CN110104522A - A kind of folding day beam traction-type construction lifting machine and its construction method - Google Patents

A kind of folding day beam traction-type construction lifting machine and its construction method Download PDF

Info

Publication number
CN110104522A
CN110104522A CN201910429456.2A CN201910429456A CN110104522A CN 110104522 A CN110104522 A CN 110104522A CN 201910429456 A CN201910429456 A CN 201910429456A CN 110104522 A CN110104522 A CN 110104522A
Authority
CN
China
Prior art keywords
girder
sheave
folded beam
pieces
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910429456.2A
Other languages
Chinese (zh)
Other versions
CN110104522B (en
Inventor
谢利明
崔文才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Haiheng Machinery Equipment Co Ltd
Original Assignee
Henan Haiheng Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Haiheng Machinery Equipment Co Ltd filed Critical Henan Haiheng Machinery Equipment Co Ltd
Priority to CN201910429456.2A priority Critical patent/CN110104522B/en
Publication of CN110104522A publication Critical patent/CN110104522A/en
Application granted granted Critical
Publication of CN110104522B publication Critical patent/CN110104522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • B66B11/043Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

A kind of folding day beam traction-type construction lifting machine, including traction machine, traction rope, girder and folded beam, girder is horizontally disposed in left-right direction, girder and folded beam are all made of two channel steels that opening front and back is disposed opposite to each other, there is installation space between two channel steels, the top and bottom of two channel steels are welded as a whole by horizontal connecting plate, and girder right end forms one whole horizontally disposed day beam after connecting with folded beam by hinge component.The invention also discloses a kind of construction methods for folding day beam traction-type construction lifting machine, the present invention is novel in design, easy to use, quick, easily operated, it is faster, more convenient, more energy efficient, more environmentally friendly than conventional installation method, also the usage mode of traction machine has been expanded, it is the good method being worthy to be popularized with very strong practicability.

Description

A kind of folding day beam traction-type construction lifting machine and its construction method
Technical field
The invention belongs to construction machine equipment technical fields, and in particular to a kind of lifting of folding day beam traction-type construction Machine and its construction method.
Background technique
Linear type unjointed beam (day beam) is usually taken with building hoist in elevator in high-building construction, and linear type is whole Body beam brings many inconvenience to installation and increasing for later period in use, since beam body is too long, linear type unjointed beam Beam body is tilted in hanging insertion hole to be provided when installing, increasing operation, this inclination, which is hung, to be not only inconvenient to operate but also uneasy Entirely, also support pad one high 1500mm split heads, the split heads of support pad to fail closely to connect with day beam again below day beam, lead to shakiness Fixed, the split heads weight 80kg of 1500mm high will lean on manpower repeatedly pickaback, the too slow not only wasting manpower and material resources of speed, the duration also without Method guarantee.
Summary of the invention
The present invention provides that a kind of security reliability is strong, the time is short, cost to solve shortcoming in the prior art Low, high-efficient folding day beam traction-type construction lifting machine and its construction method.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of folding day beam traction-type construction is gone up and down Machine, including traction machine, traction rope, girder and folded beam, girder are horizontally disposed in left-right direction, and girder and folded beam are all made of out Mouthful two channel steels being disposed opposite to each other of front and back have installation space between two channel steels, and the top and bottom of two channel steels pass through Horizontal connecting plate is welded as a whole, and girder right end forms one whole horizontally disposed day after connecting with folded beam by hinge component Beam;
It is rotated on girder and is provided with the first sheave and the second sheave, the lower part of the first sheave and the second sheave is respectively positioned on In installation space, the second sheave is located at the right side of the first sheave, is respectively set at the top and bottom of girder there are two front and back Opposite upper beam support and two opposite lower beam supports in front and back are rotated between two upper beam supports and are provided with positioned at the first conductor rope Upper left third sheave is taken turns, rotates and is provided with positioned at the first sheave lower right and the second conductor rope between two lower beam supports Take turns the 4th sheave of lower left;The both ends of traction rope are separately connected lift car and counterweight, and traction machine is located on the left of girder just Lower section, traction rope are successively bypassed the upper right quarter of the second sheave, the upper left quarter of third sheave, traction by lift car to counterweight Machine, the upper half of the first sheave and right lower quadrant, the 4th sheave upper left quarter.
The notch interior welds of the channel steel of girder and folded beam have several pieces of vertically disposed supporting plates, the right end weldering of girder It is connected to and is vertically installed with the first support end plate, the left end of folded beam, which is welded with, is vertically installed with the second support end plate, the first support End plate right side and the second support end plate left side contact.
Hinge component includes the upper mounted plate for being equipped with two pieces, bottom plate, upper mobile board and lower movable plate;Two pieces upper solid Fixed board lower side is fixedly connected on girder top right side, and two pieces of upper mounted plates front and backs are preceding to setting;Two pieces of bottom plate upper side edges It is fixedly connected on girder bottom right, two pieces of bottom plates front and backs are preceding to setting, and two pieces of upper mobile board lower sides are fixedly connected on Folded beam top left side, two pieces of upper mobile boards front and backs are preceding to setting;Two pieces of lower movable plate upper side edges are fixedly connected on folded beam bottom It is preceding to setting before and after two pieces of lower movable plates on the left of portion;
Two pieces of upper mobile board left ends are extend between two pieces of upper mounted plate right ends, and two pieces of upper mobile boards and two pieces of upper mounted plates pass through The upper pin grafting of anterior-posterior horizontal setting, two pieces of lower movable plate left ends are extend between two pieces of bottom plate right ends, living under two pieces The lower bearing pin grafting that movable plate and two pieces of bottom plates are arranged by anterior-posterior horizontal.
The central axis both ends of first sheave and the second sheave pass through the first U-bolt and are fixed at the top of girder, the The central axis both ends of three sheaves are fixed on the right upper portion of upper beam support, the center of the 4th sheave by the second U-bolt Axis both ends are fixed on lower beam support left lower by third U-bolt.
Girder right hand top and upper beam holder top balance lifting lug there are two being respectively provided with.
First sheave, the second sheave, third sheave and the 4th sheave excircle at be provided with structure phase Same gear rope device;Gear rope device includes that correspondence is provided with two struts, is fixed with water along the longitudinal direction between two struts The fixed link of flat setting, fixed link outer cover are equipped with rotatable casing.
A kind of construction method folding day beam traction-type construction lifting machine, includes the following steps,
(1), it is suitble to the girder and folded beam of lift shaft dimensions according to elevator sectional dimension processing and fabricating, girder is equal with folded beam Using 20# channel steel, weld horizontal connecting plate and supporting plate on girder and folded beam weld upper beam branch in the design position of girder Seat, lower beam support, the first support end plate, upper mounted plate and bottom plate weld the second support end in the design position of folded beam Plate, upper mobile board and lower movable plate;
(2), the design position using U-bolt in girder, upper beam support and lower beam support installs the first sheave, the second conductor rope Wheel, third sheave and the 4th sheave in the strut of the suitable position of girder and upper beam support welding gear rope device, and are installed solid Fixed pole and casing;
(3), lower bearing pin is corresponded into two pieces of lower movable plates of grafting and two pieces of bottom plates, folded beam left end and girder right end is connected It connects, folded beam is freely sagging under self gravitation effect;
(4), the floor that elevator bottom is readily transported and installs is arranged in traction machine;
(5), girder and folded beam are lifted in elevator and is positioned at the reserved opening and door opening that rise to proper height;
(6), by traction rope around successively around the upper right quarter of the second sheave, the upper left quarter of third sheave, traction machine, first The upper half of sheave and right lower quadrant, the 4th sheave upper left quarter after respectively with lift car and with reconnection;
(7), start traction machine, carry out every adjusting, it is ensured that lift car moves up and down safe and reliable;
(8) after the completion of adjusting, traction machine drives lift car as construction elevator as power-lifter and uses;
(9) it with the increase of floor construction height, needs to promote building hoist at upper one layer of reserved opening and door opening Positioning.
The detailed process of step (4) is, with two with long lifting wirerope, to hang two balance cranes in left side respectively On ear and two balance lifting lugs on right side, mounted girder and folded beam are lifted by elevator by tower crane or electric block Door opening at, stop tower crane or electric block after folded beam is corresponding with door opening on elevator right side wall or so, lead at this time Deck-molding is in the reserved opening on elevator left side wall;Then folded beam being rotated to upper right, folded beam is extend into door opening, until After second support end plate of folded beam left end supports end plate is corresponding to contact with the first of girder right end, upper pin is plugged into two pieces Between upper mobile board and two pieces of upper mounted plates;
Restart tower crane or electric block, fall girder and folded beam, when the reserved opening on girder and elevator left side wall is high Stop tower crane or electric block when spending consistent, girder and folded beam is moved horizontally to the left, girder left end extend into reserved opening Interior stopping restarts tower crane or electric block, further falls girder and folded beam, makes girder left end bottom and folded beam right end Bottom, which is respectively supported on the bottom plate of reserved opening and door opening, stops tower crane or electric block, removes two lifting wirerope, together When using expansion bolt by folded beam right end be fixed to door opening bottom plate on.
A kind of construction method folding day beam traction-type construction lifting machine, the detailed process of step (9) is,
The porthole excessively left when pouring first with elevator borehole wall will be temporarily fixed to the borehole wall with reuse steel label and metal binding wire rope On, lift car is transferred to shaft bottom, loosens preparatory disk in the hoisting wirerope of elevator car roof, dismantles expansion bolt, it will Two lifting wirerope used in step (4) hang two balance lifting lugs in two the balances lifting lugs and right side in left side respectively On, girder and folded beam are lifted up by tower crane or electric block, when two hoisting wireropes are just tightened, make girder to The right side moves horizontally, and girder left end is detached from reserved opening, is further continued for promoting girder and folded beam, folds until the height of promotion is greater than Stop tower crane or electric block after the length of beam, then remove upper pin, folded beam is downward in door opening by shaft of lower bearing pin Fold, folded beam is vertically arranged at this time, girder and folded beam in elevator, then start tower crane or electric block continue to Upper promotion girder and folded beam,
Stop tower crane or electronic calabash after folded beam is corresponding with door opening on one or more layers upper elevator right side wall or so Reed, girder is higher than one or more layers reserved opening on elevator left side wall at this time;Then folded beam is rotated to upper right, is folded Beam is extend into door opening, supports that end plate is corresponding to be contacted until the first of the second support end plate and girder right end of folded beam left end Afterwards, upper pin is plugged between two pieces of upper mobile boards and two pieces of upper mounted plates;
Restart tower crane or electric block, fall girder and folded beam, when the reserved opening on girder and elevator left side wall is high Stop tower crane or electric block when spending consistent, girder and folded beam is moved horizontally to the left, girder left end extend into reserved opening Interior stopping restarts tower crane or electric block, further falls girder and folded beam, makes girder left end bottom and folded beam right end Bottom, which is respectively supported on the bottom plate of reserved opening and door opening, stops tower crane or electric block, removes two lifting wirerope, together When using expansion bolt by folded beam right end be fixed to door opening bottom plate on;
Then it is tensioned traction rope, disassembly is previously used for the steel label and metal binding wire rope of temporary fixed weight, after items regulate, Promotion operation is increased in completion.
By adopting the above technical scheme, the present invention is novel in design, easy to use, quick, easily operated, and this method is through reality Test application, it is faster, more convenient, more energy efficient, more environmentally friendly than conventional installation method.It is that the present invention is whole without linear type fastly Inclination hanging when body beam operation, without weight 80kg, the manpower of high 1500mm split heads pickaback, saves 5 repeatedlyφ The sheave of 400mm diameter eliminates extra wirerope and passes around while reducing labor intensity;Conveniently it is that the method can be with Segmentation folds, and balance lifting eliminates passing around for wirerope;Energy conservation is that the method can save 2/3 wirerope dosage, one It is always that walk 6 ropes be exactly 1800m to 100m*3 with rope amount, the method can save 1200m rope using the building hoist of height 100m Amount,φWire Rope theory weight 34.6kg*1200m=415kg of 10mm, saves 5φThe sheave of 400mm diameter, each Sheave presses 25kg*5=125kg, and such building hoist integrally mitigates weight 540kg, and alleviating weight also just reduces work Function reduces work done, and saving on the energy reduces discharge, has reached energy-saving and environment-friendly purpose.In short, the present invention provides one Kind is simple, quick, at low cost, energy-saving and environmental protection efficient " a kind of folding day beam traction-type construction lifting machine " are also expanded simultaneously The usage mode of traction machine has very strong practicability, is the good method being worthy to be popularized.
Detailed description of the invention
Fig. 1 is the structural schematic diagram after decomposition of the invention;
Fig. 2 is that folded beam of the invention promotes schematic diagram in a folded configuration;
Fig. 3 is the schematic diagram of girder and folded beam of the invention under straight line connection status;
Fig. 4 is that day beam is lifted into elevator infolding stoplog in the scheme of installation of folded state;
Fig. 5 is the scheme of installation that day beam installation is fixed to working condition at reserved opening and door opening.
Fig. 6 is the side view of Fig. 5.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of folding day beam traction-type construction lifting machine of the invention, including traction machine 1, Traction rope 2, girder 3 and folded beam 4, girder 3 are horizontally disposed in left-right direction, and girder 3 and folded beam 4 are all made of opening front and back phase Two channel steels of setting are carried on the back, there is installation space between two channel steels, the top and bottom of two channel steels pass through horizontal connection Plate 5 is welded as a whole, and 3 right end of girder forms one whole horizontally disposed day beam after connecting with folded beam 4 by hinge component 6;
Rotation is provided with the first sheave 7 and the second sheave 8, the lower part of the first sheave 7 and the second sheave 8 on girder 3 It is respectively positioned in installation space, the second sheave 8 is located at the right side of the first sheave 7, and the top and bottom of girder 3 are respectively arranged with The opposite lower beam support 10 of two opposite upper beam supports 9 in front and back and two front and backs is rotated between two upper beam supports 9 and is provided with Positioned at the upper left third sheave 11 of the first sheave 7, rotates and be provided with positioned at the first conductor rope between two lower beam supports 10 Take turns the 4th sheave 12 of 8 lower left of 7 lower rights and the second sheave;The both ends of traction rope 2 are separately connected 25 He of lift car Counterweight 14, traction machine 1 are located at immediately below 3 left side of girder, and traction rope 2 successively bypasses the second conductor rope by lift car 25 to counterweight 14 The upper right quarter of wheel 8, the upper left quarter of third sheave 11, traction machine 1, the upper half of the first sheave 7 and right lower quadrant, the 4th conductor rope The upper left quarter of wheel 12.
The notch interior welds of the channel steel of girder 3 and folded beam 4 have several pieces of vertically disposed supporting plates 13, and supporting plate 13 rises To the effect of enhancing matter girder 3 and folded beam semi-finals degree, the right end of girder 3, which is welded with, is vertically installed with the first support end plate 15, folding The left end of stoplog 4, which is welded with, is vertically installed with the second support end plate 16, the first support 15 right side of end plate and the second support end plate 16 left side face contacts.In normal operation, the first support end plate 15 and the second support 16 press fit of end plate improve 3 He of girder The stability of 4 straight line of folded beam connection.
Hinge component 6 includes upper mounted plate 17, bottom plate 18, upper mobile board 19 and the lower movable plate for being equipped with two pieces 20;Two pieces of 17 lower sides of upper mounted plate are fixedly connected on 3 top right side of girder, and two pieces of 17 front and backs of upper mounted plate are preceding to setting;Two 18 upper side edge of block bottom plate is fixedly connected on 3 bottom right of girder, and two pieces of 18 front and backs of bottom plate are preceding to setting, two pieces of upper work 19 lower side of movable plate is fixedly connected on 4 top left side of folded beam, and two pieces of 19 front and backs of upper mobile board are preceding to setting;Two pieces of lower movable plates 20 upper side edges are fixedly connected on 4 bottom left of folded beam, and two pieces of lower 20 front and backs of movable plate are preceding to setting;
Two pieces of 19 left ends of upper mobile board are extend between two pieces of 17 right ends of upper mounted plate, two pieces of upper mobile boards 19 and two pieces of upper fixations The upper pin grafting that plate 17 is arranged by anterior-posterior horizontal, two pieces of lower 20 left ends of movable plate extend into two pieces of 18 right ends of bottom plate it Between, lower bearing pin grafting that two pieces of lower movable plates 20 and two pieces of bottom plates 18 are arranged by anterior-posterior horizontal.
The central axis both ends of first sheave 7 and the second sheave 8 pass through the first U-bolt and are fixed on 3 top of girder, The central axis both ends of third sheave 11 are fixed on the right upper portion of upper beam support 9, the 4th sheave 12 by the second U-bolt Central axis both ends lower 10 left lower of beam support is fixed on by third U-bolt.
Lifting lug 21 is balanced there are two being respectively provided at the top of 3 right hand top of girder and upper beam support 9.
First sheave 7, the second sheave 8, third sheave 11 and the 4th sheave 12 excircle at be provided with The identical gear rope device 22 of structure;Gear rope device 22 includes that correspondence is provided with two struts, is fixed with edge between two struts The horizontally disposed fixed link of front-rear direction, fixed link outer cover are equipped with rotatable casing.Casing is contacted with traction rope 2, can be made Casing rotates in fixed link.
As shown in Figure 4, Figure 5 and Figure 6, a kind of construction method folding day beam traction-type construction lifting machine, including following step Suddenly,
(1), it is suitble to the girder 3 and folded beam 4 of lift shaft dimensions, girder 3 and folding according to elevator sectional dimension processing and fabricating Beam 4 is all made of 20# channel steel, weld horizontal connecting plate 5 and supporting plate 13 on girder 3 and folded beam 4, in the design position of girder 3 Beam support 9, lower beam support 10, first support end plate 15, upper mounted plate 17 and bottom plate 18 in welding, in setting for folded beam 4 Count the second support of position welding end plate 16, upper mobile board 19 and lower movable plate 20;
(2), the design position using U-bolt in girder 3, upper beam support 9 and lower beam support 10 installs the first sheave 7, the Two sheaves 8, third sheave 11 and the 4th sheave 12 weld gear rope device 22 in the suitable position of girder 3 and upper beam support 9 Strut, and fixed link and casing are installed;
(3), lower bearing pin is corresponded into two pieces of grafting lower movable plates 20 and two pieces of bottom plates 18,4 left end of folded beam and girder 3 is right End connection, folded beam 4 are freely sagging under self gravitation effect;
(4), the floor that elevator bottom is readily transported and installs is arranged in traction machine 1;
(5), girder 3 and folded beam 4 are lifted in elevator and is determined at the reserved opening 23 and door opening 24 that rise to proper height Position;
(6), by traction rope 2 around successively around the upper right quarter of the second sheave 8, upper left quarter, the traction machine of third sheave 11 1, after the upper left quarter of the upper half of the first sheave 7 and right lower quadrant, the 4th sheave 12 respectively with lift car 25 and counterweight 14 Connection;
(7), start traction machine 1, carry out every adjusting, it is ensured that lift car 25 moves up and down safe and reliable;
(8) after the completion of adjusting, traction machine 1 drives lift car 25 to use as construction elevator as power-lifter;
(9) it with the increase of floor construction height, needs to promote building hoist to upper one layer of reserved opening 23 and door opening It is positioned at 24.
The detailed process of step (4) are as follows: with two with long lifting wirerope 26, hang two balances in left side respectively On lifting lug 21 and two balance lifting lugs 21 on right side, mounted girder 3 and folded beam 4 are hung by tower crane or electric block 27 Be attached at the door opening 24 of elevator, after folded beam 4 is corresponding with the door opening 24 or so on elevator right side wall stop tower crane or Electric block 27, girder 3 is higher than the reserved opening 23 on elevator left side wall at this time;Then folded beam 4 is rotated to upper right, folding Stoplog 4 is extend into door opening 24, until the second support end plate 16 of 4 left end of folded beam and the first support end plate of 3 right end of girder After 15 corresponding contacts, upper pin is plugged between two pieces of upper mobile boards 19 and two pieces of upper mounted plates 17;
Restart tower crane or electric block 27, falls girder 3 and folded beam 4, the hole to be provided on girder 3 and elevator left side wall 23 height of mouth stops tower crane or electric block 27 when consistent, girder 3 and folded beam 4 is moved horizontally to the left, 3 left end of girder is protruded into Stop in reserved opening 23, restart tower crane or electric block 27, further fall girder 3 and folded beam 4, keeps girder 3 left End bottom and 4 right end bottom of folded beam, which are respectively supported on the bottom plate of reserved opening 23 and door opening 24, stops tower crane or electric block 27, two lifting wirerope 26 are removed, while 4 right end of folded beam being fixed on the bottom plate of door opening 24 using expansion bolt.
The detailed process of step (9) are as follows: what is left when pouring first with elevator borehole wall crosses porthole for the steel label of counterweight 14 It is temporarily fixed on the borehole wall with metal binding wire rope, by the decentralization of lift car 25 to shaft bottom, loosens preparatory disk and pushed up in lift car 25 The hoisting wirerope in portion dismantles expansion bolt, two lifting wirerope 26 used in step (4) is hung respectively in left side On two balance lifting lugs 21 and two balance lifting lugs 21 on right side, by tower crane or electric block 27 by girder 3 and folded beam 4 to Upper promotion moves horizontally girder 3 to the right when two hoisting wireropes are just tightened, and 3 left end of girder is detached from reserved opening 23, It is further continued for promoting girder 3 and folded beam 4, stops tower crane or electric block after the height of promotion is greater than the length of folded beam 4 27, upper pin is then removed, folded beam 4 is folded down in door opening 24 using lower bearing pin as shaft, and folded beam 4 is vertically set at this time It sets, girder 3 and folded beam 4 then start tower crane or electric block 27 continue up and promotes girder 3 and fold in elevator Beam 4,
Stop tower crane or electronic after folded beam 4 is corresponding with the door opening 24 or so on one or more layers upper elevator right side wall Cucurbit 27, girder 3 is higher than one or more layers reserved opening 23 on elevator left side wall at this time;Then by folded beam 4 to upper right Rotation, folded beam 4 are extend into door opening 24, until the second of 4 left end of folded beam first for supporting end plate 16 and 3 right end of girder After supportting the corresponding contact of end plate 15, upper pin is plugged between two pieces of upper mobile boards 19 and two pieces of upper mounted plates 17;
Restart tower crane or electric block 27, falls girder 3 and folded beam 4, the hole to be provided on girder 3 and elevator left side wall 23 height of mouth stops tower crane or electric block 27 when consistent, girder 3 and folded beam 4 is moved horizontally to the left, 3 left end of girder is protruded into Stop in reserved opening 23, restart tower crane or electric block 27, further fall girder 3 and folded beam 4, keeps girder 3 left End bottom and 4 right end bottom of folded beam, which are respectively supported on the bottom plate of reserved opening 23 and door opening 24, stops tower crane or electric block 27, two lifting wirerope 26 are removed, while 4 right end of folded beam being fixed on the bottom plate of door opening 24 using expansion bolt;
Then it is tensioned traction rope 2, the steel label for being previously used for temporary fixed weight 14 is dismantled and metal binding wire rope, items regulates Afterwards, it completes to increase promotion operation.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (9)

1. a kind of folding day beam traction-type construction lifting machine, it is characterised in that: including traction machine, traction rope, girder and folded beam, Girder is horizontally disposed in left-right direction, and girder and folded beam are all made of two channel steels that opening front and back is disposed opposite to each other, two channel steels Between there is installation space, the top and bottom of two channel steels are welded as a whole by horizontal connecting plate, girder right end and folding Stoplog forms one whole horizontally disposed day beam after connecting by hinge component;
It is rotated on girder and is provided with the first sheave and the second sheave, the lower part of the first sheave and the second sheave is respectively positioned on In installation space, the second sheave is located at the right side of the first sheave, is respectively set at the top and bottom of girder there are two front and back Opposite upper beam support and two opposite lower beam supports in front and back are rotated between two upper beam supports and are provided with positioned at the first conductor rope Upper left third sheave is taken turns, rotates and is provided with positioned at the first sheave lower right and the second conductor rope between two lower beam supports Take turns the 4th sheave of lower left;The both ends of traction rope are separately connected lift car and counterweight, and traction machine is located on the left of girder just Lower section, traction rope are successively bypassed the upper right quarter of the second sheave, the upper left quarter of third sheave, traction by lift car to counterweight Machine, the upper half of the first sheave and right lower quadrant, the 4th sheave upper left quarter.
2. a kind of folding day beam traction-type construction lifting machine according to claim 1, it is characterised in that: girder and folded beam The notch interior welds of channel steel have several pieces of vertically disposed supporting plates, the right end of girder, which is welded with, is vertically installed with first End plate is supportted, the left end of folded beam, which is welded with, is vertically installed with the second support end plate, the first support end plate right side and the second support Face contact on the left of end plate.
3. a kind of folding day beam traction-type construction lifting machine according to claim 2, it is characterised in that: hinge component includes It is equipped with two pieces of upper mounted plate, bottom plate, upper mobile board and lower movable plate;Two pieces of upper mounted plate lower sides are fixedly connected on Girder top right side, two pieces of upper mounted plates front and backs are preceding to setting;Two pieces of bottom plate upper side edges are fixedly connected on girder bottom, right Side, before and after two pieces of bottom plates before to setting, two pieces of upper mobile board lower sides are fixedly connected on folded beam top left side, on two pieces To setting before before and after movable plate;Two pieces of lower movable plate upper side edges are fixedly connected on folded beam bottom left, before two pieces of lower movable plates To setting before afterwards;
Two pieces of upper mobile board left ends are extend between two pieces of upper mounted plate right ends, and two pieces of upper mobile boards and two pieces of upper mounted plates pass through The upper pin grafting of anterior-posterior horizontal setting, two pieces of lower movable plate left ends are extend between two pieces of bottom plate right ends, living under two pieces The lower bearing pin grafting that movable plate and two pieces of bottom plates are arranged by anterior-posterior horizontal.
4. a kind of folding day beam traction-type construction lifting machine according to claim 3, it is characterised in that: the first sheave and The central axis both ends of second sheave pass through the first U-bolt and are fixed at the top of girder, the central axis both ends of third sheave The right upper portion of upper beam support is fixed on by the second U-bolt, the central axis both ends of the 4th sheave pass through third U-bolt It is fixed on lower beam support left lower.
5. a kind of folding day beam traction-type construction lifting machine according to claim 4, it is characterised in that: girder right hand top With upper beam holder top be respectively provided with there are two balance lifting lug.
6. a kind of folding day beam traction-type construction lifting machine according to claim 5, it is characterised in that: the first sheave, The identical gear rope device of structure is provided at the excircle of second sheave, third sheave and the 4th sheave;Gear rope device packet It includes correspondence and is provided with two struts, horizontally disposed fixed link along the longitudinal direction is fixed between two struts, it is fixed Bar outer cover is equipped with rotatable casing.
7. using a kind of construction method for folding day beam traction-type construction lifting machine as claimed in claim 6, it is characterised in that: Include the following steps,
(1), it is suitble to the girder and folded beam of lift shaft dimensions according to elevator sectional dimension processing and fabricating, girder is equal with folded beam Using 20# channel steel, weld horizontal connecting plate and supporting plate on girder and folded beam weld upper beam branch in the design position of girder Seat, lower beam support, the first support end plate, upper mounted plate and bottom plate weld the second support end in the design position of folded beam Plate, upper mobile board and lower movable plate;
(2), the design position using U-bolt in girder, upper beam support and lower beam support installs the first sheave, the second conductor rope Wheel, third sheave and the 4th sheave in the strut of the suitable position of girder and upper beam support welding gear rope device, and are installed solid Fixed pole and casing;
(3), lower bearing pin is corresponded into two pieces of lower movable plates of grafting and two pieces of bottom plates, folded beam left end and girder right end is connected It connects, folded beam is freely sagging under self gravitation effect;
(4), the floor that elevator bottom is readily transported and installs is arranged in traction machine;
(5), girder and folded beam are lifted in elevator and is positioned at the reserved opening and door opening that rise to proper height;
(6), by traction rope around successively around the upper right quarter of the second sheave, the upper left quarter of third sheave, traction machine, first The upper half of sheave and right lower quadrant, the 4th sheave upper left quarter after respectively with lift car and with reconnection;
(7), start traction machine, carry out every adjusting, it is ensured that lift car moves up and down safe and reliable;
(8) after the completion of adjusting, traction machine drives lift car as construction elevator as power-lifter and uses;
(9) it with the increase of floor construction height, needs to promote building hoist at upper one layer of reserved opening and door opening Positioning.
8. a kind of construction method for folding day beam traction-type construction lifting machine according to claim 7, it is characterised in that: step Suddenly the detailed process of (4) is, with two with long lifting wirerope, hangs two in left side respectively and balances lifting lugs and right side On two balance lifting lugs, mounted girder and folded beam are lifted at the door opening of elevator by tower crane or electric block, Stop tower crane or electric block after folded beam is corresponding with door opening on elevator right side wall or so, girder is higher than elevator at this time Reserved opening on well left side wall;Then folded beam is rotated to upper right, folded beam is extend into door opening, until folded beam left end The second support end plate and girder right end the first support end plate is corresponding contact after, by upper pin be plugged into two pieces of upper mobile boards with Between two pieces of upper mounted plates;
Restart tower crane or electric block, fall girder and folded beam, when the reserved opening on girder and elevator left side wall is high Stop tower crane or electric block when spending consistent, girder and folded beam is moved horizontally to the left, girder left end extend into reserved opening Interior stopping restarts tower crane or electric block, further falls girder and folded beam, makes girder left end bottom and folded beam right end Bottom, which is respectively supported on the bottom plate of reserved opening and door opening, stops tower crane or electric block, removes two lifting wirerope, together When using expansion bolt by folded beam right end be fixed to door opening bottom plate on.
9. a kind of construction method for folding day beam traction-type construction lifting machine according to claim 8, it is characterised in that: step Suddenly the detailed process of (9) is,
The porthole excessively left when pouring first with elevator borehole wall will be temporarily fixed to the borehole wall with reuse steel label and metal binding wire rope On, lift car is transferred to shaft bottom, loosens preparatory disk in the hoisting wirerope of elevator car roof, dismantles expansion bolt, it will Two lifting wirerope used in step (4) hang two balance lifting lugs in two the balances lifting lugs and right side in left side respectively On, girder and folded beam are lifted up by tower crane or electric block, when two hoisting wireropes are just tightened, make girder to The right side moves horizontally, and girder left end is detached from reserved opening, is further continued for promoting girder and folded beam, folds until the height of promotion is greater than Stop tower crane or electric block after the length of beam, then remove upper pin, folded beam is downward in door opening by shaft of lower bearing pin Fold, folded beam is vertically arranged at this time, girder and folded beam in elevator, then start tower crane or electric block continue to Upper promotion girder and folded beam,
Stop tower crane or electronic calabash after folded beam is corresponding with door opening on one or more layers upper elevator right side wall or so Reed, girder is higher than one or more layers reserved opening on elevator left side wall at this time;Then folded beam is rotated to upper right, is folded Beam is extend into door opening, supports that end plate is corresponding to be contacted until the first of the second support end plate and girder right end of folded beam left end Afterwards, upper pin is plugged between two pieces of upper mobile boards and two pieces of upper mounted plates;
Restart tower crane or electric block, fall girder and folded beam, when the reserved opening on girder and elevator left side wall is high Stop tower crane or electric block when spending consistent, girder and folded beam is moved horizontally to the left, girder left end extend into reserved opening Interior stopping restarts tower crane or electric block, further falls girder and folded beam, makes girder left end bottom and folded beam right end Bottom, which is respectively supported on the bottom plate of reserved opening and door opening, stops tower crane or electric block, removes two lifting wirerope, together When using expansion bolt by folded beam right end be fixed to door opening bottom plate on;
Then it is tensioned traction rope, disassembly is previously used for the steel label and metal binding wire rope of temporary fixed weight, after items regulate, Promotion operation is increased in completion.
CN201910429456.2A 2019-05-22 2019-05-22 Traction type construction lifter for folding roof beam and construction method thereof Active CN110104522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910429456.2A CN110104522B (en) 2019-05-22 2019-05-22 Traction type construction lifter for folding roof beam and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910429456.2A CN110104522B (en) 2019-05-22 2019-05-22 Traction type construction lifter for folding roof beam and construction method thereof

Publications (2)

Publication Number Publication Date
CN110104522A true CN110104522A (en) 2019-08-09
CN110104522B CN110104522B (en) 2023-08-22

Family

ID=67491652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910429456.2A Active CN110104522B (en) 2019-05-22 2019-05-22 Traction type construction lifter for folding roof beam and construction method thereof

Country Status (1)

Country Link
CN (1) CN110104522B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110980478A (en) * 2019-12-30 2020-04-10 江苏阿尔法电梯制造有限公司 Construction lifting system
CN111039130A (en) * 2020-01-20 2020-04-21 河南省川达建筑机械有限公司 Bearing beam self-elevating hoistway construction elevator
CN111115412A (en) * 2020-01-20 2020-05-08 河南省川达建筑机械有限公司 Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator
CN111547605A (en) * 2020-04-25 2020-08-18 上海亚荣电梯设备制造有限公司 Tractor support for elevator
CN112110316A (en) * 2020-09-21 2020-12-22 马利群 Elevator shaft traction rotary telescopic construction elevator and installation and use method thereof
WO2021035863A1 (en) * 2019-08-28 2021-03-04 歌拉瑞电梯股份有限公司 Rope end connecting member, hoisting structure and traction-type building construction elevator
WO2021035864A1 (en) * 2019-08-30 2021-03-04 歌拉瑞电梯股份有限公司 Winding structure of traction type building construction elevator
WO2021042429A1 (en) * 2019-09-05 2021-03-11 歌拉瑞电梯股份有限公司 Compound wound construction hoist suitable for building hoistway
CN117142298A (en) * 2023-10-31 2023-12-01 启东凯顺机械制造有限公司 Transmission device for building site lifter
CN117486040A (en) * 2024-01-02 2024-02-02 紫金矿业建设有限公司 Cage rotation adjusting lifting device for vertical shaft mining

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4355690A (en) * 1980-12-18 1982-10-26 Deere & Company Stack folding outrigger system
JPH0510392U (en) * 1991-07-18 1993-02-09 住友ゴム工業株式会社 Lifting device
JP2005298080A (en) * 2004-04-07 2005-10-27 Toshiba Elevator Co Ltd Apparatus arrangement structure of elevator machine room
CN2880768Y (en) * 2006-02-28 2007-03-21 崔文才 Built-in construction lifter with steel cable
CN2883287Y (en) * 2005-11-16 2007-03-28 北京航天金羊电梯有限公司 Bottom elevator without cabin
CN201161858Y (en) * 2007-11-23 2008-12-10 康力电梯股份有限公司 Sightseeing elevator without machine room
JP2009215051A (en) * 2008-03-12 2009-09-24 Toshiba Elevator Co Ltd Elevator
CN203685498U (en) * 2013-09-29 2014-07-02 西门子公司 Mechanical framework for equipment in wind turbine tower, and wind turbine thereof
CN204958175U (en) * 2015-07-31 2016-01-13 中国核工业华兴建设有限公司 Collapsible monorail of suspension type
CN207810996U (en) * 2018-01-18 2018-09-04 广东讯达电梯有限公司 A kind of novel elevator main frame structure
CN109110616A (en) * 2018-09-29 2019-01-01 河南海恒机械设备有限公司 Telescopic building hoist day beam and its installation and application are set in elevator traction
CN210048319U (en) * 2019-05-22 2020-02-11 河南海恒机械设备有限公司 Traction type construction elevator with foldable top beam

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4355690A (en) * 1980-12-18 1982-10-26 Deere & Company Stack folding outrigger system
JPH0510392U (en) * 1991-07-18 1993-02-09 住友ゴム工業株式会社 Lifting device
JP2005298080A (en) * 2004-04-07 2005-10-27 Toshiba Elevator Co Ltd Apparatus arrangement structure of elevator machine room
CN2883287Y (en) * 2005-11-16 2007-03-28 北京航天金羊电梯有限公司 Bottom elevator without cabin
CN2880768Y (en) * 2006-02-28 2007-03-21 崔文才 Built-in construction lifter with steel cable
CN201161858Y (en) * 2007-11-23 2008-12-10 康力电梯股份有限公司 Sightseeing elevator without machine room
JP2009215051A (en) * 2008-03-12 2009-09-24 Toshiba Elevator Co Ltd Elevator
CN203685498U (en) * 2013-09-29 2014-07-02 西门子公司 Mechanical framework for equipment in wind turbine tower, and wind turbine thereof
CN204958175U (en) * 2015-07-31 2016-01-13 中国核工业华兴建设有限公司 Collapsible monorail of suspension type
CN207810996U (en) * 2018-01-18 2018-09-04 广东讯达电梯有限公司 A kind of novel elevator main frame structure
CN109110616A (en) * 2018-09-29 2019-01-01 河南海恒机械设备有限公司 Telescopic building hoist day beam and its installation and application are set in elevator traction
CN210048319U (en) * 2019-05-22 2020-02-11 河南海恒机械设备有限公司 Traction type construction elevator with foldable top beam

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
莫华;: "折叠式三角吊架", 建筑机械化, no. 02 *
董建松;: "采用折叠式横梁与底板的移动模架关键技术", 公路, no. 04 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021035863A1 (en) * 2019-08-28 2021-03-04 歌拉瑞电梯股份有限公司 Rope end connecting member, hoisting structure and traction-type building construction elevator
WO2021035864A1 (en) * 2019-08-30 2021-03-04 歌拉瑞电梯股份有限公司 Winding structure of traction type building construction elevator
WO2021042429A1 (en) * 2019-09-05 2021-03-11 歌拉瑞电梯股份有限公司 Compound wound construction hoist suitable for building hoistway
CN110980478B (en) * 2019-12-30 2021-04-20 江苏阿尔法电梯制造有限公司 Construction lifting system
CN110980478A (en) * 2019-12-30 2020-04-10 江苏阿尔法电梯制造有限公司 Construction lifting system
CN111039130A (en) * 2020-01-20 2020-04-21 河南省川达建筑机械有限公司 Bearing beam self-elevating hoistway construction elevator
CN111115412A (en) * 2020-01-20 2020-05-08 河南省川达建筑机械有限公司 Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator
CN111039130B (en) * 2020-01-20 2024-07-05 河南省川达建筑机械有限公司 Bearing beam self-elevating type hoistway construction lifter
CN111547605A (en) * 2020-04-25 2020-08-18 上海亚荣电梯设备制造有限公司 Tractor support for elevator
CN111547605B (en) * 2020-04-25 2021-07-16 上海亚荣电梯设备制造有限公司 Tractor support for elevator
CN112110316A (en) * 2020-09-21 2020-12-22 马利群 Elevator shaft traction rotary telescopic construction elevator and installation and use method thereof
CN117142298A (en) * 2023-10-31 2023-12-01 启东凯顺机械制造有限公司 Transmission device for building site lifter
CN117142298B (en) * 2023-10-31 2023-12-26 启东凯顺机械制造有限公司 Transmission device for building site lifter
CN117486040A (en) * 2024-01-02 2024-02-02 紫金矿业建设有限公司 Cage rotation adjusting lifting device for vertical shaft mining
CN117486040B (en) * 2024-01-02 2024-04-30 紫金矿业建设有限公司 Cage rotation adjusting lifting device for vertical shaft mining

Also Published As

Publication number Publication date
CN110104522B (en) 2023-08-22

Similar Documents

Publication Publication Date Title
CN110104522A (en) A kind of folding day beam traction-type construction lifting machine and its construction method
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN103086279B (en) Vertical transportation construction method for building construction
CN109110616A (en) Telescopic building hoist day beam and its installation and application are set in elevator traction
CN207061671U (en) Pipe gallery prefabricated part hanging turning device
CN103754775B (en) Arm disassembling method and auxiliary disassembling device of swing arm tower crane
WO2022252633A1 (en) Method for arranging upside-down hoisting power device in attached lifting scaffold
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN210048319U (en) Traction type construction elevator with foldable top beam
CN101264845A (en) Crown block high altitude integrated suspension transposition construction method
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN206069245U (en) Crawler crane setting-up balance weight dismounts luffing device certainly
CN110203834B (en) Hoisting device and hoisting method for Z-shaped cantilever beam structure of large paper machine
CN210393486U (en) Hoisting device of Z-shaped cantilever beam structure of large paper machine
CN202594608U (en) Turnover device for large-size wind generating set rack
CN201660407U (en) Simple rotary hanger for tile processing
CN205151579U (en) Two horizontal arm hoists
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN220702990U (en) Concrete trough beam lifting device
JP3939819B2 (en) Jib crane for crane demolition
CN204508645U (en) A kind of tower crane self-unloading counter weight device
CN213802530U (en) Prefabricated big cantilever track case roof beam hoisting accessory
CN202945004U (en) Gantry crane for installing large equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant