CN110173848A - The method, apparatus and computer storage medium of air-conditioner humidifying control - Google Patents

The method, apparatus and computer storage medium of air-conditioner humidifying control Download PDF

Info

Publication number
CN110173848A
CN110173848A CN201910146537.1A CN201910146537A CN110173848A CN 110173848 A CN110173848 A CN 110173848A CN 201910146537 A CN201910146537 A CN 201910146537A CN 110173848 A CN110173848 A CN 110173848A
Authority
CN
China
Prior art keywords
air
humidification
conditioning
time
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910146537.1A
Other languages
Chinese (zh)
Other versions
CN110173848B (en
Inventor
辛彩丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Co Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Original Assignee
Qingdao Haier Co Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Co Ltd, Qingdao Haier Air Conditioning Electric Co Ltd filed Critical Qingdao Haier Co Ltd
Priority to CN201910146537.1A priority Critical patent/CN110173848B/en
Publication of CN110173848A publication Critical patent/CN110173848A/en
Application granted granted Critical
Publication of CN110173848B publication Critical patent/CN110173848B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses the method, apparatus and computer storage medium of air-conditioner humidifying control, belong to intelligent appliance technical field.This method comprises: when determining that humidification function opens, and when the current humidity value of room area where air-conditioning is less than setting humidity value, the first temperature value of room area, and starts humidification timing where obtaining air-conditioning;When humidifying the present timing time of timing less than the first setting time, or, it is greater than or equal to the first setting time when the present timing time, and the temperature gap between present timing time corresponding second temperature value and the first temperature value be greater than the first set temperature value when, obtain present timing time corresponding first humidity value, and the first humidity differences between setting humidity value and the first humidity value, and determine current first humidification control strategy corresponding with the first humidity differences, the humidification control of air-conditioning is carried out according to current first humidification control strategy, wherein, current first humidification control strategy includes the switch time for humidifying waterway electromagnetic valve.

Description

The method, apparatus and computer storage medium of air-conditioner humidifying control
Technical field
The present invention relates to intelligent appliance technical field, in particular to the method, apparatus of air-conditioner humidifying control and computer is deposited Storage media.
Background technique
With the improvement of living standards, air-conditioning has been the necessary article of people's daily life.Air-conditioning not only has refrigeration, system The taproots function such as heat, can also have the function of automatically cleaning, sleep etc..Wherein, when air-conditioning largely only has refrigeration mode, Humid control can be carried out, such as: humidity reduces;And air-conditioning there is no humidification control when being in heating mode or air supply pattern System.In this way, may be such that and be air-dried when air-conditioning is run in winter, human body sensory is uncomfortable.
Summary of the invention
The embodiment of the invention provides the method, apparatus and computer storage medium of a kind of control of air-conditioner humidifying.In order to right The some aspects of the embodiment of disclosure have a basic understanding, and simple summary is shown below.The summarized section is not general General commentary, nor to determine key/critical component or describe the protection scope of these embodiments.Its sole purpose is to use Some concepts are presented in simple form, in this, as the preamble of following detailed description.
A kind of method of air-conditioner humidifying control is provided according to a first aspect of the embodiments of the present invention, comprising:
When determine humidification function open, and the air-conditioning where room area current humidity value be less than setting humidity value When, the first temperature value of room area where obtaining the air-conditioning, and start humidification timing;
When the present timing time of the humidification timing is less than the first setting time, or, working as the present timing time More than or equal to first setting time, and the present timing time corresponding second temperature value and first temperature value Between temperature gap be greater than the first set temperature value when, obtain the present timing time corresponding first humidity value, and The first humidity differences between the setting humidity value and the first humidity value, and determine work as corresponding with first humidity differences Preceding first humidification control strategy controls, wherein institute according to the humidification that the current first humidification control strategy carries out the air-conditioning Stating current first humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
In one embodiment of the invention, the determining humidification function unlatching includes:
When the air-conditioning in heating mode receives humidification control instruction, determine that the humidification function is opened;Or,
The air-conditioning in air supply pattern receives humidification control instruction, and outdoor temperature where the air-conditioning is less than and sets Determine outdoor temperature, when room temperature where the air-conditioning is greater than setting room temperature, determines that the humidification function is opened.
In one embodiment of the invention, when the air-conditioning is in air supply pattern, further includes:
When the present timing time of the humidification timing is less than the first setting time, or, working as the present timing time More than or equal to first setting time, and when the temperature gap is greater than the first set temperature value, by the wind of the air-conditioning Machine is determined as wind speed setting;
It is greater than or equal to first setting time when the present timing time, and the temperature gap is less than or equal to When the first set temperature value, the determining current second humidification control strategy corresponding with first humidity differences, and according to The current second humidification control strategy carries out the humidification control of the air-conditioning, wherein the current second humidification control strategy It include the blower wind speed strategy for opening time and shut-in time and the air-conditioning for humidifying waterway electromagnetic valve.
In one embodiment of the invention, when the air-conditioning is in heating mode, the method also includes:
It is greater than or equal to first setting time when the present timing time, and the temperature gap is being less than or is waiting When the first set temperature value, operation of air conditioner setting time is controlled according to the second temperature value, and close the humidification timing Device.
A kind of device of air-conditioner humidifying control is provided according to a second aspect of the embodiments of the present invention, and described device includes:
Start unit is humidified, for being opened when determining humidification function, and the current humidity of room area where the air-conditioning When value is less than setting humidity value, the first temperature value of room area where obtaining the air-conditioning, and start humidification timing;
First humidification control unit, for when it is described humidification timing the present timing time less than the first setting time when, Or, when the present timing time is greater than or equal to first setting time, and the present timing time corresponding second When temperature gap between temperature value and first temperature value is greater than the first set temperature value, the present timing time is obtained The first humidity differences between corresponding first humidity value and the setting humidity value and the first humidity value, and determining and institute The corresponding current first humidification control strategy of the first humidity differences is stated, according to the current first humidification control strategy progress The humidification of air-conditioning controls, wherein the current first humidification control strategy include humidify opening time of waterway electromagnetic valve with And the shut-in time.
In one embodiment of the invention, the humidification start unit is received specifically for the air-conditioning in heating mode To when humidifying control instruction, determine that the humidification function is opened;Or, the air-conditioning in air supply pattern receives humidification control Instruction, and outdoor temperature where the air-conditioning is less than setting outdoor temperature, it is indoor to be greater than setting for room temperature where the air-conditioning When temperature, determine that the humidification function is opened.
In one embodiment of the invention, when the air-conditioning is in air supply pattern,
The first humidification control unit, is also used to the blower of the air-conditioning being determined as wind speed setting;
Described device further include: the second humidification control unit, described in being greater than or equal to when the present timing time First setting time, the and when temperature gap is less than or equal to the first set temperature value, it is determining with first humidity differences The corresponding current second humidification control strategy, and adding for the air-conditioning, is carried out according to the current second humidification control strategy Wet control, wherein when the current second humidification control strategy includes opening time and the closing for humidifying waterway electromagnetic valve Between and the air-conditioning blower wind speed strategy.
In one embodiment of the invention, when the air-conditioning is in heating mode, described device includes:
Second humidification control unit, for being greater than or equal to first setting time when the present timing time, and The temperature gap is when being less than or equal to the first set temperature value, when controlling operation of air conditioner setting according to the second temperature value Between, and close the humidification timer.
A kind of device of air-conditioner humidifying control is provided according to a third aspect of the embodiments of the present invention, and described device is for sky It adjusts, described device includes:
Processor;
Memory for storage processor executable instruction;
Wherein, the processor is configured to:
When determine humidification function open, and the air-conditioning where room area current humidity value be less than setting humidity value When, the first temperature value of room area where obtaining the air-conditioning, and start humidification timing;
When the present timing time of the humidification timing is less than the first setting time, or, working as the present timing time More than or equal to first setting time, and the present timing time corresponding second temperature value and first temperature value Between temperature gap be greater than the first set temperature value when, obtain the present timing time corresponding first humidity value, and The first humidity differences between the setting humidity value and the first humidity value, and determine work as corresponding with first humidity differences Preceding first humidification control strategy controls, wherein institute according to the humidification that the current first humidification control strategy carries out the air-conditioning Stating current first humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
A kind of computer readable storage medium is provided according to a fourth aspect of the embodiments of the present invention, is stored thereon with calculating Machine instruction, which is characterized in that the step of above method is realized when the instruction is executed by processor.
Technical solution provided in an embodiment of the present invention can include the following benefits:
It, can be according to adding after the air-conditioner humidifying function in heating mode or mode of drying is opened in the embodiment of the present invention Wet time, temperature value corresponding with humidification periods or humidity value determine that corresponding humidification strategy runs to carry out the humidification of air-conditioning, In this way, the air-conditioning in heating mode or air supply pattern can also carry out humidification control, in this way, when air-conditioning is run in winter, it can also The humidity for controlling region, reduces air dried probability, has further expanded the function of air-conditioning, also improves relaxing for human body Adaptive.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment;
Fig. 2 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment;
Fig. 3 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment;
Fig. 4 is a kind of block diagram of air-conditioner humidifying control device shown according to an exemplary embodiment;
Fig. 5 is a kind of block diagram of air-conditioner humidifying control device shown according to an exemplary embodiment.
Specific embodiment
The following description and drawings fully show specific embodiments of the present invention, to enable those skilled in the art to Practice them.Embodiment only represents possible variation.Unless explicitly requested, otherwise individual components and functionality is optional, and And the sequence of operation can change.The part of some embodiments and feature can be included in or replace other embodiments Part and feature.The range of embodiment of the present invention includes the entire scope of claims and the institute of claims There is obtainable equivalent.Herein, each embodiment can individually or generally be indicated that this is only with term " invention " It is merely for convenience, and if in fact disclosing the invention more than one, it is not meant to automatically limit the range of the application For any single invention or inventive concept.Herein, relational terms such as first and second and the like are used only for one Entity, which is perhaps operated, to be distinguished and exists without requiring or implying between these entities or operation with another entity or operation Any actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that include a series of elements process, method or equipment not only include those elements, but also including Other elements that are not explicitly listed.Each embodiment herein is described in a progressive manner, and each embodiment stresses Be the difference from other embodiments, the same or similar parts in each embodiment may refer to each other.For implementing For structure, product etc. disclosed in example, since it is corresponding with part disclosed in embodiment, so being described relatively simple, phase Place is closed referring to method part illustration.
Air-conditioning has multiple-working mode, comprising: refrigeration, heating or blowing etc..In the embodiment of the present invention, when in system After the air-conditioner humidifying function of heat pattern or mode of drying is opened, can according to humidification periods, temperature value corresponding with humidification periods or Humidity value determines corresponding humidification strategy to carry out the humidification operation of air-conditioning, in this way, the sky in heating mode or air supply pattern Tune can also carry out humidification control, in this way, also can control the humidity of region when air-conditioning is run in winter, reduction is air-dried Probability, further expanded the function of air-conditioning, also improved the comfort of human body.
Fig. 1 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment.As shown in Figure 1, The process of air-conditioner humidifying control can include:
Step 101: when determine humidification function open, and air-conditioning where room area current humidity value be less than setting humidity When value, the first temperature value of room area where obtaining air-conditioning, and start humidification timing.
In the embodiment of the present invention, air-conditioning is likely to be at heating mode or air supply pattern, is also not necessarily limited to this certainly.User needs When running humidification function, humidification control instruction can be transmitted, refer in this way, the air-conditioning in heating mode receives humidification control It enables, so that it is determined that the humidification function of air-conditioning opens.Alternatively, also receiving humidification control instruction when air-conditioning is in air supply pattern , at this time, it is also necessary to and the outdoor temperature according to corresponding to air-conditioning and room temperature, to determine whether to open humidification function.One As, when outdoor temperature≤20 DEG C, it can ensure that air-conditioning is in winter heating's season.Certainly 18 DEG C, 15 DEG C etc. can also be corresponded to, and it is empty Room temperature where adjusting is generally higher than 18 DEG C or 16 DEG C, 19 DEG C, 20 DEG C, i.e. room temperature cannot be too low, can prevent the winter in this way Ji Lengfeng causes user's body-sensing uncomfortable.Therefore, the air-conditioning in air supply pattern receives humidification control instruction, and room where air-conditioning Outer temperature is less than setting outdoor temperature, when room temperature where air-conditioning is greater than setting room temperature, it may be determined that humidification function is opened.
It has been determined that humidification function opens, it is necessary to carry out humidity and judge, humidity meets condition, can not have to carry out certainly Humid control can be directly entered temperature control.And humidity then needs to carry out humid control when being unsatisfactory for condition.It therefore, can be preparatory A setting humidity value is configured, when the current humidity value of room area where air-conditioning is less than setting humidity value, this can be carried out Humid control in inventive embodiments.Here, setting humidity value can be set automatically by air-conditioning according to environmental change, alternatively, It can be set in advance according to the hobby of user itself.
When determine humidification function open, and air-conditioning where room area current humidity value be less than setting humidity value when, need Humidification control is carried out, starts corresponding humidification timing at this time, and obtains and record the first temperature of air-conditioning place room area Value.
Step 102: when humidifying the present timing time of timing less than the first setting time, or, working as the present timing time More than or equal to the first setting time, and the temperature difference between present timing time corresponding second temperature value and the first temperature value When value is greater than the first set temperature value, present timing time corresponding first humidity value, and setting humidity value and first are obtained The first humidity differences between humidity value, and determine current first humidification control strategy corresponding with the first humidity differences, according to Current first humidification control strategy carries out the humidification control of air-conditioning.
, can periodically or according to the demand of user after the humidification timing of starting air-conditioning, it can be according to the timing of humidification timing Time is sampled, and when humidifying the present timing time of timing less than the first setting time, is shown at this point, humidifying control process It is also shorter, it need to only consider that humidity carries out corresponding control.Although alternatively, the present timing time is greater than or equal to the first setting Time, and the temperature gap between present timing time corresponding second temperature value and the first temperature value is greater than the first set temperature When value, i.e. the variation of the room temperature of air-conditioning region is gone back in setting range, such as: temperature gap is greater than -2 DEG C, at this point, It can only consider that humidity carries out corresponding control.
Therefore, when humidifying the present timing time of timing less than the first setting time, or, when the present timing time is greater than Or it is equal to the first setting time, and the temperature gap between present timing time corresponding second temperature value and the first temperature value is big When the first set temperature value, present timing time corresponding first humidity value need to be obtained, and obtains setting humidity value and first The first humidity differences between humidity value.Then, it is determined that current first humidification control strategy corresponding with the first humidity differences, root The humidification control of air-conditioning is carried out according to current first humidification control strategy.
And in the present embodiment, humidification control includes the control of humidification waterway electromagnetic valve, that is, controls humidification waterway electromagnetic valve Unlatching and shut-in time.It, can according to the difference of humidifier matching humidification capacity in different humidification waterway electromagnetic valves and air-conditioning From the different opening time T1, shut-in time T2 for presetting humidification waterway electromagnetic valve, wherein T1 can be according to different humidifications Capacity determines, and T2 can be determined according to different humidity differences ranges.
Therefore, humidity differences can be pre-configured with and humidify the corresponding relationship between control strategy, wherein humidification control strategy It include the opening time T1 and shut-in time T2 for humidifying waterway electromagnetic valve.The present timing time for humidifying timing is less than First setting time, or, when the present timing time is greater than or equal to the first setting time, and present timing time corresponding second When temperature gap between temperature value and the first temperature value is greater than the first set temperature value, the humidity differences and humidification of configuration are controlled Corresponding relationship between strategy is the first corresponding relationship.
Table 1 is first corresponding between a kind of humidity differences shown according to an exemplary embodiment and humidification control strategy Relationship.
Humidity differences Humidify control strategy
△ S >=25% T1 is the fixed value with humidification capacity matching, T2=nominal time T- adjustment time △ T
15%≤△ S < 25% T1 is the fixed value with humidification capacity matching, T2=nominal time T
0 < △ S < 15% T1 is the fixed value with humidification capacity matching, T2=nominal time T+ adjustment time △ T
Table 1
As shown in table 1, if the first humidity differences are 20%, it can determine that current first humidification control strategy is according to table 1 The opening time T1 of waterway electromagnetic valve is humidified as the fixed value with humidification capacity matching, and shut-in time T2 is nominal time T.If First humidity differences are 10%, then can determine that current first humidification control strategy is the unlatching for humidifying waterway electromagnetic valve according to table 1 Time T1 is the fixed value with humidification capacity matching, and shut-in time T2 is nominal time T+ adjustment time △ T.
After current first humidification control strategy has been determined, adding for air-conditioning can be carried out according to current first humidification control strategy Wet control.
Due to being sampled according to the timing time of humidification timing, constantly being humidified during humidifying control Control, in this way, after operation of air conditioner humidifies control process, using the first obtained humidity value in setting humidity range, here, It when first humidity value is greater than or equal to setting humidity value, can stop humidifying control, humidification timing can be closed.And air-conditioning is transported After row humidification control process, setting humidity value is still greater than using the first obtained humidity value, then there is still a need for carry out humidification control System, until the first humidity value is greater than or equal to setting humidity value.
As it can be seen that in the embodiment of the present invention, it, can root after the air-conditioner humidifying function in heating mode or mode of drying is opened According to humidification periods, temperature value corresponding with humidification periods or humidity value determine corresponding humidification strategy to carry out the humidification of air-conditioning Operation, in this way, the air-conditioning in heating mode or air supply pattern can also carry out humidification control, in this way, when air-conditioning is run in winter, Also the humidity that can control region, reduces air dried probability, has further expanded the function of air-conditioning, also improved human body Comfort.
Since in the embodiment of the present invention, air-conditioning may be at heating mode or air supply pattern, wherein in adding for air supply pattern In wet control, the control for carrying out air-conditioning extension set wind speed is also needed, therefore, when air-conditioning is in air supply pattern, further includes: when humidification is counted When the present timing time less than the first setting time when, or, when the present timing time be greater than or equal to the first setting time, and When temperature gap is greater than the first set temperature value, the blower of air-conditioning is determined as wind speed setting;Be greater than when the present timing time or Equal to the first setting time, and when temperature gap is less than or equal to the first set temperature value, determination is corresponding with the first humidity differences Current second humidification control strategy, and controlled according to the humidification that current second humidification control strategy carries out air-conditioning, wherein current Second humidifies the blower wind speed of the opening time that control strategy includes humidification waterway electromagnetic valve and shut-in time and air-conditioning Strategy.
Wherein, the humidification control time is not grown, though the humidification control time it is long, the second temperature of air-conditioning region In the case where value decline is not also very much, the control process for humidifying waterway electromagnetic valve is constant, and blower wind speed is wind speed setting. But if the humidification control time is long, second temperature value is caused to decline it is obvious that at this point, not only to determine humidification water route electromagnetism Blower wind speed strategy is also predefined in the control strategy of valve.Here, it can also be pre-configured between humidity differences and humidification control strategy The second corresponding relationship, i.e., be greater than or equal to the first setting time when the present timing time, and temperature gap is less than or equal to the When one set temperature value, the configuration humidity differences of configuration and the relationship humidified between control strategy are the second corresponding relationship.
Table 2 is second corresponding between a kind of humidity differences shown according to an exemplary embodiment and humidification control strategy Relationship.
Table 2
It is greater than or equal to the first setting time when the present timing time, and temperature gap is less than or equal to the first set temperature When value, if the first humidity differences are 30%, such as table 2, the current second humidification control strategy determined includes: that T1 is and humidification capacity Matched fixed value, T2=T- △ T, by blower wind speed from high-grade air rate adjustment be middle-grade wind speed, or by blower wind speed from non- High-grade air rate adjustment is wind speed setting.If the first humidity differences are 10%, such as table 2, the current second humidification control strategy determined It include: the fixed value that T1 is with humidifies capacity matching, blower air rate adjustment is bottom by T2=nominal time T+ adjustment time △ T Shelves wind speed.
Certainly, after operation of air conditioner humidifies control process, using the first obtained humidity value in setting humidity range, this In, it when the first humidity value is greater than or equal to setting humidity value, can stop humidifying control, humidification timing can be closed.And it is empty After allocation and transportation row humidification control process, setting humidity value is still greater than using the first obtained humidity value, and second temperature value is greater than Room temperature is set, then there is still a need for humidification control is carried out, until the first humidity value is greater than or equal to setting humidity value.
When air-conditioning may be at heating mode, it is greater than or equal to the first setting time, and temperature difference when the present timing time When value is less than or equal to the first set temperature value, operation of air conditioner setting time need to be controlled according to second temperature value, so that air-conditioning institute Increase in regional temperature, meets the heat-production functions of air-conditioning.Certainly, at this point, humidification timer can be closed.When according to second temperature value After controlling operation of air conditioner setting time, above-mentioned humidification control can be still carried out.Equally, under heating mode, when operation of air conditioner humidifies After control process, using the first obtained humidity value in setting humidity range, here, the first humidity value is greater than or equal to setting It when humidity value, can stop humidifying control, humidification timing can be closed.And after operation of air conditioner humidification control process, using To the first humidity value setting humidity value is still greater than, then there is still a need for carrying out humidification control, until the first humidity value be greater than or Equal to setting humidity value.
Below by operating process set into specific embodiment, the control method of embodiment offer is illustrated the present invention.
In the present embodiment, air-conditioning is in heating mode, has pre-saved a kind of humidity differences and humidification as shown in table 1 and has controlled The first corresponding relationship between system strategy.First setting time is 10 minutes.First set temperature value is -2 DEG C.
Fig. 2 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment.As shown in Fig. 2, Air-conditioner humidifying control process include:
Step 201: the air-conditioning in heating mode receives humidification control instruction.
Does is step 202: the current humidity value of room area less than setting humidity value where judging air-conditioning? if so, executing Step 203, otherwise, step 211 is executed.
Here, set temperature value, but liked according to user, it is set in advance.Alternatively, air-conditioning passes through intelligence machine It practises, according to environment where air-conditioning, user characteristics etc. are automatically determined.It, need to be into if current humidity value is less than setting humidity value Row humidification control, can be performed step 203.If current humidity value is greater than or equal to setting humidity value, existing basis can be carried out Temperature carries out the process of heating control.
Step 203: the first temperature value of room area where obtaining air-conditioning, and start humidification timing.
It is controlled into humidification, then needs starting humidification timing, while also recording current air-conditioning place room area First temperature value.
Does step 204: sampling obtain the present timing time, judges the present timing time less than 10 minutes? if so, executing Step 205, otherwise, step 209 is executed.
Step 205: obtain present timing time corresponding first humidity value, and setting humidity value and the first humidity value it Between the first humidity differences.
Step 206: according to the first corresponding relationship of preservation, determining current first humidification control corresponding with the first humidity differences System strategy.
If the first humidity differences are 32%, current first humidification control strategy can be determined are as follows: T1 is and adds according to table 1 The matched fixed value of wet volume capacity, T2=T- △ T.Since the first humidity differences are bigger, humidify the closing of waterway electromagnetic valve Time is shorter.If the first humidity differences are 8%, according to table 1, it may be determined that current first humidification control strategy are as follows: T1 is With the fixed value of humidification capacity matching, T2=T+ △ T.Since the first humidity differences are smaller, the first humidity value and setting humidity Value is closer to, and therefore, the shut-in time for humidifying waterway electromagnetic valve can be longer.
Step 207: being controlled according to the humidification that current first humidification control strategy carries out air-conditioning.
Step 208: obtaining current humidity value, and judge that current humidity value is less than setting humidity value? if so, returning to step Rapid 204, otherwise, execute step 211.
Step 209: judging that the temperature gap between present timing time corresponding second temperature value and the first temperature value is It is no to be greater than -2 DEG C? if so, executing step 205, otherwise, step 210 is executed.
Although present timing time >=10 minute, if > -2 DEG C of temperature gap, the i.e. corresponding interior of air-conditioning at this time Regional temperature declines too much not yet, can also meet user's heating needs, at this point, can return to step 205, continue to humidify Control.Otherwise, the temperature of room area has declined, and may will affect experiencing for user, and therefore, it is necessary to execute step Rapid 210.
Step 210: being controlled operation of air conditioner 30 minutes according to second temperature value, and close humidification timer, and can return to step In rapid 202.
In the present embodiment, setting time is 30 minutes, i.e., in the embodiment of the present invention, both needs to carry out humidification control, also need Guarantee the heat-production functions of air-conditioning, therefore, behind heat-production functions 30 minutes that air-conditioning need to be continued to run, continues to humidify control.
Step 211: air-conditioning heating operation being controlled according to second temperature value, and closes humidification timer, and can return to step In 202.
I.e. current humidity value meets sets requirement, can only carry out the operation of heat-production functions.
As it can be seen that the air-conditioning in heating mode can be according to humidification periods, temperature corresponding with humidification periods in the present embodiment Angle value or humidity value determine corresponding humidification strategy to carry out the humidification operation of air-conditioning, in this way, being in the air-conditioning of heating mode Humidification control can be carried out, in this way, also can control the humidity of region when air-conditioning is run in winter, is reduced air dried several Rate has further expanded the function of air-conditioning, also improves the comfort of human body.
In another embodiment of the present invention, in the present embodiment, air-conditioning is in air supply pattern, has pre-saved as shown in table 1 The first corresponding relationship and a kind of humidity differences as shown in Table 2 between a kind of humidity differences and humidification control strategy with plus The second corresponding relationship between wet control strategy.First setting time is 12 minutes.First set temperature value is -1 DEG C, and is set Room temperature is 18 DEG C, and setting outdoor temperature can be 20 DEG C.
Fig. 3 is a kind of flow chart of air-conditioner humidifying controlling method shown according to an exemplary embodiment.As shown in figure 3, Air-conditioner humidifying control process include:
Step 301: the air-conditioning in air supply pattern receives humidification control instruction.
Step 302: judging outdoor temperature less than 20 DEG C? if so, executing step 303, otherwise, step 314 is executed.
Step 303: judging that room temperature is greater than 18 DEG C? if so, executing step 304, otherwise, step 315 is executed.
Step 304: judging that the current humidity value of room area is less than setting humidity value? if so, step 305 is executed, otherwise, Execute step 314.
Step 305: the first temperature value of room area where really obtaining air-conditioning, and start humidification timing.
Does step 306: sampling obtain the present timing time, judges the present timing time less than 12 minutes? if so, executing Step 307, otherwise, step 311 is executed.
Step 307: determining that the blower of air-conditioning is determined as wind speed setting, and obtain present timing time corresponding first humidity The first humidity differences between value, and setting humidity value and the first humidity value.
Step 308: according to the first corresponding relationship of preservation, determining current first humidification control corresponding with the first humidity differences System strategy.
Step 309: being controlled according to the humidification that current first humidification control strategy and wind speed setting carry out air-conditioning.
Step 310: obtaining current humidity value, and judge that current humidity value is less than setting humidity value? if so, returning to step Rapid 306, otherwise, execute step 314.
Step 311: judging that the temperature gap between present timing time corresponding second temperature value and the first temperature value is It is no to be greater than -1 DEG C? if so, executing step 307, otherwise, step 312 is executed.
Step 312: according to the second corresponding relationship of preservation, determining current second humidification control corresponding with the first humidity differences System strategy.
If the first humidity differences are 30%, and blower wind speed is high-grade wind speed, then can determine current second humidification according to table 2 Control strategy are as follows: T1 is the fixed value with humidification capacity matching, and T2=T- △ T, air rate adjustment is wind speed setting.Due to first wet Degree difference comparsion is big, and therefore, the shut-in time for humidifying waterway electromagnetic valve is shorter.If the first humidity differences are 10%, can Determine current second humidification control strategy according to table 2 are as follows: T1 be with the fixed value of humidification capacity matching, T2=T+ △ T, wind speed is Low-grade wind speed.Since the first humidity differences are smaller, the first humidity value and setting humidity value are closer to, therefore, humidification water The shut-in time of way solenoid valve can be longer.
Step 313: being controlled according to the humidification that current second humidification control strategy carries out air-conditioning, and return step 310.
Step 314: air-conditioning blowing operation being controlled according to second temperature value, and closes humidification timer, and can return to step In 302.
Step 315: stopping blowing operation.
In this way, can prevent from being blown into cold wind.
As it can be seen that the air-conditioning in blowing mode can be according to humidification periods, temperature corresponding with humidification periods in the present embodiment Angle value or humidity value determine corresponding humidification strategy to carry out the humidification operation of air-conditioning, in this way, being in the air-conditioning of blowing mode Humidification control can be carried out, in this way, also can control the humidity of region when air-conditioning is run in winter, is reduced air dried several Rate has further expanded the function of air-conditioning, also improves the comfort of human body.
According to the process that above-mentioned air-conditioner humidifying controls, a kind of device of air-conditioner humidifying control can be constructed.
Fig. 4 is a kind of block diagram of air-conditioner humidifying control device shown according to an exemplary embodiment.As shown in figure 4, should Device can include: humidification start unit 100 and the first humidification control unit 200.
Start unit 100 is humidified, for being opened when determining humidification function, and the current humidity value of room area where air-conditioning When less than setting humidity value, the first temperature value of room area where obtaining air-conditioning, and start humidification timing.
First humidification control unit 200, for when humidify timing the present timing time less than the first setting time when, Or, when the present timing time is greater than or equal to the first setting time, and present timing time corresponding second temperature value and first When temperature gap between temperature value is greater than the first set temperature value, present timing time corresponding first humidity value is obtained, with And the first humidity differences between setting humidity value and the first humidity value, and determine corresponding with the first humidity differences current first Control strategy is humidified, is controlled according to the humidification that current first humidification control strategy carries out air-conditioning, wherein current first humidification control Strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
In one embodiment of the invention, start unit 100 is humidified, receives humidification specifically for the air-conditioning in heating mode When control instruction, determine that humidification function is opened;Or, the air-conditioning in air supply pattern receives humidification control instruction, and air-conditioning institute When outdoor temperature is less than setting outdoor temperature, and room temperature where air-conditioning is greater than setting room temperature, determine that humidification function is opened It opens.
In one embodiment of the invention, when air-conditioning is in air supply pattern,
First humidification control unit 200, is also used to the blower of air-conditioning being determined as wind speed setting.
Device further include: the second humidification control unit, for being greater than or equal to the first setting time when the present timing time, And temperature gap be less than or equal to the first set temperature value when, determine it is corresponding with the first humidity differences it is current second humidification controls Strategy, and controlled according to the humidification that current second humidification control strategy carries out air-conditioning, wherein current second humidification control strategy packet The blower wind speed strategy of the opening time for humidifying waterway electromagnetic valve and shut-in time and air-conditioning is included.
In one embodiment of the invention, when air-conditioning is in heating mode, device includes:
Second humidification control unit, for being greater than or equal to the first setting time, and temperature gap when the present timing time When being less than or equal to the first set temperature value, operation of air conditioner setting time is controlled according to second temperature value, and closes humidification meter When device.
The device of air-conditioner humidifying control is specifically described below.
Fig. 5 is a kind of block diagram of air-conditioner humidifying control device shown according to an exemplary embodiment.As shown in figure 5, should Device can include: humidification start unit 100 and the first humidification control unit 200.It further include the second humidification control unit 300.
In this way, the air-conditioning in heating mode receives humidification control instruction, humidification start unit 100 can determine humidification function It can open, and when the current humidity value of air-conditioning place room area is less than setting humidity value, obtain room area where air-conditioning The first temperature value, and start humidification timing.
In this way, when humidifying the present timing time of timing less than the first setting time, or, when the present timing time is greater than Or it is equal to the first setting time, and the temperature gap between present timing time corresponding second temperature value and the first temperature value is big When the first set temperature value, the first humidification control unit 200 obtains present timing time corresponding first humidity value, and The first humidity differences between humidity value and the first humidity value are set, and determine that corresponding with the first humidity differences current first adds Wet control strategy is controlled according to the humidification that current first humidification control strategy carries out air-conditioning, wherein current first humidification control plan It slightly include the opening time and shut-in time for humidifying waterway electromagnetic valve.
And works as the present timing time and be greater than or equal to the first setting time, and temperature gap is less than or equal to the first setting temperature When angle value, the second humidification control unit 300 controls operation of air conditioner setting time according to second temperature value, and closes humidification timing Device.
As it can be seen that the air-conditioning in heating mode can be according to humidification periods, temperature corresponding with humidification periods in the present embodiment Angle value or humidity value determine corresponding humidification strategy to carry out the humidification operation of air-conditioning, in this way, being in the air-conditioning of heating mode Humidification control can be carried out, in this way, also can control the humidity of region when air-conditioning is run in winter, is reduced air dried several Rate has further expanded the function of air-conditioning, also improves the comfort of human body.
In one embodiment of the invention, a kind of device of air-conditioner humidifying control is provided, device is used for air-conditioning, and device includes:
Processor;
Memory for storage processor executable instruction;
Wherein, processor is configured as:
When determine humidification function open, and the air-conditioning where room area current humidity value be less than setting humidity value When, the first temperature value of room area where obtaining the air-conditioning, and start humidification timing;
When the present timing time of the humidification timing is less than the first setting time, or, working as the present timing time More than or equal to first setting time, and the present timing time corresponding second temperature value and first temperature value Between temperature gap be greater than the first set temperature value when, obtain the present timing time corresponding first humidity value, and The first humidity differences between the setting humidity value and the first humidity value, and determine work as corresponding with first humidity differences Preceding first humidification control strategy controls, wherein institute according to the humidification that the current first humidification control strategy carries out the air-conditioning Stating current first humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
The embodiment of the present invention provides a kind of computer readable storage medium, is stored thereon with computer instruction, and feature exists In when the instruction is executed by processor the step of the realization above method.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
It should be understood that the invention is not limited to the process and structure that are described above and are shown in the accompanying drawings, And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is only limited by the attached claims System.

Claims (10)

1. a kind of method of air-conditioner humidifying control characterized by comprising
When determine humidification function open, and the air-conditioning where room area current humidity value be less than setting humidity value when, obtain First temperature value of room area where taking the air-conditioning, and start humidification timing;
When the present timing time of the humidification timing is less than the first setting time, or, when the present timing time is greater than Or it is equal to first setting time, and between the present timing time corresponding second temperature value and first temperature value Temperature gap when being greater than the first set temperature value, obtain the present timing time corresponding first humidity value and described The first humidity differences between humidity value and the first humidity value are set, and determine corresponding with first humidity differences current the One humidification control strategy controls, wherein described to work as according to the humidification that the current first humidification control strategy carries out the air-conditioning Preceding first humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
2. the method as described in claim 1, which is characterized in that the determining humidification function, which is opened, includes:
When the air-conditioning in heating mode receives humidification control instruction, determine that the humidification function is opened;Or,
The air-conditioning in air supply pattern receives humidification control instruction, and outdoor temperature where the air-conditioning is less than setting room Outer temperature when room temperature where the air-conditioning is greater than setting room temperature, determines that the humidification function is opened.
3. method according to claim 2, which is characterized in that when the air-conditioning is in air supply pattern, further includes:
When the present timing time of the humidification timing is less than the first setting time, or, when the present timing time is greater than Or be equal to first setting time, and the temperature gap be greater than the first set temperature value when, the blower of the air-conditioning is true It is set to wind speed setting;
It is greater than or equal to first setting time when the present timing time, and the temperature gap is less than or equal to first When set temperature value, the current second humidification control strategy corresponding with first humidity differences is determined, and according to described Current second humidification control strategy carries out the humidification control of the air-conditioning, wherein described current second, which humidifies control strategy, includes The opening time and shut-in time of humidification waterway electromagnetic valve and the blower wind speed strategy of the air-conditioning.
4. method according to claim 2, which is characterized in that when the air-conditioning is in heating mode, the method is also wrapped It includes:
It is greater than or equal to first setting time when the present timing time, and the temperature gap is being less than or equal to the When one set temperature value, operation of air conditioner setting time is controlled according to the second temperature value, and close the humidification timer.
5. a kind of device of air-conditioner humidifying control, which is characterized in that described device includes:
Start unit is humidified, for opening when determining humidification function, and the current humidity value of room area where the air-conditioning is small When setting humidity value, the first temperature value of room area where obtaining the air-conditioning, and start humidification timing;
First humidification control unit, for when it is described humidification timing the present timing time less than the first setting time when, or, working as The present timing time is greater than or equal to first setting time, and the present timing time corresponding second temperature value When temperature gap between first temperature value is greater than the first set temperature value, it is corresponding to obtain the present timing time The first humidity differences between first humidity value and the setting humidity value and the first humidity value, and determine and described first The corresponding current first humidification control strategy of humidity differences carries out the air-conditioning according to the current first humidification control strategy Humidification control, wherein the current first humidification control strategy includes opening time and the closing for humidifying waterway electromagnetic valve Time.
6. device as claimed in claim 5, which is characterized in that
The humidification start unit determines when receiving humidification control instruction specifically for the air-conditioning in heating mode The humidification function is opened;Or, the air-conditioning in air supply pattern receives humidification control instruction, and room where the air-conditioning Outer temperature is less than setting outdoor temperature, when room temperature where the air-conditioning is greater than setting room temperature, determines the humidification function It can open.
7. device as claimed in claim 6, which is characterized in that when the air-conditioning is in air supply pattern,
The first humidification control unit, is also used to the blower of the air-conditioning being determined as wind speed setting;
Described device further include: the second humidification control unit, for being greater than or equal to described first when the present timing time Setting time, and the temperature gap be less than or equal to the first set temperature value when, determination it is corresponding with first humidity differences The current second humidification control strategy, and the humidification control of the air-conditioning is carried out according to the current second humidification control strategy System, wherein the current second humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve, with And the blower wind speed strategy of the air-conditioning.
8. device as claimed in claim 6, which is characterized in that when the air-conditioning is in heating mode, described device includes:
Second humidification control unit, for being greater than or equal to first setting time when the present timing time, and it is described Temperature gap controls operation of air conditioner setting time when being less than or equal to the first set temperature value, according to the second temperature value, And close the humidification timer.
9. a kind of device of air-conditioner humidifying control, described device are used for air-conditioning, which is characterized in that described device includes:
Processor;
Memory for storage processor executable instruction;
Wherein, the processor is configured to:
When determine humidification function open, and the air-conditioning where room area current humidity value be less than setting humidity value when, obtain First temperature value of room area where taking the air-conditioning, and start humidification timing;
When the present timing time of the humidification timing is less than the first setting time, or, when the present timing time is greater than Or it is equal to first setting time, and between the present timing time corresponding second temperature value and first temperature value Temperature gap when being greater than the first set temperature value, obtain the present timing time corresponding first humidity value and described The first humidity differences between humidity value and the first humidity value are set, and determine corresponding with first humidity differences current the One humidification control strategy controls, wherein described to work as according to the humidification that the current first humidification control strategy carries out the air-conditioning Preceding first humidification control strategy includes the opening time and shut-in time for humidifying waterway electromagnetic valve.
10. a kind of computer readable storage medium, is stored thereon with computer instruction, which is characterized in that the instruction is by processor The step of claim 1-4 the method is realized when execution.
CN201910146537.1A 2019-02-27 2019-02-27 Air conditioner humidification control method and device and computer storage medium Active CN110173848B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910146537.1A CN110173848B (en) 2019-02-27 2019-02-27 Air conditioner humidification control method and device and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910146537.1A CN110173848B (en) 2019-02-27 2019-02-27 Air conditioner humidification control method and device and computer storage medium

Publications (2)

Publication Number Publication Date
CN110173848A true CN110173848A (en) 2019-08-27
CN110173848B CN110173848B (en) 2021-11-02

Family

ID=67689174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910146537.1A Active CN110173848B (en) 2019-02-27 2019-02-27 Air conditioner humidification control method and device and computer storage medium

Country Status (1)

Country Link
CN (1) CN110173848B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114216242A (en) * 2021-11-25 2022-03-22 青岛海尔空调器有限总公司 Air conditioner control method and device, air conditioner and storage medium
WO2022160763A1 (en) * 2021-01-29 2022-08-04 青岛海尔空调器有限总公司 Humidification method and apparatus, and smart home system
WO2023077830A1 (en) * 2021-11-02 2023-05-11 青岛海尔空调器有限总公司 Method and device for controlling air conditioner, air conditioner and storage medium

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006329595A (en) * 2005-05-30 2006-12-07 Daikin Ind Ltd Humidity conditioner
JP2009008390A (en) * 2008-10-16 2009-01-15 Mitsubishi Electric Corp Air conditioner and operation method of air conditioner
KR20150091681A (en) * 2014-02-03 2015-08-12 삼성전자주식회사 Dehumidifier and method for controlling the same
CN105222271A (en) * 2015-09-17 2016-01-06 广东美的制冷设备有限公司 A kind of pleasant climate method, controller and air-conditioning system
JP2016065687A (en) * 2014-09-25 2016-04-28 パナソニックIpマネジメント株式会社 Air conditioner
CN106196471A (en) * 2016-07-25 2016-12-07 广东美的制冷设备有限公司 Air-conditioner humidity control method and air-conditioner
CN106288142A (en) * 2016-07-25 2017-01-04 广东美的制冷设备有限公司 Air-conditioner humidity control method and air-conditioner
US20170074538A1 (en) * 2015-09-11 2017-03-16 Schneider Electric It Corporation Close humidity and temperature control method
CN106594984A (en) * 2016-11-30 2017-04-26 广东美的制冷设备有限公司 Air conditioner humidification control method and device, and air conditioner
CN106705345A (en) * 2015-11-18 2017-05-24 成都超网实业有限公司 Control method of spray humidification amount of combined air conditioner
US9822990B2 (en) * 2013-07-19 2017-11-21 Honeywell International Inc. Methods, systems, and devices for humidifying
CN108006911A (en) * 2017-11-29 2018-05-08 广东美的暖通设备有限公司 Humidifying controlling method, system, air conditioner, computing device and storage medium
CN108019896A (en) * 2017-11-29 2018-05-11 广东美的制冷设备有限公司 Air conditioner and its control method and device
CN108413580A (en) * 2018-03-07 2018-08-17 广东美的制冷设备有限公司 Air-conditioner control method, device and readable storage medium storing program for executing, air conditioner
CN108562017A (en) * 2018-02-28 2018-09-21 青岛海尔空调器有限总公司 A kind of air-humidification method, control device and the air-conditioning of purified humidifying air-conditioner
CN109357365A (en) * 2018-11-09 2019-02-19 青岛海尔空调器有限总公司 The humidifying controlling method and air-conditioning system of air conditioner with humidification function

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006329595A (en) * 2005-05-30 2006-12-07 Daikin Ind Ltd Humidity conditioner
JP2009008390A (en) * 2008-10-16 2009-01-15 Mitsubishi Electric Corp Air conditioner and operation method of air conditioner
US9822990B2 (en) * 2013-07-19 2017-11-21 Honeywell International Inc. Methods, systems, and devices for humidifying
KR20150091681A (en) * 2014-02-03 2015-08-12 삼성전자주식회사 Dehumidifier and method for controlling the same
JP2016065687A (en) * 2014-09-25 2016-04-28 パナソニックIpマネジメント株式会社 Air conditioner
US20170074538A1 (en) * 2015-09-11 2017-03-16 Schneider Electric It Corporation Close humidity and temperature control method
CN105222271A (en) * 2015-09-17 2016-01-06 广东美的制冷设备有限公司 A kind of pleasant climate method, controller and air-conditioning system
CN106705345A (en) * 2015-11-18 2017-05-24 成都超网实业有限公司 Control method of spray humidification amount of combined air conditioner
CN106196471A (en) * 2016-07-25 2016-12-07 广东美的制冷设备有限公司 Air-conditioner humidity control method and air-conditioner
CN106288142A (en) * 2016-07-25 2017-01-04 广东美的制冷设备有限公司 Air-conditioner humidity control method and air-conditioner
CN106594984A (en) * 2016-11-30 2017-04-26 广东美的制冷设备有限公司 Air conditioner humidification control method and device, and air conditioner
CN108006911A (en) * 2017-11-29 2018-05-08 广东美的暖通设备有限公司 Humidifying controlling method, system, air conditioner, computing device and storage medium
CN108019896A (en) * 2017-11-29 2018-05-11 广东美的制冷设备有限公司 Air conditioner and its control method and device
CN108562017A (en) * 2018-02-28 2018-09-21 青岛海尔空调器有限总公司 A kind of air-humidification method, control device and the air-conditioning of purified humidifying air-conditioner
CN108413580A (en) * 2018-03-07 2018-08-17 广东美的制冷设备有限公司 Air-conditioner control method, device and readable storage medium storing program for executing, air conditioner
CN109357365A (en) * 2018-11-09 2019-02-19 青岛海尔空调器有限总公司 The humidifying controlling method and air-conditioning system of air conditioner with humidification function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王志毅等: "户式中央空调设计的几个问题 ", 《流体机械》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022160763A1 (en) * 2021-01-29 2022-08-04 青岛海尔空调器有限总公司 Humidification method and apparatus, and smart home system
WO2023077830A1 (en) * 2021-11-02 2023-05-11 青岛海尔空调器有限总公司 Method and device for controlling air conditioner, air conditioner and storage medium
CN114216242A (en) * 2021-11-25 2022-03-22 青岛海尔空调器有限总公司 Air conditioner control method and device, air conditioner and storage medium

Also Published As

Publication number Publication date
CN110173848B (en) 2021-11-02

Similar Documents

Publication Publication Date Title
CN104807137B (en) Method and device for controlling temperature and humidity of air conditioner
CN110173848A (en) The method, apparatus and computer storage medium of air-conditioner humidifying control
US10203122B2 (en) Air-conditioning and ventilation apparatus
CN105928139B (en) Air conditioner automatically cleaning control method
US7975495B2 (en) Control scheme for coordinating variable capacity components of a refrigerant system
EP2806223B1 (en) Air-conditioning system that adjusts temperature and humidity
US9702578B2 (en) Air conditioning control system for controlling outside air control and return air control of air conditioning system
EP3165843A1 (en) Ventilation device
CN104764147B (en) The constant temperature dehumidification control method and control system of air conditioner
CN107367023A (en) For controlling the method and device of air-conditioning
CN107192090B (en) The method and device of airconditioning control
CN108518811A (en) Method and apparatus, air treatment system and computer readable storage medium for controlling air device
CN108361926A (en) A kind of air-conditioner control method and air conditioner based on warm creeping chill
CN107084497B (en) The method and device of airconditioning control
CN107525226A (en) For controlling the method and device of air-conditioning
CN108375166A (en) The method, apparatus and computer storage media of the anti-condensation control of air-conditioning
US20140242899A1 (en) Fan Coil Unit/CRAC Optimizer System
CN108375186A (en) The method, apparatus and computer storage media of the anti-condensation control of air-conditioning
CN107477799A (en) The method and device of airconditioning control
CN113475733A (en) Method and device for drying tobacco and drying equipment
CN107631424A (en) Automatic temperature-control air-conditioner control method and air conditioner
CN108019892A (en) The control method of multi-connected air conditioning system
CN109990434A (en) Method and device for controlling household appliance and household appliance
CN110017588A (en) Progress control method, device, air conditioner and computer readable storage medium
CN113983648A (en) Control method and device of fresh air conditioning system and fresh air conditioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266101 Haier Industrial Park, No. 1 Haier Road, Laoshan District, Qingdao, Shandong

Applicant after: QINGDAO HAIER AIR-CONDITIONING ELECTRONIC Co.,Ltd.

Applicant after: Haier Smart Home Co., Ltd.

Address before: 266101 Haier Industrial Park, No. 1 Haier Road, Laoshan District, Qingdao, Shandong

Applicant before: QINGDAO HAIER AIR-CONDITIONING ELECTRONIC Co.,Ltd.

Applicant before: QINGDAO HAIER JOINT STOCK Co.,Ltd.

GR01 Patent grant
GR01 Patent grant