Prior art keywords
leaving water
water temperature
cooling tower
temperature
preset duration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910505371.8A
Other languages
Chinese (zh)
Other versions
CN110118509B (en
Inventor
徐义
李龙
郭玉娟
李立群
彭洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI PILOT TECHNOLOGY Co Ltd
Original Assignee
ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI PILOT TECHNOLOGY Co Ltd filed Critical ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority to CN201910505371.8A priority Critical patent/CN110118509B/en
Publication of CN110118509A publication Critical patent/CN110118509A/en
Application granted granted Critical
Publication of CN110118509B publication Critical patent/CN110118509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F27/00Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus
    • F28F27/003Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus specially adapted for cooling towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The application discloses a kind of blower fan of cooling tower energy-saving control method and system, belongs to refrigeration technology field.This method is applied to cooling tower, and the cooling tower is provided with frequency conversion fan;The described method includes: obtaining the currently practical leaving water temperature of the cooling tower;Judge whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets preset condition;When to be, the frequency conversion fan is controlled based on default leaving water temperature and runs the first preset duration, wherein the default leaving water temperature is less than the currently practical leaving water temperature;Obtain the practical leaving water temperature of the cooling tower in first preset duration;Target leaving water temperature is determined based on the practical leaving water temperature in first preset duration;The frequency conversion fan operation is controlled based on the target leaving water temperature.This method can monitor and adjust cooling tower leaving water temperature in real time using external parameter, reach energy saving while ideal refrigeration effect, improve the refrigeration effect of cold source control system.

Description

A kind of blower fan of cooling tower energy-saving control method and system
Technical field
The application belongs to refrigeration technology field, and in particular to a kind of blower fan of cooling tower energy-saving control method and system.
Background technique
In cold source control system, cooling tower as heat dissipation main running equipment, whether can efficiently, energy-saving run not only It is related to the operational efficiency of itself, while also largely affects the refrigeration effect of cold source control system.In data For the heart, cold source control system account for about the 4-6 of consumption of data center at.Wherein, every 1 DEG C of the decline of cooling tower leaving water temperature, cold Energy saving 2%-5%, it can be seen that, the fluctuation of temperature is most important for the energy saving of entire cold source control system.
Existing cold source control system is grabbed for the setting value of cooling tower leaving water temperature, fully relies on operator rule of thumb Setting, and there is very big uncertainty in operator, can not adjust in real time according to variable data (meteorology, load, device characteristics) It is whole, it is too high or too low that water outlet temperature setting value is caused in this way.And if water outlet temperature setting value is too low (to be less than cooling tower herein Value, namely the lower limit that can be exchanged heat lower than wet-bulb temperature are approached under under scene), since the too low cooling tower fan of setting value is bound to Full range operation, even if fan full range is run, is still unable to reach setting value, to cause the energy due to meteorological condition Waste;If setting value it is excessively high (greater than cooling tower in this scenario on approach value, namely can exchange heat higher than wet-bulb temperature The upper limit), since setting value is excessively high, cause the running frequency of cooling tower fan too small, is unable to fully reduce using outdoor energy cold But tower leaving water temperature, to reduce the utilization efficiency of cold source.
Summary of the invention
In consideration of it, the application's is designed to provide a kind of blower fan of cooling tower energy-saving control method and system, it is existing to improve It is inaccurate (too high or too low) there is cooling tower water outlet temperature setting, and causes cold source utilization efficiency low or causes asking for energy waste Topic.
Embodiments herein is achieved in that
In a first aspect, the embodiment of the present application provides a kind of blower fan of cooling tower energy-saving control method, it is applied to cooling tower, institute It states cooling tower and is provided with frequency conversion fan;The described method includes: obtaining the currently practical leaving water temperature of the cooling tower;Described in judgement Whether the relationship between currently practical leaving water temperature and current setting leaving water temperature meets preset condition;When to be, based on pre- It sets out coolant-temperature gage and controls the first preset duration of the frequency conversion fan operation, wherein the default leaving water temperature is less than described current Practical leaving water temperature;Obtain the practical leaving water temperature of the cooling tower in first preset duration;It is default based on described first Practical leaving water temperature in duration determines target leaving water temperature;The frequency conversion fan fortune is controlled based on the target leaving water temperature Row.
In the embodiment of the present application, when between the currently practical leaving water temperature for monitoring cooling tower and current setting leaving water temperature Relationship when meeting preset condition, the first preset duration is run based on default leaving water temperature control frequency conversion fan, so that cooling tower Fast-refrigerating, and the practical leaving water temperature of the cooling tower under this situation is obtained, and the practical leaving water temperature based on the cooling tower It determines target leaving water temperature, avoids being arranged excessively high by target leaving water temperature and reducing refrigeration effect, or target is discharged Temperature setting obtains too low and causes energy waste, allows to monitoring and adjust cooling tower in real time using external parameter go out water temperature Degree, reaches energy saving while ideal refrigeration effect, improves the refrigeration effect of cold source control system.
Embodiment with reference to first aspect, under a kind of possible embodiment, the water outlet of the cooling tower is provided with temperature Sensor is spent, obtains the currently practical leaving water temperature of the cooling tower, comprising: according to prefixed time interval, when second is default The leaving water temperature of the temperature sensor monitoring is repeatedly obtained in long;The average value of multiple leaving water temperatures is obtained, it is described flat Mean value is the currently practical leaving water temperature of the cooling tower.In the embodiment of the present application, by repeatedly obtaining according to prefixed time interval The average value for the multiple leaving water temperatures that takes the leaving water temperature in a period of time, and will acquire as cooling tower it is currently practical go out Coolant-temperature gage improves the accuracy and reliability of the currently practical leaving water temperature of cooling tower.
Embodiment with reference to first aspect obtains being averaged for multiple leaving water temperatures under a kind of possible embodiment Value, comprising: reject the exceptional value in multiple leaving water temperatures;Multiple leaving water temperatures after obtaining excluding outlier it is flat Mean value.In the embodiment of the present application, by removing the exceptional value in multiple leaving water temperatures, such as extreme value eliminates the influence of exceptional value, It can be further ensured that the accuracy and reliability of result.
Embodiment with reference to first aspect, under a kind of possible embodiment, judge the currently practical leaving water temperature with Whether the relationship between current setting leaving water temperature meets preset condition, comprising: judges the currently practical leaving water temperature and institute Whether the absolute value for stating the difference of current setting leaving water temperature is greater than preset threshold, if more than preset threshold, then it is pre- to characterize satisfaction If condition.In the embodiment of the present application, by the difference for judging the currently practical leaving water temperature and the current setting leaving water temperature Whether the absolute value of value is greater than preset threshold to determine whether meeting preset condition, avoids the difference of the two excessive, and causes cold The problem of source utilization efficiency is low or causes energy waste.
Embodiment with reference to first aspect, under a kind of possible embodiment, the water outlet of the cooling tower is provided with temperature Sensor is spent, obtains the practical leaving water temperature of the cooling tower in first preset duration, comprising: according between preset time Every repeatedly obtaining the leaving water temperature of temperature sensor monitoring in first preset duration;By described first it is default when Practical leaving water temperature of the average value of the multiple leaving water temperatures got in length as the cooling tower.In the embodiment of the present application, By according to prefixed time interval, the multiple leaving water temperature obtained in a period of time, and the multiple leaving water temperatures that will acquire Practical leaving water temperature of the average value as cooling tower, improves the accuracy and reliability of the practical leaving water temperature of cooling tower.
Embodiment with reference to first aspect, under a kind of possible embodiment, based on the reality in first preset duration Border leaving water temperature determines target leaving water temperature, comprising: by the practical leaving water temperature and predetermined deviation in first preset duration For the value of multiplication as the target leaving water temperature, the predetermined deviation coefficient is greater than 1 less than 1.1.In the embodiment of the present application, When determining target leaving water temperature, by the practical leaving water temperature and a predetermined deviation coefficient slightly larger than 1 in the first preset duration The value of multiplication avoids influence of the temperature fluctuation to target leaving water temperature, further improves refrigeration as target leaving water temperature Or energy saving effect.
Second aspect, the embodiment of the present application also provides a kind of blower fan of cooling tower energy-saving control systems, are applied to cooling tower, The blower fan of cooling tower energy-saving control system includes fan controller and the frequency conversion fan that connect with the fan controller; The fan controller, for obtaining the currently practical leaving water temperature of the cooling tower;The fan controller, is also used to Judge whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets preset condition;The blower Control device is also used to when to be, is controlled the frequency conversion fan based on default leaving water temperature and is run the first preset duration, In, the default leaving water temperature is less than the currently practical leaving water temperature;The fan controller is also used to obtain described The practical leaving water temperature of the cooling tower in one preset duration;The fan controller is also used to default based on described first Practical leaving water temperature in duration determines target leaving water temperature;The fan controller is also used to be discharged based on the target Temperature controls the frequency conversion fan operation.
In conjunction with second aspect embodiment, under a kind of possible embodiment, the blower fan of cooling tower energy-saving control system Further include the temperature sensor for being set to the water outlet of the cooling tower, the fan controller is used for: according to it is default when Between be spaced, the leaving water temperature of temperature sensor monitoring is repeatedly obtained in the second preset duration;Obtain multiple water outlets The average value of temperature, the average value are the currently practical leaving water temperature of the cooling tower.
In conjunction with second aspect embodiment, under a kind of possible embodiment, the fan controller is also used to: picking Except the exceptional value in multiple leaving water temperatures;The average value of multiple leaving water temperatures after obtaining excluding outlier.
In conjunction with second aspect embodiment, under a kind of possible embodiment, the fan controller is also used to: sentencing Whether the absolute value of difference of the currently practical leaving water temperature and the current setting leaving water temperature of breaking is greater than preset threshold, if Greater than preset threshold, then characterization meets preset condition.
In conjunction with second aspect embodiment, under a kind of possible embodiment, the water outlet of the cooling tower is provided with temperature Sensor is spent, the fan controller is also used to: according to prefixed time interval, repeatedly being obtained in first preset duration Take the leaving water temperature of the temperature sensor monitoring;The average value of multiple leaving water temperatures in first preset duration is obtained, The average value of multiple leaving water temperatures in first preset duration is the practical leaving water temperature.
In conjunction with second aspect embodiment, under a kind of possible embodiment, the fan controller is also used to: will The value of practical leaving water temperature and predetermined deviation multiplication in first preset duration is as the target leaving water temperature, institute Predetermined deviation coefficient is stated greater than 1 less than 1.1.
Other feature and advantage of the application will be illustrated in subsequent specification, also, partly be become from specification It is clear that being understood and implementing the embodiment of the present application.The purpose of the application and other advantages can be by written Specifically noted structure is achieved and obtained in specification and attached drawing.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.By the way that shown in attached drawing, above and other purpose, the feature and advantage of the application will be more clear.In whole Identical appended drawing reference indicates identical part in attached drawing.Attached drawing, emphasis deliberately are not drawn by actual size equal proportion scaling It is that the purport of the application is shown.
Fig. 1 shows a kind of flow diagram of blower fan of cooling tower energy-saving control method provided by the embodiments of the present application;
Fig. 2 shows the variation schematic diagrames of cooling tower leaving water temperature in a scenario provided by the embodiments of the present application;
Fig. 3 shows the variation schematic diagram of the cooling tower leaving water temperature under another scene provided by the embodiments of the present application;
Fig. 4 shows a kind of structural schematic diagram of blower fan of cooling tower energy-saving control system provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application is described.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile the application's The relational terms of such as " first ", " second " or the like are used merely to an entity or operation and another entity in description Or operation distinguishes, without necessarily requiring or implying between these entities or operation there are any this actual relationship or Person's sequence.Moreover, the terms "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, to make Obtaining the process, method, article or equipment including a series of elements not only includes those elements, but also including not arranging clearly Other element out, or further include for elements inherent to such a process, method, article, or device.Not more In the case where limitation, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element There is also other identical elements in method, article or equipment.
Furthermore term "and/or" in the application, only a kind of incidence relation for describing affiliated partner, expression can deposit In three kinds of relationships, for example, A and/or B, can indicate: individualism A exists simultaneously A and B, these three situations of individualism B.
First embodiment
Referring to Fig. 1, being a kind of blower fan of cooling tower Energy Saving Control side applied to cooling tower provided by the embodiments of the present application Method, the step of including to it below in conjunction with Fig. 1, are illustrated.Wherein, cooling tower is provided with frequency conversion fan.
Step S101: the currently practical leaving water temperature of the cooling tower is obtained.
When needing to carry out radiating control to cooling tower, the currently practical leaving water temperature of the cooling tower is obtained.By at this Temperature sensor is arranged in the water outlet of cooling tower, carrys out the practical leaving water temperature of real-time monitoring cooling tower, as a kind of embodiment party Formula can be using the temperature of the temperature sensor currently got acquisition as the currently practical leaving water temperature of cooling tower.As Another embodiment, can be using the temperature sensor repeatedly got in a period of time acquisition temperature average value as The currently practical leaving water temperature of cooling tower.For example, repeatedly obtaining temperature biography in the second preset duration according to prefixed time interval The leaving water temperature of sensor monitoring;The average value of multiple leaving water temperatures in the second preset duration is obtained, the average value is institute State the currently practical leaving water temperature of cooling tower.In order to make it easy to understand, the second preset duration is 6 with prefixed time interval for 10 seconds Minute for, that is to say, that in 6 minutes time, every 10 seconds obtain a temperature sensor monitoring leaving water temperature, one Available 36 leaving water temperatures altogether, calculate the average value of this 36 leaving water temperatures, which is the current reality of cooling tower Border leaving water temperature.
Certainly when obtaining the average value of multiple leaving water temperatures, it is also possible to first reject different in multiple leaving water temperatures Constant value;Then the average value of multiple leaving water temperatures after excluding outlier is obtained, to reduce influence of the extreme value to end value, For example, therefrom rejecting maximum value and minimum value after obtaining 36 leaving water temperatures, then calculating remaining 34 leaving water temperatures Average value.
Certainly as another embodiment, it is also possible to that multiple temperature sensors are arranged in the water outlet of cooling tower, Then the average value of the leaving water temperature of each temperature sensor acquisition will be calculated.I.e. when calculating average value, calculating one can be The average value of the leaving water temperature of a temperature sensor multi collect, is also possible to calculate multiple temperature sensors and respectively at least acquires The average value of primary leaving water temperature.
Step S102: judge whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets Preset condition.
After the currently practical leaving water temperature for obtaining cooling tower, judges the currently practical leaving water temperature and currently set out Whether the relationship between coolant-temperature gage meets preset condition, when to be, thens follow the steps S103, otherwise continues to execute step S101 And S102.
As an implementation, judging the pass between the currently practical leaving water temperature and current setting leaving water temperature When whether system meets preset condition, the difference for judging the currently practical leaving water temperature and the current setting leaving water temperature can be Whether the absolute value of value is greater than preset threshold, and if more than preset threshold, then characterization meets preset condition.In order to facilitate understanding below Citing is illustrated, it is assumed that currently practical leaving water temperature is indicated with Wtime, indicates to set out water temperature currently with Wavgnote Degree, then the above process is to judge | Wtime-Wavgnote | > 1? if the absolute value that Wtime subtracts Wavgnote difference is greater than pre- If threshold value (for example, 1), then characterization meets preset condition, executes step S103, otherwise continues step S101 and S102.Certainly It is understood that above-mentioned preset threshold is not limited to 1, it is also possible to other numerical value relatively, such as 1.5,2 these numbers Value.
Certainly, as another embodiment, judge the currently practical leaving water temperature and current setting leaving water temperature it Between relationship whether meet preset condition, be also possible to judgeorIf Wtime with Relationship between Wavgnote meetsOr meetThen characterization meets preset condition, holds Otherwise row step S103 continues step S101 and S102.
Step S103: the frequency conversion fan is controlled based on default leaving water temperature and runs the first preset duration.
Whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets preset condition, That is when the absolute value that Wtime subtracts Wavgnote difference is greater than preset threshold (such as 1), the change is controlled based on default leaving water temperature The first preset duration of frequency fan operation, so that cooling tower fast-refrigerating, and subsequent operation is executed with this condition, it avoids initially setting Fixed leaving water temperature is because being arranged to obtain excessively high adverse effect, so that the value of the target leaving water temperature finally determined is more Adduction is physical and chemical.Wherein, the default leaving water temperature is less than the currently practical leaving water temperature.For example, it is described it is currently practical go out When whether the relationship between coolant-temperature gage and current setting leaving water temperature meets preset condition, based on 16 degrees Celsius of default water temperature out Degree controls the frequency conversion fan and runs the first preset duration, such as 5 minutes.As an implementation, which can Think the accessible minimum temperature of cooling tower, for example, 16 degrees Celsius, it is of course possible to which understanding, this presets leaving water temperature also simultaneously It is not necessarily the accessible minimum temperature of cooling tower, is also possible to the lower temperature that compares, such as 16.5 degrees Celsius etc.. It is understood that first preset duration is not limited to above-mentioned 5 minutes, for example, it may be the number such as 4 minutes or 6 minutes Value.
Step S104: the practical leaving water temperature of the cooling tower in first preset duration is obtained.
When frequency conversion fan is based on default the first preset duration of leaving water temperature operation, the cooling tower in this period of time is obtained Practical leaving water temperature.Optionally, the process is similar with the above-mentioned process of step S101, for example, it may be according to it is default when Between be spaced, the leaving water temperature of temperature sensor monitoring is repeatedly obtained in first preset duration;It is pre- by described first If practical leaving water temperature of the average value of the multiple leaving water temperatures got in duration as the cooling tower.For example, with 10 seconds For interval, the leaving water temperature of the temperature sensor monitoring is repeatedly obtained in 5 minutes, available 30 leaving water temperatures will Practical leaving water temperature of the average value of this 30 leaving water temperatures as the cooling tower.
Certainly, when obtaining the average value of multiple leaving water temperatures, it is also possible to first reject in multiple leaving water temperatures Exceptional value;Then the average value of multiple leaving water temperatures after excluding outlier is obtained, to reduce extreme value to the shadow of end value It rings, for example, therefrom rejecting maximum value and minimum value after obtaining 30 leaving water temperatures, then calculates remaining 28 and go out water temperature The average value of degree.
Step S105: target leaving water temperature is determined based on the practical leaving water temperature in first preset duration.
It is getting in first preset duration after the practical leaving water temperature of the cooling tower, it is default based on described first Practical leaving water temperature in duration determines target leaving water temperature.As an implementation, which may is that described first The value of practical leaving water temperature and predetermined deviation multiplication in preset duration is described default inclined as the target leaving water temperature Poor coefficient is greater than 1 less than 1.1.Namely the product of the practical leaving water temperature and predetermined deviation coefficient in the first preset duration is obtained, The value of the product is made to be the target leaving water temperature.For example, it is assumed that in the first preset duration the cooling tower practical water outlet Temperature is 18 degrees Celsius, and predetermined deviation coefficient is 1.02, then target leaving water temperature is 18*1.02=18.36.It is understood that It is that above-mentioned predetermined deviation coefficient is not limited to above-mentioned 1.02, it is any within the scope of this less than 1.1 may be greater than 1 Numerical value.
As another embodiment, target leaving water temperature can also be the reality of the cooling tower in the first preset duration Border leaving water temperature.
Step S106: the frequency conversion fan operation is controlled based on the target leaving water temperature.
After determining the target leaving water temperature of cooling tower, the frequency conversion fan fortune is controlled based on the target leaving water temperature Row.
It should be noted that can be iteratively repeated above-mentioned during the entire process of the leaving water temperature to cooling tower controls Step S101- step S105, allow in real time adjust cooling tower leaving water temperature, while reaching ideal refrigeration effect It is energy saving.
Citing, is illustrated by above-mentioned control process in order to facilitate understanding below, it is assumed that cooling tower is currently set out Coolant-temperature gage is 22 DEG C, and since meteorological temperature declines, the leaving water temperature of cooling tower is averaged real value (namely cooling tower in 6 minutes Currently practical leaving water temperature) it is 19 DEG C, at this time due to currently practical leaving water temperature (19 DEG C) and current setting leaving water temperature (22 DEG C) between relationship meet preset condition (absolute value of difference both i.e. is greater than 1), resetting condition activation, at this point, with 16 DEG C (the default leaving water temperature of cooling tower) controls the frequency conversion fan and runs 5 minutes (the first preset duration), if the cooling in 5 minutes The practical leaving water temperature of tower be 18 DEG C (namely the leaving water temperature of the cooling tower real value that is averaged is 18 DEG C in 5 minutes), at this point, target Leaving water temperature is the product of practical leaving water temperature and predetermined deviation coefficient, namely is equal to 18*1.02=18.36, then with the mesh Mark (18.36 DEG C) of coolant-temperature gage controls frequency conversion fan operation.
Above-mentioned 18.36 DEG C of target leaving water temperature are the current setting leaving water temperature of second leg, namely at next time When conjunction, currently leaving water temperature is set as 18.36 DEG C, since the leaving water temperature that meteorological temperature rises cooling tower in 6 minutes is average real Duration (namely the currently practical leaving water temperature of cooling tower) is 21 DEG C, at this time due to currently practical leaving water temperature (18.36 DEG C) with Relationship between current setting leaving water temperature (21 DEG C) meets preset condition (i.e. the absolute value of the difference of the two is greater than 1), resetting Condition activation, at this point, running 5 minutes with 16 DEG C (the default leaving water temperature of cooling tower) the control frequency conversion fans, (first is default Duration), if the practical leaving water temperature of the cooling tower in 5 minutes be 20 DEG C (namely in 5 minutes cooling tower leaving water temperature it is average real Duration is 20 DEG C), at this point, target leaving water temperature is the product of practical leaving water temperature and predetermined deviation coefficient, namely it is equal to 20* 1.02=20.4, then with (20.4 DEG C) of the target leaving water temperature controls frequency conversion fan operation.Wherein, which goes out water temperature Degree (20.4 DEG C) is the current setting leaving water temperature of second leg.
The effect of blower fan of cooling tower energy-saving control method provided by the embodiments of the present application, Ke Yican are applied in order to facilitate understanding Read the variation schematic diagram of the cooling tower leaving water temperature under the different scenes shown in Fig. 2 and Fig. 3.It can be with from Fig. 2 and Fig. 3 It is clearly seen that using blower fan of cooling tower energy-saving control method provided by the embodiments of the present application and sets the water temperature out of cooling tower The variation of degree and the existing artificial leaving water temperature that cooling tower is set by experience.It can be seen that from figure (Fig. 2 and Fig. 3) It is able to achieve automation control using blower fan of cooling tower energy-saving control method provided by the embodiments of the present application, to replace manual operation, Environment temperature can be made full use of to carry out regulation to reach energy-saving effect, due to natural in true environment to cooling tower leaving water temperature Temperature be it is changing, different regions amplitude of variation and frequency be not also identical.And traditional manual operation is it is possible that nothing Method adjusts cooling tower leaving water temperature according to external parameter (environment temperature) and inner parameter (load) in real time.If cooling tower is discharged Desired temperature it is excessively high (greater than cooling tower in this scenario on approach value, namely can exchange heat higher than wet-bulb temperature upper Limit), it will cause underusing for cold source;, whereas if cooling tower water outlet temperature setting value is too low (to be less than cooling tower at this Value, namely the lower limit that can be exchanged heat lower than wet-bulb temperature are approached under under scape), it will lead to the operation of cooling tower full range and be but unable to reach The leaving water temperature of setting, causes energy waste.And apply blower fan of cooling tower energy-saving control method provided by the embodiments of the present application can To monitor and adjust cooling tower leaving water temperature in real time using external parameter, reach energy saving while ideal refrigeration effect.
Wherein, Fig. 2 shows be that cooling tower leaving water temperature is average real-time in the excessively high situation of cooling tower water outlet temperature setting value Value, the setting value under existing way and the setting under application blower fan of cooling tower energy-saving control method provided by the embodiments of the present application The comparison diagram of value.Wherein, Fig. 3 is shown in the too low situation of cooling tower water outlet temperature setting value, and cooling tower leaving water temperature is average Under setting value and application blower fan of cooling tower energy-saving control method provided by the embodiments of the present application under real value, existing way The comparison diagram of setting value.
Wherein, the A in Fig. 2 and Fig. 3 indicates the water outlet temperature setting value of the cooling tower under manual operation, and B indicates cooling The leaving water temperature of tower is averaged real value, and C is indicated under application blower fan of cooling tower energy-saving control method provided by the embodiments of the present application The water outlet temperature setting value of cooling tower.
Second embodiment
The embodiment of the present application also provides a kind of blower fan of cooling tower energy-saving control systems 100 applied in cooling tower, such as Shown in Fig. 4.The blower fan of cooling tower energy-saving control system 100 includes: memory 120, fan controller 130, temperature sensor 110 and frequency conversion fan 140.
The fan controller 130 and the memory 120, the temperature sensor 110 and the frequency conversion fan 140 In each element be directly or indirectly electrically connected between each other, to realize the transmission or interaction of data.For example, these element phases It can be realized and be electrically connected by one or more communication bus or signal wire between mutually.Temperature sensor 110 is for acquiring cooling The leaving water temperature of the water outlet of tower, and it is transmitted to fan controller 130.Memory 120 can be high speed and deposit at random Access to memory 120 (Random Access Memory, RAM), is also possible to non-labile 120 (non-of memory Volatile memory), a for example, at least magnetic disk storage 120.Wherein, it is stored in memory 120 computer-readable It instructs (computer program), which includes that at least one can be in the form of software or firmware (firmware) The software function module being stored in the memory 120.The fan controller 130, is deposited for executing in memory 120 The computer-readable instruction fetch of storage, to execute the step that blower fan of cooling tower energy-saving control method provided by the embodiments of the present application is included Suddenly.Such as the fan controller 130, for obtaining the currently practical leaving water temperature of the cooling tower;The air-blower control It is pre- to be also used to judge whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets for device 130 If condition;The fan controller 130, is also used to when to be, controls the frequency conversion fan 140 based on default leaving water temperature Run the first preset duration, wherein the default leaving water temperature is less than the currently practical leaving water temperature;The air-blower control dress 130 are set, is also used to obtain the practical leaving water temperature of the cooling tower in first preset duration;The fan controller 130, it is also used to determine target leaving water temperature based on the practical leaving water temperature in first preset duration;The air-blower control dress 130 are set, is also used to control the operation of frequency conversion fan 140 based on the target leaving water temperature.
Wherein, above-mentioned fan controller 130 may be a kind of IC chip, the processing capacity with signal.It should Fan controller 130 can be general processor, including central processing unit (Central Processing Unit, CPU), Network processing unit (Network Processor, NP) etc.;It can also be digital signal processor (Digital Signal Processor, DSP), it is specific integrated circuit (Application Specific Integrated Circuit, ASIC), existing It is field programmable gate array (Field Programmable Gate Array, FPGA) or other programmable logic device, discrete Door or transistor logic, discrete hardware components.It may be implemented or execute the disclosed each side in the embodiment of the present invention Method, step and logic diagram.General processor can be microprocessor or the fan controller 130 be also possible to it is any often The processor etc. of rule.
Wherein, the component of blower fan of cooling tower energy-saving control system 100 shown in Fig. 4 and structure are only exemplary, rather than Restrictive, as needed, blower fan of cooling tower energy-saving control system 100 also can have other assemblies and structure.
It should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment weight Point explanation is the difference from other embodiments, and the same or similar parts between the embodiments can be referred to each other.
The technology of the function of fan controller 130 provided by the embodiment of the present application, realization principle and generation Effect is identical with preceding method embodiment, and to briefly describe, Installation practice part does not refer to place, can refer to preceding method reality Apply corresponding contents in example.
3rd embodiment
The embodiment of the present application also provides a kind of non-volatile computer readable storage medium storing program for executing (hereinafter referred to as storage medium), It is stored thereon with computer program, the computer program executes above-mentioned when being run by processor (such as fan controller 130) The step of blower fan of cooling tower energy-saving control method as described in Figure 1.Specific implementation can be found in embodiment of the method, no longer superfluous herein It states.
Specifically, which can be general storage medium, such as mobile disk, hard disk, on the storage medium Program code when being run, be able to carry out the blower fan of cooling tower energy-saving control method shown in above-described embodiment.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the application, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the application can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, the technical solution of the application is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, laptop, server or network equipment etc.) execute each embodiment the method for the application whole Or part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. are various can store program The medium of code.
The above, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, it is any Those familiar with the art within the technical scope of the present application, can easily think of the change or the replacement, and should all contain Lid is within the scope of protection of this application.Therefore, the protection scope of the application shall be subject to the protection scope of the claim.

Claims (10)

1. a kind of blower fan of cooling tower energy-saving control method, which is characterized in that be applied to cooling tower, the cooling tower is provided with frequency conversion Blower;The described method includes:
Obtain the currently practical leaving water temperature of the cooling tower;
Judge whether the relationship between the currently practical leaving water temperature and current setting leaving water temperature meets preset condition;
When to be, the frequency conversion fan is controlled based on default leaving water temperature and runs the first preset duration, wherein is described pre- to set out Coolant-temperature gage is less than the currently practical leaving water temperature;
Obtain the practical leaving water temperature of the cooling tower in first preset duration;
Target leaving water temperature is determined based on the practical leaving water temperature in first preset duration;
The frequency conversion fan operation is controlled based on the target leaving water temperature.
2. the method according to claim 1, wherein the water outlet of the cooling tower is provided with temperature sensor, Obtain the currently practical leaving water temperature of the cooling tower, comprising:
According to prefixed time interval, the leaving water temperature of the temperature sensor monitoring is repeatedly obtained in the second preset duration;
The average value of multiple leaving water temperatures is obtained, the average value is the currently practical leaving water temperature of the cooling tower.
3. according to the method described in claim 2, it is characterized in that, obtaining the average value of multiple leaving water temperatures, comprising:
Reject the exceptional value in multiple leaving water temperatures;
The average value of multiple leaving water temperatures after obtaining excluding outlier.
4. the method according to claim 1, wherein judging the currently practical leaving water temperature and currently setting out Whether the relationship between coolant-temperature gage meets preset condition, comprising:
Judge the currently practical leaving water temperature and it is described it is current setting leaving water temperature difference absolute value whether be greater than it is default Threshold value, if more than preset threshold, then characterization meets preset condition.
5. method according to any of claims 1-4, which is characterized in that the water outlet of the cooling tower is provided with Temperature sensor obtains the practical leaving water temperature of the cooling tower in first preset duration, comprising:
According to prefixed time interval, the temperature sensor monitoring is repeatedly obtained in first preset duration goes out water temperature Degree;
Obtain the average value of multiple leaving water temperatures in first preset duration, multiple water outlets in first preset duration The average value of temperature is the practical leaving water temperature.
6. according to the method described in claim 5, it is characterized in that, based on the practical leaving water temperature in first preset duration Determine target leaving water temperature, comprising:
The value of practical leaving water temperature and predetermined deviation multiplication in first preset duration is discharged as the target Temperature, the predetermined deviation coefficient are greater than 1 less than 1.1.
7. a kind of blower fan of cooling tower energy-saving control system, which is characterized in that be applied to cooling tower, the blower fan of cooling tower energy conservation control System processed includes fan controller and the frequency conversion fan that connect with the fan controller;
The fan controller, for obtaining the currently practical leaving water temperature of the cooling tower;
The fan controller is also used to judge the pass between the currently practical leaving water temperature and current setting leaving water temperature Whether system meets preset condition;
The fan controller is also used to when to be, controls the frequency conversion fan operation first based on default leaving water temperature Preset duration, wherein the default leaving water temperature is less than the currently practical leaving water temperature;
The fan controller is also used to obtain the practical leaving water temperature of the cooling tower in first preset duration;
The fan controller is also used to determine that target goes out water temperature based on the practical leaving water temperature in first preset duration Degree;
The fan controller is also used to control the frequency conversion fan operation based on the target leaving water temperature.
8. blower fan of cooling tower energy-saving control system according to claim 7, which is characterized in that the blower fan of cooling tower energy conservation Control system further includes the temperature sensor for being set to the water outlet of the cooling tower, and the fan controller is used for: pressing According to prefixed time interval, the leaving water temperature of the temperature sensor monitoring is repeatedly obtained in the second preset duration;
The average value of multiple leaving water temperatures is obtained, the average value is the currently practical leaving water temperature of the cooling tower.
9. blower fan of cooling tower energy-saving control system according to claim 8, which is characterized in that the fan controller, It is also used to: rejecting the exceptional value in multiple leaving water temperatures;
The average value of multiple leaving water temperatures after obtaining excluding outlier.
10. blower fan of cooling tower energy-saving control system according to claim 7, which is characterized in that the fan controller, Be also used to: judge the currently practical leaving water temperature and it is described it is current setting leaving water temperature difference absolute value whether be greater than it is pre- If threshold value, if more than preset threshold, then characterization meets preset condition.
CN201910505371.8A 2019-06-11 2019-06-11 Energy-saving control method and system for cooling tower fan Active CN110118509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910505371.8A CN110118509B (en) 2019-06-11 2019-06-11 Energy-saving control method and system for cooling tower fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910505371.8A CN110118509B (en) 2019-06-11 2019-06-11 Energy-saving control method and system for cooling tower fan

Publications (2)

Publication Number Publication Date
CN110118509A true CN110118509A (en) 2019-08-13
CN110118509B CN110118509B (en) 2020-07-07

Family

ID=67523992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910505371.8A Active CN110118509B (en) 2019-06-11 2019-06-11 Energy-saving control method and system for cooling tower fan

Country Status (1)

Country Link
CN (1) CN110118509B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514026A (en) * 2019-07-23 2019-11-29 江苏天晟节能科技有限公司 Modularization industrial cooling tower control system and its working method
CN112857132A (en) * 2021-01-07 2021-05-28 丁一 Cooling tower, cooling tower detection control method, device, equipment and storage medium
CN113465441A (en) * 2021-06-29 2021-10-01 青岛海尔空调电子有限公司 Control method of cooling tower and storage medium
CN114877582A (en) * 2022-05-26 2022-08-09 杰瑞石油天然气工程有限公司 Temperature control method, device and system based on air cooling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010060166A (en) * 2008-09-01 2010-03-18 Yazaki Corp Cooling tower and heat source machine system
JP2014087728A (en) * 2012-10-29 2014-05-15 Miura Co Ltd Water treatment adjusting system
CN105953602A (en) * 2016-04-25 2016-09-21 珠海格力电器股份有限公司 Energy-saving control method and device for cooling tower and air conditioning system
CN105987617A (en) * 2015-02-05 2016-10-05 东元电机股份有限公司 Energy-saving frequency converting control system of cooling tower
CN106482573A (en) * 2016-12-05 2017-03-08 上海大众祥源动力供应有限公司 A kind of blower fan of cooling tower Optimal Control System and method
CN106979717A (en) * 2016-11-04 2017-07-25 深圳达实智能股份有限公司 The control method and device of cooling tower supply water temperature setting value

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010060166A (en) * 2008-09-01 2010-03-18 Yazaki Corp Cooling tower and heat source machine system
JP2014087728A (en) * 2012-10-29 2014-05-15 Miura Co Ltd Water treatment adjusting system
CN105987617A (en) * 2015-02-05 2016-10-05 东元电机股份有限公司 Energy-saving frequency converting control system of cooling tower
CN105953602A (en) * 2016-04-25 2016-09-21 珠海格力电器股份有限公司 Energy-saving control method and device for cooling tower and air conditioning system
CN106979717A (en) * 2016-11-04 2017-07-25 深圳达实智能股份有限公司 The control method and device of cooling tower supply water temperature setting value
CN106482573A (en) * 2016-12-05 2017-03-08 上海大众祥源动力供应有限公司 A kind of blower fan of cooling tower Optimal Control System and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514026A (en) * 2019-07-23 2019-11-29 江苏天晟节能科技有限公司 Modularization industrial cooling tower control system and its working method
CN112857132A (en) * 2021-01-07 2021-05-28 丁一 Cooling tower, cooling tower detection control method, device, equipment and storage medium
CN113465441A (en) * 2021-06-29 2021-10-01 青岛海尔空调电子有限公司 Control method of cooling tower and storage medium
CN113465441B (en) * 2021-06-29 2022-10-28 青岛海尔空调电子有限公司 Control method of cooling tower and storage medium
WO2023273827A1 (en) * 2021-06-29 2023-01-05 青岛海尔空调电子有限公司 Cooling tower control method and storage medium
CN114877582A (en) * 2022-05-26 2022-08-09 杰瑞石油天然气工程有限公司 Temperature control method, device and system based on air cooling

Also Published As

Publication number Publication date
CN110118509B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN110118509A (en) A kind of blower fan of cooling tower energy-saving control method and system
US10966346B2 (en) Method, device and system for controlling heat dissipation of electrical cabinet
Ramanathan et al. A framework for evaluation of advanced direct load control with minimum disruption
US10436851B2 (en) Electrical energy storage system with battery resistance estimation
US10692158B2 (en) Using loads with discrete finite states of power to provide ancillary services for a power grid
JP6602079B2 (en) System and method for controlling a power distribution network
CN105446156B (en) Control method, the device and system of household electrical appliance based on artificial intelligence
CN106403166B (en) A kind of cooling load prediction control method and device
US11374409B2 (en) Power system load flexibility forecasting
US9768615B2 (en) System and method for planning of demand for power on an electrical power network
CN108679800B (en) Control method and device of air conditioner
US20140094983A1 (en) Method and system for allocating energy
JP6610281B2 (en) Information processing apparatus, control method, and control program
CN112283890A (en) Cold and heat quantity control method and device suitable for building heating and ventilation equipment monitoring system
CN106969477A (en) Air conditioning control method and air-conditioner controller
CN110222398B (en) Artificial intelligence control method and device for water chilling unit, storage medium and terminal equipment
CN116191572B (en) Intelligent control method and system for photovoltaic inverter
JP6471751B2 (en) Energy control system, energy control device, energy control method and program
CN106849064B (en) Regional power grid load prediction management system based on meteorological data
CN116576557A (en) Temperature control method, device, equipment and storage medium
US10601225B2 (en) Management device, management system, control method for management device, and control program
CN116826782A (en) Power grid frequency modulation method, device, equipment and storage medium based on temperature control load
CN115103569A (en) Method and device for controlling equipment in machine room
CN110307616B (en) Temperature control equipment and control method and device thereof
Yazdkhasti et al. A pid controller for direct load control of thermostatically controlled appliances

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant