CN110108944A - A kind of line insulation test grounding wire device and its line insulation test method - Google Patents

A kind of line insulation test grounding wire device and its line insulation test method Download PDF

Info

Publication number
CN110108944A
CN110108944A CN201910482667.2A CN201910482667A CN110108944A CN 110108944 A CN110108944 A CN 110108944A CN 201910482667 A CN201910482667 A CN 201910482667A CN 110108944 A CN110108944 A CN 110108944A
Authority
CN
China
Prior art keywords
test
line
end terminal
wire device
grounding wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910482667.2A
Other languages
Chinese (zh)
Inventor
浦仕遵
李宏梅
戴旭东
刘平林
李劲松
杨荣华
陶乃泽
张辉
施平
蒋宗建
杨伟良
王洪林
梁明传
张明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co ltd Dehong Power Supply Bureau
Original Assignee
Yunnan Power Grid Co ltd Dehong Power Supply Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co ltd Dehong Power Supply Bureau filed Critical Yunnan Power Grid Co ltd Dehong Power Supply Bureau
Priority to CN201910482667.2A priority Critical patent/CN110108944A/en
Publication of CN110108944A publication Critical patent/CN110108944A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R11/00Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
    • H01R11/11End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
    • H01R11/12End pieces terminating in an eye, hook, or fork
    • H01R11/14End pieces terminating in an eye, hook, or fork the hook being adapted for hanging on overhead or other suspended lines, e.g. hot line clamp
    • H01R11/15Hook in the form of a screw clamp
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/28Clamped connections, spring connections
    • H01R4/30Clamped connections, spring connections utilising a screw or nut clamping member
    • H01R4/36Conductive members located under tip of screw

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses a kind of line insulation test grounding wire device and its line insulation test methods, it is desirable to provide a kind of line insulation test grounding wire device that operating efficiency can be improved and its line insulation test method.For clamping the conducting wire end terminal of conducting wire when grounding wire device therein includes operation, the ground operation bar being connect with conducting wire end terminal, the short-circuit line for being separately connected conducting wire end terminal and ground connection end terminal for clamping grounding body, the ground connection end terminal for being provided with operation bolt and both ends when operation;It further include being screwed in the wing bolt of the p-wire on ground connection end terminal, for connecting insulating megger, the operating head with the operation bolt clamping on ground connection end terminal, and the operating stick being connected with operating head;Pin rod is provided on the operation bolt, at one end for connecting with operating head, pin rod and operation bolt constitute cross;Operating head and operation tether the one end connect and the blind hole protruded into for shank end are arranged, and one group of limiting slot is arranged on blind hole outer wall.

Description

A kind of line insulation test grounding wire device and its line insulation test method
Technical field
The present invention relates to electric power maintenance equipment technical fields, more particularly, to a kind of line insulation test grounding wire device And its line insulation test method.
Background technique
Line insulation resistance test is the work that route is routinely carried out, especially carry out on 10kV to 110kV route compared with It is more.Before new route puts into operation, after complicated maintenance, when doing before and after pressure test or being difficult to find that fault point after failure etc., Need to carry out the work of line insulation resistance test.Due to relatively easy, specification of the people to the work of line insulation test work The attention degree of property is often covered by its test result, is not easy to cause attention.Activity duration is long, and Partial Jobs process is lack of standardization, shape Violating the regulations at habituation, Yi Yinqi induced electricity hurts sb.'s feelings, the even danger such as electric shock.Conventional line insulation method for testing resistance is divided It analyses as follows:
(1) before new route puts into operation, line insulation resistance test after complicated maintenance
New route put into operation before, after complicated maintenance when line insulation resistance test, route turns inspecting state.When testing the first phase, Installing p-wire can be completed under route inspecting state, and route switchs to cold standby state when test.Removing the phase p-wire, dress When setting a phase p-wire, tester needs to carry out route 5 times and turns to overhaul the cold standby process that turns again, consumes about 3 hour time, In order to shorten the activity duration, there are the violation situations that direct-on-line road cold standby state completes the dismounting of 5 p-wires.This is in violation of rules and regulations Operating personnel is exposed under the risk that tested line influence electricity and sending a telegram here suddenly is hurted sb.'s feelings by behavior, Yi Yinqi induced electricity hurts sb.'s feelings, The even danger such as electric shock.It according to said method to reduce electricity to hurt sb.'s feelings risk, three-phase p-wire can be assembled and disassembled simultaneously, but need to carry three times Material includes insulating megger, this is also to be difficult to, while cannot carry out phase insulation test job.Which forms habits Property violating the regulations motivation and behavior.
(2) megger test after line fault
After line fault tripping, reclosing is unsuccessful or non-reclosing, all will lead to route and is unable to normal operation, interrupts Power supply, most of route operation maintenance personnel all by rule of thumb with route operation conditions or Given information, arrive suspect compared with can at the first time Point spy's inspection of energy failure is looked into.If not finding fault point, general route is longer, when being difficult to clear failure point range, often Shen Please route turn cold standby, take megger test method judgement search fault point, when route permanent fault, it is also necessary to by line It unlocks point multistage and carries out line insulation resistance test in road.Due to coming the pressure of self-powered, customer service and route availability coefficient etc., operation Spy patrols personnel outside, and some of the staff do not handle work ticket and turn maintenance when megger test, in route cold standby state It begins to overlap p-wire with operating stick after electrical verification, if tested route is extremely connected with electromagnetic potential transformer or route and needs When wanting sectionalization test insulation resistance, electromagnetic potential transformer and strain insulator drainage thread are released, or even removes the inspection of the elements such as insulator It looks into, these operation process have that operating personnel is tested line influence electricity, suddenly incoming call injury;With permanent fault route Conducting wire is hung on next voltage class route after breaking or falling string, and measurement circuit does not turn to overhaul, so that on tested route band Under the risk hurted sb.'s feelings by hanging wire road working voltage, the danger such as Yi Yinqi induced electricity hurts sb.'s feelings, even gets an electric shock.And easily forming the habit property is disobeyed The behavior and motivation of chapter.
Summary of the invention
The purpose of the present invention is intended to overcome the shortcomings of the prior art, and operation safety can be effectively improved by providing one kind Line insulation test grounding wire device and its line insulation test method.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of line insulation test grounding wire device, for clamping the conducting wire end terminal of conducting wire when including operation, with conductor wire end The ground operation bar of wire clamp connection, the ground connection end terminal and two when operation for clamping grounding body, being provided with operation bolt End is separately connected conducting wire end terminal and is grounded the short-circuit line of end terminal;Its further include be screwed in ground connection end terminal on, be used for Connect insulating megger p-wire wing bolt, with ground connection end terminal on operation bolt clamping operating head, and with operation The connected operating stick of head;Pin rod is provided on the operation bolt, at one end for connecting with operating head, pin rod and operation bolt constitute ten Font;The operating head and operation tether the one end connect and the blind hole protruded into for shank end are arranged, and are arranged one on blind hole outer wall Group is in J-shaped, the limiting slot for being caught in for pin rod.
Preferably, the operating head is tethered with ground connection end terminal operation by J-shaped blind hole structure and is connect.
Preferably, the operating head is connect by helicitic texture with operating stick.
Preferably, the short-circuit line is used with the short-circuit line for thickening transparent insulating layer.
A kind of line insulation test method, uses grounding wire device as described above, which includes in following Hold:
Route is switched to cold standby state by step (1), and pulling open can be by the electromagnetic potential transformer and mutual induction of voltage of operation isolation Device secondary side air switch;
The strain insulator drainage thread and electromagnetic potential transformer drainage thread that step (2) investigation megger test needs to release;
Step (3) is if woth no need to release drainage thread situation test insulation resistance process:
1. installing battery of tests grounding wire device in A phase conductor after route megger test point electrical verification;
2. connecting test line: p-wire test connecting pin being connected on ground connection end terminal butterfly bolt, ground short circuit line is used It is connected to the p-wire of line conductor, connects other p-wires;
Grounding body and hanging is detached from 3. end terminal will be grounded with operating stick and dismantled;
4. measurement circuit insulation resistance;
5. restoring the ground connection end terminal of tape test line with operating stick, p-wire is removed;
6. repeating 2. -5. test b, C phase conductor;
7. removing grounding wire device, site clearing.
Step (4) needs to unlock in route the process of sectionalization test line insulation resistance:
1. installing battery of tests grounding wire device respectively at drainage thread waypoint drainage thread both ends to be unlocked;
2. unlocking drainage thread;
3. repeat step (3) in 2. -6., respectively test segmentation after each section of line insulation resistance;
4. restoring the drainage thread unlocked;
5. removing grounding wire device, site clearing.
Preferably, the process for unlocking route electromagnetic potential transformer drainage thread measurement circuit insulation resistance is as follows:
1. needing to unlock installing battery of tests grounding wire device, electromagnetism on the line conductor of electromagnetic potential transformer position One group of grounding wire device is installed on formula voltage transformer;
2. releasing electromagnetic potential transformer drainage thread;
3. in repeating said steps (3) 2. -6., measurement circuit insulation resistance;
4. restoring the voltage transformer drainage thread unlocked;
5. removing grounding wire device, site clearing.
Compared with prior art, the present invention has the advantage that
The present invention can reduce the risk of line insulation resistance test operation, effectively improve line insulation resistance test operation safety Property, normalization and operating efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural schematic diagram when present invention uses.
Fig. 2 is the structural schematic diagram of operating head in Fig. 1.
Fig. 3 is the structural schematic diagram that end terminal is grounded in Fig. 1.
In figure: conducting wire 1, conducting wire end terminal 2, pin rod 3, blind hole 4, ground operation bar 5, short-circuit line 6, grounding body 7, ground terminal Wire clamp 8, wing bolt 9 operate bolt 10, operating head 11, limiting slot 12, p-wire 13, insulating megger 14, operating stick 15.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.In the following description, structure and work side of the invention in order to clearly demonstrate Formula will be described on the basis of attached drawing by many Directional words, but should by "front", "rear", "left", "right", The Word Understandings such as "upper", "lower" are not construed as word of limitation for convenience of term.
Line insulation test grounding wire device shown in Fig. 1-3, for clamping the conducting wire end terminal of conducting wire when including operation, The ground operation bar being connect with conducting wire end terminal, ground connection end line when operation for clamping grounding body, being provided with operation bolt Folder and both ends are separately connected conducting wire end terminal and are grounded the short-circuit line of end terminal;It further includes being screwed in ground connection end line The operating head of operation bolt clamping on the wing bolt of p-wire on folder, for connecting insulating megger, with ground connection end terminal, with And the operating stick being connected with operating head;Pin rod, pin rod and operation are provided on the operation bolt, at one end for connecting with operating head Bolt constitutes cross;The operating head and operation tether the one end connect and the blind hole protruded into for shank end, and blind hole outer wall are arranged One group of upper setting is in J-shaped, the limiting slot for being caught in for pin rod.
For easy to disassemble and maintenance, operating stick is saved, the operating head is connect by helicitic texture with operating stick, it is clear that The modes such as clamping can be used to be attached.The operating head is tethered with ground connection end terminal operation by J-shaped blind hole structure and is connect.
For the ease of carrying, the operating stick is connected and composed by two sections of bodies of rod, and the modes such as threaded connection or clamping can be used It is attached.The number of segment of obvious operating stick can be increased according to its actual needs, and such as three sections.
The handling of operating stick, operating head and ground connection end terminal are very convenient quick, and when assembling only needs operating head and pin rod Back spin turns certain angle in place for docking, and dismounting, which then rotates backward operating head by operating stick, to be separated with pin rod, meet It is flexibly detached from and connection is grounded end terminal, meet the requirement of test ground terminal.Dish-shaped bolt model M8, for effectively fixed exhausted Edge megger p-wire avoids the insulating megger p-wire when assembly and disassembly are grounded end terminal from falling off." portable is short for short-circuit line satisfaction Road is grounded technical standard " on the basis of, reinforce transparent insulating layer, thickness adds to 1.2mm, and insulation resistance is greater than 100M Ω.
The present invention ought can routinely be grounded normal use completely, while not increase input substantially, configure the grounding wire mounting It postpones woth no need to repeat to configure conventional ground line.
A kind of line insulation test method, uses grounding wire device as described above, which includes in following Hold:
Route is switched to cold standby state by step (1), and pulling open can be by the electromagnetic potential transformer and mutual induction of voltage of operation isolation Device secondary side air switch;
The strain insulator drainage thread and electromagnetic potential transformer drainage thread that step (2) investigation megger test needs to release;
Step (3) is if woth no need to release drainage thread situation test insulation resistance process:
1. installing battery of tests grounding wire device in A phase conductor after route megger test point electrical verification;
2. connecting test line: p-wire test connecting pin being connected on ground connection end terminal butterfly bolt, ground short circuit line is used It is connected to the p-wire of line conductor, connects other p-wires;
Grounding body and hanging is detached from 3. end terminal will be grounded with operating stick and dismantled;
4. measurement circuit insulation resistance;
5. restoring the ground connection end terminal of tape test line with operating stick, p-wire is removed;
6. repeating 2. -5. test b, C phase conductor;
7. removing grounding wire device, site clearing.
Step (4) needs to unlock in route the process of sectionalization test line insulation resistance:
1. installing battery of tests grounding wire device respectively at drainage thread waypoint drainage thread both ends to be unlocked;
2. unlocking drainage thread;
3. repeat step (3) in 2. -6., respectively test segmentation after each section of line insulation resistance;
4. restoring the drainage thread unlocked;
5. removing grounding wire device, site clearing.
The process for unlocking route electromagnetic potential transformer drainage thread measurement circuit insulation resistance is as follows:
1. needing to unlock installing battery of tests grounding wire device, electromagnetism on the line conductor of electromagnetic potential transformer position One group of grounding wire device is installed on formula voltage transformer;
2. releasing electromagnetic potential transformer drainage thread;
3. in repeating said steps (3) 2. -6., measurement circuit insulation resistance;
4. restoring the voltage transformer drainage thread unlocked;
5. removing grounding wire device, site clearing.
Before line test insulation resistance, apply stopping all work on route to licensor, route goes to cold standby.Connect, It tears p-wire open and position electrical verification is independently selected simultaneously by operating personnel to dismantling, restore the line-to-ground required when related drainage thread operation Grounding wire device is installed to realize.Meeting " China Nanfang Grid Co., Ltd's electric power safety working regulation ", " operating personnel answers The operation in the protection scope of ground line.Forbid carrying out interruption maintenance in the case where no ground line or ground line installing are uneven complete Operation." require.Permanent fault circuit breaking or fall string after conducting wire hang on next voltage class route, measurement circuit does not turn Maintenance, so that hurting sb.'s feelings risk by hanging wire road working voltage on tested route band and motivation violating the regulations is controlled.
Line maintenance state is managed by work responsible person, is grounded the test for being connected to p-wire using test operating stick Line ground connection end terminal dismantles disengaging ground connection and test ground connection end terminal that is hanging, restoring tape test line, split-phase type connect Ground wire is dismantled ground connection end terminal and be detached from ground connection and mention body by inspection earthing line is changed into p-wire, restores ground connection end line clamping connection Ground is changed into inspection earthing line process by p-wire, avoids the operating process that route is repeated 6 times state transformation.Route repeats 6 The operation of next state transformation at least needs 3 hours per time, as long as testing then less than 10 minutes, by the entire test process of new technological process Less than 30 minutes.Route insulation resistance of every test, effective time can shorten working time contracting by least 3.5 hours It is as short as 0.5 hour.Reduce the operating quantity of 6 secondary line states transformation and wait the line status transformation waiting time, effectively avoids Habitual motivation and action violating the regulations, the habituation for having prevented route cold standby state operation are violating the regulations.
Present invention grounding wire device installs grounding wire device also just instead of connection one instead of a part of p-wire Divide p-wire, operating personnel would not lazy not attaching ground wire device.Prevent to connect not attaching ground wire device, remove p-wire It is violating the regulations with the habituation of removing, restore drainage thread, while controlling the main electricity of line insulation test and hurting sb.'s feelings risk.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of line insulation test grounding wire device, for clamping the conducting wire end terminal of conducting wire when including operation, with conducting wire The ground operation bar of end terminal connection, ground connection end terminal when operation for clamping grounding body, being provided with operation bolt, and Both ends are separately connected conducting wire end terminal and are grounded the short-circuit line of end terminal;It is characterized by also including be screwed in ground terminal The operating head of operation bolt clamping on the wing bolt of p-wire on wire clamp, for connecting insulating megger, with ground connection end terminal, And the operating stick being connected with operating head;Pin rod, pin rod and behaviour are provided on the operation bolt, at one end for connecting with operating head Make bolt and constitutes cross;The operating head and operation tether the one end connect and the blind hole protruded into for shank end are arranged, and outside blind hole One group is arranged on wall in J-shaped, the limiting slot for being caught in for pin rod.
2. line insulation test test grounding wire device according to claim 1, it is characterised in that: the operating head passes through J-shaped blind hole structure is tethered with ground connection end terminal operation and is connect.
3. line insulation test grounding wire device according to claim 1, it is characterised in that: the operating head passes through screw thread Structure is connect with operating stick.
4. line insulation test grounding wire device according to claim 1, it is characterised in that: the short-circuit line, which uses, to be had Thicken the short-circuit line of transparent insulating layer.
5. a kind of line insulation test method, it is characterised in that grounding wire device a method according to any one of claims 1-3 is used, it should Test method includes following content:
Route is switched to cold standby state by step (1), and pulling open can be by the electromagnetic potential transformer and mutual induction of voltage of operation isolation Device secondary side air switch;
The strain insulator drainage thread and electromagnetic potential transformer drainage thread that step (2) investigation megger test needs to release;
Step (3) is if woth no need to release drainage thread situation test insulation resistance process:
1. installing battery of tests grounding wire device in A phase conductor after route megger test point electrical verification;
2. connecting test line: p-wire test connecting pin being connected on ground connection end terminal butterfly bolt, ground short circuit line is used It is connected to the p-wire of line conductor, connects other p-wires;
Grounding body and hanging is detached from 3. end terminal will be grounded with operating stick and dismantled;
4. measurement circuit insulation resistance;
5. restoring the ground connection end terminal of tape test line with operating stick, p-wire is removed;
6. repeating 2. -5. test b, C phase conductor;
7. removing grounding wire device, site clearing.
Step (4) needs to unlock in route the process of sectionalization test line insulation resistance:
1. installing battery of tests grounding wire device respectively at drainage thread waypoint drainage thread both ends to be unlocked;
2. unlocking drainage thread;
3. repeat step (3) in 2. -6., respectively test segmentation after each section of line insulation resistance;
4. restoring the drainage thread unlocked;
5. removing grounding wire device, site clearing.
6. line insulation test method according to claim 5, it is characterised in that:
The process for unlocking route electromagnetic potential transformer drainage thread measurement circuit insulation resistance is as follows:
1. needing to unlock installing battery of tests grounding wire device, electromagnetism on the line conductor of electromagnetic potential transformer position One group of grounding wire device is installed on formula voltage transformer;
2. releasing electromagnetic potential transformer drainage thread;
3. in repeating said steps (3) 2. -6., measurement circuit insulation resistance;
4. restoring the voltage transformer drainage thread unlocked;
5. removing grounding wire device, site clearing.
CN201910482667.2A 2019-06-04 2019-06-04 A kind of line insulation test grounding wire device and its line insulation test method Pending CN110108944A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910482667.2A CN110108944A (en) 2019-06-04 2019-06-04 A kind of line insulation test grounding wire device and its line insulation test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910482667.2A CN110108944A (en) 2019-06-04 2019-06-04 A kind of line insulation test grounding wire device and its line insulation test method

Publications (1)

Publication Number Publication Date
CN110108944A true CN110108944A (en) 2019-08-09

Family

ID=67493876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910482667.2A Pending CN110108944A (en) 2019-06-04 2019-06-04 A kind of line insulation test grounding wire device and its line insulation test method

Country Status (1)

Country Link
CN (1) CN110108944A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111130008A (en) * 2019-12-19 2020-05-08 国网浙江龙游县供电有限公司 Adjustable drainage spreader
WO2021183065A1 (en) * 2020-03-11 2021-09-16 Esa Kompozit Ve Teknolojik Cozumler Muhendislik Sanayi Ticaret As A vice coupled with a clamp for earthing
CN114122760A (en) * 2021-11-12 2022-03-01 国家电网有限公司 Temporary grounding wire power connection clamp device and use method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2726143Y (en) * 2004-08-05 2005-09-14 陈加龄 Special high-voltage grounding rod
CN203446531U (en) * 2013-07-24 2014-02-26 刘秋明 Electronic cigarette
CN104267236A (en) * 2014-09-18 2015-01-07 江苏省电力公司 Wearable real-time monitoring device for human body induced electricity under high-voltage transmission line
CN204536669U (en) * 2015-03-20 2015-08-05 厦门华虹光学科技有限公司 Eyeglass leg changes mechanism
CN205790467U (en) * 2016-06-29 2016-12-07 国网安徽省电力公司检修公司 A kind of Portable short-circuit grounding wire device with low cost
CN106645970A (en) * 2017-03-02 2017-05-10 吕军杰 Power line insulation resistance test method and tester insulation support
CN207459201U (en) * 2017-09-27 2018-06-05 广东电网有限责任公司东莞供电局 Novel multi-functional low pressure user wiring fastener
CN207624939U (en) * 2017-10-27 2018-07-17 贵州电网有限责任公司贵阳供电局 Temporary grounding link of 35kV or less the portables with warning function
RU181891U1 (en) * 2018-04-03 2018-07-26 Общество С Ограниченной Ответственностью "Мзва" Ооо "Мзва" ISOLATED ADAPTER
CN108598725A (en) * 2018-04-17 2018-09-28 国网河南省电力公司禹州市供电公司 The multifunctional grounded hanging device of power construction
CN208013300U (en) * 2018-03-30 2018-10-26 广东电网有限责任公司 A kind of 10kV distribution wires insulation resistance measuring device
CN208570983U (en) * 2018-08-10 2019-03-01 谭斐 A kind of locking spiral conducting wire end terminal of the big grip force of pocket short-circuit grounding wire
CN210222122U (en) * 2019-06-04 2020-03-31 云南电网有限责任公司德宏供电局 Ground wire device for circuit insulation test

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2726143Y (en) * 2004-08-05 2005-09-14 陈加龄 Special high-voltage grounding rod
CN203446531U (en) * 2013-07-24 2014-02-26 刘秋明 Electronic cigarette
CN104267236A (en) * 2014-09-18 2015-01-07 江苏省电力公司 Wearable real-time monitoring device for human body induced electricity under high-voltage transmission line
CN204536669U (en) * 2015-03-20 2015-08-05 厦门华虹光学科技有限公司 Eyeglass leg changes mechanism
CN205790467U (en) * 2016-06-29 2016-12-07 国网安徽省电力公司检修公司 A kind of Portable short-circuit grounding wire device with low cost
CN106645970A (en) * 2017-03-02 2017-05-10 吕军杰 Power line insulation resistance test method and tester insulation support
CN207459201U (en) * 2017-09-27 2018-06-05 广东电网有限责任公司东莞供电局 Novel multi-functional low pressure user wiring fastener
CN207624939U (en) * 2017-10-27 2018-07-17 贵州电网有限责任公司贵阳供电局 Temporary grounding link of 35kV or less the portables with warning function
CN208013300U (en) * 2018-03-30 2018-10-26 广东电网有限责任公司 A kind of 10kV distribution wires insulation resistance measuring device
RU181891U1 (en) * 2018-04-03 2018-07-26 Общество С Ограниченной Ответственностью "Мзва" Ооо "Мзва" ISOLATED ADAPTER
CN108598725A (en) * 2018-04-17 2018-09-28 国网河南省电力公司禹州市供电公司 The multifunctional grounded hanging device of power construction
CN208570983U (en) * 2018-08-10 2019-03-01 谭斐 A kind of locking spiral conducting wire end terminal of the big grip force of pocket short-circuit grounding wire
CN210222122U (en) * 2019-06-04 2020-03-31 云南电网有限责任公司德宏供电局 Ground wire device for circuit insulation test

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111130008A (en) * 2019-12-19 2020-05-08 国网浙江龙游县供电有限公司 Adjustable drainage spreader
WO2021183065A1 (en) * 2020-03-11 2021-09-16 Esa Kompozit Ve Teknolojik Cozumler Muhendislik Sanayi Ticaret As A vice coupled with a clamp for earthing
CN114122760A (en) * 2021-11-12 2022-03-01 国家电网有限公司 Temporary grounding wire power connection clamp device and use method

Similar Documents

Publication Publication Date Title
CN110108944A (en) A kind of line insulation test grounding wire device and its line insulation test method
CN107251185A (en) Devices, systems, and methods for protecting against electric fault comprehensively
CN109444638A (en) A kind of smart grounding conduction detecting system and method
CN108459196A (en) A kind of electrical verification easy device
CN210222122U (en) Ground wire device for circuit insulation test
CN206481214U (en) Switching Power Supply soft-start circuit
CN201360110Y (en) Intelligent fireproof electricity-leakage monitor
CN111585059A (en) Grounding wire assembly with real-time electricity testing function
CN201237622Y (en) On-line monitoring device for three-phase arrester in cabinet
CN106787667A (en) Switching Power Supply soft-start circuit and control method
CN211929727U (en) 10kV outdoor grounding wire with electricity testing function
CN104362485A (en) Special lead for test on lightning arrester of power transmission cable tower
CN205726607U (en) A kind of Novel flash device of electric-power filter monitoring system
CN104183379A (en) Connecting device for maintenance of secondary side of electric power current transformer
CN203166397U (en) Circuit structure for eliminating induction voltage
Cisco Regulatory Compliance and Safety Information for the Cisco IP/VC 3540 Product Family
Cisco Regulatory Compliance and Safety Information for Cisco IP/VC 3540 Product Family
CN201289967Y (en) Distribution box for base station
CN201378178Y (en) Measuring tank for centralized multi-meter-position single-phase kilowatt-hour meter
CN2909778Y (en) Expansion personal safety wire
CN202693725U (en) Detection circuit and detection system for electric transmission and transformation equipment
CN206725721U (en) Alarm relay protection device
CN205680881U (en) Bobbin cable universal connector the end of a thread
CN213425716U (en) Grounding device for connecting insulated bus
CN205985890U (en) Insulating baffle of electric power

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination