CN110082615B - 地埋式变压器温升试验方法 - Google Patents
地埋式变压器温升试验方法 Download PDFInfo
- Publication number
- CN110082615B CN110082615B CN201810099317.3A CN201810099317A CN110082615B CN 110082615 B CN110082615 B CN 110082615B CN 201810099317 A CN201810099317 A CN 201810099317A CN 110082615 B CN110082615 B CN 110082615B
- Authority
- CN
- China
- Prior art keywords
- pit
- transformer
- temperature
- test
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
本发明提供一种地埋式变压器温升试验方法,其特征在于包括下列步骤:a试验环境坑埋或直埋时的变压器最高处应低于地表1000mm,坑或变压器周边应有一面较近的绝热墙体,其离坑的内壁或变压器的间距应不大于600mm,宽度至少为同侧坑内壁宽的1.5倍并与坑同深,若还有其他建筑物体应远离坑或变压器2000mm以上,但至少有二面大于5000mm以上,否则视为特殊温升要求。b测温点选择直埋式变压器应在地坑长、宽边设至少1处测温点,距变压器外壁100mm,深度为1000mm、1500mm;坑埋式变压器,坑顶盖板下设立一温度传感器,用于测试坑顶温度;坑底部与变压器底部同一水平线的坑壁处设立温度传感器,用于测试坑底温度;为测量顶层油温,在其箱盖温度计底座中植入温度传感器。
Description
技术领域:
本发明涉及变压器温升试验方法,特别涉及地下式变压器的温升试验方法,具体是一种地埋式变压器的温升试验方法。
背景技术:
近年来随着变压器技术的不断发展及国家电网推重的配电变压器的地埋化,地埋式变压器的发展前景光明,但随着地埋式变压器的技术不断发展及产品的涵盖面的增加、产品使用环境要求的改变等,现有的标准JB/T10544-2006中的相关温升试验方法及要求已不能全面反映产品的技术特性:地埋式变压器的温升试验应在地埋条件及额定发热状态下进行,变压器所产生的总损耗(空载损耗与负载损耗)与周边泥土形成热平衡的温度是否符合本标准的规定,并检验产品设计和地埋条件的合理性,发现产品和地埋周围的局部过热的程度。该试验方法从环境的设计及测量点选择均为地下式变压器温升试验首次使用,从而解决了其以往温升试验不能模拟其完全工况运行环境的问题。
发明内容:
本发明的目的是提供一种地埋式变压器温升试验方法,解决了地埋式变压器的温升试验:在地埋条件及额定发热状态下变压器所产生的总损耗(空载损耗与负载损耗) 与周边泥土形成热平衡的温度是否符合标准的规定,并检验产品设计和地埋条件的合理性,发现产品和地埋周围的局部过热的程度。
为实现上述目的,本发明提供一种地埋式变压器温升试验方法,其特征在于包括下列步骤:
试验环境
a.1地埋式变压器试验时不应出现与大气存在热交换的通风现象。坑埋或直埋时的变压器最高处应低于地表1000mm,坑或变压器周边应有一面较近的绝热墙体,其离坑的内壁或变压器的间距应不大于600mm,宽度至少为同侧坑内壁宽的1.5倍并与坑同深,若还有其他建筑物体应远离坑或变压器2000mm以上,但至少有二面大于5000mm 以上,否则视为特殊温升要求。
a.2坑或变压器四周的泥土中应有不低于50%的细沙组成,在500mm厚度内不得存在大于50mm直径的石块(底部除外)。地坑可混凝土或砖墙结构,其内壁应用水泥抹平。
a.3为保证坑内无水试验效果,坑内应设置水泵等自动排水设施;同时应设立溢水口,溢水口位置应与高低压电缆进出口位置在一水平面,以保证在有水试验时(如需),坑内水位的控制。由于温升试验时坑为全密封,为了试验时能有效监测坑内情况,可设置监控设施。
a.4试验地坑尺寸大小可根据最大试验容量来设置,变压器四周同坑壁距离应不小于150mm,坑埋时变压器箱盖最高点与坑顶盖板距离应保证不大于500mm,在进行小容量变压器试验时,可在坑顶垫高变压器,同时可填充水等液体至变压器底脚位置,以达到模拟坑底的效果。
a.5地埋变高低压电缆同变压器密封联接后通过预留的高低压电缆进出线孔引入到地上,以方便试验联接的需要。
b测温点选择
b.1环境温度应尽量稳定,要减少外部因素的影响,对于直埋式变压器试验时根据热传导性及对称原理应在地坑长、宽各一边设至少1处测温点,距变压器外壁100mm,深度分别为1000mm、1500mm,用于测量环境温度;
b.2对于坑埋式变压器,坑内壁处坑顶盖板下设立一温度传感器,用于测试坑顶温度;同时在坑底部与变压器底部同一水平线的坑壁处设立一温度传感器,用于测试坑底温度。
b.3为测量顶层油温,在其箱盖温度计底座中植入温度传感器,同时在油箱底部贴一温度传感器。
进一步所述的地埋式变压器温升试验方法,其特征在于所述的温升试验接线及方法、温升试验持续时间、绕组温度测量符合JB/T 501及GB 1094.2的规定。
进一步所述的地埋式变压器温升试验方法,其特征在于绕组温升计算及顶层油温升计算符合JB/T 501及GB 1094.2规定。
附图说明:
图1是本发明的温升试验坑埋示意图。
图2是本发明直埋式变压器环境测温点示意图。
图3是本发明坑埋变压器测温点示意图。
具体实施方式:
如图1所示,本发明提供一种地埋式变压器温升试验方法,其特征在于包括下列步骤:
a.1地埋式变压器试验时不应出现与大气存在热交换的通风现象,坑埋或直埋时的变压器最高处应低于地表1000mm,坑或变压器周边应有一面较近的绝热墙体,其离坑的内壁或变压器的间距应不大于600mm,宽度至少为同侧坑内壁宽的1.5倍并与坑同深,若还有其他建筑物体应远离坑或变压器2000mm以上,但至少有二面大于5000mm 以上,否则视为特殊温升要求。
a.2坑或变压器四周的泥土中应有不低于50%的细沙组成,在500mm厚度内不得存在大于50mm直径的石块(底部除外)。地坑可混凝土或砖墙结构,其内壁应用水泥抹平。
a.3为保证坑内无水试验效果,坑内应设置水泵等自动排水设施;同时应设立溢水口,溢水口位置应与高低压电缆进出口位置在一水平面,以保证在有水试验时(如需),坑内水位的控制。由于温升试验时坑为全密封,为了试验时能有效监测坑内情况,可设置监控设施。
a.4试验地坑尺寸大小可根据最大试验容量来设置,变压器四周同坑壁距离应不小于150mm,坑埋时变压器箱盖最高点与坑顶盖板距离应保证不大于500mm,在进行小容量变压器试验时,可在坑顶垫高变压器,同时可填充水等液体至变压器底脚位置,以达到模拟坑底的效果。
a.5地埋变高低压电缆同变压器密封联接后通过预留的高低压电缆进出线孔引入到地上,以方便试验联接的需要。
如图2、3所示,本发明提供一种地埋地变压器温升试验方法,其特征在于包括下列步骤:
b.1环境温度应尽量稳定,要减少外部因素的影响,对于直埋式变压器试验时根据热传导性及对称原理应在地坑长、宽各一边设至少1处测温点,距变压器外壁100mm,深度分别为1000mm、1500mm,用于测量环境温度;
b.2对于坑埋式变压器,坑内壁处坑顶盖板下设立一温度传感器,用于测试坑顶温度;同时在坑底部与变压器底部同一水平线的坑壁处设立一温度传感器,用于测试坑底温度。
b.3为测量顶层油温,在其箱盖温度计底座中植入温度传感器,同时在油箱底部贴一温度传感器。
进一步所述的地埋式变压器温升试验方法,其特征在于所述的温升试验接线及方法、温升试验持续时间、绕组温度测量符合JB/T 501及GB 1094.2的规定。
进一步所述的地埋式变压器温升试验方法,其特征在于绕组温升计算及顶层油温升计算符合JB/T 501及GB 1094.2规定。
c温度确定
顶层温度由植入箱盖上的温度计座内温度计或温度传感器所确定的。对于环境温度的确定:
直埋式变压器:
式中:θa——环境温度℃
θ1——坑边测温点1温度℃
θ2——坑边测温点2温度℃
坑埋式变压器:
式中:θa——环境温度℃
θk1——坑内顶层温度℃
θk2——坑内底层温度℃
油平均温度:
式中:θo——油平均温度℃
θo1——油顶层温度℃
θo2——油箱底层温度℃
绕组热点温升:
式中:τr——绕组热点温升℃
τo——油平均温升℃
Δτ——绕组对油平均温升℃
θo1——油顶层温度℃
θo2——油箱底层温度℃
KH——热点因素,KH=1.1-1.5,配电变压器取1.1,大中型变压器取1.3
d试验结果的判别
试验结果其温升或温度应符合地下式变压器的匝绝缘及层绝缘材料的耐温等级和绝缘液的耐温等级要求。
Claims (3)
1.一种地埋式变压器温升试验方法,其特征在于包括下列步骤:
a试验环境
a.1地埋式变压器试验时不应出现与大气存在热交换的通风现象,坑埋或直埋时的变压器最高处应低于地表1000mm,坑或变压器周边应有一面较近的绝热墙体,其离坑的内壁或变压器的间距应不大于600mm,宽度至少为同侧坑内壁宽的1.5倍并与坑同深,若还有其他建筑物体应远离坑或变压器2000mm以上,但至少有二面大于5000mm以上,否则视为特殊温升要求;
a.2坑或变压器四周的泥土中应有不低于50%的细沙组成,在500mm厚度内不得存在大于50mm直径的石块;地坑采用混凝土或砖墙结构,其内壁应用水泥抹平;
a.3为保证坑内无水试验效果,坑内应设置水泵用于排水;同时应设立溢水口,溢水口位置应与高低压电缆进出口位置在一水平面,以保证在有水试验时,坑内水位的控制;由于温升试验时坑为全密封,为了试验时能有效监测坑内情况,设置监控设施;
a.4试验地坑尺寸大小根据最大试验容量来设置,变压器四周同坑壁距离应不小于150mm,坑埋时变压器箱盖最高点与坑顶盖板距离应保证不大于500mm,在进行小容量变压器试验时,在坑底垫高变压器,同时填充水至变压器底脚位置,以达到模拟坑底的效果;
a.5地埋变高低压电缆同变压器密封联接后通过预留的高低压电缆进出线孔引入到地上,以方便试验联接的需要;
b测温点选择
b.1环境温度应尽量稳定,要减少外部因素的影响,对于直埋式变压器试验时根据热传导性及对称原理应在地坑长、宽各一边设至少1处测温点,距变压器外壁100mm,深度分别为1000mm、1500mm,用于测量环境温度;
b.2对于坑埋式变压器,坑内壁处坑顶盖板下设立一温度传感器,用于测试坑顶温度;同时在坑底部与变压器底部同一水平线的坑壁处设立一温度传感器,用于测试坑底温度;
b.3为测量顶层油温,在其箱盖温度计底座中植入温度传感器,同时在油箱底部贴一温度传感器;
c.温度确定:
顶层温度由植入箱盖上的温度计座内温度计或温度传感器所确定的;对于环境温度的确定:
直埋式变压器:
式中:θa——环境温度℃
θ1——坑边测温点1温度℃
θ2——坑边测温点2温度℃
坑埋式变压器:
式中:θa——环境温度℃
θk1——坑内顶层温度℃
θk2——坑内底层温度℃
油平均温度:
式中:θo——油平均温度℃
θo1——油顶层温度℃
θo2——油箱底层温度℃
绕组热点温升:
式中:τr——绕组热点温升℃
τo——油平均温升℃
Δτ——绕组对油平均温升℃
θo1——油顶层温度℃
θo2——油箱底层温度℃
KH——热点因素,KH=1.1-1.5,配电变压器取1.1,大中型变压器取1.3
d.试验结果的判别:
试验结果其温升或温度应符合地下式变压器的匝绝缘及层绝缘材料的耐温等级和绝缘液的耐温等级要求。
2.根据权利要求1所述的地埋式变压器温升试验方法,其特征在于:所述的温升试验接线及方法、温升试验持续时间、绕组温度测量符合JB/T501及GB1094.2的规定。
3.根据权利要求2所述的地埋式变压器温升试验方法,其特征在于:绕组温升计算及顶层油温升计算符合JB/T501及GB1094.2规定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810099317.3A CN110082615B (zh) | 2018-01-26 | 2018-01-26 | 地埋式变压器温升试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810099317.3A CN110082615B (zh) | 2018-01-26 | 2018-01-26 | 地埋式变压器温升试验方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110082615A CN110082615A (zh) | 2019-08-02 |
CN110082615B true CN110082615B (zh) | 2021-08-24 |
Family
ID=67412715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810099317.3A Active CN110082615B (zh) | 2018-01-26 | 2018-01-26 | 地埋式变压器温升试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110082615B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113835006A (zh) * | 2021-09-24 | 2021-12-24 | 南方电网科学研究院有限责任公司 | 热固性环氧绝缘件阶梯温升试验测试方法、装置及应用 |
CN116432406B (zh) * | 2023-03-09 | 2024-02-02 | 广东电网有限责任公司佛山供电局 | 一种油浸式变压器工作绕组热点温度计算的方法及装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200969278Y (zh) * | 2006-10-24 | 2007-10-31 | 上海置信电气非晶有限公司 | 直埋式非晶合金油浸变压器 |
CN101651013A (zh) * | 2008-08-13 | 2010-02-17 | 上海市电力公司 | 一种地埋式配电变压器的散热结构 |
CN101964245A (zh) * | 2009-07-24 | 2011-02-02 | 上海瑞奇电气设备有限公司 | 防雷、防过电压、过电流的地下式全密封组合变压器 |
CN103558810A (zh) * | 2006-03-16 | 2014-02-05 | 功率监视器公司 | 地下监视***和方法 |
CN106932219A (zh) * | 2017-05-03 | 2017-07-07 | 国网上海市电力公司 | 一种基于分体布置式的变压器冷却模拟试验装置 |
CN107066799A (zh) * | 2017-01-03 | 2017-08-18 | 国网上海市电力公司 | 一种地下变电站分体式冷却变压器热点温度计算方法 |
CN107462802A (zh) * | 2017-08-18 | 2017-12-12 | 国网上海市电力公司 | 一种500kV地下变电站接地***状态评估方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140172327A1 (en) * | 2012-12-18 | 2014-06-19 | Eaton Corporation | Underground transformer electrical fault detection using acoustic sensing technology |
US20140176336A1 (en) * | 2012-12-21 | 2014-06-26 | eLuminon, LLC. | System, method, and apparatus for remotely monitoring surge arrester conditions |
-
2018
- 2018-01-26 CN CN201810099317.3A patent/CN110082615B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103558810A (zh) * | 2006-03-16 | 2014-02-05 | 功率监视器公司 | 地下监视***和方法 |
CN200969278Y (zh) * | 2006-10-24 | 2007-10-31 | 上海置信电气非晶有限公司 | 直埋式非晶合金油浸变压器 |
CN101651013A (zh) * | 2008-08-13 | 2010-02-17 | 上海市电力公司 | 一种地埋式配电变压器的散热结构 |
CN101964245A (zh) * | 2009-07-24 | 2011-02-02 | 上海瑞奇电气设备有限公司 | 防雷、防过电压、过电流的地下式全密封组合变压器 |
CN107066799A (zh) * | 2017-01-03 | 2017-08-18 | 国网上海市电力公司 | 一种地下变电站分体式冷却变压器热点温度计算方法 |
CN106932219A (zh) * | 2017-05-03 | 2017-07-07 | 国网上海市电力公司 | 一种基于分体布置式的变压器冷却模拟试验装置 |
CN107462802A (zh) * | 2017-08-18 | 2017-12-12 | 国网上海市电力公司 | 一种500kV地下变电站接地***状态评估方法 |
Non-Patent Citations (2)
Title |
---|
Direct-Buried Transformer Thermal Tests;NICHOLAS A. LUCIC;《IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS》;19701031;第89卷(第7期);第1662-1669页 * |
地埋式变压器温升及地埋***热传递过程;胡敏 等;《高电压技术》;20090630;第35卷(第6期);第1497-1501页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110082615A (zh) | 2019-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110082615B (zh) | 地埋式变压器温升试验方法 | |
CN104330659B (zh) | 一种基于电缆传热模型的准动态增容方法 | |
CN205374438U (zh) | 一种盐渍土路基在干湿循环作用下的变形测试装置 | |
CN205120702U (zh) | 一种水产养殖用水质监测装置 | |
CN101988886B (zh) | 一种用于研究坡面径流和地下孔裂隙流的模拟试验装置 | |
CN205134394U (zh) | 一种检测吸力桶形基础在倾斜荷载作用下抗拔承载力的装置 | |
CN104502562A (zh) | 一种竖井排水固结软基处理模型试验装置及试验方法 | |
CN105784935B (zh) | 一种多功能融冰雪路面试验装置及评价方法 | |
CN108181446A (zh) | 一种冻土区隧道衬砌背后局部积水冻融循环作用模拟、监测装置 | |
CN203720123U (zh) | 寒区隧道室内试验装置 | |
CN208476921U (zh) | 一种冻土区隧道衬砌背后局部积水冻融循环作用模拟、监测装置 | |
CN109030236A (zh) | 一种城市地下综合管廊结构火灾行为试验装置及试验方法 | |
CN110824141A (zh) | 一种多功能冻土模型试验装置及其试验方法 | |
CN104712847B (zh) | 一种浅埋柔性管道施工方法 | |
CN108802349B (zh) | 一种常压环境下考虑热氧老化和水损害耦合作用对ogfc性能影响的室内试验方法 | |
CN109723025B (zh) | 一种地下结构边界渗流试验装置及其使用方法 | |
CN105806676B (zh) | 一种精确制备不同含水率岩土试样的装置 | |
CN109540463B (zh) | 长距离引水渠道循环水流冻结模型试验装置及试验方法 | |
CN203367936U (zh) | 电缆沟 | |
CN206339363U (zh) | 一种简易地下结构物浮力分析模型试验装置 | |
CN114018970B (zh) | 一种寒区多功能冻结低温模型试验装置 | |
CN206430788U (zh) | 磁翻板液位计 | |
CN109188333A (zh) | 一种接地网接地电阻小比例试验模型及修正方法 | |
CN212159795U (zh) | 一种泥石流启动室内模拟试验装置 | |
CN206992198U (zh) | 一种可升降式地下防水电池仓 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: SHANGHAI RUIQI ELECTRICAL EQUIPMENT Co.,Ltd. Document name: Notification of Patent Invention Entering into Substantive Examination Stage |
|
DD01 | Delivery of document by public notice | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Xu Xingcai Document name: Notification of conformity |
|
DD01 | Delivery of document by public notice |