CN110083875A - A kind of survey design integration figure automatic map framing method based on AutoCAD layout - Google Patents
A kind of survey design integration figure automatic map framing method based on AutoCAD layout Download PDFInfo
- Publication number
- CN110083875A CN110083875A CN201910255225.4A CN201910255225A CN110083875A CN 110083875 A CN110083875 A CN 110083875A CN 201910255225 A CN201910255225 A CN 201910255225A CN 110083875 A CN110083875 A CN 110083875A
- Authority
- CN
- China
- Prior art keywords
- map
- picture frame
- paper
- design integration
- attribute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013461 design Methods 0.000 title claims abstract description 49
- 230000010354 integration Effects 0.000 title claims abstract description 48
- 238000009432 framing Methods 0.000 title claims abstract description 46
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000003780 insertion Methods 0.000 claims abstract description 24
- 230000037431 insertion Effects 0.000 claims abstract description 24
- 239000000284 extract Substances 0.000 claims abstract description 6
- 238000012384 transportation and delivery Methods 0.000 claims abstract description 6
- 239000004744 fabric Substances 0.000 claims abstract description 3
- 230000008520 organization Effects 0.000 claims description 5
- 238000004364 calculation method Methods 0.000 claims description 4
- 238000000605 extraction Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000003796 beauty Effects 0.000 claims description 2
- 238000012797 qualification Methods 0.000 claims description 2
- 238000011835 investigation Methods 0.000 description 10
- 238000005520 cutting process Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010893 paper waste Substances 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000009966 trimming Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1202—Dedicated interfaces to print systems specifically adapted to achieve a particular effect
- G06F3/1203—Improving or facilitating administration, e.g. print management
- G06F3/1205—Improving or facilitating administration, e.g. print management resulting in increased flexibility in print job configuration, e.g. job settings, print requirements, job tickets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1237—Print job management
- G06F3/125—Page layout or assigning input pages onto output media, e.g. imposition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- Instructional Devices (AREA)
Abstract
The invention discloses a kind of survey design integration figure automatic map framing methods based on AutoCAD layout, it include: the choice set that the existing picture frame about survey design integration figure 1) is established in the model space of AutoCAD, extract the coordinate value of picture frame, and printing proportion ruler is combined to calculate distance in paper delivery, select suitable paper and printer;2) choice set of the existing map sheet number about survey design integration figure is established in the model space of AutoCAD, extract the coordinate value of map sheet insertion point, and the positional relationship of map sheet insertion point Yu four angle points of picture frame is judged by calculating, if there is interior packet situation, the layout of current map sheet number is then created in paper space, and viewport is created, viewport association attributes are adjusted according to paper;3) drawing margins element is added in the cloth intra-office of current AutoCAD, each element determines respective attribute according to drawing norm.The present invention realize different scale, different framing picture frame survey design integration figure a key automatic map framing, greatly improve framing working efficiency.
Description
Technical field
The present invention relates to the ground investigations of Surveying Engineering to delimit diagram technology field, and in particular to one kind is based on AutoCAD cloth
The survey design integration figure automatic map framing method of office, it is automatic that the ground investigation suitable for different scale, different framing picture frames delimits figure
Framing.
Background technique
Ground investigation delimit work mainly according to land expropriation, take over for use, transfer, sell, changed agricultural land, land use
Planning and land development such as arrange, reclaim at the requirements of one's work, define land use range on the spot, measurement circle, position, location, adjust and draw soil
Ground provides science, standard using status, calculating land area, for the grant land use right of land resources administrative responsibile institution and cadastral survey manual etc.
True basic data and the professional technique service carried out.Working contents include land red-line bound site points survey, allocation of landownership and land use right
Investigate, divide land status, areal calculation and summarize, work out ground investigation demarcation figure, write achievement technical report etc..Wherein,
Ground investigation demarcation figure is that an achievement mostly important, that workload is maximum, also the most complicated provides in ground investigation demarcation work
Material.Major part survey design integration figure is stored using the format of AutoCAD at present, and it is fixed to be required to survey when using and filing
Boundary's figure carries out framing according to certain requirement.Also there is partial software to support to carry out survey design integration figure framing at present, but exists
Picture frame cannot customized or definition file be complicated, drawing margins do not meet specification, can generate when survey design integration figure is cut
The problems such as object is lost, this is because such framing mode has been all made of the method for adding picture frame after first cutting topographic map again, gesture
The problems such as figure is broken, amount of storage becomes larger, framing trimming amount increases must be caused, and has seriously affected survey design integration figure
Modification.Ground investigation delimits work to be influenced by various factors such as natural, artificial, land policies, and it is numerous to be related to department, because
This project carry out during, land red-line inevitably needs to be adjusted, modified survey design integration figure again again into
The work of row framing, this undoubtedly increases very more workloads.
In addition, for the band-like engineering such as water conservancy, traffic, not only distance but also turns round more, delimit figure in ground investigation and divide
In width and out figure work, it is often necessary to will entire project ground investigation delimit figure framing printing after it is seamless spliced again, this to point
Width work is put forward new requirements.If being used uniformly a kind of framing picture frame, it is big etc. certainly will to there is paper waste, splicing operation amount
Problem, to greatly increase production cost.While taking into account out figure beauty, in order to reduce splicing operation to the maximum extent
Amount improves paper utilization rate, reduces out figure cost, needs neatly to carry out reasonable Division range design to survey design integration figure.
By studying the survey design integration figure framing key technology based on plane coordinates grid square or rectangular mapsubdivision method
And method, the survey design integration figure automatic map framing software suitable for different scale, different framing picture frames is developed, realizes exploration
Demarcation figure automates framing in a manner of being laid out, and the working efficiency of interior industry can be greatly improved, and reduces the labor intensity of framing work.
Summary of the invention
To solve the shortcomings of the prior art, the present invention provides a kind of survey design integration figures based on AutoCAD layout
Automatic map framing method meets user to the survey design integration figure integrality of different scale, different framing picture frame, easy storage, easily
The requirement of ornamenting, modifiability etc. considerably reduces interior work amount, mentions while guaranteeing framing accuracy
High framing efficiency.
Autocad file is divided into the model space and paper space, and an autocad file can only have a model space,
But multiple layouts in paper space can be possessed, by survey design integration figure framing to being laid out, i.e., every width figure after framing is figure
A layout in paper space.When programming realization, the contents such as mapborder are rendered directly to paper space and the model space mutually not
Interference, and the content of survey design integration figure creates a viewport, center and size by define viewports in the paper space
Method realize the mapping of the width survey design integration figure from the model space to paper space.
Survey design integration figure automatic map framing method provided by the invention includes the following steps:
1) choice set about picture frame is established in the model space, extracts the coordinate value of grid, and combine printing proportion
Ruler calculates distance in paper delivery, selects suitable paper and printer;
2) choice set about map sheet number is established in the model space, extracts the coordinate value of map sheet insertion point, and is passed through
The positional relationship for judging map sheet insertion point Yu four angle points of picture frame is calculated, if there is interior packet situation, then in paper space
The layout of current map sheet number is created, and creates viewport, viewport association attributes are adjusted according to paper.
3) in current arrangements add drawing margins element, including interior mapborder, outer border, four angular coordinate annotation of mapborder,
It is the map title, figure number, map relationship, scale bar, coordinate system title, height datum, contour interval, organization unit, survey time and foundation, close
The information such as grade and correlative measurement personnel.
As preferred: user must set framing picture frame in the model space according to code requirement, and picture frame distribution should be reasonable,
It should cover and survey area's whole landform, reduce map sheet number to the maximum extent again, rationally to utilize paper, save out figure cost;
Choice set of the foundation about picture frame, it is desirable that figure layer where the picture frame of the survey design integration figure of importing is entitled
" picture frame ", while its attribute is " AcDbPolyline ";
The coordinate value of the described extraction grid, needs to carry out permutation calculation according to coordinate value, obtain the picture frame lower left corner and
The D coordinates value in the upper right corner;
Distance in the calculating paper delivery needs to calculate picture frame using the D coordinates value in the picture frame lower left corner and the upper right corner real
Border size calculates the size that picture frame is printed upon on paper in conjunction with printing proportion ruler;
The suitable paper of the selection, it is contemplated that figure is beautiful out and map sheet binds the needs being left white, according to different paper
Type setting width and length value qualifications, select the drawing of different model to print, above-mentioned condition is with optimal situation
Premise is selected.
The suitable printer of the selection needs to be arranged " printer name ", " type style table ", " figure of printer
The attribute values such as paper size ", " drawing unit ", " default drawing Print direction ", " whether using the line width in graphic file ".
As preferred: choice set of the foundation about map sheet number, it is desirable where the survey design integration figure map sheet number of importing
Figure layer is entitled " map sheet number ", while its attribute is " AcDbText ";
The judgement map sheet insertion point and picture frame positional relationship, by comparing (X, Y) coordinate of map sheet insertion point
The size relation of value and (X, the Y) coordinate value in the picture frame lower left corner and the upper right corner, judges whether interior packet;
If there is interior packet situation, then the layout of current map sheet number is created in paper space;
Described adjusts viewport association attributes according to paper, it is desirable that viewport size and current paper sheet are adapted, and corresponding paper
The length and width of upper picture frame.
As preferred: the addition drawing margins element, it is desirable that each element is located at the coordinate in drawing according to paper type
It number is calculated:
The attribute of outer border is multi-section-line, and four angular coordinate values are that viewport angular coordinate value respectively extends out certain distance, even
It is continuous to draw,;
The attribute of interior mapborder is straight line, and four straight lines inwardly translate certain distance by outer border line, and four intersection points are constituted
Rectangle and viewport it is in the same size,;
The attribute of four angular coordinate annotation of mapborder be text, content by the picture frame lower left corner and the upper right corner (X, Y) coordinate value
Calculate gained, insertion point four corners between inside and outside mapborder;
The attribute of the map title is text, is located at the wide top center position of the Beijing Library, and insertion point is viewport midpoint coordinates, alignment thereof
Centered on be aligned;
The attribute of figure number is text, is located at immediately below the map title, and insertion point is viewport midpoint coordinates, right centered on alignment thereof
Together;
Map relationship clearly expresses the position adjacent relationship between adjacent survey design integration figure map sheet, and oblique line is decorated in centre
One Ge Daibiaoben map sheet position, eight lattice of surrounding are indicated the map title of adjoining sheet respectively, can promptly be surveyed using table of joint
Delimit the splicing of figure;Positional relationship in map relationship between this map sheet and its adjoining sheet can indicate with above-mentioned map sheet number,
The map relationship of each map sheet is different, is made of straight line, text and shade, is located at the Beijing Library exterior feature upper left side, straight by eight
Line forms nine grids, and center is placed current map sheet number and filled with shade, and it is adjacent that surrounding is inserted into remaining eight space
Map sheet number;If the picture frame size disunity imported, does not generate map relationship, is introduced directly into map sheet index map.
Printing proportion ruler is very important a framing information, not only determines actual landform representated by each map sheet
Area, the i.e. size (and size of viewport) of framing picture frame, while also determining four angular coordinates in drawing margins content
The call format and representative fraction of annotation and the display of graphic scale;Wherein, representative fraction is located at below bottom edge
Center position, graphic scale are located at representative fraction following position directly, by the inconsistent rectilinear(-al) of length, thickness,;
Coordinate system title, height datum, contour interval, survey time and foundation attribute be text, in bottom edge lower left
Position plurality of rows,;
The attribute of organization unit is multline text, in left-hand edge lower left position vertical array;
The attribute of level of confidentiality is text, in the Beijing Library exterior feature upper right side;
The attribute for surveying personnel processed is text, in bottom edge lower right position plurality of rows.
As preferred: the addition map relationship is usually located at the upper left side of survey design integration figure, for illustrate this map sheet with
The positional relationship of adjoining sheet;
The core for generating map relationship is this determining eight lattice of map sheet surrounding (i.e. due north, due east, due south, due west direction and west
North, northeast, the southeast and southwestward) adjacent sheet, correspond to one by one first picture frame diagonal corner point coordinate value and its in packet
Map sheet number, then obtain current map sheet number in wrap picture frame same angle point coordinate value, by comparing the size of coordinate value
Judge the map sheet number of the adjacent survey design integration figure of current map sheet surrounding eight, such as adjoining sheet is sky if it does not exist:
If the picture frame size disunity imported, does not generate map relationship, is introduced directly into map sheet index map.
Beneficial effects of the present invention: whole survey design integration figures are stored in inside an autocad file, convenient for management, and
And every width survey design integration figure after framing is the mapping of the model space, reduces the size of file, more conducively stores and transmits;
If after survey design integration figure updates, need to only modify the content of the model space, layout can be automatically updated, and do not needed again framing and connect
Side;Avoid the generation of object loss situation when cutting to survey design integration figure;Various objects in different width survey design integration figures
There is no really being cut because of framing, the integrality of figure ensure that;Realize a key batch framing, the degree of automation
Height, framing process are not affected by human factors, and ensure that the accuracy of framing.The present invention can substantially mitigate interior work amount,
Framing efficiency is improved, promotional value with higher is generally applicable to the framing work of ground investigation demarcation figure.
Detailed description of the invention
Fig. 1 is selection paper flow chart of the invention;
Fig. 2 is newly-built viewport flow chart of the invention;
Fig. 3 is addition drawing margins element flow chart of the invention;
Fig. 4 is that map relationship of the invention draws flow chart.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
As shown in Figure 1, user must set framing picture frame in the model space according to code requirement, picture frame distribution should be closed
Reason should cover and survey area's whole landform, reduce map sheet number to the maximum extent again, rationally to utilize paper, save out figure cost;
Choice set of the foundation about picture frame, it is desirable that the entitled " figure of figure layer where the survey design integration figure picture frame of importing
Frame ", while its attribute is " AcDbPolyline ";
The coordinate value of the described extraction grid, needs to carry out permutation calculation according to coordinate value, obtain the picture frame lower left corner and
The D coordinates value in the upper right corner;
Distance in the calculating paper delivery needs to calculate picture frame using the D coordinates value in the picture frame lower left corner and the upper right corner real
Border size calculates the size that picture frame is printed upon on paper in conjunction with printing proportion ruler;
The suitable paper of the selection, it is contemplated that figure is beautiful out and map sheet binds the needs being left white, according to different paper
Type ISO_A3_ (297.00_x_420.00_MM), ISO_A2_ (420.00_x_594.00_MM), ISO_A1_ (594.00_
X_841.00_MM), width is limited less than or equal to 200mm and length is less than or equal to 340mm, selects the drawing printing of " A3 " model,
Width is limited less than or equal to 320mm and length is less than or equal to 500mm, the drawing printing of " A2 " model is selected, limits width and be less than
Equal to 500mm and length is less than or equal to 760mm, selects the drawing printing of " A1 " model, above-mentioned condition is premised on optimal situation
It is selected.
The suitable printer of the selection needs to be arranged " printer name ", " type style table ", " figure of printer
The attribute values such as paper size ", " drawing unit ", " default drawing Print direction ", " whether using the line width in graphic file ".
As shown in Fig. 2, choice set of the foundation about map sheet number, it is desirable where the survey design integration figure map sheet number of importing
Figure layer is entitled " map sheet number ", while its attribute is " AcDbText ";
The judgement map sheet insertion point and picture frame positional relationship, by comparing (X, Y) coordinate of map sheet insertion point
The size relation of value and (X, the Y) coordinate value in the picture frame lower left corner and the upper right corner, judges whether interior packet:
I.e. as (TF (i) .x-leftlow (1)) > 0And (TF (i) .y-leftlow (0)) > 0And (TF (i) .x-
Righttop (1)) (TF (i) .y-righttop (0)) < 0 < 0And when think width insertion point in picture frame, in formula, TF be figure
The insertion point co-ordinate of width number, the coordinate in the leftlow picture frame lower left corner, the coordinate in the righttop picture frame upper right corner, if there is interior
Packet situation then creates the layout of current map sheet number in paper space;
Described adjusts viewport association attributes according to paper, it is desirable that viewport size and current paper sheet are adapted, and corresponding paper
The length and width of upper picture frame:
When the paper type number selected is " A3 ",
When the paper type number selected is " A2 ",
When the paper type number selected is " A1 ",
In formula, C_Point is the center point coordinate of viewport insertion, and XSca is width of the picture frame on paper, and YSca is picture frame
Length on paper;
It is programmed using AutoCAD VBA and realizes this function, add the order of viewport are as follows:
ThisDrawing.PaperSpace.AddPViewport(C_Point,YSca,XSca)
As shown in figure 3, the addition drawing margins element, it is desirable that each element is located at the coordinate in drawing according to paper type
It number is calculated, comprising:
The attribute of outer border is multi-section-line, and four angular coordinate values are that viewport angular coordinate value respectively extends out 11.5mm, continuously
It draws, line width angle value is 1;
The attribute of interior mapborder is straight line, and 4 straight lines inwardly translate 11.5mm, the square that four intersection points are constituted by outer border line
Shape is in the same size with viewport, and line width angle value is 0.1;
The attribute of four angular coordinate annotation of mapborder is text, and content is by the picture frame lower left corner as claimed in claim 2 and upper right
(X, the Y) coordinate value at angle calculates gained, and insertion point four corners between inside and outside mapborder, text style and text height are medium
Wire body 2.4;
The attribute of the map title is text, is located at the wide top center position of the Beijing Library, and insertion point is viewport midpoint coordinates, alignment thereof
Centered on be aligned, text style and text height are clarendon 6.0;
The attribute of figure number is text, is located at immediately below the map title, and insertion point is viewport midpoint coordinates, right centered on alignment thereof
Together, text style and text height are the wire bodies 5.0 × 2.5 such as long;
Map relationship clearly expresses the position adjacent relationship between adjacent survey design integration figure map sheet, and oblique line is decorated in centre
One Ge Daibiaoben map sheet position, eight lattice of surrounding are indicated the map title of adjoining sheet respectively, can promptly be surveyed using table of joint
Delimit the splicing of figure;Positional relationship in map relationship between this map sheet and its adjoining sheet can indicate with above-mentioned map sheet number,
The map relationship of each map sheet is different, is made of straight line, text and shade, is located at the Beijing Library exterior feature upper left side, by 8 straight lines
Nine grids are formed, center is placed current map sheet number and filled with shade, and the adjacent figure of surrounding is inserted into remaining eight space
Width number;The size of map relationship is 45.0 × 24.0, and the text style and text height of interior map sheet number are the wire bodies 2.5 such as thin;
Printing proportion ruler is very important a framing information, not only determines actual landform representated by each map sheet
Area, the i.e. size (and size of viewport) of framing picture frame, while also determining four angular coordinates in drawing margins content
The call format and representative fraction of annotation and the display of graphic scale;Wherein, representative fraction is located at below bottom edge
Center position, text style and text height are the Song typeface 4.0, and graphic scale is located at representative fraction following position directly, by
The inconsistent rectilinear(-al) of length, thickness, the text style and text height of label character are clarendon 1.6;
Coordinate system title, height datum, contour interval, survey time and foundation attribute be text, in bottom edge lower left
Position plurality of rows, text style and text height are the wire bodies 3.0 such as thin;
The attribute of organization unit is multline text, and in left-hand edge lower left position vertical array, text style and text are high
Degree is the wire bodies 4.0 such as thin;
The attribute of level of confidentiality is text, and in the Beijing Library exterior feature upper right side, text style and text height are the wire bodies 3.0 × 4.0 such as flat;
The attribute for surveying personnel processed is text, and in bottom edge lower right position plurality of rows, text style and text height are
The wire bodies 3.0 such as thin.
As shown in figure 4, the addition map relationship, is usually located at the upper left side of survey design integration figure, for illustrating this map sheet
With the positional relationship of adjoining sheet;
The core for generating map relationship is this determining eight lattice of map sheet surrounding (i.e. due north, due east, due south, due west direction and west
North, northeast, the southeast and southwestward) adjacent sheet, correspond to (X, the Y) coordinate value in the picture frame lower left corner and the upper right corner one by one first
With the map sheet number wrapped in it, then obtain current map sheet number in wrap picture frame lower left corner coordinate value, by comparing coordinate value
Size judges the map sheet number of the adjacent survey design integration figure of current map sheet surrounding 8, and such as adjoining sheet is sky if it does not exist:
Further, if the picture frame size disunity imported, does not generate map relationship, be introduced directly into map sheet index map.
The above is only a preferred embodiment of the present invention, so it is not intended to limiting the invention, is not departing from this hair
Under the premise of the spirit and scope of the present invention that bright appended claims define, obtained with equivalent replacement or equivalent transformation mode
Technical solution, these improvement also should be regarded as protection scope of the present invention.
Claims (5)
1. a kind of survey design integration figure automatic map framing method based on AutoCAD layout, it is characterised in that: the method includes as follows
Step:
S1. the choice set that the existing picture frame about survey design integration figure is established in the model space of AutoCAD, extracts the seat of picture frame
Scale value, and printing proportion ruler is combined to calculate distance in paper delivery, select suitable paper and printer;
S2. the choice set that the existing map sheet number about survey design integration figure is established in the model space of AutoCAD, extracts map sheet number
The coordinate value of insertion point, and pass through the positional relationship for calculating and judging map sheet insertion point Yu four angle points of picture frame, if there is interior
Packet situation, then create the layout of current map sheet number in paper space, and creates viewport, adjusts viewport correlation category according to paper
Property;
S3. drawing margins element, including interior mapborder, outer border, four angular coordinate of mapborder are added in the cloth intra-office of current AutoCAD
Annotation, the map title, figure number, map relationship, scale bar, coordinate system title, height datum, contour interval, organization unit, the survey time and according to
According to, level of confidentiality and correlative measurement personnel;Each element determines respective attribute according to drawing norm.
2. the survey design integration figure automatic map framing method according to claim 1 based on AutoCAD layout, it is characterised in that:
Choice set of the foundation about the picture frame of survey design integration figure, it is desirable that figure layer title where the picture frame of the survey design integration figure of importing
For " picture frame ", while attribute is " AcDbPolyline ";
The coordinate value of the existing picture frame of extraction carries out permutation calculation according to the coordinate value of picture frame angle point, it is diagonal to obtain picture frame
The D coordinates value of line angle point;
Distance in the calculating paper delivery, to calculate picture frame actual size, knot using the D coordinates value of picture frame diagonal line angle point
Printing proportion ruler is closed, the size that picture frame is printed upon on paper is calculated;
The suitable paper of the selection, contemplates the needs of figure beauty, sets width, length value qualifications, Lai Xuanyong is not
Drawing with model prints, and the condition is selected premised on optimal situation;
The described selection suitable printer is selected for the attribute value of printer is arranged.
3. the survey design integration figure automatic map framing method according to claim 1 based on AutoCAD layout, it is characterised in that:
Choice set of the foundation about the map sheet number of survey design integration figure, it is desirable that figure layer where the map sheet number of the survey design integration figure of importing
Entitled " map sheet number ", while attribute is " AcDbText ";
The judgement map sheet insertion point and picture frame positional relationship, by comparing map sheet insertion point (X, Y) coordinate value with
The size relation of the coordinate value of the picture frame diagonal line angle point, judges whether interior packet;
Described adjusts viewport association attributes according to paper, is that viewport size and current paper sheet are adapted, and correspond to picture frame on paper
Length and width.
4. the survey design integration figure automatic map framing method according to claim 1 based on AutoCAD layout, it is characterised in that:
The coordinate that each element of the addition drawing margins element is located in drawing is calculated according to paper type number;
The attribute of the outer border is multi-section-line, and four angular coordinate values are that viewport angular coordinate value respectively extends out certain distance,
It is continuous to draw;
The attribute of the interior mapborder is straight line, and four straight lines inwardly translate certain distance, four intersection point structures by outer border line
At rectangle and viewport it is in the same size;
The attribute of the four angular coordinate annotation of mapborder be text, content by the picture frame diagonal line angle point coordinate value
Calculate gained, insertion point four corners between inside and outside mapborder;
The attribute of the map title is text, is located at the wide top center position of the Beijing Library, and insertion point is viewport midpoint coordinates, alignment side
It is aligned centered on formula;
The attribute of the figure number is text, is located at immediately below the map title, and insertion point is viewport midpoint coordinates, centered on alignment thereof
Alignment;
The map relationship is made of straight line, text and shade, is located at the Beijing Library exterior feature upper left side, by eight horizontal and vertical straight lines
Nine grids are formed, center is placed current map sheet number and filled with shade, and the adjacent figure of surrounding is inserted into remaining eight space
Width number;
The scale bar rectilinear(-al) inconsistent by length, thickness is located at center position below bottom edge, according to given
The different scale bar of scale;
The coordinate system title, height datum, contour interval, survey time and foundation attribute be text, in bottom edge lower-left
Set plurality of rows in orientation;
The attribute of the organization unit is multline text, in left-hand edge lower position vertical array;
The attribute of the level of confidentiality is text, in the Beijing Library exterior feature upper right side;
The attribute of the survey personnel processed is text, in bottom edge lower right position plurality of rows.
5. the survey design integration figure automatic map framing method according to claim 4 based on AutoCAD layout, it is characterised in that:
Map relationship in the addition drawing margins element, corresponds to one by one first in the coordinate value and picture frame of diagonal line angle point of picture frame
The map sheet number of packet, then the coordinate value of the same angle point of the picture frame at current map sheet number place is obtained, by comparing the size of coordinate value
Judge the map sheet number of the adjacent survey design integration figure of current map sheet surrounding eight, such as adjoining sheet is sky if it does not exist;If importing
Box size size disunity, then do not generate map relationship, is introduced directly into map sheet index map.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910255225.4A CN110083875A (en) | 2019-04-01 | 2019-04-01 | A kind of survey design integration figure automatic map framing method based on AutoCAD layout |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910255225.4A CN110083875A (en) | 2019-04-01 | 2019-04-01 | A kind of survey design integration figure automatic map framing method based on AutoCAD layout |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110083875A true CN110083875A (en) | 2019-08-02 |
Family
ID=67414110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910255225.4A Pending CN110083875A (en) | 2019-04-01 | 2019-04-01 | A kind of survey design integration figure automatic map framing method based on AutoCAD layout |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110083875A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110189392A (en) * | 2019-06-21 | 2019-08-30 | 重庆大学 | A kind of flow rate and direction schema mapping automatic map framing method |
CN111798508A (en) * | 2020-09-09 | 2020-10-20 | 四川长园工程勘察设计有限公司 | Distribution line path diagram framing method |
CN111932655A (en) * | 2020-07-28 | 2020-11-13 | 中铁第六勘察设计院集团有限公司 | Automatic processing method for building railway line information model based on AutoCAD |
CN112446084A (en) * | 2020-12-14 | 2021-03-05 | 四川蓉信开工程设计有限公司 | Adaptive plotting method for interactive design of Revit and traditional plotting software |
CN112948607A (en) * | 2021-01-29 | 2021-06-11 | 北京城建勘测设计研究院有限责任公司 | Automatic mapping method applied to geotechnical engineering investigation industry |
CN113051885A (en) * | 2021-04-08 | 2021-06-29 | 上海市城市建设设计研究总院(集团)有限公司 | AutoCAD-based design drawing rapid typesetting method |
CN114238239A (en) * | 2021-12-21 | 2022-03-25 | 河南省鑫源土地科技有限责任公司 | Survey delimitation report generation method, system and device based on python and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2126505A1 (en) * | 1993-06-24 | 1994-12-25 | Shuichi Takada | Straight line coordinate generator |
CN101944131A (en) * | 2010-09-29 | 2011-01-12 | 中国科学院国家天文台 | Method for dividing and encoding different lunar basic scale topographic maps |
CN106873922A (en) * | 2017-01-20 | 2017-06-20 | 株洲中车机电科技有限公司 | The batch order Method of printing and device of a kind of CAD diagram paper |
CN107729511A (en) * | 2017-10-24 | 2018-02-23 | 南京市测绘勘察研究院股份有限公司 | A kind of customizable geographic information data rectangular mapsubdivision method |
CN108121867A (en) * | 2017-12-21 | 2018-06-05 | 山东同智伟业软件股份有限公司 | The general quick method for splitting of DWG drawings |
CN109165409A (en) * | 2018-07-25 | 2019-01-08 | 上海勘测设计研究院有限公司 | River class engineering plan framing method, electronic device and storage medium |
-
2019
- 2019-04-01 CN CN201910255225.4A patent/CN110083875A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2126505A1 (en) * | 1993-06-24 | 1994-12-25 | Shuichi Takada | Straight line coordinate generator |
CN101944131A (en) * | 2010-09-29 | 2011-01-12 | 中国科学院国家天文台 | Method for dividing and encoding different lunar basic scale topographic maps |
CN106873922A (en) * | 2017-01-20 | 2017-06-20 | 株洲中车机电科技有限公司 | The batch order Method of printing and device of a kind of CAD diagram paper |
CN107729511A (en) * | 2017-10-24 | 2018-02-23 | 南京市测绘勘察研究院股份有限公司 | A kind of customizable geographic information data rectangular mapsubdivision method |
CN108121867A (en) * | 2017-12-21 | 2018-06-05 | 山东同智伟业软件股份有限公司 | The general quick method for splitting of DWG drawings |
CN109165409A (en) * | 2018-07-25 | 2019-01-08 | 上海勘测设计研究院有限公司 | River class engineering plan framing method, electronic device and storage medium |
Non-Patent Citations (10)
Title |
---|
亢保军;刘维利;孔改红;: "港口工程地形图自动分幅的实现", 港工技术 * |
亢保军等: "港口工程地形图自动分幅的实现", 《港工技术》 * |
张杰等: "GIS中标准图幅打印功能的实现", 《山西建筑》 * |
张永杰 等: "利用 AutoLISP 语言开发制作标准图幅接合表程序的实践与探讨", 测绘与空间地理信息 * |
李杰等: "用VBA开发CASS中标准图幅接合图表的实践", 《地矿测绘》 * |
杨海成 等: "浅谈带状地形图任意分幅的方法", 城市勘测 * |
贺秋伟: "利用VBA编程实现地形图的自动分幅", 《科技创新导报》 * |
郑义: "大比例尺地形图程序自动分幅", 矿业工程 * |
韦强 等: "基于 ArcGIS 分幅制作及输出使用林地现状图的方法研究", 林业调查规划 * |
黎杰 等: "大比例尺数字地形图虚拟分幅技术研究", 《地质与勘测研究》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110189392A (en) * | 2019-06-21 | 2019-08-30 | 重庆大学 | A kind of flow rate and direction schema mapping automatic map framing method |
CN110189392B (en) * | 2019-06-21 | 2023-02-03 | 重庆大学 | Automatic framing method for flow velocity and flow direction map |
CN111932655A (en) * | 2020-07-28 | 2020-11-13 | 中铁第六勘察设计院集团有限公司 | Automatic processing method for building railway line information model based on AutoCAD |
CN111932655B (en) * | 2020-07-28 | 2023-04-25 | 中铁第六勘察设计院集团有限公司 | Automatic processing method for constructing railway line information model based on AutoCAD |
CN111798508A (en) * | 2020-09-09 | 2020-10-20 | 四川长园工程勘察设计有限公司 | Distribution line path diagram framing method |
CN112446084A (en) * | 2020-12-14 | 2021-03-05 | 四川蓉信开工程设计有限公司 | Adaptive plotting method for interactive design of Revit and traditional plotting software |
CN112446084B (en) * | 2020-12-14 | 2023-08-01 | 国投信开水环境投资有限公司 | Adaptive plotting method for interactive design of Revit and traditional plotting software |
CN112948607A (en) * | 2021-01-29 | 2021-06-11 | 北京城建勘测设计研究院有限责任公司 | Automatic mapping method applied to geotechnical engineering investigation industry |
CN113051885A (en) * | 2021-04-08 | 2021-06-29 | 上海市城市建设设计研究总院(集团)有限公司 | AutoCAD-based design drawing rapid typesetting method |
CN113051885B (en) * | 2021-04-08 | 2022-06-21 | 上海市城市建设设计研究总院(集团)有限公司 | AutoCAD-based design drawing rapid typesetting method |
CN114238239A (en) * | 2021-12-21 | 2022-03-25 | 河南省鑫源土地科技有限责任公司 | Survey delimitation report generation method, system and device based on python and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110083875A (en) | A kind of survey design integration figure automatic map framing method based on AutoCAD layout | |
CN104766366B (en) | A kind of method for building up of three-dimension virtual reality demonstration | |
CN103761397B (en) | Three-dimensional model slice for surface exposure additive forming and projection plane generating method | |
CN101344390B (en) | High-fidelity digital modeling method for landform altitude | |
CN102314711B (en) | Three-dimensional visualization method and device for mineral resource evaluation information | |
CN107423445A (en) | A kind of map data processing method, device and storage medium | |
CN106844977A (en) | A kind of town road BIM designs a model and GIS data integrated approach | |
CN104462298A (en) | Cadastral surveying system and method achieving automatic cadastral mapping | |
CN109446281A (en) | On-line intelligence Mapping System construction method, system and drafting method based on ArcGIS | |
CN101872492A (en) | Multi-angle map implementation method of three-dimensional simulation city | |
CN108255489A (en) | Front-end interface code generating method, device, electronic equipment and storage medium | |
CN102855810A (en) | Digital line graphic method based on satellite image map | |
CN103150328A (en) | Integration method for automatically drawing maps by utilizing database | |
CN106202245A (en) | Industry map system project special topic methods of exhibiting based on data linkage and system | |
CN107610227A (en) | The preparation method of indoor three-dimensional map | |
CN107291223A (en) | A kind of super large data volume virtual reality space Information Visualization System and method | |
CN107194549A (en) | The visual presentation method that a kind of energy efficiency indexes are decomposed | |
CN114004006A (en) | Building group arrangement method, device, equipment and storage medium | |
CN109325321A (en) | A method of for the rapid automatized modeling of pipeline | |
CN108664738A (en) | Three dimensional image processing method and device | |
CN110110028B (en) | Method and system for displaying map according to user-defined area and oriented to OGC standard | |
CN105894553B (en) | A kind of Street Space form layout method based on grid selection | |
Du | Application of CAD aided intelligent technology in landscape design | |
KR101091595B1 (en) | Method of manufacturing 3-dimension model topographic map with high accuracy | |
CN115493567B (en) | Territorial mapping and drawing method, system and application based on unmanned aerial vehicle technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190802 |