CN110118014A - A kind of outer wall template system and its construction method for exempting from external scaffolding - Google Patents

A kind of outer wall template system and its construction method for exempting from external scaffolding Download PDF

Info

Publication number
CN110118014A
CN110118014A CN201910382613.9A CN201910382613A CN110118014A CN 110118014 A CN110118014 A CN 110118014A CN 201910382613 A CN201910382613 A CN 201910382613A CN 110118014 A CN110118014 A CN 110118014A
Authority
CN
China
Prior art keywords
exterior wall
template
outside
wall
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910382613.9A
Other languages
Chinese (zh)
Other versions
CN110118014B (en
Inventor
李洪
李方宇
班德富
张红艳
韦代文
莫德荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201910382613.9A priority Critical patent/CN110118014B/en
Publication of CN110118014A publication Critical patent/CN110118014A/en
Application granted granted Critical
Publication of CN110118014B publication Critical patent/CN110118014B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of outer wall template system for exempting from external scaffolding, including exterior wall outboard template, inner side of outer wall template and K plate;The exterior wall outboard template includes large form on the outside of exterior wall, back cord, backing plate and nut;Large form, back cord, backing plate and nut are connected to each other to form an overall structure on the outside of the exterior wall;Large form is a large overall template on the outside of the exterior wall, the back cord is laterally equidistantly fixed on the outer surface of large form on the outside of exterior wall, the backing plate is equidistantly fixed on every back cord, bolt hole is offered on the backing plate, the nut is fixed on backing plate, and the screw hole of nut is corresponded to each other with the bolt hole position on backing plate;In the assembled condition, the top and bottom of large form are connected separately with one block of K plate on the outside of the exterior wall, and the exterior wall outboard template is fixed together with inner side of outer wall template by split bolt.A kind of outer wall template system that exempting from external scaffolding can achieve the peace for not utilizing external scaffolding that exterior wall outboard template can be realized and tear open and reinforce.

Description

A kind of outer wall template system and its construction method for exempting from external scaffolding
Technical field
The present invention relates to building construction technical field outer wall template, especially a kind of outer wall templates for exempting from external scaffolding System and construction method.
Background technique
The template system that existing construction site uses, has generally comprised inside and outside template, inside and outside template is oppositely arranged, institute State and be fixed together between inside and outside template by split bolt, in outer wall template fixation procedure, inside and outside template and back cord it Between, the connection between back cord and backing plate, between backing plate and nut be all to splice while assembling in the construction process, therefore pass The template of system needs to set up in the construction process external scaffolding, and (first is that safety is gone along with sb. to guard him, two are to provide operation for the effect of external scaffolding Platform) carry out high altitude operation, i.e., it on the outside of exterior sheathing and on the inside of inner template needs that split bolt is fixed simultaneously, make inside and outside Template is fixed together.External scaffolding some is set up in construction using steel pipe scaffold, has plenty of climbing frame.Regardless of which is used Kind external scaffolding form can all give engineering construction to increase biggish construction cost.
Summary of the invention
The object of the present invention is to provide a kind of outer wall template systems for exempting from external scaffolding, can achieve and do not utilize external scaffolding The peace that exterior wall outboard template can be realized is torn open and is reinforced.Invention also provides a kind of outer wall template systems for exempting from external scaffolding Construction method.
The technical solution to solve the above problems is: a kind of outer wall template system for exempting from external scaffolding, including exterior wall outer side mold Plate, inner side of outer wall template and K plate;The exterior wall outboard template includes large form on the outside of exterior wall, back cord, backing plate and nut;Institute State back cord be two it is opposite be arranged in parallel and between there are the rectangular through-pipe structure of the Two bors d's oeuveres in gap, pass through between two rectangular siphunculus Gap supporting block is attached;Large form, back cord, backing plate and nut are connected to each other to form an entirety knot on the outside of the exterior wall Structure;Large form is a large overall template on the outside of the exterior wall, and the back cord is laterally equidistantly fixed on large form on the outside of exterior wall Outer surface, the backing plate is equidistantly fixed on every back cord, bolt hole is offered on the backing plate, the nut is fixed on On backing plate, and the screw hole of nut is corresponded to each other with the bolt hole position on backing plate;In the assembled condition, big mould on the outside of the exterior wall It is solid by split bolt that the top and bottom of plate are connected separately with one block of K plate, the exterior wall outboard template and inner side of outer wall template It is scheduled on together.
Its further technical solution is: the top of large form is provided with demoulding hole and hanging ring on the outside of the exterior wall.
Further technical solution is for it: large form is mainly by fixed one formed of multiple on-gauge plates on the outside of the exterior wall A large overall template;The inner side of outer wall template is, half standard assembled by multiple on-gauge plates and multiple half on-gauge plates Side template is installed at the position of diagonal brace within the walls outside for plate setting, and the height of half on-gauge plate is the half of on-gauge plate.
Its further technical solution is: the back cord is fixedly connected by welding with the on-gauge plate of large form on the outside of exterior wall At an entirety;The backing plate is fixed by welding on back cord;The nut is fixed by welding on backing plate.
Its further technical solution is: it is equidistantly provided with connecting plate on the rectangular siphunculus of the Two bors d's oeuveres of the back cord, it is described Connecting plate is fixed with rectangular siphunculus vertical welding, offers screw hole on the connecting plate;The back cord passes through outside bolt and exterior wall The on-gauge plate of side large form is fixedly connected into an entirety.
Its further technical solution is: being arranged to angle on the downside of the K plate.
Its is relevant another solution is that a kind of construction method for the outer wall template system for exempting from external scaffolding, feature Be: it is using a kind of construction method for the outer wall template system for exempting from external scaffolding described in claim 3, construction technology stream Journey are as follows: A: drawing in-depth → B: large form assembly → C on the outside of exterior wall: hanging ring connection → D of large form on the outside of suspender and exterior wall: outer Large form lifting → E on the outside of wall: → F is fixed by bolt and K plate in large form bottom on the outside of exterior wall: on the outside of exterior wall including large form Interim diagonal brace → G is arranged in side: exterior wall reinforcement installation → H: the on-gauge plate of inner side of outer wall template is installed one by one, while being carried out to drawing spiral shell Half on-gauge plate of construction → I: inner side of outer wall template of bolt is installed one by one, while hound is moved to from exterior wall outboard template one by one Inner side of outer wall template → J: exterior wall concrete, which pours, smashes construction;Specific step are as follows:
A: drawing in-depth: in-depth to the effect that:
A1: the large overall template unit of in-depth exterior wall outboard template;
A2: in-depth K plate, the planar dimension of on-gauge plate and sectional dimension and connection type;
A3: in-depth outer wall template reinforces the spacing in length and breadth of split bolt;
B: exterior wall outboard template is assembled: exterior wall outboard template carries out spelling according to design conditions;
B1: large form on the outside of the exterior wall of an entirety is bolted into on-gauge plate;
B2: back cord is by welding or is bolted and on-gauge plate composition integrated connection;
B3: backing plate is connect by welding with back cord integral;
B4: nut is integral by being welded to connect with backing plate;
B5: demoulding hole, hanging ring are integral by welding and on-gauge plate composition connection;
C: suspender is connect with the hanging ring of exterior wall outboard template: crane hook is connected and fixed with the hanging ring on large form on the outside of exterior wall, Prepare lifting installation;
D: large form lifts on the outside of exterior wall;Large form hoisting machinery lifts in place on the outside of exterior wall;
E: large form bottom is fixed by bolt and K plate on the outside of exterior wall: after large form lifting in place on the outside of exterior wall, being first placed on On the K plate of bottom, big plate is fixed on K plate with bolt;
F: interim diagonal brace: the stability in order to guarantee large form on the outside of exterior wall is arranged in inside in large form on the outside of exterior wall, in K plate spiral shell Tether after connecing, be fixed temporarily large form on the outside of exterior wall with the double joint diagonal brace of aluminium film, diagonal brace be by the outside of exterior wall on large form it is pre- The split bolt hole stayed is fixed, after the completion of fixed, hook of dismantling;
G: exterior wall reinforcement installation: according to design drawing, exterior wall reinforcing bar is bound;
H: the on-gauge plate of inner side of outer wall template is installed one by one, while carrying out the construction of split bolt: when inner side of outer wall template is installed, The installation of advanced row on-gauge plate while on-gauge plate is installed, carries out split bolt construction, and split bolt penetrates outside exterior wall in inside Then the nut that side large form is welded and fixed is tightened completion and is reinforced;
I: half on-gauge plate of inner side of outer wall template is installed one by one, while hound is moved to outside within the walls from exterior wall outboard template one by one Side template;
I1: when the half on-gauge plate installation of inner side of outer wall template, the dismounting of exterior wall outboard template lower part hound is first carried out;
I2: and then half on-gauge plate of installation lower position;After the half on-gauge plate installation of lower position, split bolt is installed in time;
I3: the lower part hound of dismounting is fixed on the half on-gauge plate corresponding position of inner side of outer wall template lower part being installed;
I4: exterior wall outboard template top hound is removed;
I5: half on-gauge plate of position inner side of outer wall template top is installed;The installation of upper half on-gauge plate split bolt is carried out simultaneously;
I6: the top hound of dismounting is mounted on the corresponding positions that half on-gauge plate of inner side of outer wall template top of installation is completed It sets, that is, completes outer wall template installation;
J: exterior wall concrete, which pours, smashes construction: outer wall template, which is reinforced, to be completed, and is then carried out pouring for exterior wall concrete and is smash construction.
Its further technical solution is: in the construction process on the outside of exterior wall between large form unit, building corner it is outer The connection of large form unit edge joint position is completed by cage on the outside of wall.
Its further technical solution is: in the construction process, operation side is temporarily gone along with sb. to guard him by the way that Safety standardization is arranged Or lifeline is gone along with sb. to guard him the safety for facing side as operation surface layer and is gone along with sb. to guard him.
Its further technical solution is: when big plate is removed on the outside of exterior wall, the K plate of large form bottom is to pass through on the outside of exterior wall Cage is completed to remove, and large form is completed to remove by suspender on the outside of exterior wall.
Due to the adoption of the above technical scheme, a kind of outer wall template system and its construction method for exempting from external scaffolding of the invention Compared with prior art, it has the advantages that
1, it may be implemented to save great amount of cost during main body construction woth no need to set up external scaffolding.
(1) exterior wall outboard template of the invention is the integral unit for welding (or being bolted) and being fixed into, whole Peace is torn open.
(2) large form is bolted to form a large overall template list using on-gauge plate 11 on the outside of exterior wall of the present invention Member;During construction, bolt is no longer dismantled.
(3) large overall template that the back cord 3 on the outside of exterior wall of the present invention on large form and on-gauge plate 11 are formed is connected by welding (or being bolted) is connect into an entirety, is no longer dismantled during exterior wall main structure construction.
(4) backing plate 4 on the outside of exterior wall of the present invention on large form forms an entirety by welding and back cord 3, in exterior wall master It is no longer dismantled during body structure construction.
(5) 4 center of backing plate of the invention is equipped with bolt hole 41, and split bolt passes through when facilitating reinforcing.
(6) large form upper cap nut 5 is fixed by welding on backing plate 4 on the outside of exterior wall of the present invention, is applied in exterior wall main structure It is no longer dismantled during work;Split bolt can be realized and be reinforced by the way that portion turns screw rod within the walls outside when reinforcing, and no longer be needed It reinforces on the outside of personnel to exterior wall.
By above-mentioned it is found that exterior wall outboard template of the invention changes the connection knot on existing exterior sheathing between each component Structure becomes each component by the detachable splicing construction of each component and is fixedly connected to form one, exterior wall outboard template of the invention An overall structure is formed by welding (or being bolted), may be implemented during main body construction woth no need to setting up outer foot Hand cradle saves great amount of cost.
2, outer wall template system of the invention can repeatedly use:, can be to connection after the completion of main structure construction Position is removed, and the rate of recovery is high.
3, exterior wall outboard template integral hoisting of the invention is had enough to meet the need high-efficient.It lifts high-efficient.
4, outer wall template system of the invention is applied widely, can be used in any cast-in-place building system or with assembly Formula PC structure hybrids system.
5, the work progress of the outer wall template system for exempting from external scaffolding of the present invention simplifies, is green, is environmentally friendly, is energy saving.
With reference to the accompanying drawings and examples to a kind of outer wall template system for exempting from external scaffolding and its construction party of the present invention The technical characteristic of method is described further.
Detailed description of the invention
Fig. 1 is the exterior wall outboard template structural schematic diagram of the present invention;
Fig. 2 is the location diagram of outer wall template and shear wall;
Fig. 3 is side template structural schematic diagram within the walls except the present invention;
Fig. 4 is back cord of the invention, backing plate and nut schematic view of the mounting position;
Fig. 5 is the enlarged drawing of A in Fig. 4;Fig. 6 is backing structure schematic diagram of the invention;
Fig. 7 is backing plate, nut, bolt hole installation site relational graph;
Fig. 8 is the plan view of the back cord of strip connecting plate;
Fig. 9 is the cutaway view Amplified image of B-B in Fig. 8;
Figure 10 is the elevation of the back cord of strip connecting plate;
Figure 11-1~Figure 11-5 is existing on-gauge plate and on-gauge plate in-depth figure:
Figure 11-1 is the main view of existing on-gauge plate;
Figure 11-2 is the cross-sectional view of C-C in Figure 11-1;Figure 11-3 is the short side view of existing on-gauge plate;
Figure 11-4 is the cross-sectional view of D-D in Figure 11-1;Figure 11-5 is the length of existing on-gauge plate to side view;
Figure 12-1~Figure 12-5 is K plate and its in-depth figure:
Figure 12-1 is the main view of K plate;
Figure 12-2 is the cross-sectional view of E-E in Figure 12-1;Figure 12-3 is the short side view of K plate;
Figure 12-4 is the cross-sectional view of D-D in Figure 12-1;Figure 12-5 is the length of K plate to side view;
Figure 13 is exterior wall outboard template scheme of installation;
Figure 14 is exterior wall reinforcement installation schematic diagram;
Figure 15 is to remove large form lower part hound schematic diagram on the outside of exterior wall;
Figure 16 is to install installation half on-gauge plate of inner side of outer wall template lower part signal at diagonal brace position on the inside of large form on the outside of exterior wall Figure;
Figure 17 is the schematic diagram that half on-gauge plate of lower part installs split bolt;
Figure 18 is the schematic diagram of half on-gauge plate of lower part hound fixed outer wall inner side template lower part;
Figure 19 is to remove large form top hound schematic diagram on the outside of exterior wall;
Figure 20 is to install installation half on-gauge plate of inner side of outer wall template top signal at diagonal brace position on the inside of large form on the outside of exterior wall Figure;
Figure 21 is the schematic diagram that half on-gauge plate of top installs split bolt;
Figure 22 is the schematic diagram of half on-gauge plate of top hound fixed outer wall inner side template top.
In figure:
1- exterior wall outboard template, 11- on-gauge plate;2- inner side template, half on-gauge plate of 21-;3- back cord, the rectangular siphunculus of 31-, 32- Gap supporting block, 33- connecting plate, 34- screw hole;4- backing plate, 41- bolt hole;5- nut;6- demoulding hole;7- hanging ring;8-K plate; 9- split bolt;10- diagonal brace, the top 101- hound, the lower part 102- hound;12-PVC pipe.
WQ- shear wall;QG- shear force wall reinforcing steel bar.
Specific embodiment
Embodiment 1:
A kind of outer wall template system for exempting from external scaffolding, as shown in FIG. 1 to 3, including exterior wall outboard template 1, inner side of outer wall mould Plate 2 and K plate 8;The exterior wall outboard template 1 includes large form on the outside of exterior wall, back cord 3, backing plate 4 and nut 5;The back cord 3 For two it is opposite be arranged in parallel and between there are the rectangular through-pipe structure of the Two bors d's oeuveres in gap, pass through gap branch between two rectangular siphunculus Bracer 32 is attached;Large form, back cord 3, backing plate 4 and nut 5 are connected to each other to form an overall structure on the outside of the exterior wall; Large form is a large overall template on the outside of the exterior wall, and the back cord 3 is laterally equidistantly fixed on large form on the outside of exterior wall Outer surface, the backing plate 4 are equidistantly fixed on every back cord 3, and bolt hole 41 is offered on the backing plate 4, and the nut 5 is solid It is scheduled on backing plate 4, and the screw hole of nut 5 is corresponded to each other with 41 position of bolt hole on backing plate 4;In the assembled condition, described outer Wall outboard template 1 and inner side of outer wall template 2 are oppositely arranged;The top and bottom of the exterior wall outboard template 1 are connected separately with one Block K plate 8;Large form is fixed together with inner side of outer wall template 2 by split bolt 9 on the outside of the exterior wall.
The top of large form is provided with demoulding hole 6 and hanging ring 7 on the outside of the exterior wall.
In the present embodiment:
It is big that formed a entirety mainly is bolted by multiple existing on-gauge plates 11 in large form on the outside of the exterior wall Template, existing on-gauge plate are frame structure, and frame surrounding offers connecting hole, referring to Figure 11-1~Figure 11-5.Or it can also lead to It crosses other forms and on-gauge plate 11 is connected integral big plate unit.The inner side of outer wall template 2 is by multiple existing on-gauge plates Assembled with multiple half on-gauge plates, half on-gauge plate is the half (height) of on-gauge plate.Half on-gauge plate is used in outside exterior wall At the fixed position of the interim diagonal brace of side template.
The back cord 3 is attached by welding and the on-gauge plate of large form on the outside of exterior wall, and with large form on the outside of exterior wall Form an entirety.The spacing of back cord 3 is determined according to template Force Calculation;Back cord 3 can also pass through bolt and 11 shape of on-gauge plate At large form be connected to form a whole, 3 way of back cord is rectangular logical in the Two bors d's oeuveres of original back cord as shown in Fig. 8~Figure 10 Connecting plate 33 is equidistantly provided on pipe, the connecting plate 33 is fixed with rectangular 31 vertical welding of siphunculus, opened on the connecting plate Make large form shape on the outside of back cord 3 and exterior wall by fastening the bolt of the connecting hole on screw hole 34 and on-gauge plate equipped with screw hole 34 At an entirety.
The backing plate 4 is fixed by welding on back cord 3, and the horizontal spacing of backing plate is determined according to the Force Calculation of template; Bolt hole 41 is located at the center of backing plate 4, it is therefore an objective to split bolt 9 be facilitated to pass through bolt hole and the spiral shell being fixed on backing plate 4 Cap 5 connects.
The nut 5 is fixed by welding on backing plate 4, forms an entirety.
The K plate is existing common K plate, and the support as exterior wall outboard template is bolted with on-gauge plate 11 It is fixed;In order to facilitate large overall template dismounting, it is arranged to angle on the downside of K plate (referring to Figure 12-1~Figure 12-5).
The demoulding hole 6 is fixed by welding in the top of on-gauge plate 11 on the outside of exterior wall, and spacing is set as needed, generally Spaced set four;The effect in the demoulding hole 6, which is crowbar, passes through demoulding hole, it may be convenient to being made of multiple on-gauge plates 11 Large form agitate and concrete structure be detached from.
The hanging ring 7 is fixed by welding in the top of on-gauge plate 11 on the outside of exterior wall, is generally arranged 2 at top;This hangs When the effect of ring 7 is that large form is removed on the outside of exterior wall, big plate is hung by hanging ring with tower crane rope, after large form is dismantled, is led to It crosses tower crane and is lifted into one layer.
Embodiment 2:
A kind of construction method of outer wall template system that exempting from external scaffolding, it is a kind of described in embodiment 1 to exempt from the outer of external scaffolding The construction method of wall form system, construction technology process are as follows: A: it drawing in-depth → B: large form assembly → C on the outside of exterior wall: hangs Hanging ring connection → D of tool and large form on the outside of exterior wall: large form lifting → E on the outside of exterior wall: large form bottom passes through on the outside of exterior wall Bolt and K plate fix → F: interim diagonal brace → G: exterior wall reinforcement installation → H: inner side of outer wall is arranged in inside in large form on the outside of exterior wall The on-gauge plate of template is installed one by one, while carrying out construction → I of split bolt: half on-gauge plate of inner side of outer wall template is pacified one by one Dress, while hound is moved to inner side of outer wall template → J from exterior wall outboard template one by one: exterior wall concrete, which pours, smashes construction;Specifically The step of are as follows:
A: drawing in-depth: in-depth to the effect that:
A1: the large overall template unit of in-depth exterior wall outboard template;
A2: in-depth K plate, the planar dimension of on-gauge plate and sectional dimension and connection type;
A3: in-depth outer wall template reinforces the spacing in length and breadth of split bolt;Determine large form 1 and inner side of outer wall template 2 on the outside of exterior wall It is upper preset to wearing threaded hole.
B: exterior wall outboard template is assembled: exterior wall outboard template carries out spelling according to design conditions;
B1: large form on the outside of the exterior wall of an entirety is bolted into on-gauge plate 11;
B2: back cord 3 is by welding or is bolted and the composition integrated connection of on-gauge plate 11;
B3: backing plate 4 is connect by welding with back cord 3 integral;
B4: nut 5 is integral by being welded to connect with backing plate 4;
B5: demoulding hole 6, hanging ring 7 are integral by welding and the composition connection of on-gauge plate 11.
C: suspender is connect with the hanging ring 7 of exterior wall outboard template: the hanging ring on the outside of crane hook and exterior wall on large form is clamped It is fixed, prepare lifting installation.
D: large form lifts on the outside of exterior wall;Large form hoisting machinery lifts in place on the outside of exterior wall.
E: large form bottom is fixed by bolt and K plate on the outside of exterior wall: after large form lifting in place on the outside of exterior wall, first being put It sets on the K plate of bottom, big plate is fixed on K plate with bolt.
F: interim diagonal brace 10 is arranged in inside in large form on the outside of exterior wall: as shown in figure 13, in order to guarantee big mould on the outside of exterior wall The stability of plate is fixed temporarily large form on the outside of exterior wall with the double joint diagonal brace of aluminium film, diagonal brace is to pass through after the connection of K crab bolt The split bolt hole reserved on large form on the outside of exterior wall is fixed, after the completion of fixed, hook of dismantling.
G: exterior wall reinforcement installation: as shown in figure 14, according to design drawing, exterior wall reinforcing bar is bound, reports concealment acceptance after the completion.
H: the on-gauge plate of inner side of outer wall template 2 is installed one by one, while carrying out the construction of split bolt: exterior wall reinforced bar engineering is hidden After covering acceptance(check), the installation of inner side of outer wall template is carried out, when inner side of outer wall template is installed, the installation of advanced row on-gauge plate, standard While plate is installed, split bolt construction is carried out, split bolt penetrates the nut that large form on the outside of exterior wall is welded and fixed in inside 5, it then tightens completion and reinforces.
I: half on-gauge plate of inner side of outer wall template 2 is installed one by one, while hound is moved to from exterior wall outboard template one by one Inner side of outer wall template;
I1: when the half on-gauge plate installation of inner side of outer wall template 2, the dismounting of exterior wall outboard template lower part hound 102 is first carried out (referring to Figure 15);
I2: and then half on-gauge plate of installation lower position (referring to Figure 16);After the half on-gauge plate installation of lower position, install in time Split bolt (referring to Figure 17);
I3: the lower part hound of dismounting is fixed on half on-gauge plate corresponding position of the inner side of outer wall template lower part (ginseng being installed See Figure 18);
I4: exterior wall outboard template top hound 101(is removed referring to Figure 19);
I5: half on-gauge plate of position inner side of outer wall template top (referring to fig. 2 0) is installed;Upper half on-gauge plate is carried out simultaneously to drawing spiral shell The installation (referring to fig. 2 1) of bolt;
I6: the top hound of dismounting is mounted on the corresponding positions that half on-gauge plate of inner side of outer wall template top of installation is completed It sets, that is, completes outer wall template installation (referring to fig. 2 2).
J: exterior wall concrete, which pours, smashes construction: outer wall template, which is reinforced, to be completed, and after qualification of applying for checking and examination, can carry out exterior wall concrete It pours and smashes construction.
In the construction process, large form unit is spelled between large form unit, on the outside of the exterior wall of building corner on the outside of exterior wall Connection is completed by cage at seam.And work surface by be arranged Safety standardization temporarily go along with sb. to guard him or lifeline go along with sb. to guard him come The safety for facing side as operation surface layer is gone along with sb. to guard him, and can also be gone along with sb. to guard him by the safety that other forms are arranged.
When big plate is removed on the outside of exterior wall, the K plate of large form bottom is to complete to remove by cage on the outside of exterior wall, outside exterior wall Side large form is completed to remove by suspender.Large form is hung by hanging ring using tower crane rope, after large form is dismantled, passes through tower crane It is lifted into one layer.
Design principle of the invention:
Exterior wall outboard template component part: on-gauge plate 11, back are strangled 3, backing plate 4, nut 5 by being welded and fixed to form an entirety Large form facilitates the whole peace of exterior wall outboard template to tear open;Demoulding hole and hanging ring are equipped at the top of large overall template, demoulding hole is convenient Big plate is integrally agitated using crowbar and is separated with concrete structure, hanging ring is to facilitate other lifting machines such as tower crane whole by hanging ring Body lifts by crane big plate;K plate is to facilitate the support of big plate integral hoisting bottom to fix positioned at the top and bottom of large overall template.
Construction Principle are as follows: suspender connect with large overall template by hanging ring → by demoulding hole to large overall template agitate with Concrete structure separation → big supreme one layer → large form bottom of plate integral lifting fixed by bolt and K plate → large form including Side setting temporary support → exterior wall reinforcement installation → inner side of outer wall template is installed one by one, while carrying out the construction of split bolt → outer The construction of wall casting and compacting of concrete.
Technology characteristics of the invention:
The part material of the outer wall template system for exempting from external scaffolding of the invention is simple and easy to get, by being cut to raw material, It welds, punch and exterior wall outboard template 1 and inner side of outer wall template 2 can be completed.Its technique has following feature:
Feature one: the exterior wall outboard template is an integral unit being welded and fixed, and whole peace is torn open.
Feature two: the on-gauge plate 2 of the exterior wall outboard template 1 is bolted to form a large overall template unit;? During construction, bolt is no longer dismantled.
Feature three: the large overall template that the back cord 3 of the exterior wall outboard template 1 and on-gauge plate 11 are formed by be welded to connect at One entirety is no longer dismantled during exterior wall main structure construction.
Feature four: the backing plate 4 of the exterior wall outboard template 1 forms an entirety by welding and back cord 3, in exterior wall main body knot Structure is no longer dismantled during constructing;
Feature five: 4 center of backing plate of the exterior wall outboard template 1 is equipped with bolt hole 41, and split bolt passes through when facilitating reinforcing.
Feature six: the nut 5 of the exterior wall outboard template 1 is fixed by welding on backing plate 4, in exterior wall main structure construction During no longer dismantle;Split bolt can be realized and be reinforced by the way that portion turns screw rod within the walls outside when reinforcing, and no longer be needed On the outside of reinforcing personnel to exterior wall.
Feature seven: it needs to fix using internal diagonal brace after large form integral hoisting on the outside of the exterior wall, prevents big plate from tilting;It is internal Diagonal brace reinforces fixed diagonal brace using aluminium film, does not need that shoring in addition is arranged.
Feature eight: the aluminium film used reinforces shoring as dual-purpose support, and interim branch is done when exterior wall outboard template installs Support, during side template installs within the walls outside, is moved to the diagonal brace point of outboard template in inner side template one by one, completes entire branch The oblique reinforcing of modular system.
Feature nine: inner side of outer wall template installs position in diagonal brace and half on-gauge plate 21 is arranged, it is therefore an objective to facilitate exterior wall temporarily oblique Support is moved to inner side template one by one, the stability without influencing outer wall template system.
Feature ten: the K plate in big board bottom portion is to complete to remove by cage on the outside of the device exterior wall;Between large form unit, The modular unit edge joint position connection for building corner is completed by cage;
Feature 11: the work surface for exempting from the outer wall template system construction of external scaffolding is temporarily gone along with sb. to guard him by the way that Safety standardization is arranged Or lifeline is gone along with sb. to guard him the safety for facing side as operation surface layer and is gone along with sb. to guard him.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all utilizations Equivalent structure transformation made by present specification, directly or indirectly with the technology neck for being attached to other Related products Domain is included within the scope of the present invention.

Claims (10)

1. a kind of outer wall template system for exempting from external scaffolding, including exterior wall outboard template, inner side of outer wall template and K plate;It is described outer Wall outboard template includes large form on the outside of exterior wall, back cord, backing plate and nut;The back cord be two it is opposite be arranged in parallel and it Between there are the rectangular through-pipe structure of the Two bors d's oeuveres in gap, be attached between two rectangular siphunculus by gap supporting block;Its feature exists In: large form, back cord, backing plate and nut, which are connected to each other, on the outside of the exterior wall to form an overall structure;It is big on the outside of the exterior wall Template is a large overall template, and the back cord is laterally equidistantly fixed on the outer surface of large form on the outside of exterior wall, the backing plate It is equidistantly fixed on every back cord, bolt hole is offered on the backing plate, the nut is fixed on backing plate, and the spiral shell of nut Hole is corresponded to each other with the bolt hole position on backing plate;In the assembled condition, the top and bottom of large form are divided on the outside of the exterior wall It is not connected with one block of K plate, the exterior wall outboard template is fixed together with inner side of outer wall template by split bolt.
2. a kind of outer wall template system for exempting from external scaffolding according to claim 1, it is characterised in that: on the outside of the exterior wall The top of large form is provided with demoulding hole and hanging ring.
3. according to claim 1 or a kind of outer wall template system for exempting from external scaffolding described in 2, it is characterised in that: described outer Large form is mainly by the fixed large overall template formed of multiple on-gauge plates on the outside of wall;The inner side of outer wall template is by more A on-gauge plate and multiple half on-gauge plates are assembled, and the position of side template installation diagonal brace within the walls is arranged outside in half on-gauge plate Place, the height of half on-gauge plate is the half of on-gauge plate.
4. a kind of outer wall template system for exempting from external scaffolding according to claim 3, it is characterised in that: the back cord passes through Welding and the on-gauge plate of large form on the outside of exterior wall are fixedly connected into an entirety;The backing plate is fixed by welding on back cord; The nut is fixed by welding on backing plate.
5. a kind of outer wall template system for exempting from external scaffolding according to claim 3, it is characterised in that: pair of the back cord It spells and is equidistantly provided with connecting plate on rectangular siphunculus, the connecting plate is fixed with rectangular siphunculus vertical welding, on the connecting plate Offer screw hole;The back cord is fixedly connected into an entirety by the on-gauge plate of large form on the outside of bolt and exterior wall.
6. a kind of outer wall template system for exempting from external scaffolding according to claim 1, it is characterised in that: on the downside of the K plate It is arranged to angle.
7. a kind of construction method for the outer wall template system for exempting from external scaffolding, it is characterised in that: it is using described in claim 3 A kind of construction method of outer wall template system that exempting from external scaffolding, construction technology process are as follows: A: drawing in-depth → B: outside exterior wall Side large form assembly → C: hanging ring connection → D: large form lifting → E on the outside of exterior wall: exterior wall of large form on the outside of suspender and exterior wall → F is fixed by bolt and K plate in outside large form bottom: interim diagonal brace → G: exterior wall steel is arranged in inside in large form on the outside of exterior wall Muscle installation → H: the on-gauge plate of inner side of outer wall template is installed one by one, while carrying out construction → I of split bolt: inner side of outer wall template Half on-gauge plate install one by one, while hound is moved to inner side of outer wall template → J: exterior wall coagulation from exterior wall outboard template one by one Soil, which pours, smashes construction;Specific step are as follows:
A: drawing in-depth: in-depth to the effect that:
A1: the large overall template unit of in-depth exterior wall outboard template;
A2: in-depth K plate, the planar dimension of on-gauge plate and sectional dimension and connection type;
A3: in-depth outer wall template reinforces the spacing in length and breadth of split bolt;
B: exterior wall outboard template is assembled: exterior wall outboard template carries out spelling according to design conditions;
B1: large form on the outside of the exterior wall of an entirety is bolted into on-gauge plate;
B2: back cord is by welding or is bolted and on-gauge plate composition integrated connection;
B3: backing plate is connect by welding with back cord integral;
B4: nut is integral by being welded to connect with backing plate;
B5: demoulding hole, hanging ring are integral by welding and on-gauge plate composition connection;
C: suspender is connect with the hanging ring of exterior wall outboard template: crane hook is connected and fixed with the hanging ring on large form on the outside of exterior wall, Prepare lifting installation;
D: large form lifts on the outside of exterior wall;Large form hoisting machinery lifts in place on the outside of exterior wall;
E: large form bottom is fixed by bolt and K plate on the outside of exterior wall: after large form lifting in place on the outside of exterior wall, being first placed on On the K plate of bottom, big plate is fixed on K plate with bolt;
F: interim diagonal brace: the stability in order to guarantee large form on the outside of exterior wall is arranged in inside in large form on the outside of exterior wall, in K plate spiral shell Tether after connecing, be fixed temporarily large form on the outside of exterior wall with the double joint diagonal brace of aluminium film, diagonal brace be by the outside of exterior wall on large form it is pre- The split bolt hole stayed is fixed, after the completion of fixed, hook of dismantling;
G: exterior wall reinforcement installation: according to design drawing, exterior wall reinforcing bar is bound;
H: the on-gauge plate of inner side of outer wall template is installed one by one, while carrying out the construction of split bolt: when inner side of outer wall template is installed, The installation of advanced row on-gauge plate while on-gauge plate is installed, carries out split bolt construction, and split bolt penetrates outside exterior wall in inside Then the nut that side large form is welded and fixed is tightened completion and is reinforced;
I: half on-gauge plate of inner side of outer wall template is installed one by one, while hound is moved to outside within the walls from exterior wall outboard template one by one Side template;
I1: when the half on-gauge plate installation of inner side of outer wall template, the dismounting of exterior wall outboard template lower part hound is first carried out;
I2: and then half on-gauge plate of installation lower position;After the half on-gauge plate installation of lower position, split bolt is installed in time;
I3: the lower part hound of dismounting is fixed on the half on-gauge plate corresponding position of inner side of outer wall template lower part being installed;
I4: exterior wall outboard template top hound is removed;
I5: half on-gauge plate of position inner side of outer wall template top is installed;The installation of upper half on-gauge plate split bolt is carried out simultaneously;
I6: the top hound of dismounting is mounted on the corresponding positions that half on-gauge plate of inner side of outer wall template top of installation is completed It sets, that is, completes outer wall template installation;
J: exterior wall concrete, which pours, smashes construction: outer wall template, which is reinforced, to be completed, and is then carried out pouring for exterior wall concrete and is smash construction.
8. a kind of construction method of outer wall template system for exempting from external scaffolding according to claim 7, it is characterised in that: The connection of large form unit edge joint position is between large form unit, on the outside of the exterior wall of building corner on the outside of exterior wall in work progress It is completed by cage.
9. a kind of construction method of outer wall template system for exempting from external scaffolding according to claim 7, it is characterised in that: In work progress, operation side by being arranged, temporarily go along with sb. to guard him or lifeline is gone along with sb. to guard him and faced as operation surface layer by Safety standardization The safety on side is gone along with sb. to guard him.
10. a kind of construction method of outer wall template system for exempting from external scaffolding according to claim 7, it is characterised in that: When big plate is removed on the outside of exterior wall, the K plate of large form bottom is to complete to remove by cage on the outside of exterior wall, large form on the outside of exterior wall It completes to remove by suspender.
CN201910382613.9A 2019-05-09 2019-05-09 Exterior wall template system free of exterior scaffold and construction method thereof Active CN110118014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910382613.9A CN110118014B (en) 2019-05-09 2019-05-09 Exterior wall template system free of exterior scaffold and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910382613.9A CN110118014B (en) 2019-05-09 2019-05-09 Exterior wall template system free of exterior scaffold and construction method thereof

Publications (2)

Publication Number Publication Date
CN110118014A true CN110118014A (en) 2019-08-13
CN110118014B CN110118014B (en) 2024-01-02

Family

ID=67521942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910382613.9A Active CN110118014B (en) 2019-05-09 2019-05-09 Exterior wall template system free of exterior scaffold and construction method thereof

Country Status (1)

Country Link
CN (1) CN110118014B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255228A (en) * 2020-03-05 2020-06-09 北京天润建设有限公司 Shaped wall form device and construction method

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0554754U (en) * 1991-12-26 1993-07-23 株式会社竹中工務店 Formwork diagonal support
ES1051345U (en) * 2002-03-07 2002-07-16 Sanchez Fernando Verdejo Shoring support formwork concrete walls. (Machine-translation by Google Translate, not legally binding)
JP2003176628A (en) * 2001-12-11 2003-06-27 Kanai:Kk Form support fitting
JP2005002788A (en) * 2004-08-12 2005-01-06 Murakami Komuten:Kk Supporting method for plumb of wall form or the like
WO2005054604A1 (en) * 2003-11-27 2005-06-16 Ulma C Y E, S. Coop. Rigging system for formwork, scaffolding or moving loads in general
KR100643529B1 (en) * 2006-06-13 2006-11-10 (주)한국환경종합건축사사무소 Well forming for construction
JP4164117B1 (en) * 2008-01-26 2008-10-08 株式会社高長建設 Formwork apparatus for prismatic concrete structure and construction method of prismatic concrete structure using the same
CN202559724U (en) * 2012-05-02 2012-11-28 浙江东正建设实业集团有限公司 Locating device for construction mobile template
KR101209765B1 (en) * 2011-09-02 2012-12-07 주식회사 인동철강 Retaining wall and one side form supporter
CN203394028U (en) * 2013-05-14 2014-01-15 中建保华建筑有限责任公司 Wall formwork system applied to anti-seismic joint
CN204212406U (en) * 2014-11-14 2015-03-18 中建四局第五建筑工程有限公司 A kind of one-sided strengthening construction big steelmoulds
CN105155837A (en) * 2015-08-31 2015-12-16 云南科保模架有限责任公司 General aluminum alloy template system
WO2016084996A1 (en) * 2014-11-27 2016-06-02 주식회사 한국록셀보드 Clamp for form and method for constructing outside thermal insulation concrete wall using same
CN205530315U (en) * 2016-01-25 2016-08-31 杭州江润科技有限公司 Cast -in -place open caisson formwork system
TW201725304A (en) * 2016-01-04 2017-07-16 Jin Long Steel Co Ltd Injection molding method for building template structure and its application to the outer side of the structure without support comprising a mesh template, a plurality of pull rods, and an inner template
CN108385980A (en) * 2018-02-28 2018-08-10 五冶集团上海有限公司 Deformation joint shear wall set shaped steel formwork installs unidirectional fastening screw construction method
CN108487046A (en) * 2018-03-26 2018-09-04 防灾科技学院 A kind of combined dual deck bridge framed bent pier seismic Damage control system
CN208152546U (en) * 2018-05-02 2018-11-27 深圳市前海胜德建筑科技有限公司 The tall and big formwork system of aluminum alloy mould plate
CN109577517A (en) * 2018-11-28 2019-04-05 杭州江润科技有限公司 Assembly of shear wall structure and construction method
CN210659227U (en) * 2019-05-09 2020-06-02 广西建工集团第五建筑工程有限责任公司 Exterior wall formwork system free of external scaffold

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0554754U (en) * 1991-12-26 1993-07-23 株式会社竹中工務店 Formwork diagonal support
JP2003176628A (en) * 2001-12-11 2003-06-27 Kanai:Kk Form support fitting
ES1051345U (en) * 2002-03-07 2002-07-16 Sanchez Fernando Verdejo Shoring support formwork concrete walls. (Machine-translation by Google Translate, not legally binding)
WO2005054604A1 (en) * 2003-11-27 2005-06-16 Ulma C Y E, S. Coop. Rigging system for formwork, scaffolding or moving loads in general
JP2005002788A (en) * 2004-08-12 2005-01-06 Murakami Komuten:Kk Supporting method for plumb of wall form or the like
KR100643529B1 (en) * 2006-06-13 2006-11-10 (주)한국환경종합건축사사무소 Well forming for construction
JP4164117B1 (en) * 2008-01-26 2008-10-08 株式会社高長建設 Formwork apparatus for prismatic concrete structure and construction method of prismatic concrete structure using the same
KR101209765B1 (en) * 2011-09-02 2012-12-07 주식회사 인동철강 Retaining wall and one side form supporter
CN202559724U (en) * 2012-05-02 2012-11-28 浙江东正建设实业集团有限公司 Locating device for construction mobile template
CN203394028U (en) * 2013-05-14 2014-01-15 中建保华建筑有限责任公司 Wall formwork system applied to anti-seismic joint
CN204212406U (en) * 2014-11-14 2015-03-18 中建四局第五建筑工程有限公司 A kind of one-sided strengthening construction big steelmoulds
WO2016084996A1 (en) * 2014-11-27 2016-06-02 주식회사 한국록셀보드 Clamp for form and method for constructing outside thermal insulation concrete wall using same
CN105155837A (en) * 2015-08-31 2015-12-16 云南科保模架有限责任公司 General aluminum alloy template system
TW201725304A (en) * 2016-01-04 2017-07-16 Jin Long Steel Co Ltd Injection molding method for building template structure and its application to the outer side of the structure without support comprising a mesh template, a plurality of pull rods, and an inner template
CN205530315U (en) * 2016-01-25 2016-08-31 杭州江润科技有限公司 Cast -in -place open caisson formwork system
CN108385980A (en) * 2018-02-28 2018-08-10 五冶集团上海有限公司 Deformation joint shear wall set shaped steel formwork installs unidirectional fastening screw construction method
CN108487046A (en) * 2018-03-26 2018-09-04 防灾科技学院 A kind of combined dual deck bridge framed bent pier seismic Damage control system
CN208152546U (en) * 2018-05-02 2018-11-27 深圳市前海胜德建筑科技有限公司 The tall and big formwork system of aluminum alloy mould plate
CN109577517A (en) * 2018-11-28 2019-04-05 杭州江润科技有限公司 Assembly of shear wall structure and construction method
CN210659227U (en) * 2019-05-09 2020-06-02 广西建工集团第五建筑工程有限责任公司 Exterior wall formwork system free of external scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓华军;: "地下室外墙单面支模施工技术", 科协论坛(下半月), no. 04 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255228A (en) * 2020-03-05 2020-06-09 北京天润建设有限公司 Shaped wall form device and construction method

Also Published As

Publication number Publication date
CN110118014B (en) 2024-01-02

Similar Documents

Publication Publication Date Title
CN109989347A (en) Cantilever formwork of hollow bridge pier and construction method thereof
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN106948598A (en) A kind of aluminum alloy formwork system and its construction method for variable cross-section rectangular column
CN110409318A (en) A kind of large span freely-supported steel reinforced concrete bondbeam assembling method
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN210798252U (en) Assembled outer protection frame system
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN106284103A (en) Steel reinforced concrete combination beam roof steel bar concrete high-altitude cantilever pouring construction method
CN110118014A (en) A kind of outer wall template system and its construction method for exempting from external scaffolding
CN105951599B (en) High column mould bases integrated construction technique
CN202990427U (en) Climbing discharging platform
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN210659227U (en) Exterior wall formwork system free of external scaffold
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN110453689A (en) Circular foundation pit lining wall formwork construction system and construction method
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN109610325A (en) The construction method of high-speed railway bridge hanging basket mounting platform
CN110067207B (en) Reinforcing steel bar binding protection frame for high pier turnover formwork construction
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN208122354U (en) A kind of steel pipe pedestal elevator horizontal protective device
CN205953375U (en) Can dismantle and tower crane attachment jacking platform of independent assortment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20240314

Granted publication date: 20240102

PP01 Preservation of patent right