CN110056193B - Wall steel bar drag hook installation method - Google Patents

Wall steel bar drag hook installation method Download PDF

Info

Publication number
CN110056193B
CN110056193B CN201910464124.8A CN201910464124A CN110056193B CN 110056193 B CN110056193 B CN 110056193B CN 201910464124 A CN201910464124 A CN 201910464124A CN 110056193 B CN110056193 B CN 110056193B
Authority
CN
China
Prior art keywords
drag hook
adjusting sleeve
hook
threaded
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910464124.8A
Other languages
Chinese (zh)
Other versions
CN110056193A (en
Inventor
杨嘉平
袁浩峰
谢菲菲
王萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910464124.8A priority Critical patent/CN110056193B/en
Publication of CN110056193A publication Critical patent/CN110056193A/en
Application granted granted Critical
Publication of CN110056193B publication Critical patent/CN110056193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/122Machines for joining reinforcing bars
    • E04G21/123Wire twisting tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a tool for installing a wall steel bar drag hook, which comprises an adjusting sleeve, a threaded pipe and a screw rod, wherein the size of a pipe orifice at the left end of the adjusting sleeve is matched with the threaded pipe, a forward internal thread is arranged at the pipe orifice at the left end, and a matched forward thread is arranged on the outer wall of the threaded pipe; the size of the pipe orifice at the right end of the adjusting sleeve is matched with the screw, and the pipe orifice at the right end is provided with a reverse internal thread; the inner diameter of the threaded pipe is larger than the diameter of the screw rod; the adjusting sleeve is provided with a handle, and the method for installing the steel bar drag hook is also provided: the distance between hooks at two ends of the tool is adjusted; the hook is hooked on the net sheet, and the lower hook is positioned near the position where the S-shaped drag hook is required to be hung; the threaded pipes and the threaded rods at the two ends are contracted, and the hooks are tensioned to enable the middle of the reinforcing mesh to be inwards bent until the distance is smaller than or equal to the distance between the two end points of the S-shaped drag hook; 5) The S-shaped hooks with two ends bent to 135 degrees are hung on the reinforcing steel meshes at two sides, the two hooks are loosened, and the tool is detached.

Description

Wall steel bar drag hook installation method
Technical Field
The invention belongs to a field installation technology of a wall steel bar drag hook, and particularly relates to a method for installing a wall steel bar.
Background
When the construction field is used for constructing the cast-in-place concrete shear wall, firstly, the double-layer reinforcement mesh is bound, then the traditional reinforcement drag hook is used for binding, then, the stay is placed on the reinforcement mesh to ensure the thickness of the shear wall, and then, the reinforcement protection cushion block is placed on the main reinforcement of the shear wall to ensure the positions of the main reinforcement and the templates.
In the existing concrete shear wall structure design, a large number of S-shaped steel bar drag hooks are designed and used and are arranged in the wall in a quincuncial shape so as to meet the earthquake-resistant requirement of the building. In the normal construction process, one end of the tail end of the steel bar drag hook is processed into a 135-degree hook, and the other end of the tail end of the steel bar drag hook is processed into a 90-degree hook. After the steel bar drag hook is bound and formed, one end of the 90-degree hook needs to be bent into a 135-degree angle by adopting a simple steel bar spanner, and the length of the bent straight part of the hook is not less than 10d. The number of the steel bar drag hooks used in construction is huge, the angle is not well controlled when the end is secondarily bent, the length of the straight section of the hook is controlled only according to the condition of being tightly attached to the wall bar, the forming quality is not well controlled, and the construction effect is very easy to be in a condition of not meeting the specification and design requirements.
Disclosure of Invention
The invention aims to solve the problem that in the prior art, the angle of a hook head and the length shape of a straight section cannot be accurately controlled due to the field secondary bending of a steel bar hook.
The invention provides the following technical scheme for solving the problem that the shape and the specification of the second bending of the steel bar drag hook are not standard:
the wall steel bar drag hook installing method includes the steps of using installing tool comprising regulating sleeve, threaded pipe and screw, with hooks fixed to the outer ends of the threaded pipe and screw; the size of the pipe orifice at the left end of the adjusting sleeve is matched with that of the threaded pipe, the pipe orifice at the left end is provided with a forward internal thread, and the outer wall of the threaded pipe is provided with a matched forward thread; the size of the pipe orifice at the right end of the adjusting sleeve is matched with the screw, the pipe orifice at the right end is provided with reverse internal threads, and the surface of the screw is provided with the matched reverse threads; the threaded pipe and the central shaft of the screw rod are collinear, and the inner diameter of the threaded pipe is larger than the diameter of the screw rod; the adjusting sleeve is provided with a handle which is perpendicular to the axis of the adjusting sleeve; the length of the adjusting sleeve = the length of the threaded pipe = the length of the screw rod = 1/2 x the length of the S-shaped drag hook with the two ends bent;
the specific operation process is as follows:
1) After binding the reinforcing steel bars of the wall body, bending two ends of the S-shaped drag hook into 135-degree angles;
2) The whole length of the tool is adjusted to enable the distance between hooks at two ends to be larger than the distance between two reinforcing steel meshes;
3) Before the S-shaped drag hook is ready to be installed, the two ends of the device are hooked on the net sheet, and the lower hook is positioned near the position where the S-shaped drag hook is needed to be hung;
4) Rotating the adjusting sleeve, shrinking the threaded pipes and the threaded rods at the two ends, and tightening the reinforcing steel bar net sheet by the hook to enable the middle to bend inwards, and stopping operation when the distance between the bending parts of the reinforcing steel bar net sheet is smaller than or equal to the distance between the two end points of the S-shaped drag hook;
5) The S-shaped hook is hooked on the reinforcing steel meshes at two sides, then the hooks at two ends are reversely loosened, and the S-shaped hook is continuously installed at the next position after the tool is disassembled.
According to the invention, the wall mesh steel bars are pulled close by utilizing the thread biting force, so that the installation of the steel bar drag hook is convenient, the site secondary bending of the steel bars is not needed, the installation quality of the drag hook can be ensured, the standard and design requirements are met, the time and labor are saved in the installation process, the pulling force is stable, the reworking cost is saved, and the resource utilization rate is improved.
Drawings
FIG. 1 is an exploded view of an installation tool construction;
FIG. 2 is an assembly block diagram of an installation tool;
fig. 3 is a state diagram of a mounting tool for pulling wall steel bars and a mounting steel disc drag hook;
fig. 4 is a state diagram showing the removal tool and the steel bar drag hook after installation.
In the figure, a threaded pipe 1, a screw rod 2, an adjusting sleeve 3, a handle 4, a reinforcing mesh 5 and an S-shaped drag hook 6.
Detailed Description
The invention is further described below with reference to the accompanying drawings. As shown in fig. 1 and 2, the main components of the present mounting device include: a threaded tube 1, an adjusting sleeve 3 and a screw 2.
The outer end of the threaded pipe 1 is fixedly connected with a hook, and the outer surface of the pipe body is provided with external threads.
The outer end of the screw rod 2 is fixedly connected with a hook, and the outer surface of the screw rod is provided with threads. The screw thread of the screw 2 is opposite to the external thread of the threaded pipe 1, i.e. if the surface of the threaded pipe 1 is a forward thread, the surface of the screw 2 should be designed as a reverse thread. The right port of the adjusting sleeve 3 has the same specification as the inner circle of the threaded pipe 1.
The pipe wall thickness of the two side end faces of the adjusting sleeve 3 is different, and the pipe orifice of the end face is opened according to the size of the part to be installed. The size of the pipe orifice at the left end of the adjusting sleeve 3 is matched with that of the threaded pipe 1, the pipe orifice at the left end is provided with a forward internal thread, and the outer wall of the threaded pipe 1 is provided with a matched forward thread; the size of the right end pipe orifice of the adjusting sleeve 3 is matched with that of the screw rod 2, the right end pipe orifice is provided with a reverse internal thread, and the surface of the screw rod 2 is a matched reverse thread. The opposite threads allow the threaded tube 1 and the screw 2 to be "extended" or "retracted" simultaneously as the adjustment sleeve 3 is rotated.
The inner diameter of the threaded pipe 1 is slightly larger than the outer diameter of the threaded rod 2, so that the condition that the threaded rod 2 and the threaded pipe 1 are opposite to each other in the adjusting sleeve 3 when the threaded rod and the threaded pipe are retracted is avoided, the central axes of the threaded rod 2 and the threaded pipe 1 are collinear, the threaded rod 2 can be inserted into the threaded pipe 1 when retracted, enough space is reserved in the threaded pipe 1, the movement of the threaded rod 2 is not influenced, and the normal use of the device is ensured;
after the tool is formed, the threaded pipe 1 and the screw rod 2 are respectively installed into the adjusting sleeve 3 from two sides, the adjusting sleeve 3 is designed to be used for adjusting the extension or contraction length of two ends, therefore, the threaded structures of the two sides are opposite threads, and the threaded pipe 1 and the screw rod 2 can synchronously enter or exit when the adjusting sleeve 3 rotates.
Further, the handle 4 is fixedly connected to the outer part of the adjusting sleeve 3, the handle 4 can be made of straight steel pipes, and two sections of straight steel pipes are symmetrically welded on the outer wall of the adjusting sleeve in a direction perpendicular to the axis of the adjusting sleeve.
The length and the diameter of all the rods of the tool can be adjusted and changed according to the actual wall thickness of a construction site. Taking a wall body with the thickness of 800mm as an example, preferably, the threaded pipe 1 is made of a seamless steel pipe with the outer diameter of 42mm, the wall thickness of 6mm and the length of 300mm, so that the strength of the pipe wall can be ensured by throwing after the pipe wall is threaded. Preferably, the adjusting sleeve 3 is made of a seamless steel pipe with an outer diameter of 60mm, a wall thickness of 6mm and a length of 300 mm. Preferably, the screw 2 is made of round steel with a diameter of 22 mm. Preferably, the outer handle 4 of the adjusting sleeve is made of steel pipes with the diameter of 20mm, the wall thickness of 3mm and the length of 200 mm.
Preferably, the length of the threaded tube 1, the screw rod 2 and the adjusting sleeve 3 is 1:1:1, and the length is set to be one half of the linear distance between two ends of the steel bar drag hook. The length of the outer handle 4 of the adjusting sleeve is set in combination with the mesh size of the wall steel bars to facilitate the device to be taken out from the wall steel bars as a reference after the installation is completed.
The method for installing the steel bar drag hook by adopting the tool is as shown in fig. 3 and 4:
1) After binding the reinforcing steel bars of the wall body, bending two ends of the S-shaped drag hook into 135-degree angles;
2) The whole length of the tool is adjusted to enable the distance between hooks at two ends to be larger than the distance between two reinforcing steel meshes;
3) Before the S-shaped drag hook is ready to be installed, the two ends of the device are hooked on the net sheet, and the lower hook is positioned near the position where the S-shaped drag hook is needed to be hung;
4) The adjusting sleeve 3 is rotated, the threaded pipes 1 and the threaded rods 2 at the two ends are contracted, the hooks tighten the reinforcing steel bar net 5 to enable the middle to bend inwards, and when the distance between the bending parts of the reinforcing steel bar net 5 is smaller than or equal to the distance between the two end points of the S-shaped drag hook 6, the operation is stopped;
5) The S-shaped drag hook 6 is hung on the reinforcing steel meshes 5 at two sides, then the hooks at two ends are reversely loosened, and the S-shaped drag hook is continuously installed at the next position after the tool is disassembled.
According to the invention, the mesh steel bars of the wall body are pulled close by utilizing the thread biting force, so that the installation of the steel bar drag hook is convenient, the two ends of the steel bar drag hook are bent in place before the installation, no personnel are required to separately arrange to bend the steel bar drag hook for the second time, the installation quality of the drag hook can be ensured, the standard and design requirements are met, the time and the labor are saved in the installation process, the pulling force is stable, the reworking cost is saved, and the resource utilization rate is improved.

Claims (1)

1. A wall steel bar drag hook installation method is characterized in that: the used installation tool comprises an adjusting sleeve, a threaded pipe and a screw rod, wherein hooks are fixedly connected to the outer ends of the threaded pipe and the screw rod; the size of the pipe orifice at the left end of the adjusting sleeve is matched with that of the threaded pipe, the pipe orifice at the left end is provided with a forward internal thread, and the outer wall of the threaded pipe is provided with a matched forward thread; the size of the pipe orifice at the right end of the adjusting sleeve is matched with the screw, the pipe orifice at the right end is provided with reverse internal threads, and the surface of the screw is provided with the matched reverse threads; the threaded pipe and the central shaft of the screw rod are collinear, and the inner diameter of the threaded pipe is larger than the diameter of the screw rod; the adjusting sleeve is provided with a handle which is perpendicular to the axis of the adjusting sleeve; the length of the adjusting sleeve = the length of the threaded pipe = the length of the screw rod = 1/2 x the length of the S-shaped drag hook with the two ends bent;
the specific operation process is as follows:
1) After binding the reinforcing steel bars of the wall body, bending two ends of the S-shaped drag hook into 135-degree angles;
2) Adjusting the whole length of the installation tool to enable the distance between hooks at two ends to be larger than the distance between two reinforcing steel meshes;
3) Before the S-shaped drag hook is ready to be installed, hooks at two ends of an installation tool are hooked on the net sheet, and the lower hook is positioned near the position where the S-shaped drag hook is needed to be hung;
4) Rotating the adjusting sleeve, shrinking the threaded pipes and the threaded rods at the two ends, and tightening the reinforcing steel bar net sheet by the hook to enable the middle to bend inwards, and stopping operation when the distance between the bending parts of the reinforcing steel bar net sheet is smaller than or equal to the distance between the two end points of the S-shaped drag hook;
5) The S-shaped hook is hooked on the reinforcing steel meshes at two sides, then the hooks at two ends are reversely loosened, and the S-shaped hook is continuously installed at the next position after the tool is disassembled.
CN201910464124.8A 2019-05-30 2019-05-30 Wall steel bar drag hook installation method Active CN110056193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910464124.8A CN110056193B (en) 2019-05-30 2019-05-30 Wall steel bar drag hook installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910464124.8A CN110056193B (en) 2019-05-30 2019-05-30 Wall steel bar drag hook installation method

Publications (2)

Publication Number Publication Date
CN110056193A CN110056193A (en) 2019-07-26
CN110056193B true CN110056193B (en) 2024-02-13

Family

ID=67325273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910464124.8A Active CN110056193B (en) 2019-05-30 2019-05-30 Wall steel bar drag hook installation method

Country Status (1)

Country Link
CN (1) CN110056193B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324365U (en) * 2011-10-28 2012-07-11 张吉华 Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN205907878U (en) * 2016-06-30 2017-01-25 江苏瑞永建设工程技术有限公司 A anti hook assembly that floats that is used for cast -in -place hollow superstructure board
CN206393536U (en) * 2016-12-16 2017-08-11 国家电网公司 A kind of electric operating double-hook wire grip
CN206442053U (en) * 2016-12-28 2017-08-25 国网冀北电力有限公司廊坊供电公司 Damaged conductor break-proof protecting device
CN109812035A (en) * 2017-11-20 2019-05-28 上海宝冶工程技术有限公司 A kind of adjustable bearing diagonal of assembled-type house
CN210105334U (en) * 2019-05-30 2020-02-21 中国二十二冶集团有限公司 Tool for mounting wall body steel bar draw hook

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8998999B2 (en) * 2011-11-17 2015-04-07 Orthohelix Surgical Designs, Inc. Hammertoe implant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324365U (en) * 2011-10-28 2012-07-11 张吉华 Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN205907878U (en) * 2016-06-30 2017-01-25 江苏瑞永建设工程技术有限公司 A anti hook assembly that floats that is used for cast -in -place hollow superstructure board
CN206393536U (en) * 2016-12-16 2017-08-11 国家电网公司 A kind of electric operating double-hook wire grip
CN206442053U (en) * 2016-12-28 2017-08-25 国网冀北电力有限公司廊坊供电公司 Damaged conductor break-proof protecting device
CN109812035A (en) * 2017-11-20 2019-05-28 上海宝冶工程技术有限公司 A kind of adjustable bearing diagonal of assembled-type house
CN210105334U (en) * 2019-05-30 2020-02-21 中国二十二冶集团有限公司 Tool for mounting wall body steel bar draw hook

Also Published As

Publication number Publication date
CN110056193A (en) 2019-07-26

Similar Documents

Publication Publication Date Title
EP2984197B1 (en) Method for prestressing existing or newly constructed concrete structures and components, as well as structures constructed according to the method
CN106223597B (en) Detachable tapered cup nut wall-connecting piece and its construction method
CN209723401U (en) A kind of floor bar fast-positioning device
CN110056193B (en) Wall steel bar drag hook installation method
CN210105334U (en) Tool for mounting wall body steel bar draw hook
CN111236475B (en) Anti-seismic assembled shear wall structure convenient to install
CN112412497A (en) Tunnel secondary lining reinforcing steel bar limiting structure and method for correcting effective lining height
CN210032625U (en) Accurate stop device of template
CN106948339B (en) Steel reinforcement cage pipe penetrating guide and steel reinforcement cage pipe penetrating method
EP2146004A2 (en) Shear pin connection
CN214531521U (en) Radial-axial bidirectional adjustable steel bar mechanical connecting device and steel bar framework
CN212361059U (en) Combined pre-buried sleeve
CN210566724U (en) Pipeline casing fixing device placed in middle
CN201671339U (en) Fixing device for wall bodies and beam column templates of buildings
CN107419897A (en) A kind of reinforcing mould of windowsill coping formwork
CN211172720U (en) Mechanical connection structure of steel bars for prefabricated concrete structure
CN211286023U (en) But prefabricated component steel bar connection box-packed putting of leveling
DE102011005458B4 (en) Scaffold attachment kit and use thereof
CN211173119U (en) Make things convenient for pull rod assembly of dismouting
RU195721U1 (en) Butt joint of reinforcing rods
CN220889193U (en) Collision-free steel bar mechanical connecting device
CN205476088U (en) Vertical rebar positioning instrument of wall body
EP1528169B1 (en) Assembly for subsequent fixing of construction components on a building part
CN109457874A (en) Bar-spacing set control device
CN219365534U (en) Reinforcing bar planting bar connection structure that back anchor roof beam construction was used

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant