flow threshold Whether the relationship control gas heater between value enters preheating mode.
7. a kind of gas heater default control method according to claim 6, which is characterized in that in the step 2, sentence Whether disconnected gas heater enters the method for preheating mode, specifically:
When the water flow that the water flow sensing unit (4) detects be greater than preset water flow threshold value when, gas heater into Enter preheating mode;Conversely, water flow sensing unit (4) continues real-time detection water flow.
8. a kind of supercharging control method of the gas heater using any one of claim 1-5, which is characterized in that the pressurization control Method processed specifically:
Step 11, electromagnetism cut-off unit (5) in the closure state, starts the function of increasing pressure of gas heater;
Step 12, water flow sensing unit (4) real-time detection water flow, and according to the water flow and preset booting water flow threshold Whether the relationship control gas heater between value enters boost mode.
9. a kind of gas heater supercharging control method according to claim 8, which is characterized in that in step 12, sentence Whether disconnected gas heater enters the method for boost mode, specifically:
When the water flow that the water flow sensing unit (4) detects is greater than booting water flow threshold value, gas heater enters Boost mode;Conversely, water flow sensing unit (4) continues real-time detection water flow.
10. a kind of gas heater supercharging control method according to claim 9, which is characterized in that change pressurization control side Method further comprises:
After gas heater enters boost mode, water flow sensing unit (4) real-time detection water flow, when the water flow is less than When preset shutdown water flow threshold value, water pump is closed, and completes pressurization;Otherwise maintain boost mode operation.
CN201910428142.0A 2019-05-22 2019-05-22 Gas water heater, preheating control method and pressurization control method applying gas water heater Pending CN110186197A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910428142.0A CN110186197A (en) 2019-05-22 2019-05-22 Gas water heater, preheating control method and pressurization control method applying gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910428142.0A CN110186197A (en) 2019-05-22 2019-05-22 Gas water heater, preheating control method and pressurization control method applying gas water heater

Publications (1)

Publication Number Publication Date
CN110186197A true CN110186197A (en) 2019-08-30

Family

ID=67717245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910428142.0A Pending CN110186197A (en) 2019-05-22 2019-05-22 Gas water heater, preheating control method and pressurization control method applying gas water heater

Country Status (1)

Country Link
CN (1) CN110186197A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657298A (en) * 2019-11-13 2020-01-07 Tcl家用电器(中山)有限公司 Combined one-way check valve and hot water system
CN110906563A (en) * 2019-12-06 2020-03-24 华帝股份有限公司 Intelligent pressurization control method for gas water heater

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106196563A (en) * 2016-08-22 2016-12-07 广东万家乐燃气具有限公司 The pre-heating mean of gas heater, fuel gas water heating system and gas heater
WO2018072230A1 (en) * 2016-10-20 2018-04-26 广东万和新电气股份有限公司 Gas water heater having reduced initial cold water flow and system thereof
CN108036497A (en) * 2017-12-07 2018-05-15 成都前锋电子有限责任公司 A kind of gas heater and its preheating start-up and shut-down control method
CN207610371U (en) * 2017-10-18 2018-07-13 杨志 A kind of gas heater with pre- hot function
CN108679848A (en) * 2018-03-01 2018-10-19 万家乐热能科技有限公司 A kind of the flow property judgment method and gas-heating water heater of hot-water supply
JP2018193957A (en) * 2017-05-19 2018-12-06 株式会社Subaru Engine warming-up system
CN109297180A (en) * 2017-07-25 2019-02-01 青岛经济技术开发区海尔热水器有限公司 Intelligent preheating circulating gas water heater, prewarming circulating system and control method
CN208606407U (en) * 2018-06-13 2019-03-15 樱花卫厨(中国)股份有限公司 Preheating pressurization integrated gas water heater
DE102018124429A1 (en) * 2017-10-02 2019-04-04 PEWO Beteiligungs GmbH Water heating system and method for the efficient and hygienic operation of a domestic hot water storage charging system of a water heating system
CN210197734U (en) * 2019-05-22 2020-03-27 华帝股份有限公司 Gas water heater

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106196563A (en) * 2016-08-22 2016-12-07 广东万家乐燃气具有限公司 The pre-heating mean of gas heater, fuel gas water heating system and gas heater
WO2018072230A1 (en) * 2016-10-20 2018-04-26 广东万和新电气股份有限公司 Gas water heater having reduced initial cold water flow and system thereof
JP2018193957A (en) * 2017-05-19 2018-12-06 株式会社Subaru Engine warming-up system
CN109297180A (en) * 2017-07-25 2019-02-01 青岛经济技术开发区海尔热水器有限公司 Intelligent preheating circulating gas water heater, prewarming circulating system and control method
DE102018124429A1 (en) * 2017-10-02 2019-04-04 PEWO Beteiligungs GmbH Water heating system and method for the efficient and hygienic operation of a domestic hot water storage charging system of a water heating system
CN207610371U (en) * 2017-10-18 2018-07-13 杨志 A kind of gas heater with pre- hot function
CN108036497A (en) * 2017-12-07 2018-05-15 成都前锋电子有限责任公司 A kind of gas heater and its preheating start-up and shut-down control method
CN108679848A (en) * 2018-03-01 2018-10-19 万家乐热能科技有限公司 A kind of the flow property judgment method and gas-heating water heater of hot-water supply
CN208606407U (en) * 2018-06-13 2019-03-15 樱花卫厨(中国)股份有限公司 Preheating pressurization integrated gas water heater
CN210197734U (en) * 2019-05-22 2020-03-27 华帝股份有限公司 Gas water heater

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657298A (en) * 2019-11-13 2020-01-07 Tcl家用电器(中山)有限公司 Combined one-way check valve and hot water system
CN110906563A (en) * 2019-12-06 2020-03-24 华帝股份有限公司 Intelligent pressurization control method for gas water heater
CN110906563B (en) * 2019-12-06 2021-05-18 华帝股份有限公司 Intelligent pressurization control method for gas water heater

Similar Documents

Publication Publication Date Title
CN109297180A (en) Intelligent preheating circulating gas water heater, prewarming circulating system and control method
CN201233060Y (en) Automation control prewarming central water supply system for gas burner water heater
CN101315207A (en) Automatic control pre-heating central water supply system of gas burning water heater
CN109297179A (en) Electricity auxiliary warm-up cycle gas heater, prewarming circulating system and control method
CN110207389A (en) Control method for pressurization function of gas water heater
CN110186197A (en) Gas water heater, preheating control method and pressurization control method applying gas water heater
CN110186180A (en) Gas water heater, water outlet control method using gas water heater and pressurization control method
CN107367051A (en) A kind of gas heater antifreeze using water pump and adding thermal resistance and method
CN111912119A (en) Control method for pressurization function of gas water heater and gas water heater
CN205373025U (en) Water heating system
CN206530389U (en) Engine exhaust utilizes system and the automobile using the system
CN106091396A (en) Water heating apparatus and water flow regulating device thereof and method
CN110513862B (en) Series-type gas water heater, series-type system, pressurizing method and preheating method
CN210197734U (en) Gas water heater
CN110617628A (en) Zero-cold-water gas water heater, pressurization control method and preheating control method
CN208751007U (en) Central hot water gas heater and its application system
CN209326986U (en) A kind of cylinder pressure sensor constant temperature and pressure control device
CN204404545U (en) Domestic gas-fired water heater water saving fixtures
CN114484886B (en) Zero cold water control method with preheating overtemperature protection and control device thereof
CN210951842U (en) Zero-cold-water gas water heater
CN110440454A (en) A kind of gas heater external control module and its gas heater system and control method
CN110207388A (en) Intelligent shutdown control method for gas water heater
KR100465749B1 (en) Hot-water supply system of boiler for home use
CN109612109B (en) Cold water recovery type hot water system and cold water recovery method
CN205897567U (en) Hot -water heating equipment and water flow regulator thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190830