CN110138625A CN201910614864.5A CN201910614864A CN110138625A CN 110138625 A CN110138625 A CN 110138625A CN 201910614864 A CN201910614864 A CN 201910614864A CN 110138625 A CN110138625 A CN 110138625A
Authority
CN
China
Prior art keywords
distribution
topology
switch
equipment
distribution network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910614864.5A
Other languages
Chinese (zh)
Other versions
CN110138625B (en
Inventor
欧阳卫年
李高明
彭飞进
谭振鹏
黄红远
朱延廷
张文骏
郭为斌
黄小耘
曾晓丹
郭文鑫
赵瑞锋
汤志锐
吴树鸿
杜飞强
邝梓佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority to CN201910614864.5A priority Critical patent/CN110138625B/en
Publication of CN110138625A publication Critical patent/CN110138625A/en
Application granted granted Critical
Publication of CN110138625B publication Critical patent/CN110138625B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0677Localisation of faults
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Human Computer Interaction (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of distribution main website self-healing method based on electric topology connection relationship, by establishing a set of computation rule, find the mistake of topological connection relation automatically by system, automatically it is alarmed, automatic blocking main website self-healing action policy, avoids power distribution network operation risk caused by due to topological connection relation mistake causes self-healing program malfunction.The present invention checks topology exception compared to people, this method obtains related data using computer system and carries out analytic operation, efficiency and accuracy are high, can effectively take precautions against distribution network master station self-healing function because underlying topology data relationship is led to power networks risk brought by malfunction extremely.

Description

A kind of distribution main website self-healing method based on electric topology connection relationship
Technical field
The present invention relates to system for distribution network of power system regions, are based on electric topology connection relationship more particularly, to one kind Distribution main website self-healing method.
Background technique
Modern society requires the power supply reliability of the power supply reliability of power grid, especially power distribution network higher and higher.In time It was found that electric network fault point calculates optimal telegram in reply automatically according to power distribution network topological connection relation, electric network fault point, malfunction Path, and distribution network failure point is isolated by remote distribution automatization terminal, non-failure point is sent a telegram in reply.In this process In, the electric topology connection relationship of power distribution network is the most basic information of Fault Isolation, telegram in reply.If being remotely controlled in distribution power automation terminal During isolated fault point, non-failure point are sent a telegram in reply, it is wrong to will cause non-failure point because of topological connection relation mistake for system Accidentally it is isolated, causes wrong power failure.If the topological connection relation based on mistake during telegram in reply, the remote control that will cause mistake turns to supply It sends a telegram in reply, will cause misdelivery electricity under serious conditions, lead to personal injury.Therefore, when system diagnostics is to illegal electric connecting relation Should automatically to isolation, turn for etc. self-healings action policy be latched.Since power distribution network is complex, system, most distribution main website System obtains power distribution network electric topology connection relationship by interaction between system, as the power distribution network Topology connection of Southern Power Grid Company closes It is by carrying out interactive interfacing with generalized information system, by the electric topology for importing GIS figure, mould generation distribution main website that system, which is most of, Connection relationship.Due to during system interaction, being easy to lose without deleted, device model storage because of extra electrical cable It loses, unsuccessfully etc. reasons cause power distribution network electric topology connection relationship mistake to tie point storage.If distribution main website is in this electric topology Self-healing isolation, telegram in reply calculating are carried out on connection basis, will cause above-mentioned self-healing movement risk.
Summary of the invention
The present invention provides a kind of distribution main website self-healing method based on electric topology connection relationship, by establishing a set of calculating Rule is found the mistake of topological connection relation by system automatically, is alarmed automatically, automatic blocking main website self-healing action policy, Avoid power distribution network operation risk caused by due to topological connection relation mistake causes self-healing program malfunction.
In order to solve the above technical problems, technical scheme is as follows:
A kind of distribution main website self-healing method based on electric topology connection relationship, which comprises the following steps:
S1: distribution main station system from safe production management system, marketing system, distribution generalized information system, major network EMS system, metering from Dynamicization system obtains the data for constructing electric topology connection relationship, and distribution main station system directly adopts distribution automation terminal letter Breath;
S2: distribution main station system is detection distribution network system failure, right by the information sent in acquisition distribution power automation terminal equipment System unsafe condition carries out early warning;
S3: to distribution line localization of fault, the switch through fault point upstream, downstream is separated, and is detached from power supply point power supply;
S4: the various distribution line exception connection relationships of real-time monitoring, abnormal signal automatically generate block signal, match for being latched The isolation of power grid main website self-healing controls and remote control turns to supply;
S5: to turning for telegram in reply for distribution network failure.
It preferably, include being obtained from distribution generalized information system for constructing the data of electric topology connection relationship in step S1 Distribution Network Equipment parameter, station-line-change relationship of equipment subordinate, power distribution network electric topology connection relationship.
Preferably, in step S1 distribution automation terminal information include power distribution network switch electric current, voltage, power factor, Active and reactive, switching-state information and switch protection fault message.
Preferably, block signal is automatically generated in step S4, specifically includes the following steps:
S4.1: distribution feeder application obtains the figure of distribution line, modulus evidence one by one from distribution generalized information system, obtains feeder line model;
S4.2: judgment step S4.1 obtained feeder line model whether there is electric topology isolated island, if electric topology isolated island is by electrical Equipment it is true it is spare or deactivated caused by, then enter step S4.3;If electric topology isolated island is that shortage of data causes electric topology Disconnecting then carries out data correction by distribution generalized information system and regenerates correct distribution feeder figure, mould, notifies distribution Main station system reacquires;
Whether the device parameter in S4.3: verification step S4.2 obtained feeder line model is qualified, if device parameter is qualified, enters Step S4.4;If device parameter is unqualified, carry out device parameter amendment and regenerate correctly to match by distribution generalized information system Electric feeder line figure, mould, notice distribution main station system reacquire;
S4.4: distribution main station system enters library by GIS model for qualified feeder line model data is verified in S4.3, by feeder line Distribution Network Equipment parameter, station-line-change relationship of equipment subordinate, power distribution network electric topology connection relationship are imported one by one to host It stands system, forms the device parameter of entire power distribution network armamentarium, station-line-change subordinate relation of whole Distribution Network Equipments and complete Electric topology connection relationship between Distribution Network Equipment;
S4.5: the equipment in feeder line group on all feeder lines is given in reading system;
S4.6: in given feeder line group, a certain substation's outlet switch is starting point, using opposite side substation outlet switch as terminal, Search for its supply path;If can not be by including cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point company The outlet switch of opposite side substation is passed to, then generates topology and interrupts block signal, and enter step S4.9;If can be by including electricity Cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point relationship are connected to the outlet switch of opposite side substation, then This feeder line group is belonged to side apparatus, then does not generate topology and interrupts block signal, and enter step S4.8;If cable, frame can be passed through The relationships such as ceases to be busy, switch, disconnecting link, bus and its connection end point, tie point are connected to other feedbacks being subordinated to other than this feeder line group Equipment L on line, enters step S4.7;
S4.7: detection device L with feeder line group in equipment electric topology connection relationship, if equipment L is not with equipment in feeder line group It is attached by contact point switch, then generates topological abnormal obliteration signal, enter step S4.9;If in equipment L and feeder line group Equipment be by contact point switch be attached, but contact point switch in state close, then generate topological abnormal obliteration signal, and Enter step S4.9;If equipment L is to be attached by contact point switch, but contact point switch is in shape with equipment in feeder line group State point, then do not generate topological abnormal obliteration signal, and enter step S4.8;
S4.8: output topology exception=0, topology interrupt=0, are not latched distribution network master station self-healing function;It is delayed specified time, enters Next round topology is abnormal and topology interrupts detection;
S4.9: locking distribution network master station self-healing, locking distribution network master station self-healing remote control isolation, locking distribution network master station self-healing turn to supply Telegram in reply;It is delayed specified time, interrupts detection into next round topology exception and topology.
Preferably, distribution network failure is turned to specifically include for telegram in reply in step S5:
Given two or more there are the feeder line of electric connecting relation as can looped network turn the self-healing feeder line group of confession, when normal operation, Contact point switch disjunction between two feeder lines is opened, and is separated power supply to two feeder lines;After failure occurs, fault point is isolated Afterwards, by closing contact point switch, restore the customer power supply of trouble point downstream.
Compared with prior art, the beneficial effect of technical solution of the present invention is:
Topology exception is checked compared to people, the present invention has found the mistake of topological connection relation automatically, alarmed automatically, automatic blocking Main website self-healing action policy avoids power distribution network caused by due to topological connection relation mistake causes self-healing program malfunction from running wind Danger.The present invention obtains related data using computer system and carries out analytic operation, and efficiency and accuracy are high, can effectively take precautions against Distribution network master station self-healing function is led to power networks risk brought by malfunction because of underlying topology data relationship extremely.
Detailed description of the invention
Fig. 1 is a kind of distribution main website self-healing method flow chart based on electric topology connection relationship.
Fig. 2 is the flow chart for generating topological block signal.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
In order to better illustrate this embodiment, the certain components of attached drawing have omission, zoom in or out, and do not represent the ruler of actual product It is very little;
To those skilled in the art, the omitting of some known structures and their instructions in the attached drawings are understandable.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
The present embodiment discloses a kind of distribution main website self-healing method based on electric topology connection relationship, such as Fig. 1, comprising: S1: distribution Main station system is obtained from safe production management system, marketing system, distribution generalized information system, major network EMS system, metering automation system Take the Distribution Network Equipment parameter, equipment subordinate in the data of building electric topology connection relationship, obtained from distribution generalized information system Standing, directly to adopt distribution automation terminal information include distribution for-line-change relationship, power distribution network electric topology connection relationship distribution main station system Net electric current, voltage, power factor, active and reactive, switching-state information and the switch protection fault message of switch;
S2: distribution main station system is detection distribution network system failure, right by the information sent in acquisition distribution power automation terminal equipment System unsafe condition carries out early warning;
S3: to distribution line localization of fault, the switch through fault point upstream, downstream is separated, and is detached from power supply point power supply;
S4: the various distribution line exception connection relationships of real-time monitoring, abnormal signal automatically generate block signal, match for being latched The isolation of power grid main website self-healing controls and remote control turns to supply;Block signal, such as Fig. 2 are automatically generated in step S4, are specifically included following Step:
S4.1: distribution feeder application obtains the figure of distribution line, modulus evidence one by one from distribution generalized information system, obtains feeder line model;
S4.2: judgment step S4.1 obtained feeder line model whether there is electric topology isolated island, if electric topology isolated island is by electrical Equipment it is true it is spare or deactivated caused by, then enter step S4.3;If electric topology isolated island is that shortage of data causes electric topology Disconnecting then carries out data correction by distribution generalized information system and regenerates correct distribution feeder figure, mould, notifies distribution Main station system reacquires;
Whether the device parameter in S4.3: verification step S4.2 obtained feeder line model is qualified, if device parameter is qualified, enters Step S4.4;If device parameter is unqualified, carry out device parameter amendment and regenerate correctly to match by distribution generalized information system Electric feeder line figure, mould, notice distribution main station system reacquire;
S4.4: distribution main station system enters library by GIS model for qualified feeder line model data is verified in S4.3, by feeder line Distribution Network Equipment parameter, station-line-change relationship of equipment subordinate, power distribution network electric topology connection relationship are imported one by one to host It stands system, forms the device parameter of entire power distribution network armamentarium, station-line-change subordinate relation of whole Distribution Network Equipments and complete Electric topology connection relationship between Distribution Network Equipment;
S4.5: the equipment in feeder line group on all feeder lines is given in reading system;
S4.6: in given feeder line group, a certain substation's outlet switch is starting point, using opposite side substation outlet switch as terminal, Search for its supply path;If can not be by including cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point company The outlet switch of opposite side substation is passed to, then generates topology and interrupts block signal, and enter step S4.9;If can be by including electricity Cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point relationship are connected to the outlet switch of opposite side substation, then This feeder line group is belonged to side apparatus, then does not generate topology and interrupts block signal, and enter step S4.8;If cable, frame can be passed through The relationships such as ceases to be busy, switch, disconnecting link, bus and its connection end point, tie point are connected to other feedbacks being subordinated to other than this feeder line group Equipment L on line, enters step S4.7;
S4.7: detection device L with feeder line group in equipment electric topology connection relationship, if equipment L is not with equipment in feeder line group It is attached by contact point switch, then generates topological abnormal obliteration signal, enter step S4.9;If in equipment L and feeder line group Equipment be by contact point switch be attached, but contact point switch in state close, then generate topological abnormal obliteration signal, and Enter step S4.9;If equipment L is to be attached by contact point switch, but contact point switch is in shape with equipment in feeder line group State point, then do not generate topological abnormal obliteration signal, and enter step S4.8;
S4.8: output topology exception=0, topology interrupt=0, are not latched distribution network master station self-healing function;It is delayed specified time, enters Next round topology is abnormal and topology interrupts detection;
S4.9: locking distribution network master station self-healing, locking distribution network master station self-healing remote control isolation, locking distribution network master station self-healing turn to supply Telegram in reply;It is delayed specified time, interrupts detection into next round topology exception and topology.
S5: to turning for telegram in reply for distribution network failure, giving two or more, there are the feeder lines of electric connecting relation as can ring Net turns the self-healing feeder line group supplied, and when normal operation, the contact point switch disjunction between two feeder lines is opened, and divides two feeder lines Every power supply;After failure occurs, after fault point is isolated, by closing contact point switch, the user for restoring trouble point downstream is supplied Electricity.
The same or similar label correspond to the same or similar components;
The terms describing the positional relationship in the drawings are only for illustration, should not be understood as the limitation to this patent;
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be to this hair The restriction of bright embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description Other various forms of variations or variation out.There is no necessity and possibility to exhaust all the enbodiments.It is all in the present invention Spirit and principle within made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the claims in the present invention Within the scope of shield.

Claims (5)

1. a kind of distribution main website self-healing method based on electric topology connection relationship, which comprises the following steps:
S1: distribution main station system from safe production management system, marketing system, distribution generalized information system, major network EMS system, metering from Dynamicization system obtains the data for constructing electric topology connection relationship, and distribution main station system directly adopts distribution automation terminal letter Breath;
S2: distribution main station system is detection distribution network system failure, right by the information sent in acquisition distribution power automation terminal equipment System unsafe condition carries out early warning;
S3: to distribution line localization of fault, the switch through fault point upstream, downstream is separated, and is detached from power supply point power supply;
S4: the various distribution line exception connection relationships of real-time monitoring, abnormal signal automatically generate block signal, match for being latched The isolation of power grid main website self-healing controls and remote control turns to supply;
S5: to turning for telegram in reply for distribution network failure.
2. the distribution main website self-healing method according to claim 1 based on electric topology connection relationship, which is characterized in that step Data in rapid S1 for constructing electric topology connection relationship include the Distribution Network Equipment parameter obtained from distribution generalized information system, set Station-line-change relationship, the power distribution network electric topology connection relationship of standby subordinate.
3. the distribution main website self-healing method according to claim 2 based on electric topology connection relationship, which is characterized in that step Distribution automation terminal information includes the electric current of power distribution network switch, voltage, power factor, active and reactive, switch state in rapid S1 Information and switch protection fault message.
4. the distribution main website self-healing method according to claim 3 based on electric topology connection relationship, which is characterized in that step Block signal is automatically generated in rapid S4, specifically includes the following steps:
S4.1: distribution feeder application obtains the figure of distribution line, modulus evidence one by one from distribution generalized information system, obtains feeder line model;
S4.2: judgment step S4.1 obtained feeder line model whether there is electric topology isolated island, if electric topology isolated island is by electrical Equipment it is true it is spare or deactivated caused by, then enter step S4.3;If electric topology isolated island is that shortage of data causes electric topology Disconnecting then carries out data correction by distribution generalized information system and regenerates correct distribution feeder figure, mould, notifies distribution Main station system reacquires;
Whether the device parameter in S4.3: verification step S4.2 obtained feeder line model is qualified, if device parameter is qualified, enters Step S4.4;If device parameter is unqualified, carry out device parameter amendment and regenerate correctly to match by distribution generalized information system Electric feeder line figure, mould, notice distribution main station system reacquire;
S4.4: distribution main station system enters library by GIS model for qualified feeder line model data is verified in S4.3, by feeder line Distribution Network Equipment parameter, station-line-change relationship of equipment subordinate, power distribution network electric topology connection relationship are imported one by one to host It stands system, forms the device parameter of entire power distribution network armamentarium, station-line-change subordinate relation of whole Distribution Network Equipments and complete Electric topology connection relationship between Distribution Network Equipment;
S4.5: the equipment in feeder line group on all feeder lines is given in reading system;
S4.6: in given feeder line group, a certain substation's outlet switch is starting point, using opposite side substation outlet switch as terminal, Search for its supply path;If can not be by including cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point company The outlet switch of opposite side substation is passed to, then generates topology and interrupts block signal, and enter step S4.9;If can be by including electricity Cable, overhead line, switch, disconnecting link, bus and its connection end point, tie point relationship are connected to the outlet switch of opposite side substation, then This feeder line group is belonged to side apparatus, then does not generate topology and interrupts block signal, and enter step S4.8;If cable, frame can be passed through The relationships such as ceases to be busy, switch, disconnecting link, bus and its connection end point, tie point are connected to other feedbacks being subordinated to other than this feeder line group Equipment L on line, enters step S4.7;
S4.7: detection device L with feeder line group in equipment electric topology connection relationship, if equipment L is not with equipment in feeder line group It is attached by contact point switch, then generates topological abnormal obliteration signal, enter step S4.9;If in equipment L and feeder line group Equipment be by contact point switch be attached, but contact point switch in state close, then generate topological abnormal obliteration signal, and Enter step S4.9;If equipment L is to be attached by contact point switch, but contact point switch is in shape with equipment in feeder line group State point, then do not generate topological abnormal obliteration signal, and enter step S4.8;
S4.8: output topology exception=0, topology interrupt=0, are not latched distribution network master station self-healing function;It is delayed specified time, enters Next round topology is abnormal and topology interrupts detection;
S4.9: locking distribution network master station self-healing, locking distribution network master station self-healing remote control isolation, locking distribution network master station self-healing turn to supply Telegram in reply;It is delayed specified time, interrupts detection into next round topology exception and topology.
5. the distribution main website self-healing method according to claim 1 based on electric topology connection relationship, which is characterized in that step Distribution network failure is turned to specifically include for telegram in reply in rapid S5:
Given two or more there are the feeder line of electric connecting relation as can looped network turn the self-healing feeder line group of confession, when normal operation, Contact point switch disjunction between two feeder lines is opened, and is separated power supply to two feeder lines;After failure occurs, fault point is isolated Afterwards, by closing contact point switch, restore the customer power supply of trouble point downstream.
CN201910614864.5A 2019-07-09 2019-07-09 A kind of distribution main website self-healing method based on electric topology connection relationship Active CN110138625B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910614864.5A CN110138625B (en) 2019-07-09 2019-07-09 A kind of distribution main website self-healing method based on electric topology connection relationship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910614864.5A CN110138625B (en) 2019-07-09 2019-07-09 A kind of distribution main website self-healing method based on electric topology connection relationship

Publications (2)

Publication Number Publication Date
CN110138625A true CN110138625A (en) 2019-08-16
CN110138625B CN110138625B (en) 2019-10-25

Family

ID=67566820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910614864.5A Active CN110138625B (en) 2019-07-09 2019-07-09 A kind of distribution main website self-healing method based on electric topology connection relationship

Country Status (1)

Country Link
CN (1) CN110138625B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601156A (en) * 2019-09-09 2019-12-20 广东电网有限责任公司 Master station centralized self-healing locking method based on remote sensing abnormity of distribution network terminal
CN110866735A (en) * 2019-11-13 2020-03-06 广东电网有限责任公司 Method and system for positioning switch of distribution network line contact point by using GIS model and readable storage medium
CN110941642A (en) * 2019-11-20 2020-03-31 贵州电网有限责任公司电力科学研究院 Power distribution network data processing method and device based on Lucene full-text retrieval
CN111697569A (en) * 2020-05-22 2020-09-22 国网山东省电力公司德州供电公司 Comprehensive analysis system and method for fault self-healing capability of distribution line
CN111952929A (en) * 2020-08-13 2020-11-17 广东电网有限责任公司 Self-healing false switching-on judgment method and device for distribution network feeder automation terminal
CN112182816A (en) * 2020-09-22 2021-01-05 国网福建省电力有限公司龙岩供电公司 Method for preventing misoperation in online mode in accident voltage loss region of 35 kV-110 kV power grid
CN112993996A (en) * 2021-04-01 2021-06-18 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Automatic checking and allocating system for power grid topology
CN112986746A (en) * 2021-05-06 2021-06-18 广东电网有限责任公司佛山供电局 Distribution network feeder fault cure rate automatic analysis method, system and equipment
CN113507117A (en) * 2021-07-08 2021-10-15 国网河北省电力有限公司电力科学研究院 Power distribution network topology model generation method and terminal equipment
CN113765223A (en) * 2021-09-07 2021-12-07 广东电网有限责任公司 Position identification method of distributed topological structure, intelligent terminal and storage medium
CN113852195A (en) * 2021-09-18 2021-12-28 广东电网有限责任公司 Distribution automation terminal self-healing method, device, equipment and storage medium
CN114094554A (en) * 2021-12-02 2022-02-25 广东电网有限责任公司 Master station in-place cooperative self-healing error isolation prevention method and related device
CN114678869A (en) * 2022-05-30 2022-06-28 广东电网有限责任公司佛山供电局 Self-healing method and device for power distribution network, electronic equipment and storage medium
CN112906174B (en) * 2021-03-23 2023-12-01 广东电网有限责任公司佛山供电局 Intelligent analysis method and system for grid problem of distribution network self-healing line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001065823A1 (en) * 2000-02-29 2001-09-07 Quadlogic Controls Corporation System and method for on-line monitoring and billing of power consumption
CN105049282A (en) * 2015-07-07 2015-11-11 中国南方电网有限责任公司 Intelligent relay protection device control overhauling method based on on-line monitoring information
CN106443277A (en) * 2016-10-27 2017-02-22 积成电子股份有限公司 Feeder line tree-based anti-misoperation checking method for power distribution network operation
CN107025344A (en) * 2017-04-01 2017-08-08 江苏金智科技股份有限公司 A kind of power distribution automation analogue system and emulation mode for distribution DTS
CN107612148A (en) * 2017-10-31 2018-01-19 南方电网科学研究院有限责任公司 Distribution network overhead line fault self-healing method and system
CN108092239A (en) * 2017-12-29 2018-05-29 安徽罗伯特科技股份有限公司 Arc light protection system
CN108664485A (en) * 2017-03-28 2018-10-16 深圳市凯立德科技股份有限公司 A kind of method and device of data inspection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001065823A1 (en) * 2000-02-29 2001-09-07 Quadlogic Controls Corporation System and method for on-line monitoring and billing of power consumption
CN105049282A (en) * 2015-07-07 2015-11-11 中国南方电网有限责任公司 Intelligent relay protection device control overhauling method based on on-line monitoring information
CN106443277A (en) * 2016-10-27 2017-02-22 积成电子股份有限公司 Feeder line tree-based anti-misoperation checking method for power distribution network operation
CN108664485A (en) * 2017-03-28 2018-10-16 深圳市凯立德科技股份有限公司 A kind of method and device of data inspection
CN107025344A (en) * 2017-04-01 2017-08-08 江苏金智科技股份有限公司 A kind of power distribution automation analogue system and emulation mode for distribution DTS
CN107612148A (en) * 2017-10-31 2018-01-19 南方电网科学研究院有限责任公司 Distribution network overhead line fault self-healing method and system
CN108092239A (en) * 2017-12-29 2018-05-29 安徽罗伯特科技股份有限公司 Arc light protection system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘健: "分布智能型馈线自动化***快速自愈技术及可靠性保障措施", 《电力***自动化》 *
田肖艳: "基于配网结构自愈***的研究与应用", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
金文佩: "城市配电网智能分布式馈线自动化***研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601156B (en) * 2019-09-09 2020-09-25 广东电网有限责任公司 Master station centralized self-healing locking method based on remote sensing abnormity of distribution network terminal
CN110601156A (en) * 2019-09-09 2019-12-20 广东电网有限责任公司 Master station centralized self-healing locking method based on remote sensing abnormity of distribution network terminal
CN110866735A (en) * 2019-11-13 2020-03-06 广东电网有限责任公司 Method and system for positioning switch of distribution network line contact point by using GIS model and readable storage medium
CN110866735B (en) * 2019-11-13 2024-01-23 广东电网有限责任公司 Method, system and readable storage medium for positioning connection point switch of distribution network line by GIS model
CN110941642A (en) * 2019-11-20 2020-03-31 贵州电网有限责任公司电力科学研究院 Power distribution network data processing method and device based on Lucene full-text retrieval
CN110941642B (en) * 2019-11-20 2022-12-23 贵州电网有限责任公司电力科学研究院 Power distribution network data processing method and device based on Lucene full-text retrieval
CN111697569A (en) * 2020-05-22 2020-09-22 国网山东省电力公司德州供电公司 Comprehensive analysis system and method for fault self-healing capability of distribution line
CN111952929B (en) * 2020-08-13 2022-08-16 广东电网有限责任公司 Self-healing false switching-on judgment method and device for distribution network feeder automation terminal
CN111952929A (en) * 2020-08-13 2020-11-17 广东电网有限责任公司 Self-healing false switching-on judgment method and device for distribution network feeder automation terminal
CN112182816B (en) * 2020-09-22 2023-02-28 国网福建省电力有限公司龙岩供电公司 Method for preventing misoperation in online mode in accident voltage loss region of 35 kV-110 kV power grid
CN112182816A (en) * 2020-09-22 2021-01-05 国网福建省电力有限公司龙岩供电公司 Method for preventing misoperation in online mode in accident voltage loss region of 35 kV-110 kV power grid
CN112906174B (en) * 2021-03-23 2023-12-01 广东电网有限责任公司佛山供电局 Intelligent analysis method and system for grid problem of distribution network self-healing line
CN112993996A (en) * 2021-04-01 2021-06-18 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Automatic checking and allocating system for power grid topology
CN112986746B (en) * 2021-05-06 2021-07-30 广东电网有限责任公司佛山供电局 Distribution network feeder fault self-healing rate automatic analysis method, system and equipment
CN112986746A (en) * 2021-05-06 2021-06-18 广东电网有限责任公司佛山供电局 Distribution network feeder fault cure rate automatic analysis method, system and equipment
CN113507117A (en) * 2021-07-08 2021-10-15 国网河北省电力有限公司电力科学研究院 Power distribution network topology model generation method and terminal equipment
CN113507117B (en) * 2021-07-08 2022-09-02 国网河北省电力有限公司电力科学研究院 Power distribution network topology model generation method and terminal equipment
CN113765223A (en) * 2021-09-07 2021-12-07 广东电网有限责任公司 Position identification method of distributed topological structure, intelligent terminal and storage medium
CN113765223B (en) * 2021-09-07 2023-08-22 广东电网有限责任公司 Position identification method of distributed topology structure, intelligent terminal and storage medium
CN113852195B (en) * 2021-09-18 2023-06-23 广东电网有限责任公司 Power distribution automation terminal self-healing method, device, equipment and storage medium
CN113852195A (en) * 2021-09-18 2021-12-28 广东电网有限责任公司 Distribution automation terminal self-healing method, device, equipment and storage medium
CN114094554B (en) * 2021-12-02 2023-06-30 广东电网有限责任公司 Method and related device for preventing error isolation by master station in-situ cooperative self-healing
CN114094554A (en) * 2021-12-02 2022-02-25 广东电网有限责任公司 Master station in-place cooperative self-healing error isolation prevention method and related device
CN114678869A (en) * 2022-05-30 2022-06-28 广东电网有限责任公司佛山供电局 Self-healing method and device for power distribution network, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN110138625B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
CN110138625B (en) A kind of distribution main website self-healing method based on electric topology connection relationship
Zhao et al. Review and prospect of hidden failure: protection system and security and stability control system
CN106771883A (en) A kind of multi-source information distribution fault localization method and system based on cloud
CN110380514B (en) Intelligent substation relay protection secondary circuit fault diagnosis method
CN107944657A (en) A kind of electric power multi-source information fault location and pre-judging method
CN105379135B (en) The system and method diagnosed automatically in real time in power network
Guo et al. An analytic model-based approach for power system alarm processing employing temporal constraint network
CN107785998B (en) Monitoring method of distribution automation equipment in distribution system
CN103227450A (en) On-line failure recovery method and system
CN109149771A (en) A kind of feeder test method based on petal type power grid
CN107679745A (en) A kind of typical rack feeder line power supply reliability evaluation method
Ni et al. Reliability assessment of cyber physical power system considering communication failure in monitoring function
Hajian-Hoseinabadi Availability comparison of various power substation automation architectures
CN108287290A (en) A kind of power grid cascading fault pre-alarming analysis system based on the operation of big regional power grid
CN107910855B (en) A kind of connection applied to intelligent substation cuts small power supply device
CN108616114B (en) A kind of power distribution network distributed layer protection system and method for the group containing microgrid
CN113746073A (en) Main station and terminal cooperative self-adaptive power distribution network fault processing method and system
CN109921389A (en) A kind of direct-current grid fault protecting method and system
Qiu Risk assessment of power system catastrophic failures and hidden failure monitoring & control system
CN107196279B (en) Intelligent distribution network resultant fault localization method
CN106712298B (en) Monitoring system for distribution automation system
CN109768619A (en) Monitoring information automatic debugging system and adjustment method
CN106685087B (en) A kind of distribution management equipment for electrical power distribution automatization system
CN112751421A (en) Digital computing enhanced high-reliability low-voltage power distribution safety monitoring system
CN104535894B (en) Earth fault line selection method and device under the double-bus method of operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant