CN110158448A - A kind of shear connector - Google Patents

A kind of shear connector Download PDF

Info

Publication number
CN110158448A
CN110158448A CN201910474903.6A CN201910474903A CN110158448A CN 110158448 A CN110158448 A CN 110158448A CN 201910474903 A CN201910474903 A CN 201910474903A CN 110158448 A CN110158448 A CN 110158448A
Authority
CN
China
Prior art keywords
rod iron
pin rod
hole
mounting plate
rotary table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910474903.6A
Other languages
Chinese (zh)
Inventor
李旺旺
苏永华
班新林
葛凯
陶晓燕
韩冰
荣峤
赵体波
朱希同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China State Railway Group Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS, China Railway Corp filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201910474903.6A priority Critical patent/CN110158448A/en
Publication of CN110158448A publication Critical patent/CN110158448A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention provides a kind of shear connectors, including pin rod iron (1), pin rod iron mounting plate (2) and perforated steel plate (3), installation through-hole is provided on the pin rod iron mounting plate (2), the pin rod iron (1) is set in the installation through-hole, the pin steel plate mounting plate (2) is vertically installed in steel construction (4) upper surface, the perforated steel plate (3) is provided at least one through-hole, the pin rod iron mounting plate (2) passes vertically through the through-hole, the perforated steel plate (3) is set to above the steel construction (4).A kind of shear connector of the present invention realizes the reserved hole location of concrete slab and accurately docks with girder steel connector, ensure overall performance of the concrete slab after reserved hole location, steel construction and concrete structure are connected to become whole co-operation by the effect for giving full play to shear connector.

Description

A kind of shear connector
Technical field
The present invention relates to field of bridge construction, and in particular to a kind of shear connector.
Background technique
Steel-concrete combined structure is that one kind is formed steel construction and concrete structure integrally altogether by shear connector With the structure type of work, shear connector is the key that steel-concrete combined structure stress performance.This kind of structure type can The mechanical property of steel and concrete material is given full play to, high, rigidity is greatly, self weight is small, stability is good with good bearing capacity And the advantages that easy for construction, in the engineering fields extensive application such as bridge, building structure, piping lane.
With the development of engineering technology, requirement of the people to construction technology and construction quality is higher and higher, fabricated construction The application of technology is further extensive.The construction of Standard formula can be achieved component and all complete in factory, can be improved component quality, Construction material dosage is reduced, for building energy conservation important in inhibiting.Fabricated construction can greatly reduce site operation workload And the time, stringent and site operation bad environments engineering important roles are required for the construction period.
The problem of how shear connector is set is faced in the fabricated construction of the mixed composite structure of steel-.At present using the most Extensive Welded-Stud Conectors need multi-point to coordinate, and reserving point in precast slab can be since concrete be in hardening process In contraction and change in location occurs, be unable to complete in installation process multi-point matching.Perforated steel plate connector is due to along beam It is longitudinally continuous and runs through, longitudinal direction can not be reserved in precast slab through seam, and cannot achieve perforated steel plate connector and mix Effective connection of solidifying soil prefabricated board.Concrete prefabricated board reserves large hole in separate type peg group's connection method existing at present Hole, longitudinal reinforcement and transverse steel between reserving hole are all truncated, and seriously affect the globality of concrete slab, and peg group with Power transmission is only carried out by rear pouring concrete between precast slab, Welded-Stud Conectors be unable to give full play effect by steel construction and Concrete structure is connected to become entirety.
The prefabricated construction of steel-concrete combined structure needs to solve the problems, such as three aspects of connector.First, prefabricated mixed How reserved hole location in concrete board is accurately docked with the Welded-Stud Conectors on steel construction.Second, how to reduce prefabricated mixed Concrete board reserving hole reduces its influence to precast slab globality.How third gives full play to shear connector Effect, is connected to become entirety for steel construction and concrete structure.
Patent CN201120487335 disclose it is a kind of in bridge construction fasten concrete shear key, if including by The shear key ontology that shear key unit interconnected is constituted is done, the shear key unit includes support plate, the support plate Both ends are provided with mounting plate, and several groups through-hole is provided on the mounting plate, is provided with support column between every group of through-hole.
Though the patent is using the entirety being interconnected to constitute using shear key unit, since its supporting plate structure is more multiple It is miscellaneous, cause manufacturing process equally complex;Though being caused between its each shear key using its shear key unit set-up mode simultaneously Entirety is so formed, but is affected to concrete globality.
Now need a kind of reserved hole location in precast slab that can carry out with the Welded-Stud Conectors on steel construction accurate Docking;Concrete slab preformed hole is smaller;Steel construction and concrete structure are connected to become to whole shear connector.
Summary of the invention
The present invention is docked precisely to solve the reserved hole location of concrete slab in the prior art with Welded-Stud Conectors on steel construction The problem of degree reduces the influence to precast slab globality, gives full play to the effect of shear connector, provides one kind and cuts Power connector, concrete slab globality is high, and preformed hole is smaller, is easy to accurately dock, solves the above problem.
The present invention provides a kind of shear connector, including pin rod iron, pin rod iron mounting plate and perforated steel plate, pin Installation through-hole is provided on rod iron mounting plate, pin rod iron is set in installation through-hole, and pin steel plate mounting plate is vertically installed in Steel construction upper surface, perforated steel plate are provided at least one through-hole, and pin rod iron mounting plate passes vertically through through-hole, and perforated steel plate is set It is placed in above steel construction.
By burying pin rod iron mounting plate in concrete structure, the hole location merging precision of shear connector is improved;Pass through Pin rod iron and pin rod iron mounting plate realize it is easy, quickly, be reliably connected.Perforated steel plate is arranged reserved at design position Perforated steel plate is installed in hole, and both ends and template top are neat, guarantees that position does not change in concreting process, is realized anti- Connector hole location is cut accurately to dock.Perforated steel plate after the installation is completed, is laid with common stirrup and disconnects stirrup in concrete structure, And weld it with pre-buried perforated steel plate, the longitudinal reinforcement at the alternative position of perforated steel plate avoids at the position Longitudinal reinforcement is disconnected due to reserving hole, improves structural integrity.
Connector connection method is to dock after the completion of concrete slab and prefabricated steel construction according to perforated steel plate through-hole hole location After the completion, pin rod iron is inserted into pin rod iron mounting plate, that completes shear connector is reliably fixed connection.
Two kinds of preformed holes on pin rod iron mounting plate and perforated steel plate consider suitably to amplify, to consider concrete shrinkage It is influenced with various errors.
A kind of shear connector of the present invention, it is preferred that, pin rod iron includes the first rotary table, the second circle Platform, cylinder interconnecting piece, the first rotary table, the second rotary table and cylinder interconnecting piece are coaxial, the first rotary table and the setting of the second rotary table bottom surface In two bottom surface of cylinder interconnecting piece, the first rotary table and the second rotary table bottom surface area≤cylinder interconnecting piece base area.
A kind of shear connector of the present invention, it is preferred that, the first rotary table and the second truncated conical shape size phase Together, the first rotary table and the second rotary table bottom surface area are equal with cylinder interconnecting piece base area.
Splicing efficiency is improved convenient for positioning when splicing using the pin rod iron of class shuttle shape.
A kind of shear connector of the present invention, it is preferred that, perforated steel plate through-hole and pin rod iron mounting plate For interference fit.
A kind of shear connector of the present invention, it is preferred that, between pin rod iron mounting plate and steel construction Connection type is welding.
A kind of shear connector of the present invention, it is preferred that, pin rod iron mounting plate through-hole is round tube hole, is led to Bore dia is pin rod iron maximum width.
A kind of shear connector of the present invention, it is preferred that, pin rod iron mounting plate along beam lateral arrangement with At the top of steel construction.
Pin steel column connecting plate can also improve lateral shear behavior along the lateral arrangement of beam.
A kind of shear connector of the present invention, it is preferred that, pin rod iron connecting plate along beam be longitudinally arranged in At the top of steel construction.
Pin steel column connecting plate can be longitudinally arranged along beam, and longitudinal shear resistance performance can be improved.
A kind of shear connector of the present invention, it is preferred that, it further include stirrup, the surrounded plane of stirrup is vertical Horizontal plane, stirrup spatially network.
The explanation of one section of application method can be increased
Stirrup includes the disconnection stirrup connecting with shear connector and the common stirrup not connecting with shear connector, positive throwing It is provided with the setting of perforated steel plate position on shadow face and disconnects stirrup, common stirrup is set without perforated steel plate position on frontal plane of projection.
The present invention has the beneficial effect that:
(1) pre-buried perforated steel plate is welded with common stirrup and the section place of opening stirrup in reinforced concrete structure, is avoided Stirrup is disconnected and being influenced at reserved hole location, improves the globality of structure;
(2) longitudinal reinforcement in reinforced concrete structure at the alternative position of pre-buried perforated steel plate, avoids the position Place's longitudinal reinforcement is disconnected due to reserved hole location, improves the globality of structure;
(3) after steel construction and concrete structure are installed according to reserved hole location, by installing pin rod iron in perforated steel plate The two is formed into entirety, not only considered the convenience of construction but also can guarantee effective connection of connector;The rigidity of pin rod iron compared with Greatly, the shearing between steel construction and concrete structure can be effectively transmitted, while being effective against between concrete structure and steel construction Start;
(4) perforated steel plate can be according to the vertical and horizontal flexible arrangement of beam, applicability with higher.
Detailed description of the invention
Fig. 1 is shear connector schematic diagram;
Fig. 2 is shear connector pin rod iron schematic diagram.
Appended drawing reference:
1, pin rod iron;11, the first rotary table;12, the second rotary table;13, cylinder interconnecting piece;2, pin rod iron mounting plate;3, Perforated steel plate;4, steel construction.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Embodiment 1
As shown in Figure 1, a kind of shear connector, including pin rod iron 1, pin rod iron mounting plate 2 and perforated steel plate 3, pin Installation through-hole is provided on bolt rod iron mounting plate 2, pin rod iron 1 is set in installation through-hole, and pin steel plate mounting plate 2 is vertically set It is placed in 4 upper surface of steel construction, perforated steel plate 3 is provided at least one through-hole, and pin rod iron mounting plate 2 passes vertically through through-hole, band Hole steel plate 3 is set to 4 top of steel construction.
Pin rod iron mounting plate 2 is made of steel plate, Circularhole diameter and pin rod iron cylinder interconnecting piece base circle diameter (BCD) phase Match, root weld is at the top of steel construction.
As shown in Fig. 2, pin rod iron 1 include the first rotary table 11, the second rotary table 12, cylinder interconnecting piece 13, the first rotary table 11, Second rotary table 12 and cylinder interconnecting piece 13 are coaxial, and the first rotary table 11 and 12 bottom surface of the second rotary table are set to 13 liang of cylinder interconnecting piece Bottom surface, the first rotary table 11 is identical with 12 shape size of the second rotary table, the first rotary table 11 and 12 bottom surface area of the second rotary table and circle 13 base area of column interconnecting piece is equal.Pin rod iron 1 is made of steel, and the arrangement of pin rod iron mounting plate 2 can be vertical To arrangement, it is also possible to lateral arrangement;The spacing of pin rod iron mounting plate 2, its own length, arrangement form can be according to reality Requirement of engineering design determines.
The construction method of the shear connector of assembled composite structure, comprising the following steps:
S1, production pin rod iron 1;
S2, production girder steel and pin rod iron mounting plate 2, pin rod iron mounting plate 2 are welded in girder steel top surface;
S3, production concrete perforated steel plate 3;Prefabricated reinforced concrete structure template support is carried out, pin rod iron peace is laid with Loading board 2 is laid with disconnection stirrup at common stirrup and reserved hole location, and common stirrup and disconnection stirrup are carried out with perforated steel plate 3 Welding;It is laid with longitudinal regular reinforcement;Preformed hole at concrete slab connector position is set;Casting concrete, concrete curing are complete At rear demoulding;
S4, on-site consolidation is carried out, steel construction pin rod iron mounting plate 2 is reserved into hole location with concrete slab and carries out docking spelling Dress;By concrete slab preformed hole and the reversed one end insertion girder steel pin rod iron peace of pre-buried perforated steel plate is arranged in pin rod iron 1 In loading board 2;
S5, the very-high performance fiber concrete that the non-evaporating feeding microdilatancy of self-compaction is poured at reserved hole location.
The preformed hole to match with pin rod iron mounting plate 2 on steel construction is reserved in concrete structure prefabrication process, simultaneously The reserved preformed hole that pin rod iron 1 can be fit into reserved steel plate.Two kinds of preformed holes consider suitably to amplify, mixed to consider Solidifying soil is shunk and various errors influence.
Preformed hole is arranged in perforated steel plate 3 at design position, installs pre-buried perforated steel plate 3, and both ends and template top are neat, protects Card position in concreting process does not change, and realizes that shear connector hole location is accurately docked.Pre-buried perforated steel plate 3 exists In concrete structure after the installation is completed, it is laid with common stirrup and disconnects stirrup, and it is welded with pre-buried perforated steel plate 3.
After the completion of concrete structure and prefabricated steel construction, after the completion of the docking of reserved hole location, pin rod iron 1 is inserted into In pin rod iron mounting plate 2, that completes shear connector is reliably fixed connection.
After the completion of concrete structure and steel structure assembling, the non-evaporating feeding microdilatancy superelevation of self-compaction is poured in reserved hole location Energy fiber concrete, considers property easy for construction and connection reliability.
Shear connector and construction method proposed by the present invention for assembled steel-concrete combined structure, by It pre-buried perforated steel plate 3 and is welded with stirrup in concrete structure, welds pin rod iron mounting plate 2 in girder steel top surface;In work After the completion of factory is prefabricated, after being installed by reserved hole location, it is fixed by pin rod iron 1;After the installation is completed, in preformed hole Inside pour the very-high performance fiber concrete of the non-evaporating feeding microdilatancy of self-compaction.This kind of connection type substantially increases assembled steel- The globality of concrete combined structure effectively enhances shearing strength and rigidity that assembled steel-mixes composite structure, has ensured steel The collaborative work of structure and concrete structure.
Embodiment 2
As shown in Figure 1, a kind of shear connector, including pin rod iron 1, pin rod iron mounting plate 2 and perforated steel plate 3, pin Installation through-hole is provided on bolt rod iron mounting plate 2, pin rod iron 1 is set in installation through-hole, and pin steel plate mounting plate 2 is vertically set It is placed in 4 upper surface of steel construction, perforated steel plate 3 is provided at least one through-hole, and pin rod iron mounting plate 2 passes vertically through through-hole, band Hole steel plate 3 is set to 4 top of steel construction.
The position of opening of concrete perforated steel plate 3 should carry out aperture according to being pre-designed at connector position, and when aperture answers The amplification of 1~2mm is considered, to consider that various errors influence.The steel plate both ends should be neat with template top, prevents in concreting Steel plate position is buried in journey to change and cannot carry out Matching installation with the connector being pre-designed.
Pin rod iron mounting plate 2 is made of steel plate, Circularhole diameter and pin rod iron cylinder interconnecting piece base circle diameter (BCD) phase Match, root weld is at the top of steel construction.
As shown in Fig. 2, pin rod iron 1 include the first rotary table 11, the second rotary table 12, cylinder interconnecting piece 13, the first rotary table 11, Second rotary table 12 and cylinder interconnecting piece 13 are coaxial, and the first rotary table 11 and 12 bottom surface of the second rotary table are set to 13 liang of cylinder interconnecting piece Bottom surface, the first rotary table 11 is identical with 12 shape size of the second rotary table, the first rotary table 11 and 12 bottom surface area of the second rotary table and circle 13 base area of column interconnecting piece is equal.Pin rod iron 1 is made of steel, and the arrangement of pin rod iron mounting plate 2 can be vertical To arrangement, it is also possible to lateral arrangement;The spacing of pin rod iron mounting plate 2, its own length, arrangement form can be according to reality Requirement of engineering design determines.
The construction method of the shear connector of assembled composite structure, comprising the following steps:
S1, production pin rod iron 1;
S2, production girder steel and pin rod iron mounting plate 2, pin rod iron mounting plate 2 are welded in girder steel top surface;
S3, production concrete perforated steel plate 3;Prefabricated reinforced concrete structure template support is carried out, pin rod iron peace is laid with Loading board 2 is laid with disconnection stirrup at common stirrup and reserved hole location, and common stirrup and disconnection stirrup are carried out with perforated steel plate 3 Welding;It is laid with longitudinal regular reinforcement;Preformed hole at concrete slab connector position is set;Casting concrete, concrete curing are complete At rear demoulding;
S4, on-site consolidation is carried out, steel construction pin rod iron mounting plate 2 is reserved into hole location with concrete slab and carries out docking spelling Dress;By concrete slab preformed hole and the reversed one end insertion girder steel pin rod iron peace of pre-buried perforated steel plate is arranged in pin rod iron 1 In loading board 2;
S5, the very-high performance fiber concrete that the non-evaporating feeding microdilatancy of self-compaction is poured at reserved hole location.
The preformed hole to match with pin rod iron mounting plate 2 on steel construction is reserved in concrete structure prefabrication process, simultaneously The reserved preformed hole that pin rod iron 1 can be fit into reserved steel plate.Two kinds of preformed holes consider suitably to amplify, mixed to consider Solidifying soil is shunk and various errors influence.
Concrete slab includes concrete slab ontology and high-performance fiber concrete, and concrete body is board-like, concrete sheet Body is provided with preformed hole, and preformed hole is counterbore, and preformed hole is set to the reversed one end of pre-buried perforated steel plate, and preformed hole bottom end is provided with It is overlapped the identical through-hole of size with mounting hole vertical position, through-hole assembly shear key is provided in preformed hole, high-performance is fine Tie up Concrete Filled preformed hole.
Preformed hole is arranged in perforated steel plate 3 at design position, installs pre-buried perforated steel plate 3, and both ends and template top are neat, protects Card position in concreting process does not change, and realizes that shear connector hole location is accurately docked.Pre-buried perforated steel plate 3 exists In concrete structure after the installation is completed, it is laid with common stirrup and disconnects stirrup, and it is welded with pre-buried perforated steel plate 3.
After the completion of concrete structure and prefabricated steel construction, after the completion of the docking of reserved hole location, pin rod iron 1 is inserted into In pin rod iron mounting plate 2, that completes shear connector is reliably fixed connection.
After the completion of concrete structure and steel structure assembling, the non-evaporating feeding microdilatancy superelevation of self-compaction is poured in reserved hole location Energy fiber concrete, considers property easy for construction and connection reliability.
Shear connector and construction method proposed by the present invention for assembled steel-concrete combined structure, by It pre-buried perforated steel plate 3 and is welded with stirrup in concrete structure, welds pin rod iron mounting plate 2 in girder steel top surface;In work After the completion of factory is prefabricated, after being installed by reserved hole location, it is fixed by pin rod iron 1;After the installation is completed, in preformed hole Inside pour the very-high performance fiber concrete of the non-evaporating feeding microdilatancy of self-compaction.This kind of connection type substantially increases assembled steel- The globality of concrete combined structure effectively enhances shearing strength and rigidity that assembled steel-mixes composite structure, has ensured steel The collaborative work of structure and concrete structure.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of shear connector, it is characterised in that: including pin rod iron (1), pin rod iron mounting plate (2) and perforated steel plate (3), installation through-hole is provided on the pin rod iron mounting plate (2), the pin rod iron (1) is set to the installation through-hole In, the pin steel plate mounting plate (2) is vertically installed in steel construction (4) upper surface, and the perforated steel plate (3) is provided at least one A through-hole, the pin rod iron mounting plate (2) pass vertically through the through-hole, and the perforated steel plate (3) is set to the steel construction (4) top.
2. a kind of shear connector according to claim 1, it is characterised in that: the pin rod iron (1) includes the first circle Platform (11), the second rotary table (12), cylinder interconnecting piece (13), first rotary table (11), second rotary table (12) and the circle Column interconnecting piece (13) coaxially, the first rotary table (11) bottom surface and second rotary table (12) bottom surface respectively with the cylinder (13) two bottom surface of interconnecting piece is connected, and the first rotary table (11) bottom surface area and second rotary table (12) bottom surface area≤ Cylinder interconnecting piece (13) base area.
3. a kind of shear connector according to claim 2, it is characterised in that: first rotary table (11) and described second Rotary table (12) shape size is identical, and first rotary table (11) and second rotary table (12) bottom surface area and the cylinder connect Socket part (13) base area is equal.
4. a kind of shear connector described in any one of its according to claim 1~3, it is characterised in that: the steel with holes Plate (3) through-hole and the pin rod iron mounting plate (2) are interference fit.
5. a kind of shear connector according to claim 4, it is characterised in that: the pin rod iron mounting plate (2) and institute The connection type between steel construction (4) is stated as welding.
6. a kind of shear connector according to claim 5, it is characterised in that: pin rod iron mounting plate (2) through-hole For round tube hole, the through-hole diameter is pin rod iron (1) maximum width.
7. a kind of shear connector according to claim 6, it is characterised in that: the pin rod iron mounting plate (2) is along beam Lateral arrangement is at the top of the steel construction (4).
8. a kind of shear connector according to claim 6, it is characterised in that: the pin rod iron mounting plate (2) is along beam It is longitudinally arranged at the top of the steel construction (4).
CN201910474903.6A 2019-06-03 2019-06-03 A kind of shear connector Pending CN110158448A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910474903.6A CN110158448A (en) 2019-06-03 2019-06-03 A kind of shear connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910474903.6A CN110158448A (en) 2019-06-03 2019-06-03 A kind of shear connector

Publications (1)

Publication Number Publication Date
CN110158448A true CN110158448A (en) 2019-08-23

Family

ID=67627137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910474903.6A Pending CN110158448A (en) 2019-06-03 2019-06-03 A kind of shear connector

Country Status (1)

Country Link
CN (1) CN110158448A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202170572U (en) * 2011-07-04 2012-03-21 浙江省交通规划设计研究院 Steel and concrete shear connector structure
JP2014167254A (en) * 2014-04-23 2014-09-11 Taisei Corp Steel plate concrete structure
US20150139719A1 (en) * 2011-09-22 2015-05-21 Jiangsu Transportation Research Institute Co., Ltd Shear connector for corrugated sheet steel and concrete
CN206736696U (en) * 2017-05-04 2017-12-12 西京学院 A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam
CN210975497U (en) * 2019-06-03 2020-07-10 中国铁道科学研究院集团有限公司铁道建筑研究所 Shear connector

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202170572U (en) * 2011-07-04 2012-03-21 浙江省交通规划设计研究院 Steel and concrete shear connector structure
US20150139719A1 (en) * 2011-09-22 2015-05-21 Jiangsu Transportation Research Institute Co., Ltd Shear connector for corrugated sheet steel and concrete
JP2014167254A (en) * 2014-04-23 2014-09-11 Taisei Corp Steel plate concrete structure
CN206736696U (en) * 2017-05-04 2017-12-12 西京学院 A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam
CN210975497U (en) * 2019-06-03 2020-07-10 中国铁道科学研究院集团有限公司铁道建筑研究所 Shear connector

Similar Documents

Publication Publication Date Title
CN102587495B (en) Steel beam and concrete wall semi-rigid full-bolted-connection joint
CN103437425A (en) Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method
CN108179806B (en) Fully assembled reinforced concrete frame structure system
CN110792165A (en) Prefabricated assembly type concrete beam column joint connecting device and method
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
CN103726613B (en) A kind of novel fabricated concrete column
CN105040822A (en) Steel coupling beam and concrete shear wall assembly type connecting structure reserving construction allowance
CN108166619A (en) A kind of novel fabricated concrete structure bean column node
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN110670732A (en) Connection node of steel truss with inverted V-shaped section and reinforced concrete structure and construction method
CN111519826B (en) Assembly type stiff concrete shear wall structure with embedded connecting steel plates and manufacturing method
CN207436278U (en) A kind of assembly concrete-filled steel tube column-girder steel punching node
CN111305066A (en) Hybrid combination beam steel-concrete combination section and mounting method thereof
CN111101645A (en) Self-in-place reinforced precast concrete wallboard, connecting structure and construction method
CN110158448A (en) A kind of shear connector
CN210975497U (en) Shear connector
CN211368387U (en) Novel shear force component combination beam
CN111877831B (en) Assembled prefabricated column splicing type rigid connecting node and construction method
CN209228135U (en) A kind of reinforced concrete precast assembling movie theatre stand structure
CN104453013A (en) Prefabricated wall component and fabricated reinforced concrete shear wall
CN212053436U (en) Strenghthened type precast concrete wallboard and connection structure with from structure of taking one's place
CN212426749U (en) Hybrid reinforced concrete joint section
CN211228913U (en) Steel truss and reinforced concrete shear wall structure node with load transfer component
CN110158464A (en) A kind of novel shear key combination beam and its construction method
CN207761108U (en) A kind of level splices and combines wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination