CN110134421A CN201910439560.XA CN201910439560A CN110134421A CN 110134421 A CN110134421 A CN 110134421A CN 201910439560 A CN201910439560 A CN 201910439560A CN 110134421 A CN110134421 A CN 110134421A
Authority
CN
China
Prior art keywords
electric energy
energy meter
upgraded
upgrade
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910439560.XA
Other languages
Chinese (zh)
Inventor
万路
李鹏
张乐平
肖勇
胡珊珊
罗鸿轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Original Assignee
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd, China Southern Power Grid Co Ltd filed Critical China South Power Grid International Co ltd
Priority to CN201910439560.XA priority Critical patent/CN110134421A/en
Publication of CN110134421A publication Critical patent/CN110134421A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses an electric energy meter management chip upgrading method, an electric energy meter management chip upgrading system, an electronic device and a computer readable storage medium, wherein the method comprises the following steps: acquiring an upgrading program, and determining an electric energy meter to be upgraded according to upgrading conditions in the upgrading program; and transparently forwarding an upgrading file in the upgrading program to the electric energy meter to be upgraded through a target terminal corresponding to the electric energy meter to be upgraded so that the electric energy meter to be upgraded is upgraded by using the upgrading file. According to the method for upgrading the management chip of the electric energy meter, the upgrade file is transmitted to the electric energy meter to be upgraded in a terminal transparent forwarding mode, compared with the mode that the upgrade file is issued to the terminal and then issued to the electric energy meter by the terminal in the prior art, the communication traffic between the main station and the terminal is consistent, the process that the terminal stores the upgrade file is omitted, the terminal does not need to reserve the space, the error risk caused by downloading and storing of the terminal is reduced, and the upgrade success rate of the management chip in the electric energy meter is improved.

Description

Electric energy meter managing chip upgrade method, system and electronic equipment and storage medium
Technical field
This application involves electric energy meter technical fields, more specifically to a kind of electric energy meter managing chip upgrade method, are System and a kind of electronic equipment and a kind of computer readable storage medium.
Background technique
Business with more in-depth function of measuring application in intelligent electric energy meter, such as end perception, non-intrusion type are born The business such as lotus judgement and monitoring, electric flux quality analysis.And for the managing chip in intelligent electric energy meter, need timing to upgrade.
In the prior art, the upgrade file for being used to upgrade is downloaded to terminal by main website, is passed the upgrade file by terminal Electric energy meter to be upgraded is transported to, and is confirmed by the downloading that terminal completes the upgrade file of electric energy meter to be upgraded and sent upgrade command. The signal intelligence that above scheme is limited to different regions is different, such as the area of narrowband carrier, if upgrade file is larger, leads Cause the download of terminal big, the time delay of communication will reduce success rate for upgrading.
Therefore, how to improve the success rate for upgrading of the managing chip in electric energy meter is that those skilled in the art need to solve Technical problem.
Summary of the invention
The application's is designed to provide a kind of electric energy meter managing chip upgrade method, system and a kind of electronic equipment and one Kind computer readable storage medium, improves the success rate for upgrading of the managing chip in electric energy meter.
To achieve the above object, this application provides a kind of electric energy meter managing chip upgrade methods, comprising:
Upgrade procedure is obtained, and electric energy meter to be upgraded is determined according to the promotion condition in the upgrade procedure;
Upgrade file in the upgrade procedure is passed through into the corresponding target terminal transparent forwarding of the electric energy meter to be upgraded To the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
Wherein, the promotion condition according in the upgrade procedure determines electric energy meter to be upgraded, comprising:
Promotion condition in the upgrade procedure is sent to all terminals, so that all terminals are according to the upgrading Condition determines electric energy meter to be upgraded in administrative all electric energy meters.
Wherein, the upgrade file in the upgrade procedure is transparent by the corresponding target terminal of the electric energy meter to be upgraded It is forwarded to the electric energy meter to be upgraded, comprising:
Processing is grouped to all electric energy meters to be upgraded, and determines multicast address;
The upgrade file in the upgrade procedure electric energy meter to be upgraded is sent to according to the multicast address to correspond to Target terminal, so that the target terminal is by the upgrade file transparent forwarding to the electric energy meter to be upgraded.
Wherein, the promotion condition includes identification information, company-information, version information and the module letter of electric energy meter to be upgraded Any one of breath appoints several combinations.
Wherein, after the promotion condition according in the upgrade procedure determines electric energy meter to be upgraded, further includes:
Judge whether the file size of the upgrade file in the upgrade procedure is greater than preset value;
The upgrade file in the upgrade procedure is passed through into the electric energy meter to be upgraded corresponding target end if so, executing The step of holding transparent forwarding to the electric energy meter to be upgraded.
Wherein, the upgrade file in the upgrade procedure is transparent by the corresponding target terminal of the electric energy meter to be upgraded It is forwarded to after the electric energy meter to be upgraded, further includes:
Upgrade file is sent to the target terminal and downloads confirmation request, so that the target terminal is by described to be upgraded The upgrade file transmission block status word of electric energy meter determines whether the upgrade file is downloaded completely.
Wherein, the upgrade file in the upgrade procedure is transparent by the corresponding target terminal of the electric energy meter to be upgraded It is forwarded to after the electric energy meter to be upgraded, further includes:
By the target terminal to the electric energy meter transparent forwarding upgrade command to be upgraded, so as to the electric energy to be upgraded Table is upgraded using the upgrade file.
To achieve the above object, this application provides a kind of electric energy meter managing chip upgrade-systems, comprising:
Determining module determines electricity to be upgraded for obtaining upgrade procedure, and according to the promotion condition in the upgrade procedure It can table;
Sending module, for the upgrade file in the upgrade procedure to be passed through the corresponding target of the electric energy meter to be upgraded Terminal transparent forwarding is to the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
To achieve the above object, this application provides a kind of electronic equipment, comprising:
Memory, for storing computer program;
Processor realizes the step such as above-mentioned electric energy meter managing chip upgrade method when for executing the computer program Suddenly.
To achieve the above object, this application provides a kind of computer readable storage medium, the computer-readable storages It is stored with computer program on medium, such as above-mentioned electric energy meter managing chip liter is realized when the computer program is executed by processor The step of grade method.
By above scheme it is found that a kind of electric energy meter managing chip upgrade method provided by the present application, comprising: obtain upgrading Program, and electric energy meter to be upgraded is determined according to the promotion condition in the upgrade procedure;By the upgrading text in the upgrade procedure Part by the corresponding target terminal transparent forwarding of the electric energy meter to be upgraded to the electric energy meter to be upgraded, so as to described to be upgraded Electric energy meter is upgraded using the upgrade file.
Electric energy meter managing chip upgrade method provided by the present application, upgrade file are transmitted by way of terminal transparent forwarding To electric energy meter to be upgraded, and upgrade file is issued to the mode phase for being issued to electric energy meter after terminal by terminal again in the prior art Than main website is consistent to the traffic between terminal, but eliminates the process of terminal storage upgrade file, and terminal does not need reserved be somebody's turn to do Space reduces because terminal downloads store bring risk of error, improves the success rate for upgrading of the managing chip in electric energy meter. Disclosed herein as well is a kind of electric energy meter managing chip upgrade-system and a kind of electronic equipment and a kind of computer-readable storage mediums Matter is equally able to achieve above-mentioned technical effect.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited Application.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.Attached drawing is and to constitute specification for providing further understanding of the disclosure A part, be used to explain the disclosure together with following specific embodiment, but do not constitute the limitation to the disclosure.Attached In figure:
Fig. 1 is a kind of flow chart of electric energy meter managing chip upgrade method shown according to an exemplary embodiment;
Fig. 2 is the flow chart of another electric energy meter managing chip upgrade method shown according to an exemplary embodiment;
Fig. 3 is the flow chart according to another electric energy meter managing chip upgrade method shown in an exemplary embodiment;
Fig. 4 is a kind of structure chart of electric energy meter managing chip upgrade-system shown according to an exemplary embodiment;
Fig. 5 is the structure chart according to a kind of electronic equipment shown in an exemplary embodiment.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall in the protection scope of this application.
The embodiment of the present application discloses a kind of electric energy meter managing chip upgrade method, improves the managing chip in electric energy meter Success rate for upgrading.
Referring to Fig. 1, a kind of flow chart of electric energy meter managing chip upgrade method shown according to an exemplary embodiment, such as Shown in Fig. 1, comprising:
S101: upgrade procedure is obtained, and electric energy meter to be upgraded is determined according to the promotion condition in the upgrade procedure;
The executing subject of the present embodiment is main website, and upgrade request process is initiated by main website first, and main website obtains upgrade procedure, The upgrade procedure may include promotion condition and upgrade file.Promotion condition is for determining electric energy meter to be upgraded, upgrade file packet The executable program and whole verification, file as a whole for including modules are carried out down by the way of block transmission Hair, for upgrading to electric energy meter to be upgraded.Promotion condition herein may include the identification information of electric energy meter to be upgraded, factory Family's information, version information and module information etc., module refer to that the communication module on electric energy meter, such as bandwidth carrier communicate mould Block, narrowband carrier communication module etc., module information are the information such as address, the communication mode of these modules.That is, this implementation Example can electric energy meter to concrete model, the electric energy meter of target producer, in target producer target version electric energy meter or electric energy meter In specific module carry out updating operation, herein without specifically limiting.
It should be noted that electric energy meter to be upgraded can by directly by main website according to promotion condition using in a manner of point-to-point into Row determines that is, main website traverses all electric energy meters successively according to promotion condition with determination electric energy meter to be upgraded, and certain main website can also The promotion condition to be sent to all terminals, electric energy meter to be upgraded is determined by terminal, i.e., according in the upgrade procedure Promotion condition determines that the step of electric energy meter to be upgraded may include: that the promotion condition in the upgrade procedure is sent to all ends End, so that all terminals determine electric energy meter to be upgraded according to the promotion condition in administrative all electric energy meters.Specific In implementation, terminal respectively verifies its administrative electric energy meter one by one, meets the electric energy meter of promotion condition for electric energy meter information (such as Mailing address, version number etc.) terminal is returned to, all electric energy meter information for meeting promotion condition of terminal tissue are uploaded to main website, So that main website determines electric energy meter to be upgraded, it is only necessary to know that whether there is electric energy meter to be upgraded below each terminal for main website , require no knowledge about the specific mailing address of electric energy meter to be upgraded.
S102: it is transparent that the upgrade file in the upgrade procedure is passed through into the corresponding target terminal of the electric energy meter to be upgraded It is forwarded to the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
In this step, upgrade file is by the corresponding target terminal of electric energy meter to be upgraded according to the logical of electric energy meter to be upgraded Believe that address carries out transparent forwarding, electric energy meter to be upgraded upgraded using the upgrade file, terminal do not need for upgrade file it is pre- Stay memory space.
Preferably, after this step further include: Xiang Suoshu target terminal sends upgrade file and downloads confirmation request, so as to The target terminal by the upgrade file transmission block status word of the electric energy meter to be upgraded determine the upgrade file whether under It carries complete.
In specific implementation, it is transmitted due to upgrade file by main website to electric energy meter one direction to be upgraded, in order to ensure All electric energy meters to be upgraded receive complete upgrade file, can initiate upgrade file by main website and download confirmation request, under The mode for being dealt into terminal reading power meters file transmission block status word after terminal carries out the confirmation of administrative electric energy meter to be upgraded, by Terminal is downloaded determining Task-decomposing, can mitigate communication pressure between main website and terminal, electric energy meter.For the data of packet loss Can also by main website by the way of point-to-point transmission by the data distributing of packet loss to electric energy meter to be upgraded.In view of same packet number According to the possibility that may have more electric energy meters while packet loss, in order to improve efficiency, issuing for packet loss can be using multicast mode by leading It stands erectly to connect and is issued to electric energy meter, terminal carries out transparent forwarding.
In the confirmation for being downloaded file, if there is certain packets receive it is incomplete, cannot unconfined repetition go down, main website can To limit sending times, such as 5 times.Main station judging sending times can continue the liter of other electric energy meters to be upgraded when reaching the upper limit Grade process, the information of abnormal electric energy meter is reported.
Preferably, after this step further include: by the target terminal to described transparent turn of electric energy meter to be upgraded Upgrade command is sent out, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
In specific implementation, upgrade command is issued by main website, in order to ensure upgrade file receives the complete equal energy of electric energy meter The upgrade command is received, electric energy meter to be upgraded can be issued to by the way of point-to-point transparent forwarding by terminal, it is to be upgraded Electric energy meter responds the upgrade command, and updating result is transmitted to terminal, terminal again transparent forwarding to main website.
Electric energy meter managing chip upgrade method provided by the embodiments of the present application, upgrade file pass through the side of terminal transparent forwarding Formula is transmitted to electric energy meter to be upgraded, is issued to electric energy meter by terminal again with upgrade file is issued to after terminal in the prior art Mode is compared, and main website is consistent to the traffic between terminal, but eliminates the process of terminal storage upgrade file, and terminal does not need The space is reserved, reduces because terminal downloads store bring risk of error, improves the upgrading of the managing chip in electric energy meter Success rate.
The embodiment of the present application discloses a kind of electric energy meter managing chip upgrade method, relative to a upper embodiment, this implementation Example has made further instruction and optimization to technical solution.It is specific:
Referring to fig. 2, the flow chart of another electric energy meter managing chip upgrade method shown according to an exemplary embodiment, As shown in Figure 2, comprising:
S201: upgrade procedure is obtained, and electric energy meter to be upgraded is determined according to the promotion condition in the upgrade procedure;
S202: judge whether the file size of the upgrade file in the upgrade procedure is greater than preset value;If so, into S203;
In the present embodiment, judge whether the file size of upgrade file is greater than preset value, if so, into S203, if It is no, then it, can be by the way of the prior art, i.e., after upgrade file being issued to terminal to guarantee that the downloading of upgrade file is complete The mode of electric energy meter is issued to by terminal again.
S203: it is transparent that the upgrade file in the upgrade procedure is passed through into the corresponding target terminal of the electric energy meter to be upgraded It is forwarded to the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
It can be seen that the present embodiment is upgraded when the file size of upgrade file is greater than preset value using terminal transparent forwarding Upgrade file is transmitted to electric energy meter to be upgraded by the mode of file, solve terminal because download cause greatly success rate for upgrading compared with Low problem realizes the escalation policy adaptive based on the traffic.
The embodiment of the present application discloses a kind of electric energy meter managing chip upgrade method, relative to a upper embodiment, this implementation Example has made further instruction and optimization to technical solution.It is specific:
Referring to Fig. 3, the flow chart of another electric energy meter managing chip upgrade method shown according to an exemplary embodiment, As shown in Figure 3, comprising:
S301: upgrade procedure is obtained;
S302: being sent to all terminals for the promotion condition in the upgrade procedure, so that all terminals are according to institute It states promotion condition and determines electric energy meter to be upgraded in administrative all electric energy meters.
S303: processing is grouped to all electric energy meters to be upgraded, and determines multicast address;
In the present embodiment, all electric energy meters to be upgraded are grouped, grouping request can be initiated by main website, be issued point After group address to terminal, then by terminal group address is issued to electric energy meter to be upgraded, realizes the grouping to electric energy meter to be upgraded.
S304: the upgrade file in the upgrade procedure is sent to by the electric energy meter to be upgraded according to the multicast address Corresponding target terminal, so that the target terminal is by the upgrade file transparent forwarding to the electric energy meter to be upgraded.
In specific implementation, upgrade file is sent to electric energy meter to be upgraded corresponding target end according to multicast address by main website End, target terminal is by its transparent forwarding to electric energy meter to be upgraded.Upgrade file does not need to support link layer framing when downloading, due to It is that multicast issues, electric energy meter is not replied, to obtain higher success rate, when two frame period when main website issues data frame can be set Between, it is greater than 1S.
A kind of electric energy meter managing chip upgrade-system provided by the embodiments of the present application is introduced below, it is described below A kind of electric energy meter managing chip upgrade-system can be cross-referenced with a kind of above-described electric energy meter managing chip upgrade method.
Referring to fig. 4, the structure chart of a kind of electric energy meter managing chip upgrade-system shown according to an exemplary embodiment, such as Shown in Fig. 4, comprising:
Determining module 401 for obtaining upgrade procedure, and is determined according to the promotion condition in the upgrade procedure to be upgraded Electric energy meter;
Sending module 402, for the upgrade file in the upgrade procedure is corresponding by the electric energy meter to be upgraded Target terminal transparent forwarding is to the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is risen using the upgrade file Grade.
Electric energy meter managing chip upgrade-system provided by the embodiments of the present application, upgrade file pass through the side of terminal transparent forwarding Formula is transmitted to electric energy meter to be upgraded, is issued to electric energy meter by terminal again with upgrade file is issued to after terminal in the prior art Mode is compared, and main website is consistent to the traffic between terminal, but eliminates the process of terminal storage upgrade file, and terminal does not need The space is reserved, reduces because terminal downloads store bring risk of error, improves the upgrading of the managing chip in electric energy meter Success rate.
On the basis of the above embodiments, the determining module 401 includes: as a preferred implementation manner,
Acquiring unit, for obtaining upgrade procedure;
Determination unit, for the promotion condition in the upgrade procedure to be sent to all terminals, so as to all ends End determines electric energy meter to be upgraded according to the promotion condition in administrative all electric energy meters.
On the basis of the above embodiments, the sending module 402 includes: as a preferred implementation manner,
Grouped element for being grouped processing to all electric energy meters to be upgraded, and determines multicast address;
Transmission unit, it is described wait rise for being sent to the upgrade file in the upgrade procedure according to the multicast address The corresponding target terminal of grade electric energy meter, so that the target terminal is by the upgrade file transparent forwarding to the electric energy to be upgraded Table.
On the basis of the above embodiments, the promotion condition includes electric energy to be upgraded as a preferred implementation manner, Any one of identification information, company-information, version information and module information of table appoint several combinations.
On the basis of the above embodiments, as a preferred implementation manner, further include:
Judgment module, for judging whether the file size of the upgrade file in the upgrade procedure is greater than preset value;If It is the workflow for then starting the sending module 402.
On the basis of the above embodiments, as a preferred implementation manner, further include:
Determining module is downloaded, confirmation request is downloaded for sending upgrade file to the target terminal, so as to the target Terminal determines whether the upgrade file is downloaded completely by the upgrade file transmission block status word of the electric energy meter to be upgraded.
On the basis of the above embodiments, as a preferred implementation manner, further include:
Upgrade command module is sent, for ordering by the target terminal to the electric energy meter transparent forwarding upgrading to be upgraded It enables, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
About the system in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
Present invention also provides a kind of electronic equipment, referring to Fig. 5, a kind of electronic equipment 500 provided by the embodiments of the present application Structure chart, as shown in figure 5, may include processor 11 and memory 12.The electronic equipment 500 can also include multimedia group Part 13, one or more of input/output (I/O) interface 14 and communication component 15.
Wherein, processor 11 is used to control the integrated operation of the electronic equipment 500, manages core to complete above-mentioned electric energy meter All or part of the steps in piece upgrade method.Memory 12 is for storing various types of data to support in the electronic equipment 500 operation, these data for example may include any application or method for operating on the electronic equipment 500 Instruction and the relevant data of application program, such as contact data, the message of transmitting-receiving, picture, audio, video etc..This is deposited Reservoir 12 can be realized by any kind of volatibility or non-volatile memory device or their combination, such as static random It accesses memory (Static Random Access Memory, abbreviation SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, abbreviation EEPROM), erasable programmable Read-only memory (Erasable Programmable Read-Only Memory, abbreviation EPROM), programmable read only memory (Programmable Read-Only Memory, abbreviation PROM), and read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or CD.Multimedia component 13 may include screen and audio component.Wherein shield Curtain for example can be touch screen, and audio component is used for output and/or input audio signal.For example, audio component may include one A microphone, microphone is for receiving external audio signal.The received audio signal can be further stored in memory It 12 or is sent by communication component 15.Audio component further includes at least one loudspeaker, is used for output audio signal.I/O interface 14 provide interface between processor 11 and other interface modules, other above-mentioned interface modules can be keyboard, mouse, button Deng.These buttons can be virtual push button or entity button.Communication component 15 for the electronic equipment 500 and other equipment it Between carry out wired or wireless communication.Wireless communication, such as Wi-Fi, bluetooth, near-field communication (Near Field Communication, abbreviation NFC), 2G, 3G or 4G or they one or more of combination, therefore corresponding communication Component 15 may include: Wi-Fi module, bluetooth module, NFC module.
In one exemplary embodiment, electronic equipment 500 can be by one or more application specific integrated circuit (Application Specific Integrated Circuit, abbreviation ASIC), digital signal processor (Digital Signal Processor, abbreviation DSP), digital signal processing appts (Digital Signal Processing Device, Abbreviation DSPD), programmable logic device (Programmable Logic Device, abbreviation PLD), field programmable gate array (Field Programmable Gate Array, abbreviation FPGA), controller, microcontroller, microprocessor or other electronics member Part is realized, for executing above-mentioned electric energy meter managing chip upgrade method.
In a further exemplary embodiment, a kind of computer readable storage medium including program instruction is additionally provided, it should The step of above-mentioned electric energy meter managing chip upgrade method is realized when program instruction is executed by processor.For example, this is computer-readable Storage medium can be the above-mentioned memory 12 including program instruction, and above procedure instruction can be by the processor of electronic equipment 500 11 execute to complete above-mentioned electric energy meter managing chip upgrade method.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For system disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.It should be pointed out that for those skilled in the art, under the premise of not departing from the application principle, also Can to the application, some improvement and modification can also be carried out, these improvement and modification also fall into the protection scope of the claim of this application It is interior.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.

Claims (10)

1. a kind of electric energy meter managing chip upgrade method characterized by comprising
Upgrade procedure is obtained, and electric energy meter to be upgraded is determined according to the promotion condition in the upgrade procedure;
Upgrade file in the upgrade procedure is passed through into the corresponding target terminal transparent forwarding of the electric energy meter to be upgraded to institute Electric energy meter to be upgraded is stated, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
2. electric energy meter managing chip upgrade method according to claim 1, which is characterized in that described according to the upgrade procedure In promotion condition determine electric energy meter to be upgraded, comprising:
Promotion condition in the upgrade procedure is sent to all terminals, so that all terminals are according to the promotion condition Electric energy meter to be upgraded is determined in administrative all electric energy meters.
3. electric energy meter managing chip upgrade method according to claim 2, which is characterized in that by the liter in the upgrade procedure Grade file passes through the corresponding target terminal transparent forwarding of the electric energy meter to be upgraded to the electric energy meter to be upgraded, comprising:
Processing is grouped to all electric energy meters to be upgraded, and determines multicast address;
The upgrade file in the upgrade procedure is sent to the corresponding mesh of the electric energy meter to be upgraded according to the multicast address Terminal is marked, so that the target terminal is by the upgrade file transparent forwarding to the electric energy meter to be upgraded.
4. electric energy meter managing chip upgrade method according to claim 1, which is characterized in that the promotion condition includes wait rise Any one of identification information, company-information, version information and module information of grade electric energy meter appoint several combinations.
5. electric energy meter managing chip upgrade method according to claim 1, which is characterized in that described according to the upgrade procedure In promotion condition determine electric energy meter to be upgraded after, further includes:
Judge whether the file size of the upgrade file in the upgrade procedure is greater than preset value;
If so, executing the upgrade file in the upgrade procedure is saturating by the corresponding target terminal of the electric energy meter to be upgraded Bright the step of being forwarded to the electric energy meter to be upgraded.
6. electric energy meter managing chip upgrade method according to claim 1, which is characterized in that by the liter in the upgrade procedure After grade file is by the corresponding target terminal transparent forwarding to the electric energy meter to be upgraded of the electric energy meter to be upgraded, also wrap It includes:
Upgrade file is sent to the target terminal and downloads confirmation request, so that the target terminal passes through the electric energy to be upgraded The upgrade file transmission block status word of table determines whether the upgrade file is downloaded completely.
7. according to claim 1 to electric energy meter managing chip upgrade method described in any one of 6, which is characterized in that by the liter Upgrade file in grade program passes through the corresponding target terminal transparent forwarding of the electric energy meter to be upgraded to the electric energy to be upgraded After table, further includes:
By the target terminal to the electric energy meter transparent forwarding upgrade command to be upgraded, so as to the electric energy meter benefit to be upgraded Upgraded with the upgrade file.
8. a kind of electric energy meter managing chip upgrade-system characterized by comprising
Determining module determines electric energy meter to be upgraded for obtaining upgrade procedure, and according to the promotion condition in the upgrade procedure;
Sending module, for the upgrade file in the upgrade procedure to be passed through the corresponding target terminal of the electric energy meter to be upgraded Transparent forwarding is to the electric energy meter to be upgraded, so that the electric energy meter to be upgraded is upgraded using the upgrade file.
9. a kind of electronic equipment characterized by comprising
Memory, for storing computer program;
Processor realizes the electric energy meter managing chip as described in any one of claim 1 to 7 when for executing the computer program The step of upgrade method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes the electric energy meter managing chip liter as described in any one of claim 1 to 7 when the computer program is executed by processor The step of grade method.
CN201910439560.XA 2019-05-24 2019-05-24 Electric energy meter management chip upgrading method and system, electronic equipment and storage medium Pending CN110134421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910439560.XA CN110134421A (en) 2019-05-24 2019-05-24 Electric energy meter management chip upgrading method and system, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910439560.XA CN110134421A (en) 2019-05-24 2019-05-24 Electric energy meter management chip upgrading method and system, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110134421A true CN110134421A (en) 2019-08-16

Family

ID=67573017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910439560.XA Pending CN110134421A (en) 2019-05-24 2019-05-24 Electric energy meter management chip upgrading method and system, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110134421A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110597539A (en) * 2019-09-05 2019-12-20 威胜集团有限公司 Electric energy meter upgrading method, system and storage medium
CN112035147A (en) * 2020-09-14 2020-12-04 上海仙塔智能科技有限公司 Upgrade time management method, upgrade time management system, and computer storage medium
CN113050976A (en) * 2019-12-28 2021-06-29 浙江宇视科技有限公司 FPGA parallel upgrading method, device, medium and electronic equipment based on PCIe bus
CN113741941A (en) * 2021-09-16 2021-12-03 杭州海兴电力科技股份有限公司 Ammeter upgrading method, device and system
WO2024082491A1 (en) * 2022-10-20 2024-04-25 杭州粒合信息科技有限公司 Method and system for quickly upgrading fan device, and device and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102376153A (en) * 2011-11-15 2012-03-14 深圳市科陆电子科技股份有限公司 Method for remotely updating carrier sheet and acquirer in concentrated meter reading system
CN103209362A (en) * 2013-04-12 2013-07-17 深圳市共进电子股份有限公司 Method for upgrading multiple devices between passive optical network devices
CN104951341A (en) * 2015-06-18 2015-09-30 烟台东方威思顿电气股份有限公司 Method for remotely upgrading collector

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102376153A (en) * 2011-11-15 2012-03-14 深圳市科陆电子科技股份有限公司 Method for remotely updating carrier sheet and acquirer in concentrated meter reading system
CN103209362A (en) * 2013-04-12 2013-07-17 深圳市共进电子股份有限公司 Method for upgrading multiple devices between passive optical network devices
CN104951341A (en) * 2015-06-18 2015-09-30 烟台东方威思顿电气股份有限公司 Method for remotely upgrading collector

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孙楠等: ""基于DLMS/COSEM协议的集中器抄表机制设计"" *
王伟红;周淦林;: "电能信息采集***终端软件远程升级方案的设计与实现" *
郜波;: "一种基于IR46理念的智能电能表设计方案研究" *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110597539A (en) * 2019-09-05 2019-12-20 威胜集团有限公司 Electric energy meter upgrading method, system and storage medium
CN113050976A (en) * 2019-12-28 2021-06-29 浙江宇视科技有限公司 FPGA parallel upgrading method, device, medium and electronic equipment based on PCIe bus
CN112035147A (en) * 2020-09-14 2020-12-04 上海仙塔智能科技有限公司 Upgrade time management method, upgrade time management system, and computer storage medium
CN113741941A (en) * 2021-09-16 2021-12-03 杭州海兴电力科技股份有限公司 Ammeter upgrading method, device and system
WO2024082491A1 (en) * 2022-10-20 2024-04-25 杭州粒合信息科技有限公司 Method and system for quickly upgrading fan device, and device and medium

Similar Documents

Publication Publication Date Title
CN110134421A (en) Electric energy meter management chip upgrading method and system, electronic equipment and storage medium
CN103501333B (en) Method, device and terminal equipment for downloading files
CN103209439A (en) Method, apparatus and device for monitoring data traffic
CN111343020A (en) Unified management method and device for multi-protocol Internet of things equipment
CN108737259A (en) Gateway device, data transmission method and storage medium
CN109818962B (en) Service data processing method and device, electronic equipment and storage medium
CN103106095A (en) Method for remotely upgrading industrial camera and camera
CN104735657B (en) Security terminal verification method, wireless access point binding method, apparatus and system
CN102053813A (en) Splicing wall control method and device, and splicing wall system
CN103546467A (en) Method for transmitting Modbus RTU protocol on TCP/IP network
CN101216834A (en) File downloading method, system, device and server
CN103634935B (en) WPS (Wi-Fi protected setup) or QSS (quick secure setup)-based network accessing method and device
CN110244693A (en) Test macro, method, vehicle and the machine readable media of vehicle arrangement
CN108592313A (en) Wireless networking method of air conditioner, air conditioner internal unit and air conditioner external unit
CN103176825A (en) Processing method and processing device for service updating data of application program
CN110417871A (en) A kind of smart machine upgrade method
CN109862123A (en) Data processing method, Internet of Things module and equipment
CN104850873A (en) Communication apparatus, information processing apparatus, and control method for the same
CN116578066A (en) Vehicle diagnosis method, device, equipment and medium
CN106528199A (en) Method and terminal for updating automobile instrument panel system
CN113378041B (en) Prompt message pushing method, device, electronic equipment and computer readable medium
CN107179740B (en) The Compilation Method and embedded system of Embedded PLC
CN103079190B (en) It is a kind of to realize method, system and main frame that wireless terminal browses webpage function
CN113791766B (en) Method for combining data interfaces, electronic device and readable storage medium
KR101656416B1 (en) Apparatus and method of generating message automatically in real-time data transmission processing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination