CN110080277A - Using the di rect-buried bolt installation method of installation moulding bed - Google Patents

Using the di rect-buried bolt installation method of installation moulding bed Download PDF

Info

Publication number
CN110080277A
CN110080277A CN201910277930.4A CN201910277930A CN110080277A CN 110080277 A CN110080277 A CN 110080277A CN 201910277930 A CN201910277930 A CN 201910277930A CN 110080277 A CN110080277 A CN 110080277A
Authority
CN
China
Prior art keywords
moulding bed
bolt
installation
fixture
folding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910277930.4A
Other languages
Chinese (zh)
Other versions
CN110080277B (en
Inventor
管聪聪
潘志刚
沈汉兵
刘高峰
宋茂祥
曾斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201910277930.4A priority Critical patent/CN110080277B/en
Publication of CN110080277A publication Critical patent/CN110080277A/en
Application granted granted Critical
Publication of CN110080277B publication Critical patent/CN110080277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to the basic field as substructure, specially a kind of di rect-buried bolt installation method using installation moulding bed.A kind of di rect-buried bolt installation method using installation moulding bed, including 1. moulding bed is installed, it is characterized in that: successively implementing as follows: 1. installing moulding bed;2. assembling reinforcement and installation template;3. installing bolt;4. casting concrete.Quick for installation, save the cost of the invention, securely and reliably.

Description

Using the di rect-buried bolt installation method of installation moulding bed
Technical field
The present invention relates to the basic field as substructure, specially a kind of di rect-buried bolt installation using installation moulding bed Method.
Background technique
Building surface in big industrial factory needs to install large number of equipment in construction, and all equipment installations all need to be consolidated with bolt The mode that people generally use di rect-buried bolt when determining, and constructing carries out bolt installment work, and so-called di rect-buried bolt directly will Location and installation is cast in concrete foundation bolt on framework of steel reinforcement by drawing, only need to be pre- by pedestal when equipment installation It boxes out and covers on di rect-buried bolt, carry out centering, fastening work;Usually one hand steered bolt, another when live bolt is installed Hand be welded and fixed operation, while both hands will also also take into account shield, and workpeople in order to install bolt usually only faster Probably to fix bolt and framework of steel reinforcement binding site, adjusted by tilt bolt angle upper position guarantee bolt with Axial location is coincide, and the usual perpendicularity deviation of the bolt constructed in this way is excessive, and carries out multitrack operation content construction simultaneously, There are more security risks.
Summary of the invention
In order to overcome the drawbacks of the prior art, a kind of quick for installation, save the cost, safe and reliable mounting bracket are provided, The invention discloses a kind of di rect-buried bolt installation methods using installation moulding bed.
The present invention reaches goal of the invention by following technical solution:
1. a kind of di rect-buried bolt installation method using installation moulding bed, including installs moulding bed, it is characterized in that: as follows according to Secondary implementation:
1. installing moulding bed: moulding bed includes moulding bed ontology, fixed link, folding and unfolding wire box, cotton rope and fixture, and moulding bed ontology is cube Frame, moulding bed ontology includes sheer pole, cross tube and upright bar, and sheer pole, cross tube and upright bar respectively have four, four sheer poles Successively it is spliced into the lower rectangular frame and upper rectangular frame of congruence, the both ends difference of four upright bars from beginning to end respectively with four cross tubes Connect the corresponding vertex of the lower rectangular frame and the upper rectangular frame vertically to be spliced into the moulding bed ontology of cube;
Fixed link is cross horizontal bars, and four the outer end points of fixed link are separately fixed on the midpoint of four cross tubes, Folding and unfolding wire box is fixed on the crosspoint at fixed link center, winding mechanism is equipped in folding and unfolding wire box, one end of cotton rope ties up to folding and unfolding On winding mechanism in wire box, the other end of cotton rope connects the fixture of horizontally disposed annular after drawing out of folding and unfolding wire box;
Fixture is equipped with inside-diameter adjustment device, the central point that straight line where cotton rope passes through fixture when fixture cotton rope is freely sagging.
2. assembling reinforcement and installation template: on the basis of assembling reinforcement, when binding constructs in strict accordance with drawing requirement, steel Muscle binding finishes and the installation template after management acceptance(check), it is noted that the control of sectional dimension, indwelling are controlled well when template is installed Line processed, for checking template installation situation, when template equally reports the pre- acceptance(check) of management after the installation is completed;
3. installing bolt: moulding bed ontology is placed on the anchor point of bolt, by sheer pole and outside rubber and reinforcing bar it is tight Close friction fixes moulding bed ontology, and moulding bed ontology is avoided to be subjected to displacement, by bolt be inserted in the centre bore of fixture and with folder Tool is fixed, and is packed up cotton rope by folding and unfolding wire box to sling fixture to keep bolt in a vertical state, is then passed through folding and unfolding wire box Release cotton rope transferred bolt vertically to designed elevation, bolt still keeps vertical state at this time, can fixing bolt, so Other bolts are fixed one by one;
4. casting concrete: the casting concrete in template, it is noted that checking the stabilization of basic framework in time when casting concrete Property, it finds there be handling in time for mobile tendency, bolt relative position is avoided to change, meanwhile, to carry out the vibration of concrete Work is smash, to accomplish " fast insert pulls out slowly, is layered not leak source ", avoiding concrete, there are honeycombs, leakage the muscle even generation of hole phenomenon.
The described di rect-buried bolt installation method using installation moulding bed, it is characterized in that: step 1. when, sheer pole and cross tube All to be tubular, soft rubber is coated on the lateral surface of sheer pole, sheer pole, cross tube and upright bar all select aluminium alloy etc. hollow Light alloy material.
The invention has the following beneficial effects: the installations that can quickly and efficiently complete bolt to position work, guarantees bolt Verticality, avoiding the occurrence of tilt bolt causes equipment that can not install in place, has effectively saved cost of labor, has reduced process Between uncertain factor, saved the duration, simultaneously, it is ensured that the safety of worker avoids sucking a large amount of noxious materials.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram when present invention uses.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A kind of di rect-buried bolt installation method using installation moulding bed, successively implements as follows:
1. installing moulding bed: moulding bed includes moulding bed ontology 1, fixed link 2, folding and unfolding wire box 3, cotton rope 4 and fixture 5, tire as shown in Figure 1: Frame ontology 1 is the frame of cube, and moulding bed ontology 1 includes sheer pole 11, cross tube 12 and upright bar 13, sheer pole 11, cross tube 12 and upright bar 13 respectively have four, four sheer poles 11 and four cross tubes 12 are successively spliced into the lower rectangle frame of congruence from beginning to end respectively Frame and upper rectangular frame, the both ends of four upright bars 13 are respectively perpendicular pair for connecting the lower rectangular frame and the upper rectangular frame Vertex is answered to be spliced into the moulding bed ontology 1 of cube;In the present embodiment: sheer pole 11 and cross tube 12 are all tubular, lower cross Soft rubber is coated on the lateral surface of bar 11, the hollow lights such as aluminium alloy are all selected in sheer pole 11, cross tube 12 and upright bar 13 Alloy material;
Fixed link 2 is cross horizontal bars, and four the outer end points of fixed link 2 are separately fixed at the midpoint of four cross tubes 12 On, folding and unfolding wire box 3 is fixed on the crosspoint at 2 center of fixed link, and winding mechanism, one end system of cotton rope 4 are equipped in folding and unfolding wire box 3 On the winding mechanism in folding and unfolding wire box 3, the other end of cotton rope 4 connects horizontally disposed annular after drawing out of folding and unfolding wire box 3 Fixture 5;
Fixture 5 is equipped with inside-diameter adjustment device, and 4 place straight line of cotton rope passes through the central point of fixture 5 when 5 cotton rope of fixture 4 is freely sagging.
2. assembling reinforcement and installation template: on the basis of assembling reinforcement 6, when binding constructs in strict accordance with drawing requirement, steel The binding of muscle 6 finishes and the installation template 7 after management acceptance(check), it is noted that the control of sectional dimension, indwelling are good when template 7 is installed Control line, for checking 7 installation situation of template, when the equally report pre- acceptance(check) of management after the installation is completed of template 7;
3. installing bolt: moulding bed ontology 1 being placed on the anchor point of bolt 8, pass through sheer pole 11 and the rubber and reinforcing bar of outside 6 tight friction fixes moulding bed ontology 1, and moulding bed ontology 1 is avoided to be subjected to displacement, and bolt 8 is inserted in the centre bore of fixture 5 It is interior and fixed with fixture 5, cotton rope 4 is packed up by folding and unfolding wire box 3 to sling fixture 5 to keep bolt 8 in a vertical state, then Cotton rope 4 is released by folding and unfolding wire box 3 transferring bolt 8 to designed elevation vertically, bolt 8 still keeps vertical state at this time, Can fixing bolt 8, so fix other bolts 8 one by one;
4. casting concrete: the casting concrete in template 7, it is noted that checking the steady of basic framework in time when casting concrete Qualitative, discovery has handling in time for mobile tendency, and 8 relative position of bolt is avoided to change, meanwhile, to carry out concrete It vibrates work, to accomplish " fast insert pulls out slowly, be layered not leak source ", avoid concrete there are honeycomb, leak the hair of muscle or even hole phenomenon It is raw.

Claims (2)

1. a kind of di rect-buried bolt installation method using installation moulding bed, including 1. moulding bed is installed, it is characterized in that: as follows Successively implement:
1. installing moulding bed: moulding bed includes moulding bed ontology (1), fixed link (2), folding and unfolding wire box (3), cotton rope (4) and fixture (5), tire Frame ontology (1) is the frame of cube, and moulding bed ontology (1) includes sheer pole (11), cross tube (12) and upright bar (13), sheer pole (11), cross tube (12) and upright bar (13) respectively have four, and four sheer pole (11) He Sigen cross tubes (12) distinguish successively head and the tail It is spliced into the lower rectangular frame and upper rectangular frame of congruence, the both ends of four upright bars (13) are respectively perpendicular the connection lower rectangle frame The corresponding vertex of frame and the upper rectangular frame is to be spliced into the moulding bed ontology (1) of cube;
Fixed link (2) is cross horizontal bars, and four the outer end points of fixed link (2) are separately fixed at four cross tubes (12) Midpoint on, folding and unfolding wire box (3) is fixed on the crosspoint at fixed link (2) center, winding mechanism is equipped in folding and unfolding wire box (3), One end of cotton rope (4) ties up on the winding mechanism in folding and unfolding wire box (3), and the other end of cotton rope (4) is drawn out of folding and unfolding wire box (3) The fixture (5) of horizontally disposed annular is connected afterwards;
Fixture (5) is equipped with inside-diameter adjustment device, and straight line where cotton rope (4) passes through fixture when fixture (5) cotton rope (4) is freely sagging (5) central point;
2. assembling reinforcement and installation template: on the basis of assembling reinforcement (6), reinforcing bar (6) bind after installation template (7);
3. installing bolt: moulding bed ontology (1) being placed on the anchor point of bolt (8), pass through sheer pole (11) and the rubber of outside Moulding bed ontology (1) is fixed with the tight friction of reinforcing bar (6), moulding bed ontology (1) is avoided to be subjected to displacement, bolt (8) are covered Enter in the centre bore of fixture (5) and with fixture (5) fixation, cotton rope (4) is packed up by folding and unfolding wire box (3) with sling fixture (5) from And keep bolt (8) in a vertical state, then by folding and unfolding wire box (3) release cotton rope (4) with by bolt (8) vertically decentralization to setting Count absolute altitude, bolt (8) still keeps vertical state at this time, can fixing bolt (8), so fix other bolts (8) one by one;
4. casting concrete: in template (7) interior casting concrete.
2. the di rect-buried bolt installation method using installation moulding bed as described in claim 1, it is characterized in that: step 1. when, lower cross Bar (11) and cross tube (12) be all it is tubular, soft rubber, sheer pole (11), upper cross are coated on the lateral surface of sheer pole (11) Aluminium alloy is all selected in bar (12) and upright bar (13).
CN201910277930.4A 2019-04-08 2019-04-08 Direct-buried bolt mounting method adopting mounting jig frame Active CN110080277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910277930.4A CN110080277B (en) 2019-04-08 2019-04-08 Direct-buried bolt mounting method adopting mounting jig frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910277930.4A CN110080277B (en) 2019-04-08 2019-04-08 Direct-buried bolt mounting method adopting mounting jig frame

Publications (2)

Publication Number Publication Date
CN110080277A true CN110080277A (en) 2019-08-02
CN110080277B CN110080277B (en) 2021-01-15

Family

ID=67414485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910277930.4A Active CN110080277B (en) 2019-04-08 2019-04-08 Direct-buried bolt mounting method adopting mounting jig frame

Country Status (1)

Country Link
CN (1) CN110080277B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172984A (en) * 1999-12-21 2001-06-26 Yoshinori Okura Anchor bolt retaining fittings
CN101538858A (en) * 2009-04-15 2009-09-23 中国十七冶建设有限公司 Method and device for jointing reinforcement and vibration readjustment construction of pre-embedded bolt

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172984A (en) * 1999-12-21 2001-06-26 Yoshinori Okura Anchor bolt retaining fittings
CN101538858A (en) * 2009-04-15 2009-09-23 中国十七冶建设有限公司 Method and device for jointing reinforcement and vibration readjustment construction of pre-embedded bolt

Also Published As

Publication number Publication date
CN110080277B (en) 2021-01-15

Similar Documents

Publication Publication Date Title
US9267287B1 (en) Pre-fabricated threaded bar assemblies
CN111877603B (en) Precast concrete shear wall supporting and grouting surrounding integrated tool system and method
CN103470093B (en) Concrete chimney dismantling method
CN108915153A (en) Assembly concrete superposed column installation method and system
JP3878900B2 (en) Remodeling method to remove pillar of existing building
CN110080277A (en) Using the di rect-buried bolt installation method of installation moulding bed
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
JP3158383U (en) Body reinforcement assembly jig
CN117005664A (en) Electric translation type hanging basket
KR102281205B1 (en) Extension arm and construction method of transmission tower
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
KR101918450B1 (en) Structure Using Non Scaffold and Construction Method thereof
CN210316610U (en) Direct-buried bolt mounting jig frame
CN211647357U (en) Tool type chute
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
JP6223874B2 (en) Lifting device and method of attaching and removing pole using the same
JP6446075B2 (en) How to build a curing net
CN112096075B (en) Safety protection method for precast beam construction
JPH11247450A (en) Precast column unit and column construction method using it
CN216056154U (en) Cable pipe gallery convenient to assembly
CN104818675A (en) Assembling method of rebar segments
CN220365282U (en) Electric translation type hanging basket
CN214784805U (en) Embedded part replacing inner expansion pipe
CN213391169U (en) Outer wall scaffold is wall structure even
CN212002197U (en) Wall connecting piece capable of being freely assembled and disassembled

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant