CN110127556A - Mining fully-mechanized mining equipment assembly and disassembly boom hoisting - Google Patents

Mining fully-mechanized mining equipment assembly and disassembly boom hoisting Download PDF

Info

Publication number
CN110127556A
CN110127556A CN201910453185.4A CN201910453185A CN110127556A CN 110127556 A CN110127556 A CN 110127556A CN 201910453185 A CN201910453185 A CN 201910453185A CN 110127556 A CN110127556 A CN 110127556A
Authority
CN
China
Prior art keywords
fixedly installed
disassembly
wirerope
chassis
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910453185.4A
Other languages
Chinese (zh)
Inventor
郑立军
付玉军
张华峰
李艳飞
于春生
穆利斌
张磊
凌可
王志耿
范建江
夏刘云
孙伟
张铮
王超杰
赵志远
张悦
景伟
崔源
宋静静
董社
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo Coal Industry (group) Co Ltd
Original Assignee
Jiaozuo Coal Industry (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Coal Industry (group) Co Ltd filed Critical Jiaozuo Coal Industry (group) Co Ltd
Priority to CN201910453185.4A priority Critical patent/CN110127556A/en
Publication of CN110127556A publication Critical patent/CN110127556A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/006Equipment transport systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D2700/00Capstans, winches or hoists
    • B66D2700/02Hoists or accessories for hoists
    • B66D2700/026Pulleys, sheaves, pulley blocks or their mounting
    • B66D2700/028Pulley blocks with multiple sheaves

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of mining fully-mechanized mining equipment assembly and disassembly boom hoistings, pedestal including the setting of two pieces of parallel side-by-sides, under(-)chassis is fixedly installed on every piece of pedestal, several needlings are fixedly installed along under(-)chassis trend is intermediate inside it, it is erect in needling and is fixedly installed hydraulic column, top plate is fixedly connected in the piston tip of hydraulic column, it is fixedly installed hanging pulley respectively on top plate both sides, it is fixedly installed contrary hydraulic cylinder respectively in both sides inside it along under(-)chassis trend, the piston tip of hydraulic cylinder is fixedly connected with pulling wheel and directive wheel, one end of wirerope is connected to pulling wheel, the other end of wirerope is wound at top plate after hanging pulley by directive wheel and is hung down, wirerope lower part end is connected with hook.It can satisfy the wider working environment space of field condition range, easy to repair, transport and installation.

Description

Mining fully-mechanized mining equipment assembly and disassembly boom hoisting
Technical field
The invention belongs to the assemblings of underground coal mine fully-mechanized mining working fully-mechanized mining equipment, disassembly boom hoisting technical field.
Background technique
With the propulsion of safety of coal mines efficient operation, fully-mechanized coalface is more and more, and fully-mechanized mining equipment makes Used in being continuously increased, fully-mechanized mining equipment removal of home, the number installed also gradually increase, and on the one hand need to carry out lifting group to fully-mechanized mining equipment Dress forms complete machine and is applied to coal working face, on the other hand needs to carry out complete machine disassembly lifting removal of home, large-scale fully-mechanized mining equipment Boom hoisting frequency of use is also stepping up.Current mining fully-mechanized mining equipment boom hoisting includes: four columns, four tops Beam, four hydraulic cylinders, four top beams assemble to form rectangular configuration, and the top of four columns is hinged with the quadrangle of rectangle top beam respectively Fixed, a square frame structure is integrally formed in column and top beam, erects on the inside of each column and fixes a hydraulic cylinder, hydraulic One pulley of fixed hanging on corresponding top beam at the top of cylinder, one end of wirerope are connected to hydraulic cylinder piston end, wirerope it is another One end is hung down by being wound at top beam after pulley, and wirerope lower part end is fixed with hook.Entire boom hoisting is by emulsifying Liquid pump provides power by fluid pressure line, controls hydraulic cylinder by hydraulic valve, the lifting by the flexible realization of hydraulic cylinder to equipment.By It is more by underground site Working Environments in current boom hoisting, such as: live height, width, transport, there are it is many not Just and insecurity factor, and column figure is excessive, and height is generally at four meters or more, and there are certain difficulty, steel wires for transport Rope from pulley abjection slide down after also bad processing;Especially for different live coal working face spatial altitude width, need The assembly and disassembly boom hoisting of processing installation different height width, causes repetition and waste, and it is not convenient enough to use.
Summary of the invention
The object of the present invention is to provide a kind of easy to repair, installations, transport, and adapt to the wider mine of field condition range With fully-mechanized mining equipment assembly and disassembly boom hoisting.
To achieve the goals above, the present invention includes the pedestal of two pieces of parallel side-by-sides setting, and fixation is set on every piece of pedestal It is equipped with under(-)chassis, several needlings is fixedly installed along under(-)chassis trend is intermediate inside it, erects and fix in needling It is provided with hydraulic column, is fixedly connected with top plate in the piston tip of hydraulic column, hanging is fixedly installed respectively on top plate both sides and slides Wheel is fixedly installed contrary hydraulic cylinder, the piston top of hydraulic cylinder in both sides inside it along under(-)chassis trend respectively End is fixedly connected with pulling wheel and directive wheel, and one end of wirerope is connected to pulling wheel, and the other end of wirerope passes through directive wheel It being wound at top plate and hangs down after hanging pulley, wirerope lower part end is connected with hook, and pedestal both ends are fixedly installed fixed block, Two ipsilateral fixed blocks are connected using stayed pole, two pedestals is made to form one.
There are six the needling settings.
The pedestal uses two-stage structure, is connected by fixed connecting plate.
The top plate uses two-stage structure, is connected by fixed connecting plate.
In this way, the present invention is installed to job site, according to place of working when lifting by crane to mining fully-mechanized mining equipment assembly and disassembly Space of points condition meets working space width requirement using the distance of the adjustable two pieces of pedestals of stayed pole, by hydraulic cylinder and liquid Compression leg is connected to hydraulic power unit and operation valve by fluid pressure line.After hydraulic pump startup, liquid is realized by manipulation operations valve first Stretching for compression leg, hydraulic column is slowly risen, top plate is made tightly to withstand tunnel roof, and the present invention is made to be fixed on work solid and reliablely Make place, meets working space requirement for height.Then four hydraulic cylinders are manipulated and drive wirerope, the extension under wirerope when flexible Hook block hangs to be translated or gone up and down, and is achieved in the lifting or decentralization to equipment, completes the assembly and disassembly of fully-mechanized mining equipment Slinging work.Due to the lift action of hydraulic column and the adjustment effect of stayed pole, the present invention can satisfy field condition range compared with Wide working environment space does not need to buy multiple devices again, is just able to satisfy the requirement of underground coal mine different location;Hydraulic cylinder and Pull wheel and directive wheel that the lower part of device is set, it might as well processing after derailment of cable wire;In addition, composition component is also without larger ruler Very little component, convenient in narrow underground space maintenance, transport and installation.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the overlooking structure diagram inside pedestal and under(-)chassis.
In figure: pedestal -1;Stayed pole -2;Fixed block -3;Under(-)chassis -4;Needling -5;Hydraulic column -6;Top plate -7;It is fixed Connection -8;Hanging pulley -9;Hook -10;Wirerope -11;Directive wheel -12;Pull wheel -13;Hydraulic cylinder -14.
Specific embodiment
As seen from Figure 1, Figure 2, the present invention includes the pedestal 1 of two pieces of parallel side-by-sides setting, and pedestal is welded using mining steel plate Processing and fabricating square block, pedestal are readily transported using two-stage structure, are fixedly connected with 8 plates by rigidity and be connected fixation and form one Body.Under(-)chassis 4 is fixedly installed on every piece of pedestal, under(-)chassis is fabricated to groove-like using mining steel plate welding processing. Along under(-)chassis trend, there are six needlings 5 for intermediate fixed setting inside it, erect in each needling and are fixedly installed liquid Compression leg 6, hydraulic column can be used mine individual hydraulic prop, and the pedestal size shape of needling and hydraulic column should be mutually matched.In liquid The piston tip of compression leg is fixedly connected with top plate 7, and top plate uses mining U-shaped steel processing and fabricating, and top plate is convenient for using two-stage structure Transport, by rigidity be fixedly connected 8 plates be connected it is fixed is formed it is integrated.It is fixedly installed hanging pulley 9 respectively on top plate both sides. Along the trend of under(-)chassis 4, both sides are fixedly installed contrary hydraulic cylinder 14 respectively inside it, and hydraulic cylinder is using mining Telescopic hydraulic cylinder, the piston tip of hydraulic cylinder is fixedly connected with pulling wheel 13 and directive wheel 12, one end of wirerope 11 are connected to Wheel 13 is pulled, the other end of wirerope is wound at top plate by directive wheel 12 to hang down after hanging pulley 9, under the wirerope to hang down Portion end is connected with hook 10, and flexible by hydraulic cylinder can drive wirerope and hook to move up and down.The fixation of pedestal both ends is set It is equipped with fixed block 3, two ipsilateral fixed blocks are connected using stayed pole 2, two pedestals is made to form one, facilitates adjusting whole Body width meets site space requirement, while can also enhance the secure stability of pedestal entirety.In use, hydraulic column and Hydraulic cylinder is connected to hydraulic station and operation valve by fluid pressure line, realizes that the lifting of hydraulic column consolidates device by manipulation operations valve It is scheduled on workplace;The flexible of hydraulic cylinder is realized by manipulation operations valve, is completed by four hook cooperative achievements to components/devices Lifting.

Claims (4)

1. mining fully-mechanized mining equipment assembly and disassembly boom hoisting, the pedestal (1) including the setting of two pieces of parallel side-by-sides, on every piece of pedestal Under(-)chassis (4) are fixedly installed, it is characterized in that being fixedly installed several needlings along under(-)chassis trend is intermediate inside it (5), it is erect in needling and is fixedly installed hydraulic column (6), be fixedly connected with top plate (7) in the piston tip of hydraulic column, pushing up Plate both sides are fixedly installed hanging pulley (9) respectively, are fixedly installed respectively on both sides inside it along under(-)chassis (4) trend Contrary hydraulic cylinder (14), the piston tip of hydraulic cylinder are fixedly connected with pulling wheel (13) and directive wheel (12), wirerope (11) one end is connected to pulling wheel (13), and the other end of wirerope is wound to hanging pulley at top plate by directive wheel (12) (9) it hangs down after, wirerope lower part end is connected with hook (10), and pedestal both ends are fixedly installed fixed block (3), utilizes stayed pole (2) two ipsilateral fixed blocks are connected, two pedestals is made to form one.
2. mining fully-mechanized mining equipment assembly and disassembly boom hoisting according to claim 1, it is characterized in that the needling (5) is set There are six setting.
3. mining fully-mechanized mining equipment assembly and disassembly boom hoisting according to claim 1, it is characterized in that the pedestal uses Two-stage structure is connected by fixed connecting plate.
4. mining fully-mechanized mining equipment assembly and disassembly boom hoisting according to claim 1, it is characterized in that the top plate uses Two-stage structure is connected by fixed connecting plate.
CN201910453185.4A 2019-05-28 2019-05-28 Mining fully-mechanized mining equipment assembly and disassembly boom hoisting Pending CN110127556A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910453185.4A CN110127556A (en) 2019-05-28 2019-05-28 Mining fully-mechanized mining equipment assembly and disassembly boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910453185.4A CN110127556A (en) 2019-05-28 2019-05-28 Mining fully-mechanized mining equipment assembly and disassembly boom hoisting

Publications (1)

Publication Number Publication Date
CN110127556A true CN110127556A (en) 2019-08-16

Family

ID=67582387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910453185.4A Pending CN110127556A (en) 2019-05-28 2019-05-28 Mining fully-mechanized mining equipment assembly and disassembly boom hoisting

Country Status (1)

Country Link
CN (1) CN110127556A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021072997A1 (en) * 2019-10-16 2021-04-22 山东中衡光电科技有限公司 Intelligent mining platform for lifting, installation, and dismantling, control system and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061792A (en) * 2013-01-17 2013-04-24 北京诚田恒业煤矿设备有限公司 Hydraulic support for coal mine vehicle
CN203513159U (en) * 2013-10-11 2014-04-02 上海大屯能源股份有限公司 Equipment used for hoisting and loading downhole chutes
CN106185677A (en) * 2016-08-29 2016-12-07 安徽马钢工程技术集团有限公司 A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN207330250U (en) * 2017-09-01 2018-05-08 河南国龙矿业建设有限公司 A kind of hydraulic hoisting attaching/detaching apparatus
CN108516461A (en) * 2018-06-15 2018-09-11 大连宏远气动液压船舶辅机有限公司 The mining boom hoisting of the swingable tune that declines
CN108545594A (en) * 2018-07-17 2018-09-18 中铁工程装备集团有限公司 A kind of mortar jar handling apparatus
CN108622806A (en) * 2017-03-24 2018-10-09 上海五钢设备工程有限公司 Hoisting tooling and the thickness control device replacing options for using the hoisting tooling
CN210065019U (en) * 2019-05-28 2020-02-14 焦作煤业(集团)有限责任公司 Assembling, disassembling and hoisting device for mining fully-mechanized mining equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061792A (en) * 2013-01-17 2013-04-24 北京诚田恒业煤矿设备有限公司 Hydraulic support for coal mine vehicle
CN203513159U (en) * 2013-10-11 2014-04-02 上海大屯能源股份有限公司 Equipment used for hoisting and loading downhole chutes
CN106185677A (en) * 2016-08-29 2016-12-07 安徽马钢工程技术集团有限公司 A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN108622806A (en) * 2017-03-24 2018-10-09 上海五钢设备工程有限公司 Hoisting tooling and the thickness control device replacing options for using the hoisting tooling
CN207330250U (en) * 2017-09-01 2018-05-08 河南国龙矿业建设有限公司 A kind of hydraulic hoisting attaching/detaching apparatus
CN108516461A (en) * 2018-06-15 2018-09-11 大连宏远气动液压船舶辅机有限公司 The mining boom hoisting of the swingable tune that declines
CN108545594A (en) * 2018-07-17 2018-09-18 中铁工程装备集团有限公司 A kind of mortar jar handling apparatus
CN210065019U (en) * 2019-05-28 2020-02-14 焦作煤业(集团)有限责任公司 Assembling, disassembling and hoisting device for mining fully-mechanized mining equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021072997A1 (en) * 2019-10-16 2021-04-22 山东中衡光电科技有限公司 Intelligent mining platform for lifting, installation, and dismantling, control system and method

Similar Documents

Publication Publication Date Title
CN201458596U (en) Crane with self-dismounting device
CN202186848U (en) Universal movable maintenance gantry crane
CN101967961B (en) Hydraulic lifting device special for workover operation tubes and rods
CN203159047U (en) Hydraulic span and height adjustable gantry crane
CN204224105U (en) A kind of telescopic gallows frame
CN204057851U (en) Performance stage booth lifting mechanism
EP3301064A1 (en) Apparatus for lifting heavy loads
CN105668426A (en) Novel hoisting device
CN105129665A (en) Elevator with extensible operating platform
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN110759246B (en) Novel fixed mining hydraulic lifting device
CN110127556A (en) Mining fully-mechanized mining equipment assembly and disassembly boom hoisting
CN205943646U (en) Distribution transformer carries platform
CN214834720U (en) Tool type unilateral formwork system
CN204689579U (en) The lifting appliance of indoor various voltage transformer grade gas-insulated switchgear device
CN201567160U (en) Detachable combined high-level crane boom
CN203022785U (en) Stepping type hydraulic shed lifting device
CN104724632A (en) Modularized combined-type lifting device for transformer bell cover
CN208024056U (en) A kind of double flat arm ground type pole
CN210065019U (en) Assembling, disassembling and hoisting device for mining fully-mechanized mining equipment
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN109236211A (en) A kind of production rig
CN201722937U (en) Sliding platform for installation of net rack
CN201826779U (en) Special hydraulic lifting device for workover operation tube rod
CN203855324U (en) Lifting device for installing and removing underground coal mine working face

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination