CN110130327A - Organizational pile foundation structure and its installation method - Google Patents

Organizational pile foundation structure and its installation method Download PDF

Info

Publication number
CN110130327A
CN110130327A CN201810128563.7A CN201810128563A CN110130327A CN 110130327 A CN110130327 A CN 110130327A CN 201810128563 A CN201810128563 A CN 201810128563A CN 110130327 A CN110130327 A CN 110130327A
Authority
CN
China
Prior art keywords
pile
organizational
foundation structure
cutoff
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810128563.7A
Other languages
Chinese (zh)
Inventor
黄�俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201810128563.7A priority Critical patent/CN110130327A/en
Publication of CN110130327A publication Critical patent/CN110130327A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the installation methods of piling strtucture technical field more particularly to a kind of organizational pile foundation structure and the organizational pile foundation structure.The organizational pile foundation structure includes pile body, and pile body includes the lower pile cutoff that material is concrete and the upper pile cutoff that material is steel, is fixedly connected between lower pile cutoff and upper pile cutoff, and when pile body is squeezed into ground, lower pile cutoff enters Deep Rock soil layer, and upper pile cutoff enters shallow rock soil layer.The installation method of the organizational pile foundation structure includes Step 1: specifying target position to drill in rock-soil layer, and the diameter in hole is greater than the maximum gauge of the pile body of organizational pile foundation structure;Step 2: the pile body kind of organizational pile foundation structure is entered in hole;Step 3: filling backfilling material in the inner space of pile body and in the gap in pile body and hole.Lower pile cutoff is made of concrete, not only can guarantee the bearing capacity of piling strtucture, but also can effectively reduce the dosage of Steel material, substantially reduces the project cost of piling strtucture, and manufacture very convenient.

Description

Organizational pile foundation structure and its installation method
Technical field
The present invention relates to piling strtucture technical field more particularly to a kind of organizational pile foundation structures and the organizational pile foundation structure Installation method.
Background technique
Land building or offshore engineering structure, which all have, squeezes into the piling strtucture of rock-soil layer certain depth as brace foundation, The pile body of piling strtucture enters the part (part for entering Deep Rock soil layer) of rock-soil layer certain depth, and stress is mainly axis Xiang Li, suffered horizontal force and moment of flexure are then smaller, and the increase of usual pile body length is mainly axially held also for meeting piling strtucture Carry the requirement of power.
It in the prior art, is the intensity and bearing capacity that ensure piling strtucture, pile body is all made of Steel material and is made.But with close The price of Steel material is constantly soaring over year, and the project cost of piling strtucture is caused gradually to be promoted.Therefore, needing one kind can be full Under the premise of sufficient piling strtucture requirement for bearing capacity, reduction Steel material dosage, the piling strtucture for reducing cost.
Summary of the invention
The technical problem to be solved in the present invention is to provide the installation sides of a kind of organizational pile foundation structure and the organizational pile foundation structure Method can reduce Steel material dosage, reduce cost, to overcome existing skill under the premise of meeting piling strtucture requirement for bearing capacity The drawbacks described above of art.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of organizational pile foundation structure, including pile body, pile body includes the lower pile cutoff that material is concrete and material is the upper of steel Pile cutoff is fixedly connected between lower pile cutoff and upper pile cutoff, and when pile body is squeezed into rock-soil layer, lower pile cutoff enters Deep Rock soil layer, upper stake Section enters shallow rock soil layer.
Preferably, it is equipped with first flange disk close to one end of upper pile cutoff in lower pile cutoff, in upper pile cutoff close to the one of lower pile cutoff End is equipped with second flange disk, and first flange disk is connected to each other with second flange disk.
Preferably, lower pile cutoff is prestressed reinforced concrete construction.
Preferably, lower pile cutoff and/or upper pile cutoff are thin-wall construction.
Preferably, the axis of upper pile cutoff and lower pile cutoff overlaps.
Preferably, pile body is equipped with one, is equipped in upper pile cutoff far from one end of lower pile cutoff and is supported structure for connecting Third ring flange.
Preferably, pile body is equipped with multiple, and organizational pile foundation structure further includes one for connecting the supporting station for being supported structure, is propped up Cushion cap is supported on the upper pile cutoff of all pile bodies far from one end of lower pile cutoff.
A kind of installation method of organizational pile foundation structure as described above, comprising the following steps: Step 1: specified in rock-soil layer Target position drilling, the diameter in hole are greater than the maximum gauge of the pile body of organizational pile foundation structure;Step 2: by organizational pile foundation structure Pile body kind enters in hole;Step 3: filling backfilling material in the inner space of pile body and in the gap in pile body and hole.
Preferably, in step 1, first specify target position to squeeze into a steel pile casting in rock-soil layer, then in steel pile casting into Row drilling.
Preferably, further comprising the steps of after step 3: Step 4: extracting steel pile casting;Step 5: extracting steel Backfilling material is filled in the hole generated after casing.
Compared with prior art, the present invention has significant progress:
Pile body is divided into two sections, enter Deep Rock soil layer lower pile cutoff be made of concrete, with enter shallow rock soil The upper pile cutoff of the steel material of layer collectively forms a combined pile body, thus instead of the whole-steel pile body of existing piling strtucture, significantly Reduce the dosage of Steel material.Since lower pile cutoff enters Deep Rock soil layer, stress is mainly axial force, suffered horizontal force and Moment of flexure is then smaller, moreover, the stake soil side resistance value between concrete-pile and piling bar and rock-soil layer differs smaller, therefore, lower pile cutoff It is made of concrete, not only can guarantee the bearing capacity of piling strtucture, but also the dosage of Steel material can be effectively reduced, substantially reduced pile foundation The project cost of structure, and manufacture very convenient.Especially for China's wind-powered electricity generation industry piling strtucture the universal size of pile body compared with Long status provides a kind of organizational pile foundation structure of alternative good economy performance, has significant economic benefit.
Detailed description of the invention
Fig. 1 is the schematic front view of the pile body of organizational pile foundation structure of the invention.
Fig. 2 is the schematic cross-sectional view in Fig. 1 along A-A.
Fig. 3 is the schematic cross-sectional view in Fig. 2 along B-B.
Fig. 4 is the schematic diagram of the first embodiment of organizational pile foundation structure of the invention.
Fig. 5 is the schematic diagram of second of embodiment of organizational pile foundation structure of the invention.
In figure:
10, rock-soil layer 1, pile body
11, lower pile cutoff 12, upper pile cutoff
13, first flange disk 14, second flange disk
15, third ring flange 2, bolt
3, structure 4, supporting station are supported
5, changeover portion 51, the 4th ring flange
6, backfilling material
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.These embodiments are only used for Illustrate the present invention, and not limitation of the present invention.
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply opposite Importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood as the case may be Concrete meaning in the present invention.
In addition, in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.
As shown in Figures 1 to 5, the present invention provides a kind of organizational pile foundation structures.
Referring to Fig. 1 to Fig. 3, organizational pile foundation structure of the invention includes pile body 1, and pile body 1 includes lower pile cutoff 11 and upper pile cutoff 12, the material of lower pile cutoff 11 is concrete, and the material of upper pile cutoff 12 is steel, is fixedly connected between lower pile cutoff 11 and upper pile cutoff 12. Referring to fig. 4, when pile body 1 being squeezed into rock-soil layer 10, lower pile cutoff 11 enters Deep Rock soil layer 10, and upper pile cutoff 12 enters shallow rock soil layer 10, that is, the depth for descending pile cutoff 11 to enter rock-soil layer 10 is greater than the depth that upper pile cutoff 12 enters rock-soil layer 10, that is, in rock-soil layer 10 In, lower pile cutoff 11 is located at the lower section of upper pile cutoff 12.Since lower pile cutoff 11 enters Deep Rock soil layer 10, stress is mainly axial Power, suffered horizontal force and moment of flexure are then smaller, moreover, the stake soil side between concrete-pile and piling bar and rock-soil layer 10 hinders value phase Difference is smaller, and therefore, lower pile cutoff 11 is made of concrete, not only can guarantee the bearing capacity of piling strtucture, but also can effectively reduce steel The dosage of material substantially reduces the project cost of piling strtucture, and manufactures very convenient.
Preferably, the lower pile cutoff 11 of pile body 1 can be prestressed reinforced concrete construction.Further, lower pile cutoff 11 can use Thin-wall construction, and the cross-sectional shape of lower pile cutoff 11 does not limit to, it can be to be round rectangular or quincunx, it should be according to practical need It asks and is determined.
Preferably, the upper pile cutoff 12 of pile body 1 can also use thin-wall construction, and the cross-sectional shape of upper pile cutoff 12 is not yet Limitation, can be rectangular or quincunx for circle, should be determined according to actual needs.
Preferably, the upper pile cutoff 12 of pile body 1 and the axis of lower pile cutoff 11 overlap, to obtain maximum axial carrying Power.
Referring to Fig. 3, to realize lower being fixedly connected between pile cutoff 11 and upper pile cutoff 12, it is preferable that can be in lower pile cutoff 11 It is equipped with first flange disk 13 close to one end of upper pile cutoff 12, is equipped with second flange disk close to one end of lower pile cutoff 11 in upper pile cutoff 12 14, first flange disk 13 is connected to each other with second flange disk 14, to realize the connection of lower pile cutoff 11 and upper pile cutoff 12.First flange The form of disk 13 and second flange disk 14 is not limited to, and can be L-type or T-type.First flange disk 13 and second flange disk 14 Docking mode also do not limit to, for example, first flange disk 13 can be fixedly connected with second flange disk 14 by bolt 2, certainly, First flange disk 13 can also be attached with second flange disk 14 by other attachments.
Referring to fig. 4, in one embodiment of the invention, when pile body 1 is when being relatively large in diameter, organizational pile foundation structure can be with One pile body 1 is only set, and directly arrangement is supported structure 3 on pile body 1.Preferably, can pile body 1 upper pile cutoff 12 it is remote Third ring flange 15 is set on one end from lower pile cutoff 11, is connect by third ring flange 15 with structure 3 is supported, is realized single Support of the pile body 1 to structure 3 is supported.It is supported structure 3 not limit to, such as can be blower fan tower barrel.
Referring to Fig. 5, in another embodiment of the invention, when the diameter of pile body 1 is smaller, organizational pile foundation structure can Multiple pile bodies 1 are arranged, then organizational pile foundation structure further includes one for connecting the supporting station for being supported structure (being not shown in Fig. 5) 4, supporting station 4 is supported on the upper pile cutoff 12 of all pile bodies 1 far from one end of lower pile cutoff 11, by supporting station 4 and is supported knot Structure connection, realizes the support to structure is supported jointly of multiple pile bodies 1.The quantity of pile body 1 is not limited to, can be according to pile body 1 Size and be supported the size and weight of structure and be designed.The form of supporting station 4 is not also limited to, and can be concrete bearing Platform can also use steel truss structure.Preferably, a changeover portion 5 can be set on the holding table 4, in changeover portion 5 far from bearing One the 4th ring flange 51 is arranged in one end of platform 4, then can be connect by the 4th ring flange 51 with structure is supported.Preferably, transition Section 5 is made of Steel material.Do not limit to likewise, being supported structure, such as can be blower fan tower barrel.
To sum up, organizational pile foundation structure of the invention, it is two sections that pile body 1, which is divided to, enters the lower pile cutoff of Deep Rock soil layer 10 11 are made of concrete, collectively form a combined pile body 1 with the upper pile cutoff 12 for the steel material for entering shallow rock soil layer 10, thus Instead of the whole-steel pile body of existing piling strtucture, the dosage of Steel material is greatly reduced.Since lower pile cutoff 11 enters deep layer rock Soil layer 10, stress are mainly axial force, and suffered horizontal force and moment of flexure are then smaller, moreover, concrete-pile and piling bar and ground Stake soil side resistance value difference between layer 10 is smaller, and therefore, lower pile cutoff 11 is made of concrete, both can guarantee piling strtucture Bearing capacity, and the dosage of Steel material can be effectively reduced, the project cost of piling strtucture is substantially reduced, and manufacture very convenient.Especially It is to provide a kind of alternative economy for the status of the universal longer dimension of pile body of China's wind-powered electricity generation industry piling strtucture Good organizational pile foundation structure has significant economic benefit.
Based on said combination piling strtucture, the present invention also provides a kind of installation methods of organizational pile foundation structure.The present invention Organizational pile foundation structure installation method the following steps are included:
Step 1: specifying target position to drill in rock-soil layer 10, the diameter in hole is greater than the pile body 1 of organizational pile foundation structure most Major diameter, for being put into pile body 1.When 10 geological stability of rock-soil layer is preferable, can directly drill on rock-soil layer 10.Work as rock When 10 geological stability of soil layer is not good enough, then first target position can be specified to squeeze into a steel pile casting in rock-soil layer 10, then in steel It drills in casing.
Step 2: a kind of pile body of organizational pile foundation structure is entered in hole.Since the lower pile cutoff 11 of pile body 1 uses concrete system At intensity is relatively low, and it is relatively deep to bury, and should not directly be squeezed into rock-soil layer 10 using pile monkey, therefore first refers in rock-soil layer 10 Set the goal position drilling, then a kind of pile body of organizational pile foundation structure is entered in hole, can guarantee the embedded depth of pile body 1, and guarantee The quality of lower pile cutoff 11, for embedding rock area, economic advantages will be particularly evident.
Step 3: filling backfilling material 6 in the inner space of pile body 1 and in pile body 1 and the gap in hole.Backfilling material 6 It can be Cast-in-situ Piles in Sand-filling clay, or concrete perfusion.The backfill amount of backfilling material 6 should be according to the carrying of organizational pile foundation structure Power needs and the actual loading feature of pile body 1 is determined.
Step 4: if drilling in step 1 using steel pile casting steel pile casting need to be extracted after completing step 3.
Step 5: filling backfilling material in the hole generated after extracting steel pile casting, the backfilling material filled at this time can also Think backfill sand clay or concrete perfusion.
So far, organizational pile foundation structure of the present invention is installed.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these are improved and replacement Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of organizational pile foundation structure, which is characterized in that including pile body (1), the pile body (1) includes that material is under concrete Pile cutoff (11) and material are the upper pile cutoff (12) of steel, are fixedly connected between lower pile section (11) and upper pile section (12), will When the pile body (1) squeezes into rock-soil layer (10), lower pile section (11) enter Deep Rock soil layer (10), upper pile section (12) into Enter shallow rock soil layer (10).
2. organizational pile foundation structure according to claim 1, which is characterized in that in lower pile section (11) close to upper pile One end of section (12) is equipped with first flange disk (13), is equipped with the close to the one end of lower pile section (11) in upper pile section (12) Two ring flanges (14), the first flange disk (13) are connected to each other with the second flange disk (14).
3. organizational pile foundation structure according to claim 1, which is characterized in that lower pile section (11) is prestressed concrete Structure.
4. organizational pile foundation structure according to claim 1, which is characterized in that lower pile section (11) and/or upper pile Section (12) is thin-wall construction.
5. organizational pile foundation structure according to claim 1, which is characterized in that upper pile section (12) and lower pile section (11) axis overlaps.
6. organizational pile foundation structure according to claim 1, which is characterized in that the pile body (1) is equipped with one, on described Pile cutoff (12) is equipped with far from the one end of lower pile section (11) for connecting the third ring flange (14) for being supported structure (3).
7. organizational pile foundation structure according to claim 1, which is characterized in that the pile body (1) is equipped with multiple, the combination Piling strtucture further includes one for connecting the supporting station (4) for being supported structure, and the supporting station (4) is supported on all pile bodies (1) upper pile section (12) is far from the one end of lower pile section (11).
8. a kind of installation method of organizational pile foundation structure as claimed in any of claims 1 to 7 in one of claims, which is characterized in that packet Include following steps:
Step 1: specifying target position to drill in rock-soil layer (10), the diameter in the hole is greater than the institute of the organizational pile foundation structure State the maximum gauge of pile body (1);
Step 2: the pile body (1) of the organizational pile foundation structure is planted in the hole;
Step 3: filling backfilling material in the inner space of the pile body (1) and in the pile body (1) and the gap in the hole (6)。
9. the installation method of organizational pile foundation structure according to claim 8, which is characterized in that in said step 1, first It specifies target position to squeeze into a steel pile casting in rock-soil layer (10), then drills in the steel pile casting.
10. the installation method of organizational pile foundation structure according to claim 9, which is characterized in that after the step 3, It is further comprising the steps of:
Step 4: extracting the steel pile casting;
Step 5: filling backfilling material in the hole generated after extracting the steel pile casting.
CN201810128563.7A 2018-02-08 2018-02-08 Organizational pile foundation structure and its installation method Pending CN110130327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810128563.7A CN110130327A (en) 2018-02-08 2018-02-08 Organizational pile foundation structure and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810128563.7A CN110130327A (en) 2018-02-08 2018-02-08 Organizational pile foundation structure and its installation method

Publications (1)

Publication Number Publication Date
CN110130327A true CN110130327A (en) 2019-08-16

Family

ID=67567447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810128563.7A Pending CN110130327A (en) 2018-02-08 2018-02-08 Organizational pile foundation structure and its installation method

Country Status (1)

Country Link
CN (1) CN110130327A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847166A (en) * 2019-11-02 2020-02-28 苏州市水利设计研究院有限公司 Ecological combined pile and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
JP2005155103A (en) * 2003-11-21 2005-06-16 Shimizu Corp Hybrid pile and construction method for hybrid pile
KR100720946B1 (en) * 2006-09-12 2007-05-25 (주)한맥기술 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
CN201007003Y (en) * 2007-02-27 2008-01-16 王伟明 Reinforced concrete compounded pile
KR20110044720A (en) * 2009-10-23 2011-04-29 이상진 Combined pile having a different diameter
CN102226343A (en) * 2011-04-18 2011-10-26 上海华铸地基技术有限公司 Combined anchor-rod static pressure pile
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN104929116A (en) * 2015-06-11 2015-09-23 中交四航局港湾工程设计院有限公司 Precision pile sinking foundation structure of underwater engineering and underwater chute pile foundation structure construction method
KR101608286B1 (en) * 2015-06-02 2016-04-11 (주) 동인지테크 Composite Pile with PHC Pile and Steel Beam Pile
CN208088290U (en) * 2018-02-08 2018-11-13 上海勘测设计研究院有限公司 Organizational pile foundation structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
JP2005155103A (en) * 2003-11-21 2005-06-16 Shimizu Corp Hybrid pile and construction method for hybrid pile
KR100720946B1 (en) * 2006-09-12 2007-05-25 (주)한맥기술 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
CN201007003Y (en) * 2007-02-27 2008-01-16 王伟明 Reinforced concrete compounded pile
KR20110044720A (en) * 2009-10-23 2011-04-29 이상진 Combined pile having a different diameter
CN102226343A (en) * 2011-04-18 2011-10-26 上海华铸地基技术有限公司 Combined anchor-rod static pressure pile
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
KR101608286B1 (en) * 2015-06-02 2016-04-11 (주) 동인지테크 Composite Pile with PHC Pile and Steel Beam Pile
CN104929116A (en) * 2015-06-11 2015-09-23 中交四航局港湾工程设计院有限公司 Precision pile sinking foundation structure of underwater engineering and underwater chute pile foundation structure construction method
CN208088290U (en) * 2018-02-08 2018-11-13 上海勘测设计研究院有限公司 Organizational pile foundation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847166A (en) * 2019-11-02 2020-02-28 苏州市水利设计研究院有限公司 Ecological combined pile and construction method

Similar Documents

Publication Publication Date Title
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN105863042A (en) All-steel structure building and construction method thereof
CN205712137U (en) Foundation pit supporting construction
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN203547753U (en) Profile steel concrete shaft wall base
CN109944269B (en) Anti-freeze drawing device and construction method thereof
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN103711139A (en) Semi-rigid connection structure between pile foundation and bearing platform
CN208933955U (en) Organizational pile foundation structure suitable for coral reef geology
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN208088290U (en) Organizational pile foundation structure
CN110130327A (en) Organizational pile foundation structure and its installation method
CN207047834U (en) A kind of construction system of hollow preformed pile
CN202767281U (en) Assembly type reinforced concrete combination back wall
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN215105392U (en) Retractable prefabricated retaining wall supporting structure for manual hole digging pile
CN202148523U (en) Jet grouting soil-cement-pile strengthened pile
CN105200984B (en) A kind of novel sea engineering pile foundation reducing pile body displacement and preparation method thereof
CN212656218U (en) Heavy pile machine load underpinning structure
CN212452738U (en) Novel ring-tube bearing type fan foundation applicable to steep mountain terrain
CN202266065U (en) Heliostat pillar
CN208251078U (en) A kind of bottom-expanding sinking-pipe pilework
CN202509521U (en) Roadbed side slope retaining protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination