CN110158971A - A kind of keel assembly equipment and assembling method - Google Patents

A kind of keel assembly equipment and assembling method Download PDF

Info

Publication number
CN110158971A
CN110158971A CN201810144770.1A CN201810144770A CN110158971A CN 110158971 A CN110158971 A CN 110158971A CN 201810144770 A CN201810144770 A CN 201810144770A CN 110158971 A CN110158971 A CN 110158971A
Authority
CN
China
Prior art keywords
main joist
joist
frame body
track
mounting layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810144770.1A
Other languages
Chinese (zh)
Other versions
CN110158971B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jingfeng Investment Holding Group Co.,Ltd.
Original Assignee
Nanjing Hi Wai Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hi Wai Construction Technology Co Ltd filed Critical Nanjing Hi Wai Construction Technology Co Ltd
Priority to CN201810144770.1A priority Critical patent/CN110158971B/en
Publication of CN110158971A publication Critical patent/CN110158971A/en
Application granted granted Critical
Publication of CN110158971B publication Critical patent/CN110158971B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of keel assembly equipment and assembling method, the assembly of main joist and secondary joist is realized, and occupied area is small, it is assembled high-efficient.The keel assembly equipment, including mounting layer, frame body and track, wherein mounting layer is connected with frame body, and track is fixedly connected with frame body;When installation, main joist is in upright state.

Description

A kind of keel assembly equipment and assembling method
Technical field
The invention belongs to the keel assembly in building field, it particularly relates to a kind of keel assembly equipment and assembly side Method.
Background technique
Light gauge cold-formed steel shape is assembled into frame structure, then the after-pouring coagulation in conjunction with precast composite slab at the construction field (site) Soil is a kind of novel building system having wide range of applications.
Light gauge cold-formed steel shape frame is connected to main joist by stiffener using a pair of of C-shaped light gauge cold-formed steel shape, and by π shape Light gauge cold-formed steel shape is as secondary joist as transversal reinforcement.It is fixed between general main joist and secondary joist using Self Drilling Screws, frame Frame lies in ground, by manually upper Self Drilling Screws.This mode of operation requires site area larger, and turn-over is more difficult, is unfavorable for It is efficient in factory to be produced.
Summary of the invention
The present invention provides a kind of keel assembly equipment and assembling method, realizes the assembly of main joist and secondary joist, and take up an area Area is small, assembled high-efficient.
In order to achieve the above object, the following technical solution is employed for the embodiment of the present invention:
A kind of keel assembly equipment, the equipment include mounting layer, frame body and track, wherein and mounting layer is connected with frame body, Track is fixedly connected with frame body;When installation, main joist is in upright state.
As preference, the track is located at the top of frame body.
As preference, the keel assembly equipment, further includes suspender, and the suspender is embedded in track, can be along rail Road is mobile.
As preference, an at least lateral edge mounting layer edge for the track is laid, and installation is stretched out in the end of the track Layer.
As preference, the track in a ring, U-shaped or L shape.
As preference, the mounting layer is 2 layers or 3 layers, and mounting layer is laid up and down, and distribution is connect with frame body.
As preference, in the mounting layer, the mounting layer positioned at bottom is fixedly connected with frame body, remaining mounting layer with Frame body is flexibly connected.
The present invention also provides a kind of keel assembling methods, comprising:
Main joist is erect, and main joist side and frame body cooperation are fixed;
Secondary joist is installed in main joist side;
Main joist direction is rotated, and the main joist other side and frame body cooperation are fixed;
Secondary joist is installed in the main joist other side, to complete keel assembly.
It is described to erect main joist as preference, and main joist side and frame body cooperation are fixed, including the use of suspender Main joist is connected, main joist is in upright state, is then fixedly connected with main joist with frame body using fixing piece.
It is described that secondary joist is installed in main joist side, comprising: in the mounting layer for standing for worker as preference On, secondary joist is installed to main joist side.
It is described that secondary joist is installed in main joist side as preference, comprising: to control the lifting of mounting layer, realize in master Keel side different location installs secondary joist.
As preference, the rotation main joist direction, comprising: by movement of the suspender in track so that main joist from Standby installation side is opened up, positioned at the end of equipment, rotates main joist, so that the other side of main joist and equipment face;Then again Suspender is move in orbit, so that the installation side face of the other side of main joist and equipment.
Compared with prior art, the keel assembly equipment and assembling method of the embodiment of the present invention realizes main joist and time dragon The assembly of bone, and occupied area is small, it is assembled high-efficient.The keel assembly equipment of the present embodiment includes at least one layer of mounting layer, frame Body and track.In use, main joist is in upright state, does not need to tile on the ground as prior art, be greatly saved Occupied area.Meanwhile after main joist side is installed secondary joist, overturn main joist so that the main joist other side with Mounting layer is opposite, installs secondary joist in the main joist other side.Which greatly enhances assembled efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the front view of the embodiment of the present invention.
Have in figure: mounting layer 1, frame body 2, track 3, servo electric cylinders 4, suspender 5.
Specific embodiment
With reference to the accompanying drawing, technical solution of the present invention is described in detail.
As shown in Figure 1, a kind of keel assembly equipment of the embodiment of the present invention, including mounting layer 1, frame body 2 and track 3.Peace It fills layer 1 and frame body 2 connects, track 3 is fixedly connected with frame body 2.When installation, main joist is in upright state.
Using the keel assembly equipment of above structure, main joist is placed in track 3, main joist is in upright state.In this way, Installer stands on mounting layer 1, and secondary joist is mounted on main joist, and it is assembled to complete keel.During the assembly, main dragon Bone is in upright state, does not need to tile on the ground as prior art, occupied area is greatly saved.Meanwhile in main dragon After bone side is installed secondary joist, secondary joist is installed in the main joist other side, substantially increases assembled efficiency.
To operate conveniently, the track 3 is located at the top of frame body 2.In this way, the top of main joist is mounted in track 3.? On ground or 2 lower part of frame body, is not provided with track 3, so that the substructure of equipment is simple, is convenient for worker operation.Certainly, rail Road also can be set on the lower part or ground of frame body 2.But be arranged on the lower part or ground of frame body 2, it is easy to fall Ash, needs to clear up, and is also not easy to worker's walking.
For convenient for after main joist side is installed secondary joist, overturning main joist, keel assembly equipment further includes suspender 5.Suspender 5 can be electric block or other common utensils for playing the role of slinging.Suspender 5 is embedded in track 3, can be along rail Road 3 is mobile.In this way, suspender 5 slings main joist.By suspender 5 in the movement of track 3, the movement of main joist is realized.Work as master After keel side is installed secondary joist, by movable hanger 5, so that main joist also moves.In suitable position, overturning master Keel, so that the main joist other side is towards frame body 2.Then movable hanger 5, so that 2 face of the main joist other side and frame body.Pass through Suspender 5 is set, had not only realized the lifting to main joist, but also realize the overturning of main joist.
Secondary joist is installed to main joist two sides to realize, 1 edge of an at least lateral edge mounting layer of the track 3 is laid, institute Mounting layer 1 is stretched out in the end for stating track 3.For example, track 3 is in L shape.It lays at 1 edge of an edge mounting layer of track 3.In this way, When being sling main joist by suspender 5, the side of main joist is just opposite with mounting layer 1.Mounting layer 1 is stretched out in the end of track 3. When needing to overturn main joist, by movable hanger 5, main joist is moved to the end of track 3.Since the end of track 3 is stretched Mounting layer 1 out, so there is enough spaces to overturn for main joist.In the end of track 3, main joist overturning is realized, keep winner imperial The bone other side is towards mounting layer 1.In another example the track 3 is in U-shape.It lays at two edge mounting layers, 1 edge of track 3.Pass through When suspender 5 slings main joist, the side of main joist is just opposite with mounting layer 1.Mounting layer 1 is stretched out in the end of track 3.When When needing to overturn main joist, by movable hanger 5, main joist is moved to the end of track 3, realizes main joist overturning.At this point, Suspender can also be moved to the another side of track 3 with backtracking, carry out consolidation service.In another example track 3 is in a ring.
When the height of main joist is at 2 meters or more, one layer of mounting layer 1 is only set, it is difficult to allow worker to main joist top It realizes assembled.To improve assembled efficiency, the mounting layer 1 is 2 layers or 3 layers, and about 1 mounting layer is laid, and is distributed and frame body 2 Connection.Multilayer mounting layer 1 is set, allows installer to entire main joist assembly secondary joist.
More preferred, in the mounting layer 1, the mounting layer 1 positioned at bottom is fixedly connected with frame body 2, remaining installation Layer 1 is flexibly connected with frame body 2.For example, being equipped with idler wheel between mounting layer 1 and frame body 2, and configure servo electric cylinders 4.Servo electricity Cylinder driving, move up and down mounting layer 1 can along frame body 2.To protect servo electric cylinders 4, equipment is equipped with limit up and down, makes mounting layer 1 The stroke of servo electric cylinders is not exceeded when moving up and down.By the way that the mounting layer 1 being flexibly connected with frame body 2 is arranged, mounting layer 1 is realized Height adjustability on frame body 2.According to the height of main joist, the height of part mounting layer 1 is adjusted flexibly.
The embodiment of the present invention also provides a kind of keel assembling method, comprising:
Step 10) erects main joist, and main joist side and the cooperation of frame body 2 are fixed;
Step 20) installs secondary joist in main joist side;
Step 30) rotates main joist direction, and the main joist other side and the cooperation of frame body 2 are fixed;
Step 40) installs secondary joist in the main joist other side, to complete keel assembly.
In above-mentioned assembling method, main joist is erect, carries out the assembly of main joist and secondary joist.In this way, in assembled process In, main joist occupied area is small, saves working space.Meanwhile main joist is erect and secondary joist is assembled, it is assembled completing side Afterwards, main joist is overturn, to main joist other side assembly secondary joist.Which greatly enhances assembled efficiency.
As preference, in above-mentioned keel assembling method, step 10) includes: to connect main joist, main joist using suspender 5 In upright state, then main joist is fixedly connected with frame body 2 using fixing piece.It is realized using suspender 5 to the mobile position of main joist The control set, so that the movement of main joist is more flexible controllable.
As preference, in above-mentioned keel assembling method, in step 20) or step 40): in the peace for standing for worker It fills on layer 1, secondary joist is installed to main joist side.Main joist is in upright state, so worker stands on mounting layer 1, to main dragon Bone and secondary joist carry out assembled.More preferred, in assembly, the lifting of mounting layer 1 is controlled, is realized in main joist side difference Position is installed by secondary joist.Since main joist height is up to 2 meters or more, so the lifting of control mounting layer 1, is realized to entire main The assembly of keel side.Allow worker in main joist by improving the position of mounting layer 1 on the top of main joist Top assembly secondary joist.
As preference, in above-mentioned keel assembling method, step 30) includes: the movement by suspender 5 in track 3, is made The installation side that main joist leaves equipment is obtained, positioned at the end of equipment, rotates main joist, so that the other side of main joist and equipment are just It is right;Then suspender 5 is moved in track 3 again, so that the installation side face of the other side of main joist and equipment.In the peace of equipment Side is filled, after completing main joist side assembly secondary joist, since space is limited, main joist can not be overturn, so will be led by suspender 5 Keel are moved to the end of equipment.Main joist is overturn in the end of equipment, so that the other side of main joist and equipment face.The step In rapid, using the end space of equipment, main joist overturning is realized.
The basic principles, main features and advantages of the invention have been shown and described above.Those skilled in the art should Understand, the present invention do not limited by above-mentioned specific embodiment, the description in above-mentioned specific embodiment and specification be intended merely into One step illustrates the principle of the present invention, without departing from the spirit and scope of the present invention, the present invention also have various change and It improves, these changes and improvements all fall within the protetion scope of the claimed invention.The scope of protection of present invention is wanted by right Ask book and its equivalent thereof.

Claims (12)

1. a kind of keel assembly equipment, which is characterized in that the equipment includes mounting layer (1), frame body (2) and track (3), In,
Mounting layer (1) and frame body (2) connection, track (3) are fixedly connected with frame body (2);When installation, main joist is in upright state.
2. keel assembly equipment described in accordance with the claim 1, which is characterized in that the track (3) is located at the upper of frame body (2) Portion.
3. keel assembly equipment according to claim 2, which is characterized in that further include suspender (5), the suspender (5) is embedding It, can be mobile along track (3) extremely in track (3).
4. keel assembly equipment described in accordance with the claim 1, which is characterized in that an at least lateral edge for the track (3) is installed Layer (1) edge is laid, and mounting layer (1) is stretched out in the end of the track (3).
5. keel assembly equipment described in accordance with the claim 1, which is characterized in that the track (3) in a ring, U-shaped or L Shape.
6. keel assembly equipment described in accordance with the claim 1, which is characterized in that the mounting layer (1) is 2 layers or 3 layers, peace Dress layer (1) is laid up and down, and distribution is connect with frame body (2).
7. keel assembly equipment according to claim 6, which is characterized in that in the mounting layer (1), positioned at bottom Mounting layer (1) is fixedly connected with frame body (2), remaining mounting layer (1) is flexibly connected with frame body (2).
8. a kind of keel assembling method characterized by comprising
Main joist is erect, and main joist side and frame body (2) cooperation are fixed;
Secondary joist is installed in main joist side;
Main joist direction is rotated, and the main joist other side and frame body (2) cooperation are fixed;
Secondary joist is installed in the main joist other side, to complete keel assembly.
9. keel assembling method according to claim 8, which is characterized in that it is described to erect main joist, and by main joist Side and frame body (2) cooperation are fixed, including
Main joist is connected using suspender (5), main joist is in upright state, then using fixing piece that main joist and frame body (2) is solid Fixed connection.
10. keel assembling method according to claim 8, which is characterized in that it is described that secondary joist is installed in main joist side, Include:
In the mounting layer (1) for standing for worker, secondary joist is installed to main joist side.
11. keel assembling method according to claim 8, which is characterized in that it is described that secondary joist is installed in main joist side, Include:
The lifting of mounting layer (1) is controlled, realizes and secondary joist is installed in main joist side different location.
12. keel assembling method according to claim 8, which is characterized in that the rotation main joist direction, comprising:
By movement of the suspender (5) in track (3), so that main joist leaves the installation side of equipment, positioned at the end of equipment, rotation Main joist, so that the other side of main joist and equipment face;Then suspender (5) is moved in track (3) again, so that main joist The other side and equipment installation side face.
CN201810144770.1A 2018-02-12 2018-02-12 Keel assembling equipment and assembling method Active CN110158971B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810144770.1A CN110158971B (en) 2018-02-12 2018-02-12 Keel assembling equipment and assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810144770.1A CN110158971B (en) 2018-02-12 2018-02-12 Keel assembling equipment and assembling method

Publications (2)

Publication Number Publication Date
CN110158971A true CN110158971A (en) 2019-08-23
CN110158971B CN110158971B (en) 2022-02-18

Family

ID=67634974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810144770.1A Active CN110158971B (en) 2018-02-12 2018-02-12 Keel assembling equipment and assembling method

Country Status (1)

Country Link
CN (1) CN110158971B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201423636Y (en) * 2009-06-25 2010-03-17 泉州市麦格士液压技术有限公司 Assembling rotary table
CN201560587U (en) * 2009-09-28 2010-08-25 中国建筑土木建设有限公司 Box beam tensioning rack adopting post-tensioning method
CN101890757A (en) * 2010-07-07 2010-11-24 中铁四局集团第一工程有限公司 Assembled adjustable steel bar binding clamping fixture support
CN102182318A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 Construction method of cement internal partition wall with hollow internal mould steel mesh
CN202689016U (en) * 2012-07-12 2013-01-23 中铁二十局集团有限公司 Cofferdam assembling and lifting platform for double-wall steel cofferdam construction of deep-water bridge pier
CN104708579A (en) * 2015-02-06 2015-06-17 广东五星太阳能股份有限公司 Flat plate heat collector single set slope type semiautomatic cover plate assembling machine
CN205363174U (en) * 2015-12-30 2016-07-06 天津天瑞达自动化设备有限公司 Quick shaping wall body assembly manufacturing line length fossil fragments feed mechanism
CN206356906U (en) * 2017-01-10 2017-07-28 山东飞越钢结构工程有限公司 A kind of light steel wall fully-automatic production device of utilization green wood
CN206373528U (en) * 2016-03-02 2017-08-04 文登蓝岛建筑工程有限公司 Well word keel positioning tool
CN206468018U (en) * 2016-12-29 2017-09-05 山东飞越钢结构工程有限公司 A kind of lightgage steel joist framework assembly platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201423636Y (en) * 2009-06-25 2010-03-17 泉州市麦格士液压技术有限公司 Assembling rotary table
CN201560587U (en) * 2009-09-28 2010-08-25 中国建筑土木建设有限公司 Box beam tensioning rack adopting post-tensioning method
CN101890757A (en) * 2010-07-07 2010-11-24 中铁四局集团第一工程有限公司 Assembled adjustable steel bar binding clamping fixture support
CN102182318A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 Construction method of cement internal partition wall with hollow internal mould steel mesh
CN202689016U (en) * 2012-07-12 2013-01-23 中铁二十局集团有限公司 Cofferdam assembling and lifting platform for double-wall steel cofferdam construction of deep-water bridge pier
CN104708579A (en) * 2015-02-06 2015-06-17 广东五星太阳能股份有限公司 Flat plate heat collector single set slope type semiautomatic cover plate assembling machine
CN205363174U (en) * 2015-12-30 2016-07-06 天津天瑞达自动化设备有限公司 Quick shaping wall body assembly manufacturing line length fossil fragments feed mechanism
CN206373528U (en) * 2016-03-02 2017-08-04 文登蓝岛建筑工程有限公司 Well word keel positioning tool
CN206468018U (en) * 2016-12-29 2017-09-05 山东飞越钢结构工程有限公司 A kind of lightgage steel joist framework assembly platform
CN206356906U (en) * 2017-01-10 2017-07-28 山东飞越钢结构工程有限公司 A kind of light steel wall fully-automatic production device of utilization green wood

Also Published As

Publication number Publication date
CN110158971B (en) 2022-02-18

Similar Documents

Publication Publication Date Title
CN103244151B (en) Tunnel arch multifunctional supporting chassis
CN101672102B (en) Steel structural overhead ceiling construction platform
CN102781812A (en) Adjustment head for a hoisting device
CN103291330A (en) All-round manipulator special for tunnels
CN105672655A (en) Side wall self-propelled type triangular truss and construction method thereof
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN204491393U (en) Portable pedestrian overcrossing
CN206233099U (en) A kind of Collison fence for bridge construction and security protection platform
CN201619964U (en) Device for lifting waveform steel web plate at rear end of cantilever construction truss car
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN110158971A (en) A kind of keel assembly equipment and assembling method
CN106121253B (en) Installation component adjustable auxiliary installation device and method
CN109537912A (en) A kind of safe and stable type Provincial Rink and its construction technology
CN105484166A (en) Ladder-shaped mast type cantilever assembling crane
CN108468433A (en) A kind of construction tool of workshop metal Roof inner panel
CN205529915U (en) Ladder type masts type hangs pieces together loop wheel machine
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN106939642A (en) Under hanging packway davit structure and its installation forming method
CN206408807U (en) A kind of connecting bracket
CN203285458U (en) Multifunctional supporting trolley of tunnel arch center
CN206319628U (en) One kind building assembled wallboard fitting machine
CN205711767U (en) Bridge Erector for Prestressed Concrete Bridges prefabricated subsection construction of splicing span by span
CN205835637U (en) Prefabricated case beam maintenance spray system
CN205932963U (en) Many landing legs tire formula tracklaying crane
CN104878928B (en) Method for integrally hoisting steel structure galleries across factory buildings in place by aid of multiple machines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211117

Address after: 210000 Dongshan science and Technology Innovation Park, Jiangning District, Nanjing City, Jiangsu Province

Applicant after: Jiangsu Jingfeng Investment Holding Group Co.,Ltd.

Address before: 211106 building 08, Jingfeng smart Industrial Park, No. 98, Chengxin Avenue, Jiangning Economic and Technological Development Zone, Nanjing, Jiangsu Province

Applicant before: NANJING SHANWEI BUILDING TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant