CN110145159A - A kind of hard crossbeam of the contact net of welded connecting and its construction method - Google Patents

A kind of hard crossbeam of the contact net of welded connecting and its construction method Download PDF

Info

Publication number
CN110145159A
CN110145159A CN201910559265.8A CN201910559265A CN110145159A CN 110145159 A CN110145159 A CN 110145159A CN 201910559265 A CN201910559265 A CN 201910559265A CN 110145159 A CN110145159 A CN 110145159A
Authority
CN
China
Prior art keywords
crossbeam
hard
steel column
contact net
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910559265.8A
Other languages
Chinese (zh)
Other versions
CN110145159B (en
Inventor
邓诚
黄河
胡基冬
白林
沈弓召
刘国辉
张维
陈晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electricity Affair Engineering Co of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Electricity Affair Engineering Co of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electricity Affair Engineering Co of China Railway No 8 Engineering Group Co Ltd filed Critical Electricity Affair Engineering Co of China Railway No 8 Engineering Group Co Ltd
Priority to CN201910559265.8A priority Critical patent/CN110145159B/en
Publication of CN110145159A publication Critical patent/CN110145159A/en
Priority to DE212020000443.9U priority patent/DE212020000443U1/en
Priority to PCT/CN2020/097591 priority patent/WO2020259469A1/en
Application granted granted Critical
Publication of CN110145159B publication Critical patent/CN110145159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/20Arrangements for supporting or suspending trolley wires, e.g. from buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/28Manufacturing or repairing trolley lines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Materials Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Laser Beam Processing (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of hard crossbeam of the contact net of welded connecting and its construction methods, hard crossbeam includes several steel columns, crossbeam is connected between adjacent two steel columns, steel column and crossbeam are precast construction part, the height of steel column is determined according to the foundation elevation that measurement obtains, the centre distance on two bases that the length of crossbeam is obtained according to measurement is determined, and the negative degree of speeding of crossbeam is determined according to crossbeam vertical load suffered under normal use operating condition;Construction method is poured including basis;Negative degree of speeding needed for calculating crossbeam;It determines the height of every steel column of hard crossbeam, and carries out prefabricated;Determine the length of every group of crossbeam of hard crossbeam, and according to required negative degree of speeding prefabricated crossbeam;On the basis of steel column is fixed on;In place by crossbeam transhipment, and the length of crossbeam is checked;Lifting cross beam is temporarily bolted crossbeam with steel column, is carried out secondary bolt after recycling crane to adjust crossbeam to required negative degree of speeding, is finally welded to connect in junction.

Description

A kind of hard crossbeam of the contact net of welded connecting and its construction method
Technical field
The present invention relates to a kind of hard crossbeam of contact net, in particular to the hard crossbeam of a kind of contact net of welded connecting and its construction Method.
Background technique
The hard crossbeam of welded type gate has rigidity good compared to the hard crossbeam that traditional ring flange connects, indeformable excellent Point, but its construction process requirement is more complicated, and process is more, and the processes such as welding and adjustment need to complete in high-altitude, difficulty of construction It is larger.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, a kind of contact of welded connecting is provided Net hard crossbeam and its construction method.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of construction method of the hard crossbeam of the contact net of welded connecting, comprising the following steps:
Step 1: basis pours, and when construction ensures the center line on each basis point-blank, and is surveyed using level The absolute altitude for measuring each basis, using the centre distance between the two neighboring basis of laser range finder and level measurement;
Step 2: needed for calculating the crossbeam of hard crossbeam according to hard crossbeam vertical load suffered under normal use operating condition Negative degree of speeding;
Step 3: the foundation elevation obtained according to step 1 measurement determines the height of every steel column of hard crossbeam, and carries out pre- System;
Step 4: according to the centre distance on two bases that the step 1 measurement obtains, every group of crossbeam of hard crossbeam is determined Length, and according to the prefabricated crossbeam of negative degree of speeding that the step 2 is calculated;
Step 5: by the prefabricated steel column be fixed on it is described on the basis of, and using pole centralizing device or crowbar to steel Column position is corrected;
Step 6: in place by prefabricated crossbeam transhipment, grouping carries out assembled connection, and multiple using laser range finder The length of crossbeam described in core;
Step 7: lifting the crossbeam, and the cross beam edges section of the crossbeam is directly welded on the quarter line pillaring of the steel column, The crossbeam straight section of the crossbeam and the capital pillar of the intermediolateral column of the steel column are temporarily bolted, recycle crane described The crossbeam straight section of crossbeam carries out secondary bolt after adjusting to required negative degree of speeding, and is finally welded to connect, is being welded in junction When observe the negative sag value of crossbeam in real time with digital display horizontal rule.
Wherein, the sequencing of the step 3 and step 4 can be exchanged, and can also carry out simultaneously.
Hard crossbeam construction method of the present invention determines the dimension information of steel column and crossbeam by in-site measurement, and tight Lattice carry out prefabricated, site operation error of keeping under strict control, it is ensured that construction precision according to required size;It is born needed for crossbeam by precalculating Degree of speeding, and prefabrication is carried out according to required negative degree of speeding, the negative degree of speeding of every group of crossbeam of having gone bail for is up to standard;During assembly and spell Detection process is introduced after the completion of dress, it is ensured that construction one-time-reach-place prevents phenomenon of doing over again.Using construction method of the present invention, Working procedure can be greatly simplified, guarantees construction precision, improves construction efficiency.
Preferably, in the step 1: ensure the center line on each basis using transit survey point-blank, Transit survey precision is higher.
Preferably, in the step 2: the vertical load includes crossbeam self weight, maintenance load and dead load.
Preferably, in the step 2: the dead load is to generate after hanging installing contact net since contact net is self-possessed Load.
Preferably, in the step 5: the steel column installation site is measured using laser range finder and level meter, Ensure that steel column is correct in the position along line direction and horizontal path direction.
Preferably, in the step 7: after the completion of the crossbeam and steel column welded connecting, also having carried out preservative treatment.
The invention also discloses a kind of hard crossbeams of the contact net of welded connecting, including several steel columns, in adjacent two institutes It states and is connected with crossbeam between steel column, the steel column and crossbeam are precast construction part, and the height of the steel column is obtained according to measurement Foundation elevation be determined, the centre distances on two bases that the length of the crossbeam is obtained according to measurement are determined, described The negative degree of speeding of crossbeam is determined according to crossbeam vertical load suffered under normal use operating condition.
The hard crossbeam of contact net of the present invention has the accuracy of manufacture high, is convenient for assembling construction, can be improved construction precision and The advantages of construction efficiency.
Preferably, the foundation elevation is obtained using level measurement, and the centre distance on two basis uses Laser Measuring Distance meter and level measurement measurement obtain.
Preferably, the steel column includes quarter line pillaring and intermediolateral column, is equipped with capital pillar in the top of the intermediolateral column, described Crossbeam includes cross beam edges section and crossbeam straight section, and the cross beam edges section is connected with crossbeam straight section by connecting sleeve assembly, the cross Beam side section is welded to connect with the quarter line pillaring, and the crossbeam straight section is welded to connect after bolting with the capital pillar.
Preferably, the crossbeam and steel column are applied according to a kind of construction method of the hard crossbeam of contact net of welded connecting Work obtains.
Compared with prior art, beneficial effects of the present invention:
Hard crossbeam construction method of the present invention determines the dimension information of steel column and crossbeam by in-site measurement, and tight Lattice carry out prefabricated, site operation error of keeping under strict control, it is ensured that construction precision according to required size;It is born needed for crossbeam by precalculating Degree of speeding, and prefabrication is carried out according to required negative degree of speeding, the negative degree of speeding of every group of crossbeam of having gone bail for is up to standard;During assembly and spell Detection process is introduced after the completion of dress, it is ensured that construction one-time-reach-place prevents phenomenon of doing over again.Using construction method of the present invention, Working procedure can be greatly simplified, guarantees construction precision, improves construction efficiency.
The hard crossbeam of contact net of the present invention has the accuracy of manufacture high, is convenient for assembling construction, can be improved construction precision and The advantages of construction efficiency.
Detailed description of the invention:
Fig. 1 is a kind of structural schematic diagram of the hard crossbeam of contact net of welded connecting of the present invention.
Marked in the figure: 1- quarter line pillaring, 2- intermediolateral column, the capital 3- pillar, 4- connecting sleeve, 5- bolt, 6- cross beam edges section, 7- Crossbeam straight section, the basis 8-.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
A kind of construction method of the hard crossbeam of the contact net of welded connecting, comprising the following steps:
Step 1: basis pours, and when construction ensures the center line on each basis in straight line using transit survey On, and use level measures the absolute altitude on each basis, using between the two neighboring basis of laser range finder and level measurement Centre distance;
Step 2: needed for calculating the crossbeam of hard crossbeam according to hard crossbeam vertical load suffered under normal use operating condition Negative degree of speeding, the vertical load includes crossbeam self weight, maintenance load and dead load, and the dead load is suspension installation contact After net, since contact net is self-possessed and the load of generation;
Step 3: the foundation elevation obtained according to step 1 measurement determines the height of every steel column of hard crossbeam, and carries out pre- System;
Step 4: according to the centre distance on two bases that the step 1 measurement obtains, every group of crossbeam of hard crossbeam is determined Length, and according to the prefabricated crossbeam of negative degree of speeding that the step 2 is calculated;
Step 5: by the prefabricated steel column be fixed on it is described on the basis of, using laser range finder and level meter The steel column installation site is measured, it is ensured that the steel column the position along line direction and horizontal path direction just Really;
Step 6: in place by prefabricated crossbeam transhipment, grouping carries out assembled connection, and multiple using laser range finder The length of crossbeam described in core;
Step 7: lifting the crossbeam, and the cross beam edges section of the crossbeam is directly welded on the quarter line pillaring of the steel column, The crossbeam straight section of the crossbeam and the capital pillar of the intermediolateral column of the steel column are temporarily bolted, recycle crane described The crossbeam straight section of crossbeam carries out secondary bolt after adjusting to required negative degree of speeding, and finally carries out at welded connecting and anti-corrosion in junction Reason observes the negative sag value of crossbeam with digital display horizontal rule in welding in real time.
Wherein, the sequencing of the step 3 and step 4 can be exchanged, and can also carry out simultaneously.
Embodiment 2
As shown in Figure 1, a kind of hard crossbeam of the contact net of welded connecting, including several steel columns, the steel column include two Quarter line pillaring 1 and several intermediolateral columns 2 are equipped with capital pillar 3 at the top of the intermediolateral column 2.The hard crossbeam of contact net further includes having Several crossbeams, the crossbeam include cross beam edges section 6 and crossbeam straight section 7, and the cross beam edges section 6 and crossbeam straight section 7 pass through connection The assembled connection of casing 4.
The steel column and crossbeam are precast construction part, the absolute altitude on the basis 8 that the height of the steel column is obtained according to measurement It is determined, the centre distance on two bases 8 that the length of the crossbeam is obtained according to measurement is determined, and the negative of the crossbeam speeds Degree is determined according to crossbeam vertical load suffered under normal use operating condition.Basic 8 absolute altitude is surveyed using level It measures, the centre distance on two basis 8 is obtained using laser range finder and level measurement measurement.
The cross beam edges section 6 and 1 being directly welded to connect of quarter line pillaring, the crossbeam straight section 7 and the capital pillar 3 are logical After crossing the connection of bolt 5, then it is welded to connect.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (10)

1. a kind of construction method of the hard crossbeam of the contact net of welded connecting, which comprises the following steps:
Step 1: basis pours, and when construction ensures the center line on each basis point-blank, and every using level measurement The absolute altitude on a basis, using the centre distance between the two neighboring basis of laser range finder and level measurement;
Step 2: it is born needed for calculating the crossbeam of hard crossbeam according to hard crossbeam vertical load suffered under normal use operating condition Degree of speeding;
Step 3: the foundation elevation obtained according to step 1 measurement determines the height of every steel column of hard crossbeam, and carries out prefabricated;
Step 4: according to the centre distance on two bases that the step 1 measurement obtains, the length of every group of crossbeam of hard crossbeam is determined Degree, and according to the prefabricated crossbeam of negative degree of speeding that the step 2 is calculated;
Step 5: by the prefabricated steel column be fixed on it is described on the basis of, and using pole centralizing device or crowbar to steel column position It sets and is corrected;
Step 6: in place by prefabricated crossbeam transhipment, grouping carries out assembled connection, and checks institute using laser range finder State the length of crossbeam;
Step 7: lifting the crossbeam, and the cross beam edges section of the crossbeam is directly welded on the quarter line pillaring of the steel column, by institute The capital pillar of the crossbeam straight section and the intermediolateral column of the steel column of stating crossbeam is temporarily bolted, and recycles crane by the crossbeam Crossbeam straight section adjust to required negative degree of speeding after carry out secondary bolt, be finally welded to connect in junction, used in welding Digital display horizontal rule observes the negative sag value of crossbeam in real time.
2. a kind of construction method of the hard crossbeam of contact net of welded connecting according to claim 1, which is characterized in that described In step 1: ensuring the center line on each basis using transit survey point-blank.
3. a kind of construction method of the hard crossbeam of contact net of welded connecting according to claim 1, which is characterized in that described In step 2: the vertical load includes crossbeam self weight, maintenance load and dead load.
4. a kind of construction method of the hard crossbeam of contact net of welded connecting according to claim 3, which is characterized in that described In step 2: the dead load is the load of generation due to contact net self weight after suspension installing contact net.
5. a kind of construction method of the hard crossbeam of contact net of welded connecting according to claim 1, which is characterized in that described In step 5: being measured using laser range finder and level meter to the steel column installation site, it is ensured that the steel column is in fair line The position in road direction and horizontal path direction is correct.
6. a kind of construction method of the hard crossbeam of contact net of -5 any welded connectings, feature exist according to claim 1 In in the step 7: after the completion of the crossbeam and steel column welded connecting, also having carried out preservative treatment.
7. a kind of hard crossbeam of the contact net of welded connecting, which is characterized in that including several steel columns, in adjacent two steel columns Between be connected with crossbeam, the steel column and crossbeam are precast construction part, the basis that the height of the steel column is obtained according to measurement Absolute altitude is determined, and the centre distance on two bases that the length of the crossbeam is obtained according to measurement is determined, the crossbeam Negative degree of speeding is determined according to crossbeam vertical load suffered under normal use operating condition.
8. a kind of hard crossbeam of contact net of welded connecting according to claim 7, which is characterized in that the foundation elevation is adopted It is obtained with level measurement, the centre distance on two basis is obtained using laser range finder and level measurement measurement.
9. a kind of hard crossbeam of contact net of welded connecting according to claim 7, which is characterized in that the steel column includes side Pillar and intermediolateral column are equipped with capital pillar in the top of the intermediolateral column, and the crossbeam includes cross beam edges section and crossbeam straight section, institute It states cross beam edges section and is connected with crossbeam straight section by connecting sleeve assembly, the cross beam edges section and the quarter line pillaring are welded to connect, institute It is welded to connect after stating crossbeam straight section and capital pillar bolt.
10. according to a kind of hard crossbeam of contact net of any welded connecting of claim 7-9, which is characterized in that the crossbeam It constructs to obtain according to a kind of construction method of the hard crossbeam of contact net of any welded connecting of claim 1-6 with steel column.
CN201910559265.8A 2019-06-25 2019-06-25 Welding connection contact net hard cross beam and construction method thereof Active CN110145159B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201910559265.8A CN110145159B (en) 2019-06-25 2019-06-25 Welding connection contact net hard cross beam and construction method thereof
DE212020000443.9U DE212020000443U1 (en) 2019-06-25 2020-06-23 Welded hard cross member of an overhead contact line system
PCT/CN2020/097591 WO2020259469A1 (en) 2019-06-25 2020-06-23 Welded overhead line system hard cross beam and construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910559265.8A CN110145159B (en) 2019-06-25 2019-06-25 Welding connection contact net hard cross beam and construction method thereof

Publications (2)

Publication Number Publication Date
CN110145159A true CN110145159A (en) 2019-08-20
CN110145159B CN110145159B (en) 2024-02-27

Family

ID=67596413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910559265.8A Active CN110145159B (en) 2019-06-25 2019-06-25 Welding connection contact net hard cross beam and construction method thereof

Country Status (3)

Country Link
CN (1) CN110145159B (en)
DE (1) DE212020000443U1 (en)
WO (1) WO2020259469A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110594536A (en) * 2019-09-04 2019-12-20 河南省安装集团有限责任公司 Verticality adjusting method for tower equipment
WO2020259469A1 (en) * 2019-06-25 2020-12-30 中铁八局集团电务工程有限公司 Welded overhead line system hard cross beam and construction method therefor

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001311412A (en) * 2000-04-28 2001-11-09 East Japan Railway Co Connecting structure of brace and beam for construction
CN101073994A (en) * 2007-06-19 2007-11-21 中铁电气化局集团有限公司 Contact network system of high-speed electric railway
RU96273U1 (en) * 2010-03-15 2010-07-20 Открытое Акционерное Общество "Научно-Производственный Комплекс "Дедал" COMPLEX OF PROTECTION OF LONG-TERM TWO-RAILWAY SECTIONS
CN102936873A (en) * 2012-11-21 2013-02-20 中铁四局集团第四工程有限公司 Contact net line protection system for continuous beam construction of overpass electrified railway
CN203318190U (en) * 2013-05-10 2013-12-04 陕西高嘉电力科技有限公司 Movable contact net of electrified railway
CN203361327U (en) * 2013-07-08 2013-12-25 刘凯 Suspended portal rigid frame structure with adjustable supporting rod
CN205202774U (en) * 2015-11-30 2016-05-04 中铁电气化勘测设计研究院有限公司 Built on stilts rigidity contact net span design model
CN107609213A (en) * 2017-08-03 2018-01-19 西南交通大学 A kind of contact net clue Three-Dimensional Dynamic modeling method based on static balance
CN107620261A (en) * 2017-09-14 2018-01-23 中国铁路设计集团有限公司 Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN207902211U (en) * 2017-12-27 2018-09-25 中国铁路南昌局集团有限公司福州供电段 A kind of hard beam structure applied to contact net pantograph contact line relation simulation system
CN208088034U (en) * 2017-11-27 2018-11-13 中铁二十二局集团电气化工程有限公司 Lofting instrument for railroad track
CN208315045U (en) * 2017-12-27 2019-01-01 中国铁路南昌局集团有限公司福州供电段 A kind of contact net pantograph contact line relation structural simulation system
CN109878380A (en) * 2019-04-04 2019-06-14 中铁建大桥工程局集团电气化工程有限公司 A kind of metro depot rigid suspension OCS trackless pipeline construction method
CN210622423U (en) * 2019-06-25 2020-05-26 中铁八局集团电务工程有限公司 Welded connection's hard crossbeam of contact net

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT318705B (en) * 1972-06-06 1974-11-11 Siemens Ag Chain system for overhead lines for electric railways
JP2006232261A (en) * 2005-01-26 2006-09-07 East Japan Railway Co On-column rotary workbench apparatus
CN105275251A (en) * 2014-12-30 2016-01-27 中国铁建电气化局集团第五工程有限公司 Railway existing line overhead line system hard crossbeam erection method
CN110145159B (en) * 2019-06-25 2024-02-27 中铁八局集团电务工程有限公司 Welding connection contact net hard cross beam and construction method thereof

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001311412A (en) * 2000-04-28 2001-11-09 East Japan Railway Co Connecting structure of brace and beam for construction
CN101073994A (en) * 2007-06-19 2007-11-21 中铁电气化局集团有限公司 Contact network system of high-speed electric railway
RU96273U1 (en) * 2010-03-15 2010-07-20 Открытое Акционерное Общество "Научно-Производственный Комплекс "Дедал" COMPLEX OF PROTECTION OF LONG-TERM TWO-RAILWAY SECTIONS
CN102936873A (en) * 2012-11-21 2013-02-20 中铁四局集团第四工程有限公司 Contact net line protection system for continuous beam construction of overpass electrified railway
CN203318190U (en) * 2013-05-10 2013-12-04 陕西高嘉电力科技有限公司 Movable contact net of electrified railway
CN203361327U (en) * 2013-07-08 2013-12-25 刘凯 Suspended portal rigid frame structure with adjustable supporting rod
CN205202774U (en) * 2015-11-30 2016-05-04 中铁电气化勘测设计研究院有限公司 Built on stilts rigidity contact net span design model
CN107609213A (en) * 2017-08-03 2018-01-19 西南交通大学 A kind of contact net clue Three-Dimensional Dynamic modeling method based on static balance
CN107620261A (en) * 2017-09-14 2018-01-23 中国铁路设计集团有限公司 Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN208088034U (en) * 2017-11-27 2018-11-13 中铁二十二局集团电气化工程有限公司 Lofting instrument for railroad track
CN207902211U (en) * 2017-12-27 2018-09-25 中国铁路南昌局集团有限公司福州供电段 A kind of hard beam structure applied to contact net pantograph contact line relation simulation system
CN208315045U (en) * 2017-12-27 2019-01-01 中国铁路南昌局集团有限公司福州供电段 A kind of contact net pantograph contact line relation structural simulation system
CN109878380A (en) * 2019-04-04 2019-06-14 中铁建大桥工程局集团电气化工程有限公司 A kind of metro depot rigid suspension OCS trackless pipeline construction method
CN210622423U (en) * 2019-06-25 2020-05-26 中铁八局集团电务工程有限公司 Welded connection's hard crossbeam of contact net

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020259469A1 (en) * 2019-06-25 2020-12-30 中铁八局集团电务工程有限公司 Welded overhead line system hard cross beam and construction method therefor
CN110594536A (en) * 2019-09-04 2019-12-20 河南省安装集团有限责任公司 Verticality adjusting method for tower equipment
CN110594536B (en) * 2019-09-04 2020-12-11 河南省安装集团有限责任公司 Verticality adjusting method for tower equipment

Also Published As

Publication number Publication date
CN110145159B (en) 2024-02-27
WO2020259469A1 (en) 2020-12-30
DE212020000443U1 (en) 2021-04-19

Similar Documents

Publication Publication Date Title
CN103087731B (en) A kind of Laser measurement installation method of coke dry quenching furnace furnace shell
CN109989349A (en) A kind of Continuous Beam-arch Bridge steel tube arch rib construction method of installation
CN101736698B (en) Accurate positioning method for cable-stayed bridge pylon cable guide pipe
CN110145159A (en) A kind of hard crossbeam of the contact net of welded connecting and its construction method
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN103821372A (en) Method for installing trusses with different heights
CN114541264B (en) Cable-stayed bridge cable guide pipe integrated measurement positioning method
CN106223623B (en) Steel construction box arched roof truss installation method
CN107964864A (en) A kind of trapezoidal bending component of gradual change and manufacture method of anchoringwire in vivo
CN111254835A (en) Continuous matching construction method for steel box girder segments in factory
CN102102444A (en) Assembling and positioning construction method of large steel casting members
CN115467421B (en) Hoisting construction method for complex large-span steel roof
CN111660422B (en) BIM-based box girder segment prefabricating method by adopting short line method
CN115075398A (en) Reverse-order socket construction method for installing Y-shaped steel column
CN112580135B (en) BIM application-based steel column section hoisting method
CN106400675A (en) Steel anchor box and mounting method thereof
CN210622423U (en) Welded connection's hard crossbeam of contact net
CN218059932U (en) Steel anchor box installation mechanism
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN207228148U (en) A kind of single-pipe tower precast splice type basis
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN111139808B (en) Method for carrying cantilever beam of self-elevating drilling platform
CN106245695B (en) The revolving platform of dumping plough and pylon assembly method
CN208167491U (en) A kind of trapezoidal bending component of gradual change of internal anchoringwire
CN113264450A (en) Small curve radius non-balanced cantilever of tire type beam lifting machine and assembling construction system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant