CN110124418A - A kind of building engineering construction building site spray dust system - Google Patents

A kind of building engineering construction building site spray dust system Download PDF

Info

Publication number
CN110124418A
CN110124418A CN201910442534.2A CN201910442534A CN110124418A CN 110124418 A CN110124418 A CN 110124418A CN 201910442534 A CN201910442534 A CN 201910442534A CN 110124418 A CN110124418 A CN 110124418A
Authority
CN
China
Prior art keywords
spray
water
dust
water pipe
filter device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910442534.2A
Other languages
Chinese (zh)
Inventor
张连波
于长胜
王立强
左海波
刘春芝
张振波
程艳敏
邵燕宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910442534.2A priority Critical patent/CN110124418A/en
Publication of CN110124418A publication Critical patent/CN110124418A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/01Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements
    • B01D29/03Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements self-supporting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/50Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with multiple filtering elements, characterised by their mutual disposition
    • B01D29/56Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with multiple filtering elements, characterised by their mutual disposition in series connection
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention provides a kind of building engineering construction building site spray dust systems, including filter device, the side of filter device is equipped with acquisition device, acquisition device is connect by water pipe with filter device, the upper end of filter device is equipped with spray equipment, spray equipment is equipped with water plug, and spray equipment is connect with filter device by water plug, and spray equipment is also connected with the aqueduct in building site.Building engineering construction building site spray dust system provided by the invention, signal is transmitted to microprocessor by dust inductor, after microprocessor receives signal, the control of multi gear position is carried out to the spray head quantity for carrying out water spray work according to the size of signal value, to enable spray dust's system according to the size of dust concentration decision amount of water sprayed, in the case where not influencing dust-laying effect, water resource has been saved;It is easy to operate, energy conservation and environmental protection.

Description

A kind of building engineering construction building site spray dust system
Technical field
The present invention relates to dust falling system, in particular to a kind of building engineering construction building site spray dust system.
Background technique
With the continuous quickening of modernization construction, inevitably there are a large amount of construction site, various construction sites The influence of very severe is caused to ambient enviroment, what is stood in the breach is exactly dust pollution.It will be generated in construction site a large amount of Dust, in dust, and have and largely belong to the substance being harmful to the human body, it will caused to the health of worker, resident It influences.Currently, the fixation wind spraying aid type depositing dust spraying machine that construction site uses, is not directly against construction site, water mist Spray point height rises and falls greatly, and Density inhomogeneity, area coverage is small, and must have special messenger's Operation and Maintenance, costly, and benefit With tap water, cost is very high.Although the prior art can reduce fugitive dust content, but due to the watering time according to it is artificial judge with Meaning property is big, and be easy to cause the waste of water resource usually because cannot in time close water after dedusting.
Summary of the invention
The purpose of the present invention is to provide and a kind of building engineering construction building site spray dust system, solve in the prior art The problem of waste water resource.
To achieve the above object, the technical solution of the present invention is as follows:
The present invention provides a kind of building engineering construction building site spray dust systems, and the side of filter device, filter device is equipped with Acquisition device, acquisition device are connect by water pipe with filter device, and the upper end of filter device is equipped with spray equipment, on spray equipment Between be equipped with water plug, spray equipment connect with filter device by water plug, and water plug includes drinking-water pipe and suction pump, Drinking-water pipe is fixedly connected with suction pump, and spray equipment is also connected with the aqueduct in building site.
Preferably, water plug includes drinking-water pipe and suction pump, and filter device includes Rose Box, is equipped with filter in Rose Box Net, Rose Box are connect with spray equipment by drinking-water pipe, and drinking-water pipe is connect with suction pump.
Preferably, water level sensor is equipped in Rose Box, spray equipment is equipped with controller, controller and water level sensor Signal connection, controller are electrically connected with suction pump.
Preferably, strainer is two.
Preferably, acquisition device includes tank, and a side edge of tank extends outward to form acquisition leaf, tank Bottom is equipped with water outlet, and water outlet is connected by water pipe with the bottom of Rose Box, and water outlet is equipped with valve.
Preferably, spray equipment includes bracket water pipe, and bracket water pipe is equipped with spray head, and the top of bracket water pipe is equipped with dust Sensor and microprocessor, dust sensor are electrically connected with microprocessor, and Rose Box is connect by drinking-water pipe with bracket water pipe.
The invention has the following beneficial effects:
1. building engineering construction building site spray dust system provided by the invention is transmitted to microprocessor by dust inductor and is believed Number, after microprocessor receives signal, the control of multi gear position is carried out to the spray head quantity for carrying out water spray work according to the size of signal value, To enable spray dust's system to determine that the size of amount of water sprayed is saved in the case where not influencing dust-laying effect according to dust concentration About water resource;It is easy to operate, energy conservation and environmental protection.
2. building engineering construction building site spray dust system provided by the invention sprayed dust by acquisition device acquisition Sewage, will be recycled after sewage water filtration, structure is simple, easy to operate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of building engineering construction building site spray dust system provided in an embodiment of the present invention;
Fig. 2 is the right view of Fig. 1;
1, filter device;11, Rose Box;12, strainer;13, drinking-water pipe;2, acquisition device;21, acquire leaf;22, tank;23, Valve;3 spray equipments;31, bracket water pipe;32, spray head;33, suction pump.
Specific embodiment
With reference to the accompanying drawing, a specific embodiment of the invention is illustrated.
A kind of building engineering construction building site spray dust system, as shown in Figs. 1-2, including filter device 1, filter device 1 Including Rose Box 11, the side of filter device 1 is equipped with acquisition device 2, and acquisition device 2 includes tank 22, and the one of tank 22 Side is equipped with water outlet along acquisition leaf 21, the bottom of tank 22 is extended outward to form, and water outlet passes through water pipe and Rose Box 11 Bottom be connected, water outlet is equipped with valve 23, and valve 23 uses uniaxial pressure check-valves in the embodiment of the present invention.Acquisition device 2 are connect by water pipe with filter device 1, and the upper end of filter device 1 is equipped with spray equipment 3, and spray equipment 3 is equipped with the dress that draws water It sets, spray equipment 3 is connect with filter device 1 by water plug, and water plug includes drinking-water pipe 13 and suction pump 33, drinking-water pipe 13 are fixedly connected with suction pump 33, and spray equipment 3 is also connected with the aqueduct in building site.Strainer 12 is equipped in Rose Box 11, Strainer 12 is two.Sequentially consist of the first strainer and the second strainer.The top of strainer 12 is equipped with water pipe, one end of water pipe Be detachably connected on the second strainer upper surface, the other end stretches out after cabinet is connected with suction pump 33, then by drinking-water pipe 13 and Spray equipment 3 connects, and suction pump 33 is located at 11 outside of Rose Box, the model of suction pump 33 in the embodiment of the present invention 200QJR80-12, Rose Box 11 is interior to be equipped with water level sensor, and the pressure in Rose Box 11 is subatmospheric strong, Rose Box 11 1 Side is equipped with vacuum pumping pump, reduces by 11 internal pressure of Rose Box using vacuum pumping pump, and the internal pressure of Rose Box 11 is less than External pressure, after valve 23 is opened, due to the effect of pressure, the water flow circulation for making tank 22 flow into Rose Box 11 is more suitable Freely.The model PY201 silicon piezoresistance type liquid level sensor of water level sensor in the embodiment of the present invention.Spray equipment 3 is equipped with control Device processed, controller are connect with water level sensor signal, and controller is electrically connected with suction pump 33.When the water that water level sensor senses When position is close to full water place value, water level sensor sends the signal to controller, and controller opens suction pump 33, and suction pump 33 starts Work.When the dust falling system initial setup of the embodiment of the present invention, a lowest water level value is set.Lowest water level value is higher than the second filter The setting height of net.When water level is lower than lowest water level value initially set, water level sensor issues signal, control to controller After device receives signal, suction pump 33 is closed.
Further, spray equipment 3 includes bracket water pipe 31, and bracket water pipe 31 is equipped with spray head 32, the top of bracket water pipe 31 End is equipped with dust sensor and microprocessor, and dust sensor be electrically connected with microprocessor, Rose Box 11 pass through drinking-water pipe 13 and Bracket water pipe 31 connects.The key control unit that microprocessor is used as which is provided with the working condition sprayed water for spray head 32 Control circuit.It totally 60, spray head 32, is evenly distributed on bracket water pipe 31, and by all spray heads 32 according to putting in order successively Number, all odd numbers are divided into first group, and all even numbers labels are divided into second group.Controller carries out two grades of controls to spray head 32: point It Wei not be high-grade and low-grade.Wherein, high-grade for all work of two groups of spray heads 32;Low grade is only first group of water spray work of spray head 32.It is micro- Processor can realize the control to two grades of working conditions of sprinkler head 32 by low and high level signal.On the microprocessor, The default density N1 and N2 there are two being stored in advance, N1 < N2.When microprocessor is received from dust sensor transmission When dust concentration signal, it is compared with default first concentration value N1 and the second concentration value N2, when the concentration signal is big In default first concentration value N1 and when less than the second concentration value N2, which is adjusted to the working condition of spray head 32 low Shelves, when the dust concentration signal is greater than default second concentration value N2, which is adjusted to the working condition of spray head 32 It is high-grade.
In use, the dust signal received is transferred on microprocessor by dust sensor, when the concentration signal is greater than Default first concentration value N1 and when less than the second concentration value N2, which is adjusted to low grade for the working condition of spray head 32, First group of spray head 32 carries out spray work.When the dust concentration signal is greater than default second concentration value N2, the microprocessor The working condition of spray head 32 is adjusted to top grade, all spray heads 32 carry out spray work.After spray work starts, sprayed by spray head 32 The water mist penetrated carries out depositing dust spray to dust, and the water after part sprays can be fallen on acquisition leaf 21, is collected into storage by acquisition leaf 21 In pond 22, since valve 23 is uniaxial pressure check-valves, after the hydraulic pressure in tank 22 reaches certain pressure value, valve 23 It opens, the water in tank 22 flows into Rose Box 11 via water pipe, filters by 2 layers of strainer 12 in Rose Box 11, works as water When the inductor water level that senses in position is close to full water place value, water level sensor sends the signal to controller, and controller, which is opened, to be taken out Water pump 33, suction pump 33 are started to work.The water supply of spray head 32 is supplied at this time by two, water of filtered sewage and aqueduct It is grouped as.When water level is lower than lowest water level value initially set, water level sensor issues signal to controller, and controller receives After signal, suction pump 33 is closed.When dust concentration is reduced to safe range, dust inductor issues signal to microprocessor, Microprocessor closes spray system, and spray operation finishes.
Building engineering construction building site spray dust system provided by the invention is transmitted by dust inductor to microprocessor Dust signal after microprocessor receives signal, carries out multi gear to the spray head quantity for carrying out water spray work according to the size of signal value Position control, to enable spray dust's system according to the size of dust concentration decision amount of water sprayed, in the feelings for not influencing dust-laying effect Under condition, water resource has been saved;It is easy to operate, energy conservation and environmental protection.
Building engineering construction building site spray dust system provided by the invention sprayed dust by acquisition device acquisition Sewage will recycle after sewage water filtration, and structure is simple, easy to operate.

Claims (6)

1. a kind of building engineering construction building site spray dust system, including filter device (1), the side of the filter device (1) Equipped with acquisition device (2), the acquisition device (2) is connect by water pipe with filter device (1), and the upper end of filter device (1) is set Have spray equipment (3), the spray equipment (3) is equipped with water plug, and spray equipment (3) and filter device (1) pass through described Water plug connection, spray equipment (3) are also connected with the aqueduct in building site.
2. building engineering construction building site spray dust system according to claim 1, it is characterised in that: the water plug Including drinking-water pipe (13) and suction pump (33), the filter device (1) includes Rose Box (11), is equipped in the Rose Box (11) Strainer (12), Rose Box (11) are connect with the spray equipment (3) by the drinking-water pipe (13), the drinking-water pipe (13) and institute State suction pump (33) connection.
3. building engineering construction building site spray dust system according to claim 2, it is characterised in that: the Rose Box (11) water level sensor is equipped in, the spray equipment (3) is equipped with controller, and the controller and the water level sensor are believed Number connection, controller is electrically connected with the suction pump (33).
4. building engineering construction building site spray dust system according to claim 2, it is characterised in that: the strainer (12) It is two.
5. building engineering construction building site spray dust system according to claim 1, it is characterised in that: the acquisition device It (2) include tank (22), a side edge of the tank (22) extends outward to form acquisition leaf (21), the tank (22) bottom is equipped with water outlet, and the water outlet is connected by water pipe with the bottom of Rose Box (11), and water outlet is equipped with Valve (23).
6. building engineering construction building site spray dust system according to claim 1, it is characterised in that: the spray equipment It (3) include bracket water pipe (31), the bracket water pipe (31) is equipped with spray head (32), and the top of bracket water pipe (31) is equipped with dust Sensor and microprocessor, the dust sensor are electrically connected with the microprocessor;Rose Box (11) passes through the drinking-water pipe (13) it is connect with the bracket water pipe (31).
CN201910442534.2A 2019-05-25 2019-05-25 A kind of building engineering construction building site spray dust system Pending CN110124418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910442534.2A CN110124418A (en) 2019-05-25 2019-05-25 A kind of building engineering construction building site spray dust system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910442534.2A CN110124418A (en) 2019-05-25 2019-05-25 A kind of building engineering construction building site spray dust system

Publications (1)

Publication Number Publication Date
CN110124418A true CN110124418A (en) 2019-08-16

Family

ID=67581713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910442534.2A Pending CN110124418A (en) 2019-05-25 2019-05-25 A kind of building engineering construction building site spray dust system

Country Status (1)

Country Link
CN (1) CN110124418A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113546497A (en) * 2021-07-23 2021-10-26 江苏徐工工程机械研究院有限公司 Wet dust removal device and dust removal method
CN114104778A (en) * 2021-11-19 2022-03-01 北京华能新锐控制技术有限公司 Automatic spraying dust-settling device for coal conveying belt

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106362575A (en) * 2016-08-27 2017-02-01 华润电力(菏泽)有限公司 Desulfurization spraying system of thermal power plant, and desulfurization control method
CN207324366U (en) * 2017-06-14 2018-05-08 毕一沣 A kind of water-saving device for reducing dust
CN208073020U (en) * 2018-04-17 2018-11-09 王宏伟 A kind of construction work surface spray dust heat sink

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106362575A (en) * 2016-08-27 2017-02-01 华润电力(菏泽)有限公司 Desulfurization spraying system of thermal power plant, and desulfurization control method
CN207324366U (en) * 2017-06-14 2018-05-08 毕一沣 A kind of water-saving device for reducing dust
CN208073020U (en) * 2018-04-17 2018-11-09 王宏伟 A kind of construction work surface spray dust heat sink

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113546497A (en) * 2021-07-23 2021-10-26 江苏徐工工程机械研究院有限公司 Wet dust removal device and dust removal method
CN113546497B (en) * 2021-07-23 2023-01-17 江苏徐工工程机械研究院有限公司 Wet dust removal device and dust removal method
CN114104778A (en) * 2021-11-19 2022-03-01 北京华能新锐控制技术有限公司 Automatic spraying dust-settling device for coal conveying belt

Similar Documents

Publication Publication Date Title
CN103657941B (en) A kind of automatic fuel spray device and automatic oil spout method thereof
CN108049355A (en) A kind of environmental-protection sprinkler of automatic avoidance pedestrian
CN110124418A (en) A kind of building engineering construction building site spray dust system
CN101574078B (en) Sprayer
CN112160394A (en) Sponge urban rainwater collecting and processing system
CN208311910U (en) A kind of rotary kiln tug lubricating arrangement
CN107775786B (en) Automatic spraying health preserving system and spraying method
CN207652973U (en) A kind of novel garden greening drip irrigation system
CN204690662U (en) A kind of building site atomizing de-dusting apparatus
CN205975458U (en) Urban road automatic watering device
CN208512257U (en) A kind of deodorizing device with cleaning and automatic mixing medical fluid function
CN207221427U (en) The filter plant of air-conditioner outdoor unit water for cleaning
CN202844821U (en) Device for collecting and processing overflow gas
CN206170865U (en) Printing machine
CN208615028U (en) A kind of water-saving automatic maintenance device of precast beam
CN207456690U (en) A kind of water circulation system of outdoor cabinet waterproof test device
CN111706385B (en) Regional variable dust removal system and method for coal mine working face
CN209445046U (en) A kind of filtering pump control system of lubricant filtration systems
CN207494166U (en) Engineering machinery oil tank cleaning system
CN207846323U (en) A kind of environmental-protection sprinkler of automatic evacuation pedestrian
CN203794718U (en) Fracturing flowback liquid treating device
CN216785926U (en) Landfill leachate&#39;s separation evaporation plant
CN208949814U (en) A kind of cleaning vehicle with automatic water pressure adjustment function
CN206730587U (en) A kind of oily water separating equipment
CN201880399U (en) Industrial sewage oil-removing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816