CN110172965A CN201910480299.8A CN201910480299A CN110172965A CN 110172965 A CN110172965 A CN 110172965A CN 201910480299 A CN201910480299 A CN 201910480299A CN 110172965 A CN110172965 A CN 110172965A
Authority
CN
China
Prior art keywords
fashioned iron
heavy frame
steel
wirerope
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910480299.8A
Other languages
Chinese (zh)
Other versions
CN110172965B (en
Inventor
黄�俊
张军
陈耀钢
姜雪岐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongnan Construction Industry Group Co Ltd
Original Assignee
Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongnan Construction Industry Group Co Ltd filed Critical Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority to CN201910480299.8A priority Critical patent/CN110172965B/en
Publication of CN110172965A publication Critical patent/CN110172965A/en
Application granted granted Critical
Publication of CN110172965B publication Critical patent/CN110172965B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of diaphram wall steel bar segmentation formula constructing devices, and including continuous wall groove located underground, the flat place suitable for reading of continuous wall groove is successively laid with steel plate, concrete floor from top to bottom, and steel plate is fixedly connected by two steel columns with fashioned iron crossbeam;Two steel columns are respectively placed in the both ends of fashioned iron crossbeam;It is sequentially connected hoist engine, wirerope, heavy frame from top to bottom in the middle part of fashioned iron crossbeam;Hoist engine is two, and one end of hoist engine is fixedly connected with fashioned iron crossbeam, and the other end is fixedly connected by wirerope with heavy frame;Also set up section longitudinal beam on fashioned iron crossbeam, section longitudinal beam be it is multiple, be provided with platform at the top of multiple section longitudinal beams;It is fixedly connected with multiple main reinforcements on heavy frame, horizontal reinforcement is successively set at equal intervals in multiple main reinforcements, horizontal reinforcement drops in binding.The invention also discloses a kind of construction method, prefabricated land occupation is few, safely, solve the dynamic rebuffed phenomenon of skeleton Huang, be rebuffed due to skeleton under do not go, reveal the phenomenon of muscle, collapse hole, diaphragm wall folder soil.

Description

Diaphram wall steel bar segmentation formula constructing device and construction method
Technical field
The present invention relates to a kind of segmented constructing device and construction method more particularly to a kind of diaphram wall steel bar segmentations Formula constructing device and construction method, belong to technical field of building construction.
Background technique
Diaphragm wall reinforcement construction device in the prior art and construction method are needed larger generally by the way of prefabricated Prefabricated assembling reinforcement skeleton place, take large area shelf binding platform.It is therefore easily-deformable when the lifting of tall and big framework of steel reinforcement, And to rely on tall and big hoisting machinery;There are problems that being inserted into difficulty in wall chase and touches cell wall, easily dew muscle greatly, easily.
Summary of the invention
It is an object of the invention to overcome in the prior art prefabricated diaphragm wall reinforcement construction device lifting mutability, rely on Difficulty is big in hoisting machinery, insertion wall chase, easily touches cell wall, the deficiency of easily dew muscle, provides a kind of diaphram wall steel bar segmentation formula and applies Tooling is set, and technical solution is as follows:
Diaphram wall steel bar segmentation formula constructing device, including continuous wall groove located underground, the flat position suitable for reading of continuous wall groove It sets place and is successively laid with steel plate, concrete floor from top to bottom, steel plate is fixedly connected by two steel columns with fashioned iron crossbeam;Two Steel column is respectively placed in the both ends of fashioned iron crossbeam;
It is sequentially connected hoist engine, wirerope, heavy frame from top to bottom in the middle part of fashioned iron crossbeam;Hoist engine be two, the one of hoist engine End is fixedly connected with fashioned iron crossbeam, and the other end is fixedly connected by wirerope with heavy frame;
Also set up section longitudinal beam on fashioned iron crossbeam, section longitudinal beam be it is multiple, be provided with platform at the top of multiple section longitudinal beams;
It is fixedly connected with multiple main reinforcements on heavy frame, horizontal reinforcement is successively set at equal intervals in multiple main reinforcements, horizontal reinforcement side is tied up Prick side tenesmus.
Further, the truncation surface of continuous wall groove is polygon or linear type.
Preferably, multiple section longitudinal beams are symmetrically set on fashioned iron crossbeam.
Preferably, hoist engine is automatic linkage motor hoist engine.
Further, steel plate is welded on concrete floor.
Preferably, stop collar is arranged in the lower section of heavy frame.
Further, Hanging Basket is installed on fashioned iron crossbeam, there are two Hanging Baskets, is hung at the two sides of fashioned iron crossbeam respectively, hangs Basket includes sunpender, platform hanging basket and railing, and platform hanging basket is fixedly connected by sunpender with fashioned iron crossbeam, and railing is installed at equal intervals On sunpender.
A kind of construction method using aforementioned diaphram wall steel bar segmentation formula constructing device, comprising the following steps:
Step 1: digging continuous wall groove in underground, heavy frame is set up on continuous wall groove;On heavy frame, in main reinforcement and heavy frame Weld straight thread casing in corresponding position;
Step 2: hanging oneself in shaped steel frame and set Hanging Basket and reinforcing bar binding Hanging Basket inner platform, vertically transferred by root downwards by platform hanging basket Main reinforcement, and be fixed on heavy frame by straight thread bolt;
Step 3: heavy frame is hung on fashioned iron crossbeam by hoist engine and wirerope;
Step 4: starting hoist engine and heavy frame is adjusted at continuous wall groove flat position suitable for reading;
Step 5: a part of construction personnel vertically transfers main reinforcement by root downwards by platform, and is consolidated main reinforcement by straight thread bolt It is scheduled on heavy frame;
Another part construction personnel stands on binding horizontal reinforcement and lacing wire and horizontal structure connector in platform hanging basket;
Step 6: every to have bound a section diaphragm wall framework of steel reinforcement, decentralization is primary;
Bound final section diaphragm wall framework of steel reinforcement, under discharge last time diaphragm wall framework of steel reinforcement, pull wirerope and holding Draw-string pin at power frame extracts wirerope out;
Step 7: pouring continuous wall concrete.
Preferably, pumping pin rope is connected on the solution rope pin in construction method, by pulling pumping pin rope rope pin and steel wire will be solved Rope and heavy frame are detached from, to extract wirerope out.
Compared with prior art, advantageous effects of the invention:
Prefabricated land occupation is few, small to lifting capacity, height, the working radius requirement of hoisting machinery, and safety, worker tie up in platform hanging basket It pricks in operation set and does not change, vertical Hanging type assembling reinforcement skeleton is indeformable, upright position is easy to control, to have prevented skeleton Huang dynamic touches Wall phenomenon, the phenomenon for having prevented phenomena such as not going under being rebuffed due to skeleton, reveal muscle, collapse hole, having prevented diaphragm wall folder soil.
Detailed description of the invention
Fig. 1 is the structure chart of constructing device of the invention;
Fig. 2 is the truncation surface schematic diagram of the polygon continuous wall groove in embodiment 1;
Fig. 3 is the heavy frame detail view in Fig. 1;
Fig. 4 is the fixed schematic diagram of heavy frame wirerope in Fig. 1;
Fig. 5 is the detail view of the Xie Shengxiao in Fig. 4;
Fig. 6 is the detail view of the platform in embodiment 1;
Fig. 7 is the wall framework of steel reinforcement bracket of the heavy frame in Fig. 1;
In figure: 1. main reinforcements, 2. platforms, 3. fashioned iron crossbeams, 4. section longitudinal beams, 5. steel columns, 6. Hanging Baskets, 601. sunpenders, 602. hang Basket platform, 603. railings, 7. horizontal reinforcements, 8. solution rope pins, 801. through-holes, 802. iron wires, 9. hoist engines, 10. wirerope, 11. Continuous wall groove, 12. steel plates, 13. concrete floors, 14. heavy frames, 15. straight thread casings, 16. stop collars, 17. pumping pin ropes, 18. rope.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
As shown in Fig. 1 ~ Fig. 6, diaphram wall steel bar segmentation formula constructing device of the invention, including located underground continuous Wall chase 11, steel plate 12, concrete floor 13 are successively laid at the flat position suitable for reading of continuous wall groove 11 from top to bottom, and steel plate 12 is logical Two steel columns 5 are crossed to be fixedly connected with fashioned iron crossbeam 3;Two steel columns 5 are respectively placed in the both ends of fashioned iron crossbeam 3;
3 middle part of fashioned iron crossbeam is sequentially connected hoist engine 9, wirerope 10, heavy frame 14 from top to bottom;Hoist engine 9 is two, elevator One end of machine 9 is fixedly connected with fashioned iron crossbeam 3, and the other end is fixedly connected by wirerope 10 with heavy frame 14;
Also set up section longitudinal beam 4 on fashioned iron crossbeam 3, section longitudinal beam 4 be it is multiple, be provided with platform 2 at the top of multiple section longitudinal beams 4;
It is fixedly connected with multiple main reinforcements 1 on heavy frame 14, horizontal bar muscle 7, horizontal bar 7 are successively set at equal intervals in multiple main reinforcements 1 It drops in binding.Specifically, welding straight thread casing 15 on heavy frame 14, main reinforcement 1 passes through straight thread bolt and heavy frame 14 It is threadedly coupled.
The truncation surface of continuous wall groove 11 is polygon or linear type.
Multiple section longitudinal beams 4 are symmetrically set on fashioned iron crossbeam 3.
Hoist engine 9 is automatic linkage motor hoist engine 9.
Steel plate 12 is welded on concrete floor 13.Specifically, steel plate 12 is big steel plate.
Stop collar 16 is arranged in the lower section of heavy frame 14.Specifically, stop collar is 10 steel of Φ being welded below heavy frame 14 Muscle stop collar.
Hanging Basket 6 is installed, there are two Hanging Baskets 6, is hung at the two sides of fashioned iron crossbeam 3 respectively, and Hanging Basket 6 wraps on fashioned iron crossbeam 3 Sunpender 601, platform hanging basket 602 and railing 603 are included, platform hanging basket 602 is fixedly connected by sunpender 601 with fashioned iron crossbeam 3, railing 603 are mounted on sunpender 601 at equal intervals.The safety of the construction personnel of assembling reinforcement is preferably protected in the setting of railing 603, is prevented Only construction personnel falls from platform hanging basket 602.Two Hanging Baskets are located at the two sides of continuous wall groove 11 or heavy frame 14, by steel Tube clamps are composed, and divide upper and lower level work layer, 6 meters long, 800 millimeters wide, with 16@, 1500 steel wire hang in formed steel construction cross On beam 3.
A kind of construction method using aforementioned diaphram wall steel bar segmentation formula constructing device, comprising the following steps:
Step 1: digging continuous wall groove 11 in underground, heavy frame 14 is set up on continuous wall groove 11;On heavy frame 14, in main reinforcement 1 welds straight thread casing 15 with 14 corresponding position of heavy frame;Specifically, straight thread casing 15 is welded on heavy frame 14.It is logical It crosses platform 2 and vertically puts main reinforcement 1 by root downwards, and be fixed on heavy frame 14 by straight thread casing 15.Main reinforcement 1 vertically connects, Wall, column are transferred from formed steel construction body panel 2,1 liang of head threading of main reinforcement, pass through straight screw sleeve (figure between main reinforcement 1 and main reinforcement 1 In be not shown) connection;
Formed steel construction frame on ground, have column, crossbeam, on have the blanking of wall main reinforcement, connect main reinforcement platform 2, under have worker bind steel Muscle Hanging Basket 6, under there is diaphragm wall framework of steel reinforcement is mobile to automatically control bracket.
Step 2: shaped steel frame hang oneself set Hanging Basket 6 and reinforcing bar binding platform hanging basket 602, by platform hanging basket 602 downwards by Root vertically transfers main reinforcement 1, and is fixed on heavy frame 14 by straight thread bolt;
Step 3: heavy frame 14 is hung on fashioned iron crossbeam 3 by hoist engine 9 and wirerope 10;
Step 4: starting hoist engine 9 and heavy frame 14 is adjusted at the flat position suitable for reading of continuous wall groove 11;
Step 5: a part of construction personnel vertically transfers downwards main reinforcement 1 by platform 2 by root, and passes through straight thread bolt for main reinforcement 1 is fixed on heavy frame 14;
Another part construction personnel stands on binding horizontal reinforcement 7 and lacing wire and horizontal structure connector in platform hanging basket 602; Construction personnel's station operation in platform hanging basket 602, position, platform are constant, and framework of steel reinforcement flows downward, and people does not move, as vertical Assembly line, construction safety, labor intensity are small;
Step 6: every to have bound a section diaphragm wall framework of steel reinforcement, decentralization is primary;
Bound final section diaphragm wall framework of steel reinforcement, under discharge last time diaphragm wall framework of steel reinforcement, diaphragm wall framework of steel reinforcement It occupies stably on 11 bottom of continuous wall groove, absolute altitude is inspected for acceptance after qualification, and draw-string pin of the wirerope 10 at heavy frame 14 is pulled, and is extracted out Wirerope 10;Specifically, framework of steel reinforcement binds 3000mm high every time, and often tying up a section is 1500mm high.
Step 7: after qualification of inspecting for acceptance, pouring continuous wall concrete.
Pumping pin rope 17 is connected on solution rope pin 8 in construction method, by pulling pumping pin rope 17 so that rope pin 8 and wirerope will be solved 10 and heavy frame 14 be detached from, to extract wirerope 10 out.10 lower end of wirerope makes a rope sling, specifically, 10 lower end of wirerope After rope 18 upwards, upwards after wirerope 10 curve a semicircle, half circle imbeds rope sling, fixed with pumping pin rope 17, The ring part of pin obliquely and ties up on pumping pin rope 17, and specific pumping pin rope 17 is cotton cord, and the other end of cotton cord is pricked In the pillar (not shown) on concrete floor 13;In addition rope 18 is restricted around 14 fashioned iron crossbeam of heavy frame, 3 end is tied External application solution rope pin 8 is fixed;Between wirerope 10, steel wire cable 18, with 3 contact position of fashioned iron crossbeam with steel paunch mat (in figure not Show) it pads.Iron wire 802 passes through through-hole 801, and rope 18 is fixed by solution rope pin 8.
Such as Fig. 6, the platform 2 in the present embodiment on preferred mode fashioned iron crossbeam 3 is grating type profile steel blanking platform, fashioned iron It is hung below crossbeam 3 and sets Hanging Basket 6 and its platform hanging basket 602.
As shown in fig. 7, platform 2 selects the wooden scaffold board of 50mm thickness in the present embodiment;Fashioned iron crossbeam 3, which is removed, selects N20 work Word steel, 2000 ㎜ of spacing.Section longitudinal beam 4 generally selects N16 I-steel, 800~1000 ㎜ of spacing;Steel column 5, which is removed, selects N20 260 × 10 steel pipe of I-steel, 2000 ㎜ of spacing, I-steel used in fashioned iron crossbeam 3, section longitudinal beam 4 and steel column 5 it is big Rootlet obtains according to calculating in actual use.The sunpender 601 of Hanging Basket 6 selects 48 × 3 steel pipe spacing, and railing 603 selects 48 × 2.7 900 ㎜ of steel pipe spacing, platform hanging basket 602 select the wooden scaffold board of 50mm thickness, are layered on to be formed on the horizontal steel tube of cradle bottom and put down Platform.Specifically, the steel pipe under backing steel pipe, that is, platform hanging basket 602 holds the wooden scaffold board of 50mm thickness, forms platform.Platform Steel pipe selects 48 × 3 ㎜ of spacing 800mm~1000 under plate;The lifting capacity size of hoist engine 9 is determined by calculating;Hoist rope 10 specifications are by calculating determination, 1500 ㎜ of spacing;12 thickness of steel plate, 20~30 ㎜;The strength grade of concrete of concrete floor 13 is 150 ㎜ of C25 thickness;Heavy frame 14 is N14 I-steel and crossbeam (1500 ㎜ of spacing) downhand welding, weld four longitudinal direction N14 I-steel (with 1 number of rows of main reinforcement, centre to centre spacing are identical), on longitudinal I-steel, straight thread set is welded in vertical 1 corresponding position of main reinforcement of wall Pipe, to fix the position of the vertical main reinforcement 1 of wall.
Diaphram wall steel bar segmentation formula constructing device of the invention and construction method are a kind of vertical diaphram walls Framework of steel reinforcement does not need great prefabricated place for scene binding, and vertical direction binds one section and transfers one section, horizontal reinforcement It is bound in the main reinforcement of vertical direction with horizontal reinforcement by design requirement, a section framework of steel reinforcement is completed, and a section is transferred.It is prefabricated to account for Ground lacks, small to lifting capacity, height, the working radius requirement of hoisting machinery, and safety, worker bind operation, base in platform hanging basket This is not necessarily to shift position in situ, and concentration does not change, vertical Hanging type assembling reinforcement skeleton is indeformable, upright position is easy to control, The dynamic rebuffed phenomenon of skeleton Huang is prevented, has prevented phenomena such as not going under being rebuffed due to skeleton, reveal muscle, collapse hole, prevented diaphragm wall Press from both sides the phenomenon of soil.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (9)

1. diaphram wall steel bar segmentation formula constructing device, which is characterized in that described continuous including continuous wall groove located underground Successively be laid with steel plate, concrete floor at the flat position suitable for reading of wall chase from top to bottom, the steel plate by two steel columns with Fashioned iron crossbeam is fixedly connected;Two steel columns are respectively placed in the both ends of the fashioned iron crossbeam;
It is sequentially connected hoist engine, wirerope, heavy frame from top to bottom in the middle part of the fashioned iron crossbeam;The hoist engine is two, institute The one end for stating hoist engine is fixedly connected with the fashioned iron crossbeam, and the other end is fixedly connected by wirerope with heavy frame;
Section longitudinal beam is also set up on the fashioned iron crossbeam, the section longitudinal beam is multiple, setting at the top of multiple section longitudinal beams There is platform;
It is fixedly connected with multiple main reinforcements on the heavy frame, horizontal reinforcement is successively set at equal intervals in multiple main ribs, it is described Horizontal reinforcement drops in binding.
2. constructing device according to claim 1, which is characterized in that the truncation surface of the continuous wall groove is for polygon or directly Line style.
3. constructing device according to claim 1, which is characterized in that multiple section longitudinal beams are symmetrically set in the fashioned iron On crossbeam.
4. constructing device according to claim 1, which is characterized in that the hoist engine is automatic linkage motor elevator Machine.
5. constructing device according to claim 1, which is characterized in that the steel plate is welded on the concrete floor.
6. constructing device according to claim 1, which is characterized in that stop collar is arranged in the lower section of the heavy frame.
7. constructing device according to claim 1, which is characterized in that be equipped with Hanging Basket, the extension on the fashioned iron crossbeam There are two baskets, is hung at the two sides of the fashioned iron crossbeam respectively, and the Hanging Basket includes sunpender, platform hanging basket and railing, the extension Basket platform is fixedly connected by sunpender with the fashioned iron crossbeam, and the railing is installed on the suspender at equal intervals.
8. a kind of construction method using diaphram wall steel bar segmentation formula constructing device described in claim 1, feature exist In, comprising the following steps:
Step 1: digging continuous wall groove in underground, the heavy frame is set up on the continuous wall groove;On the heavy frame, Straight thread casing is welded in main ribs and the heavy frame corresponding position;
Step 2: it hangs oneself in shaped steel frame and sets Hanging Basket and reinforcing bar binding Hanging Basket inner platform, it is vertical by root downwards by the platform hanging basket Main ribs are transferred, and are fixed on the heavy frame by the straight thread bolt;
Step 3: the heavy frame is hung on the fashioned iron crossbeam by the hoist engine and the wirerope;
Step 4: starting the hoist engine and the heavy frame is adjusted at the continuous wall groove flat position suitable for reading;
Step 5: a part of construction personnel vertically transfers main ribs by root downwards by the platform, and passes through straight thread bolt Main ribs are fixed on the heavy frame;
Another part construction personnel stands on binding horizontal reinforcement and lacing wire and horizontal structure connector in the platform hanging basket;
Step 6: every to have bound a section diaphragm wall framework of steel reinforcement, decentralization is primary;
Bound final section diaphragm wall framework of steel reinforcement, under discharge last time diaphragm wall framework of steel reinforcement, pull the wirerope Draw-string pin at the heavy frame, extracts the wirerope out;
Step 7: pouring continuous wall concrete.
9. construction method according to claim 8, which is characterized in that connect pumping pin rope on the solution rope pin, pass through pulling Pumping pin rope is solution rope pin to be detached from the wirerope and the heavy frame, to extract the wirerope out.
CN201910480299.8A 2019-06-04 2019-06-04 Sectional construction device and construction method for underground continuous wall reinforcing steel bars Active CN110172965B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910480299.8A CN110172965B (en) 2019-06-04 2019-06-04 Sectional construction device and construction method for underground continuous wall reinforcing steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910480299.8A CN110172965B (en) 2019-06-04 2019-06-04 Sectional construction device and construction method for underground continuous wall reinforcing steel bars

Publications (2)

Publication Number Publication Date
CN110172965A true CN110172965A (en) 2019-08-27
CN110172965B CN110172965B (en) 2021-08-10

Family

ID=67697716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910480299.8A Active CN110172965B (en) 2019-06-04 2019-06-04 Sectional construction device and construction method for underground continuous wall reinforcing steel bars

Country Status (1)

Country Link
CN (1) CN110172965B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU718544A1 (en) * 1978-07-26 1980-02-29 Научно-Исследовательский Институт Оснований И Подземных Сооружений Им. Н.М.Герсеванова Method of erecting wall in soil
JP2001131962A (en) * 1999-11-01 2001-05-15 Ohbayashi Corp Installation of cage
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Steel bar mounting hanger
CN102561316A (en) * 2012-01-20 2012-07-11 中国建筑第八工程局有限公司 Construction method for diaphragm walls
CN105672353A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Cast-in-place underground diaphragm wall and assembled type subway station construction integrated method
CN106223625A (en) * 2016-07-25 2016-12-14 中国建筑第八工程局有限公司 Reinforcing bar upright handling method in small space based on integral platform
CN206255777U (en) * 2016-06-24 2017-06-16 中国水电建设集团十五工程局有限公司 Self-propelled multipurpose is adjustable double lifting point truss straddle truck
CN109555111A (en) * 2018-12-29 2019-04-02 上海建工四建集团有限公司 NEW TYPE OF COMPOSITE ground-connecting-wall structure and construction method under a kind of low clearance
CN109706918A (en) * 2018-12-11 2019-05-03 中铁六局集团有限公司 A kind of lifting restricted clearance steel reinforcement cage aperture molding machine and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU718544A1 (en) * 1978-07-26 1980-02-29 Научно-Исследовательский Институт Оснований И Подземных Сооружений Им. Н.М.Герсеванова Method of erecting wall in soil
JP2001131962A (en) * 1999-11-01 2001-05-15 Ohbayashi Corp Installation of cage
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Steel bar mounting hanger
CN102561316A (en) * 2012-01-20 2012-07-11 中国建筑第八工程局有限公司 Construction method for diaphragm walls
CN105672353A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Cast-in-place underground diaphragm wall and assembled type subway station construction integrated method
CN206255777U (en) * 2016-06-24 2017-06-16 中国水电建设集团十五工程局有限公司 Self-propelled multipurpose is adjustable double lifting point truss straddle truck
CN106223625A (en) * 2016-07-25 2016-12-14 中国建筑第八工程局有限公司 Reinforcing bar upright handling method in small space based on integral platform
CN109706918A (en) * 2018-12-11 2019-05-03 中铁六局集团有限公司 A kind of lifting restricted clearance steel reinforcement cage aperture molding machine and its construction method
CN109555111A (en) * 2018-12-29 2019-04-02 上海建工四建集团有限公司 NEW TYPE OF COMPOSITE ground-connecting-wall structure and construction method under a kind of low clearance

Also Published As

Publication number Publication date
CN110172965B (en) 2021-08-10

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN103669845B (en) High-altitude long-span overhung cornice formwork bracing system and construction method thereof
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
CN201420385Y (en) Overhanging type unloading platform for building construction
CN112049236A (en) Construction method for hanging decoration construction platform under high-altitude large cantilever structure of high-rise building
CN206581577U (en) Using housing construction builder's jack
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN206110635U (en) Automatic convertible integrally lift up elevator shaft operating platform of landing leg
CN107035131A (en) Elevator shaft integral lifting type construction operation platform and elevator shaft construction method
CN207812485U (en) One kind being used for basement boiler side into hanging apparatus
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN106351245A (en) Tower crane foundation base and construction method thereof
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN203475801U (en) Telescopic steel platform for elevator shaft
CN110172965A (en) Diaphram wall steel bar segmentation formula constructing device and construction method
CN216516954U (en) Self-climbing concrete distributing device in super high-rise well way
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant