- Publication number
- CN110158448A CN110158448A CN201910474903.6A CN201910474903A CN110158448A CN 110158448 A CN110158448 A CN 110158448A CN 201910474903 A CN201910474903 A CN 201910474903A CN 110158448 A CN110158448 A CN 110158448A
- Authority
- CN
- China
- Prior art keywords
- rod iron
- pin rod
- hole
- mounting plate
- rotary table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 118
- 239000010959 steel Substances 0.000 claims abstract description 118
- 229910000754 Wrought iron Inorganic materials 0.000 claims abstract description 89
- 238000010276 construction Methods 0.000 claims abstract description 55
- 238000009434 installation Methods 0.000 claims abstract description 16
- 238000003466 welding Methods 0.000 claims description 4
- 239000004567 concrete Substances 0.000 abstract description 70
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 11
- 238000004519 manufacturing process Methods 0.000 description 7
- 230000002787 reinforcement Effects 0.000 description 7
- 238000005056 compaction Methods 0.000 description 6
- 238000001704 evaporation Methods 0.000 description 6
- 239000002131 composite material Substances 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- 229920006253 high performance fiber Polymers 0.000 description 5
- 238000003032 molecular docking Methods 0.000 description 5
- 239000011150 reinforced concrete Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009417 prefabrication Methods 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The present invention provides a kind of shear connectors, including pin rod iron (1), pin rod iron mounting plate (2) and perforated steel plate (3), installation through-hole is provided on the pin rod iron mounting plate (2), the pin rod iron (1) is set in the installation through-hole, the pin steel plate mounting plate (2) is vertically installed in steel construction (4) upper surface, the perforated steel plate (3) is provided at least one through-hole, the pin rod iron mounting plate (2) passes vertically through the through-hole, the perforated steel plate (3) is set to above the steel construction (4).A kind of shear connector of the present invention realizes the reserved hole location of concrete slab and accurately docks with girder steel connector, ensure overall performance of the concrete slab after reserved hole location, steel construction and concrete structure are connected to become whole co-operation by the effect for giving full play to shear connector.
Description
Technical field
The present invention relates to field of bridge construction, and in particular to a kind of shear connector.
Background technique
Steel-concrete combined structure is that one kind is formed steel construction and concrete structure integrally altogether by shear connector
With the structure type of work, shear connector is the key that steel-concrete combined structure stress performance.This kind of structure type can
The mechanical property of steel and concrete material is given full play to, high, rigidity is greatly, self weight is small, stability is good with good bearing capacity
And the advantages that easy for construction, in the engineering fields extensive application such as bridge, building structure, piping lane.
With the development of engineering technology, requirement of the people to construction technology and construction quality is higher and higher, fabricated construction
The application of technology is further extensive.The construction of Standard formula can be achieved component and all complete in factory, can be improved component quality,
Construction material dosage is reduced, for building energy conservation important in inhibiting.Fabricated construction can greatly reduce site operation workload
And the time, stringent and site operation bad environments engineering important roles are required for the construction period.
The problem of how shear connector is set is faced in the fabricated construction of the mixed composite structure of steel-.At present using the most
Extensive Welded-Stud Conectors need multi-point to coordinate, and reserving point in precast slab can be since concrete be in hardening process
In contraction and change in location occurs, be unable to complete in installation process multi-point matching.Perforated steel plate connector is due to along beam
It is longitudinally continuous and runs through, longitudinal direction can not be reserved in precast slab through seam, and cannot achieve perforated steel plate connector and mix
Effective connection of solidifying soil prefabricated board.Concrete prefabricated board reserves large hole in separate type peg group's connection method existing at present
Hole, longitudinal reinforcement and transverse steel between reserving hole are all truncated, and seriously affect the globality of concrete slab, and peg group with
Power transmission is only carried out by rear pouring concrete between precast slab, Welded-Stud Conectors be unable to give full play effect by steel construction and
Concrete structure is connected to become entirety.
The prefabricated construction of steel-concrete combined structure needs to solve the problems, such as three aspects of connector.First, prefabricated mixed
How reserved hole location in concrete board is accurately docked with the Welded-Stud Conectors on steel construction.Second, how to reduce prefabricated mixed
Concrete board reserving hole reduces its influence to precast slab globality.How third gives full play to shear connector
Effect, is connected to become entirety for steel construction and concrete structure.
Patent CN201120487335 disclose it is a kind of in bridge construction fasten concrete shear key, if including by
The shear key ontology that shear key unit interconnected is constituted is done, the shear key unit includes support plate, the support plate
Both ends are provided with mounting plate, and several groups through-hole is provided on the mounting plate, is provided with support column between every group of through-hole.
Though the patent is using the entirety being interconnected to constitute using shear key unit, since its supporting plate structure is more multiple
It is miscellaneous, cause manufacturing process equally complex;Though being caused between its each shear key using its shear key unit set-up mode simultaneously
Entirety is so formed, but is affected to concrete globality.
Now need a kind of reserved hole location in precast slab that can carry out with the Welded-Stud Conectors on steel construction accurate
Docking;Concrete slab preformed hole is smaller;Steel construction and concrete structure are connected to become to whole shear connector.
Summary of the invention
The present invention is docked precisely to solve the reserved hole location of concrete slab in the prior art with Welded-Stud Conectors on steel construction
The problem of degree reduces the influence to precast slab globality, gives full play to the effect of shear connector, provides one kind and cuts
Power connector, concrete slab globality is high, and preformed hole is smaller, is easy to accurately dock, solves the above problem.
The present invention provides a kind of shear connector, including pin rod iron, pin rod iron mounting plate and perforated steel plate, pin
Installation through-hole is provided on rod iron mounting plate, pin rod iron is set in installation through-hole, and pin steel plate mounting plate is vertically installed in
Steel construction upper surface, perforated steel plate are provided at least one through-hole, and pin rod iron mounting plate passes vertically through through-hole, and perforated steel plate is set
It is placed in above steel construction.
By burying pin rod iron mounting plate in concrete structure, the hole location merging precision of shear connector is improved;Pass through
Pin rod iron and pin rod iron mounting plate realize it is easy, quickly, be reliably connected.Perforated steel plate is arranged reserved at design position
Perforated steel plate is installed in hole, and both ends and template top are neat, guarantees that position does not change in concreting process, is realized anti-
Connector hole location is cut accurately to dock.Perforated steel plate after the installation is completed, is laid with common stirrup and disconnects stirrup in concrete structure,
And weld it with pre-buried perforated steel plate, the longitudinal reinforcement at the alternative position of perforated steel plate avoids at the position
Longitudinal reinforcement is disconnected due to reserving hole, improves structural integrity.
Connector connection method is to dock after the completion of concrete slab and prefabricated steel construction according to perforated steel plate through-hole hole location
After the completion, pin rod iron is inserted into pin rod iron mounting plate, that completes shear connector is reliably fixed connection.
Two kinds of preformed holes on pin rod iron mounting plate and perforated steel plate consider suitably to amplify, to consider concrete shrinkage
It is influenced with various errors.
A kind of shear connector of the present invention, it is preferred that, pin rod iron includes the first rotary table, the second circle
Platform, cylinder interconnecting piece, the first rotary table, the second rotary table and cylinder interconnecting piece are coaxial, the first rotary table and the setting of the second rotary table bottom surface
In two bottom surface of cylinder interconnecting piece, the first rotary table and the second rotary table bottom surface area≤cylinder interconnecting piece base area.
A kind of shear connector of the present invention, it is preferred that, the first rotary table and the second truncated conical shape size phase
Together, the first rotary table and the second rotary table bottom surface area are equal with cylinder interconnecting piece base area.
Splicing efficiency is improved convenient for positioning when splicing using the pin rod iron of class shuttle shape.
A kind of shear connector of the present invention, it is preferred that, perforated steel plate through-hole and pin rod iron mounting plate
For interference fit.
A kind of shear connector of the present invention, it is preferred that, between pin rod iron mounting plate and steel construction
Connection type is welding.
A kind of shear connector of the present invention, it is preferred that, pin rod iron mounting plate through-hole is round tube hole, is led to
Bore dia is pin rod iron maximum width.
A kind of shear connector of the present invention, it is preferred that, pin rod iron mounting plate along beam lateral arrangement with
At the top of steel construction.
Pin steel column connecting plate can also improve lateral shear behavior along the lateral arrangement of beam.
A kind of shear connector of the present invention, it is preferred that, pin rod iron connecting plate along beam be longitudinally arranged in
At the top of steel construction.
Pin steel column connecting plate can be longitudinally arranged along beam, and longitudinal shear resistance performance can be improved.
A kind of shear connector of the present invention, it is preferred that, it further include stirrup, the surrounded plane of stirrup is vertical
Horizontal plane, stirrup spatially network.
The explanation of one section of application method can be increased
Stirrup includes the disconnection stirrup connecting with shear connector and the common stirrup not connecting with shear connector, positive throwing
It is provided with the setting of perforated steel plate position on shadow face and disconnects stirrup, common stirrup is set without perforated steel plate position on frontal plane of projection.
The present invention has the beneficial effect that:
(1) pre-buried perforated steel plate is welded with common stirrup and the section place of opening stirrup in reinforced concrete structure, is avoided
Stirrup is disconnected and being influenced at reserved hole location, improves the globality of structure;
(2) longitudinal reinforcement in reinforced concrete structure at the alternative position of pre-buried perforated steel plate, avoids the position
Place's longitudinal reinforcement is disconnected due to reserved hole location, improves the globality of structure;
(3) after steel construction and concrete structure are installed according to reserved hole location, by installing pin rod iron in perforated steel plate
The two is formed into entirety, not only considered the convenience of construction but also can guarantee effective connection of connector;The rigidity of pin rod iron compared with
Greatly, the shearing between steel construction and concrete structure can be effectively transmitted, while being effective against between concrete structure and steel construction
Start;
(4) perforated steel plate can be according to the vertical and horizontal flexible arrangement of beam, applicability with higher.
Detailed description of the invention
Fig. 1 is shear connector schematic diagram;
Fig. 2 is shear connector pin rod iron schematic diagram.
Appended drawing reference:
1, pin rod iron;11, the first rotary table;12, the second rotary table;13, cylinder interconnecting piece;2, pin rod iron mounting plate;3,
Perforated steel plate;4, steel construction.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Embodiment 1
As shown in Figure 1, a kind of shear connector, including pin rod iron 1, pin rod iron mounting plate 2 and perforated steel plate 3, pin
Installation through-hole is provided on bolt rod iron mounting plate 2, pin rod iron 1 is set in installation through-hole, and pin steel plate mounting plate 2 is vertically set
It is placed in 4 upper surface of steel construction, perforated steel plate 3 is provided at least one through-hole, and pin rod iron mounting plate 2 passes vertically through through-hole, band
Hole steel plate 3 is set to 4 top of steel construction.
Pin rod iron mounting plate 2 is made of steel plate, Circularhole diameter and pin rod iron cylinder interconnecting piece base circle diameter (BCD) phase
Match, root weld is at the top of steel construction.
As shown in Fig. 2, pin rod iron 1 include the first rotary table 11, the second rotary table 12, cylinder interconnecting piece 13, the first rotary table 11,
Second rotary table 12 and cylinder interconnecting piece 13 are coaxial, and the first rotary table 11 and 12 bottom surface of the second rotary table are set to 13 liang of cylinder interconnecting piece
Bottom surface, the first rotary table 11 is identical with 12 shape size of the second rotary table, the first rotary table 11 and 12 bottom surface area of the second rotary table and circle
13 base area of column interconnecting piece is equal.Pin rod iron 1 is made of steel, and the arrangement of pin rod iron mounting plate 2 can be vertical
To arrangement, it is also possible to lateral arrangement;The spacing of pin rod iron mounting plate 2, its own length, arrangement form can be according to reality
Requirement of engineering design determines.
The construction method of the shear connector of assembled composite structure, comprising the following steps:
S1, production pin rod iron 1;
S2, production girder steel and pin rod iron mounting plate 2, pin rod iron mounting plate 2 are welded in girder steel top surface;
S3, production concrete perforated steel plate 3;Prefabricated reinforced concrete structure template support is carried out, pin rod iron peace is laid with
Loading board 2 is laid with disconnection stirrup at common stirrup and reserved hole location, and common stirrup and disconnection stirrup are carried out with perforated steel plate 3
Welding;It is laid with longitudinal regular reinforcement;Preformed hole at concrete slab connector position is set;Casting concrete, concrete curing are complete
At rear demoulding;
S4, on-site consolidation is carried out, steel construction pin rod iron mounting plate 2 is reserved into hole location with concrete slab and carries out docking spelling
Dress;By concrete slab preformed hole and the reversed one end insertion girder steel pin rod iron peace of pre-buried perforated steel plate is arranged in pin rod iron 1
In loading board 2;
S5, the very-high performance fiber concrete that the non-evaporating feeding microdilatancy of self-compaction is poured at reserved hole location.
The preformed hole to match with pin rod iron mounting plate 2 on steel construction is reserved in concrete structure prefabrication process, simultaneously
The reserved preformed hole that pin rod iron 1 can be fit into reserved steel plate.Two kinds of preformed holes consider suitably to amplify, mixed to consider
Solidifying soil is shunk and various errors influence.
Preformed hole is arranged in perforated steel plate 3 at design position, installs pre-buried perforated steel plate 3, and both ends and template top are neat, protects
Card position in concreting process does not change, and realizes that shear connector hole location is accurately docked.Pre-buried perforated steel plate 3 exists
In concrete structure after the installation is completed, it is laid with common stirrup and disconnects stirrup, and it is welded with pre-buried perforated steel plate 3.
After the completion of concrete structure and prefabricated steel construction, after the completion of the docking of reserved hole location, pin rod iron 1 is inserted into
In pin rod iron mounting plate 2, that completes shear connector is reliably fixed connection.
After the completion of concrete structure and steel structure assembling, the non-evaporating feeding microdilatancy superelevation of self-compaction is poured in reserved hole location
Energy fiber concrete, considers property easy for construction and connection reliability.
Shear connector and construction method proposed by the present invention for assembled steel-concrete combined structure, by
It pre-buried perforated steel plate 3 and is welded with stirrup in concrete structure, welds pin rod iron mounting plate 2 in girder steel top surface;In work
After the completion of factory is prefabricated, after being installed by reserved hole location, it is fixed by pin rod iron 1;After the installation is completed, in preformed hole
Inside pour the very-high performance fiber concrete of the non-evaporating feeding microdilatancy of self-compaction.This kind of connection type substantially increases assembled steel-
The globality of concrete combined structure effectively enhances shearing strength and rigidity that assembled steel-mixes composite structure, has ensured steel
The collaborative work of structure and concrete structure.
Embodiment 2
As shown in Figure 1, a kind of shear connector, including pin rod iron 1, pin rod iron mounting plate 2 and perforated steel plate 3, pin
Installation through-hole is provided on bolt rod iron mounting plate 2, pin rod iron 1 is set in installation through-hole, and pin steel plate mounting plate 2 is vertically set
It is placed in 4 upper surface of steel construction, perforated steel plate 3 is provided at least one through-hole, and pin rod iron mounting plate 2 passes vertically through through-hole, band
Hole steel plate 3 is set to 4 top of steel construction.
The position of opening of concrete perforated steel plate 3 should carry out aperture according to being pre-designed at connector position, and when aperture answers
The amplification of 1~2mm is considered, to consider that various errors influence.The steel plate both ends should be neat with template top, prevents in concreting
Steel plate position is buried in journey to change and cannot carry out Matching installation with the connector being pre-designed.
Pin rod iron mounting plate 2 is made of steel plate, Circularhole diameter and pin rod iron cylinder interconnecting piece base circle diameter (BCD) phase
Match, root weld is at the top of steel construction.
As shown in Fig. 2, pin rod iron 1 include the first rotary table 11, the second rotary table 12, cylinder interconnecting piece 13, the first rotary table 11,
Second rotary table 12 and cylinder interconnecting piece 13 are coaxial, and the first rotary table 11 and 12 bottom surface of the second rotary table are set to 13 liang of cylinder interconnecting piece
Bottom surface, the first rotary table 11 is identical with 12 shape size of the second rotary table, the first rotary table 11 and 12 bottom surface area of the second rotary table and circle
13 base area of column interconnecting piece is equal.Pin rod iron 1 is made of steel, and the arrangement of pin rod iron mounting plate 2 can be vertical
To arrangement, it is also possible to lateral arrangement;The spacing of pin rod iron mounting plate 2, its own length, arrangement form can be according to reality
Requirement of engineering design determines.
The construction method of the shear connector of assembled composite structure, comprising the following steps:
S1, production pin rod iron 1;
S2, production girder steel and pin rod iron mounting plate 2, pin rod iron mounting plate 2 are welded in girder steel top surface;
S3, production concrete perforated steel plate 3;Prefabricated reinforced concrete structure template support is carried out, pin rod iron peace is laid with
Loading board 2 is laid with disconnection stirrup at common stirrup and reserved hole location, and common stirrup and disconnection stirrup are carried out with perforated steel plate 3
Welding;It is laid with longitudinal regular reinforcement;Preformed hole at concrete slab connector position is set;Casting concrete, concrete curing are complete
At rear demoulding;
S4, on-site consolidation is carried out, steel construction pin rod iron mounting plate 2 is reserved into hole location with concrete slab and carries out docking spelling
Dress;By concrete slab preformed hole and the reversed one end insertion girder steel pin rod iron peace of pre-buried perforated steel plate is arranged in pin rod iron 1
In loading board 2;
S5, the very-high performance fiber concrete that the non-evaporating feeding microdilatancy of self-compaction is poured at reserved hole location.
The preformed hole to match with pin rod iron mounting plate 2 on steel construction is reserved in concrete structure prefabrication process, simultaneously
The reserved preformed hole that pin rod iron 1 can be fit into reserved steel plate.Two kinds of preformed holes consider suitably to amplify, mixed to consider
Solidifying soil is shunk and various errors influence.
Concrete slab includes concrete slab ontology and high-performance fiber concrete, and concrete body is board-like, concrete sheet
Body is provided with preformed hole, and preformed hole is counterbore, and preformed hole is set to the reversed one end of pre-buried perforated steel plate, and preformed hole bottom end is provided with
It is overlapped the identical through-hole of size with mounting hole vertical position, through-hole assembly shear key is provided in preformed hole, high-performance is fine
Tie up Concrete Filled preformed hole.
Preformed hole is arranged in perforated steel plate 3 at design position, installs pre-buried perforated steel plate 3, and both ends and template top are neat, protects
Card position in concreting process does not change, and realizes that shear connector hole location is accurately docked.Pre-buried perforated steel plate 3 exists
In concrete structure after the installation is completed, it is laid with common stirrup and disconnects stirrup, and it is welded with pre-buried perforated steel plate 3.
After the completion of concrete structure and prefabricated steel construction, after the completion of the docking of reserved hole location, pin rod iron 1 is inserted into
In pin rod iron mounting plate 2, that completes shear connector is reliably fixed connection.
After the completion of concrete structure and steel structure assembling, the non-evaporating feeding microdilatancy superelevation of self-compaction is poured in reserved hole location
Energy fiber concrete, considers property easy for construction and connection reliability.
Shear connector and construction method proposed by the present invention for assembled steel-concrete combined structure, by
It pre-buried perforated steel plate 3 and is welded with stirrup in concrete structure, welds pin rod iron mounting plate 2 in girder steel top surface;In work
After the completion of factory is prefabricated, after being installed by reserved hole location, it is fixed by pin rod iron 1;After the installation is completed, in preformed hole
Inside pour the very-high performance fiber concrete of the non-evaporating feeding microdilatancy of self-compaction.This kind of connection type substantially increases assembled steel-
The globality of concrete combined structure effectively enhances shearing strength and rigidity that assembled steel-mixes composite structure, has ensured steel
The collaborative work of structure and concrete structure.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (8)
1. a kind of shear connector, it is characterised in that: including pin rod iron (1), pin rod iron mounting plate (2) and perforated steel plate
(3), installation through-hole is provided on the pin rod iron mounting plate (2), the pin rod iron (1) is set to the installation through-hole
In, the pin steel plate mounting plate (2) is vertically installed in steel construction (4) upper surface, and the perforated steel plate (3) is provided at least one
A through-hole, the pin rod iron mounting plate (2) pass vertically through the through-hole, and the perforated steel plate (3) is set to the steel construction
(4) top.
2. a kind of shear connector according to claim 1, it is characterised in that: the pin rod iron (1) includes the first circle
Platform (11), the second rotary table (12), cylinder interconnecting piece (13), first rotary table (11), second rotary table (12) and the circle
Column interconnecting piece (13) coaxially, the first rotary table (11) bottom surface and second rotary table (12) bottom surface respectively with the cylinder
(13) two bottom surface of interconnecting piece is connected, and the first rotary table (11) bottom surface area and second rotary table (12) bottom surface area≤
Cylinder interconnecting piece (13) base area.
3. a kind of shear connector according to claim 2, it is characterised in that: first rotary table (11) and described second
Rotary table (12) shape size is identical, and first rotary table (11) and second rotary table (12) bottom surface area and the cylinder connect
Socket part (13) base area is equal.
4. a kind of shear connector described in any one of its according to claim 1~3, it is characterised in that: the steel with holes
Plate (3) through-hole and the pin rod iron mounting plate (2) are interference fit.
5. a kind of shear connector according to claim 4, it is characterised in that: the pin rod iron mounting plate (2) and institute
The connection type between steel construction (4) is stated as welding.
6. a kind of shear connector according to claim 5, it is characterised in that: pin rod iron mounting plate (2) through-hole
For round tube hole, the through-hole diameter is pin rod iron (1) maximum width.
7. a kind of shear connector according to claim 6, it is characterised in that: the pin rod iron mounting plate (2) is along beam
Lateral arrangement is at the top of the steel construction (4).
8. a kind of shear connector according to claim 6, it is characterised in that: the pin rod iron mounting plate (2) is along beam
It is longitudinally arranged at the top of the steel construction (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910474903.6A CN110158448A (en) | 2019-06-03 | 2019-06-03 | A kind of shear connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910474903.6A CN110158448A (en) | 2019-06-03 | 2019-06-03 | A kind of shear connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110158448A true CN110158448A (en) | 2019-08-23 |
Family
ID=67627137
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910474903.6A Pending CN110158448A (en) | 2019-06-03 | 2019-06-03 | A kind of shear connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158448A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202170572U (en) * | 2011-07-04 | 2012-03-21 | 浙江省交通规划设计研究院 | Steel and concrete shear connector structure |
JP2014167254A (en) * | 2014-04-23 | 2014-09-11 | Taisei Corp | Steel plate concrete structure |
US20150139719A1 (en) * | 2011-09-22 | 2015-05-21 | Jiangsu Transportation Research Institute Co., Ltd | Shear connector for corrugated sheet steel and concrete |
CN206736696U (en) * | 2017-05-04 | 2017-12-12 | 西京学院 | A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam |
CN210975497U (en) * | 2019-06-03 | 2020-07-10 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Shear connector |
-
2019
- 2019-06-03 CN CN201910474903.6A patent/CN110158448A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202170572U (en) * | 2011-07-04 | 2012-03-21 | 浙江省交通规划设计研究院 | Steel and concrete shear connector structure |
US20150139719A1 (en) * | 2011-09-22 | 2015-05-21 | Jiangsu Transportation Research Institute Co., Ltd | Shear connector for corrugated sheet steel and concrete |
JP2014167254A (en) * | 2014-04-23 | 2014-09-11 | Taisei Corp | Steel plate concrete structure |
CN206736696U (en) * | 2017-05-04 | 2017-12-12 | 西京学院 | A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam |
CN210975497U (en) * | 2019-06-03 | 2020-07-10 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Shear connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587495B (en) | Steel beam and concrete wall semi-rigid full-bolted-connection joint | |
CN103437425A (en) | Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method | |
CN108179806B (en) | Fully assembled reinforced concrete frame structure system | |
CN110792165A (en) | Prefabricated assembly type concrete beam column joint connecting device and method | |
CN110512765A (en) | A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace | |
CN103726613B (en) | A kind of novel fabricated concrete column | |
CN105040822A (en) | Steel coupling beam and concrete shear wall assembly type connecting structure reserving construction allowance | |
CN108166619A (en) | A kind of novel fabricated concrete structure bean column node | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN110670732A (en) | Connection node of steel truss with inverted V-shaped section and reinforced concrete structure and construction method | |
CN111519826B (en) | Assembly type stiff concrete shear wall structure with embedded connecting steel plates and manufacturing method | |
CN207436278U (en) | A kind of assembly concrete-filled steel tube column-girder steel punching node | |
CN111305066A (en) | Hybrid combination beam steel-concrete combination section and mounting method thereof | |
CN111101645A (en) | Self-in-place reinforced precast concrete wallboard, connecting structure and construction method | |
CN110158448A (en) | A kind of shear connector | |
CN210975497U (en) | Shear connector | |
CN211368387U (en) | Novel shear force component combination beam | |
CN111877831B (en) | Assembled prefabricated column splicing type rigid connecting node and construction method | |
CN209228135U (en) | A kind of reinforced concrete precast assembling movie theatre stand structure | |
CN104453013A (en) | Prefabricated wall component and fabricated reinforced concrete shear wall | |
CN212053436U (en) | Strenghthened type precast concrete wallboard and connection structure with from structure of taking one's place | |
CN212426749U (en) | Hybrid reinforced concrete joint section | |
CN211228913U (en) | Steel truss and reinforced concrete shear wall structure node with load transfer component | |
CN110158464A (en) | A kind of novel shear key combination beam and its construction method | |
CN207761108U (en) | A kind of level splices and combines wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |