CN110046143A - A kind of the overall architecture optimization system and optimization method of intergrated workbench - Google Patents

A kind of the overall architecture optimization system and optimization method of intergrated workbench Download PDF

Info

Publication number
CN110046143A
CN110046143A CN201910160776.2A CN201910160776A CN110046143A CN 110046143 A CN110046143 A CN 110046143A CN 201910160776 A CN201910160776 A CN 201910160776A CN 110046143 A CN110046143 A CN 110046143A
Authority
CN
China
Prior art keywords
module
electrically
database
hard disk
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910160776.2A
Other languages
Chinese (zh)
Other versions
CN110046143B (en
Inventor
刘颖
孙宝华
胡畔
薄珏
白亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Information and Telecommunication Branch of State Grid Liaoning Electric Power Co Ltd
Original Assignee
Information and Telecommunication Branch of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Information and Telecommunication Branch of State Grid Liaoning Electric Power Co Ltd filed Critical Information and Telecommunication Branch of State Grid Liaoning Electric Power Co Ltd
Priority to CN201910160776.2A priority Critical patent/CN110046143B/en
Publication of CN110046143A publication Critical patent/CN110046143A/en
Application granted granted Critical
Publication of CN110046143B publication Critical patent/CN110046143B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/211Schema design and management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/217Database tuning
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of overall architecture optimization systems of intergrated workbench of pad optimization technical field, including database, electrically output connects database monitoring running state module to database, database monitoring running state module electrically exports connection management end and prioritization scheme selecting module, hard disk and the two-way electric connection distribution adjustment module of server, the distribution adjustment two-way electric connection Optimized model generation module of module, adjust order confirmation module electrically input connection management end, distribution adjustment module electrically exports connection process optimization module process optimization module electrically food output connection server, the present invention can select different prioritization schemes according to the specific operating scheme of database monitoring running state module, be database operation it is efficient, energy conservation, by distribution adjustment module and process optimization module to hard disk and server Adjust separately, the operation of database can be made to reach peak efficiency, promote the value of data.

Description

A kind of the overall architecture optimization system and optimization method of intergrated workbench
Technical field
The present invention relates to pad optimization technical field, the overall architecture optimization system of specially a kind of intergrated workbench And optimization method.
Background technique
Database is the most important data storage device of current big data era, and the running quality of database directly affects , the value and effect of data are excessive using the people of database in peak period, and it is easy to make the speed of service of database slow, Caton, even server crash, therefore, it is desirable to server be optimized, traditional mode is to need to pass through administrative staff Server is optimized manually manually, improves the running efficiency of server, it, will if database is operated in peak efficiency always A large amount of energy waste is caused, for this purpose, it is proposed that a kind of overall architecture optimization system of intergrated workbench and optimization side Method.
Summary of the invention
The purpose of the present invention is to provide a kind of overall architecture optimization systems of intergrated workbench, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the invention provides the following technical scheme: a kind of overall architecture of intergrated workbench is excellent Change system, including database, electrically output connects database monitoring running state module, database monitoring running state to database Electrically output connection management end and prioritization scheme selecting module, management end electrically export connection prioritization scheme selecting module to module, Electrically output connection Optimized model generation module, Optimized model generation module electrically export Optimized model to prioritization scheme selecting module Distribution module, electrically output join algorithm adjusts module to Optimized model distribution module, and it is excellent that algorithm adjusts the two-way electric connection of module Change model generation module, the two-way electrically output connection hard disk of database and server, hard disk and the two-way electric connection of server Distribution adjustment module, the distribution adjustment two-way electric connection Optimized model generation module of module, Optimized model generation module are electrically defeated Enter connection adjustment order confirmation module, electrically input connection management end, distribution adjustment module are electrically defeated for adjustment order confirmation module Electrically food output connects server to connection process optimization module process optimization module out.
Preferably, distribution adjustment module includes server monitoring module and hard disk monitoring module, server monitoring module electricity Property output linking parsing module, the two-way electric connection hard disk monitoring module of analysis module, the electrically output connection of hard disk monitoring module Hard disk distribution module.
Preferably, electrically input connection hard disk, hard disk monitoring module electrically input connection server to hard disk monitoring module, firmly Electrically input connection Optimized model generation module, server monitoring module electrically export connection process and optimize mould disk monitoring module Block, electrically output connects hard disk to hard disk distribution module.
Preferably, Optimized model generation module includes model adjustment module, and model adjusts module electrically output link model Generation module, model adjusts module, and electrically output connection distribution adjustment module and algorithm adjust module, and model generation module is electrical Optimized model distribution module is connected out.
Preferably, process optimization module includes process analysis module, and electrically output connection process terminates process analysis module Module, electrically input connects distribution adjustment module to process analysis module, and electrically output connects server to process ending module.
Preferably, prioritization scheme selecting module includes Manual selection modules and automatically selects module, Manual selection modules and It automatically selects module and electrically exports connection scheme library.
Preferably, Manual selection modules electrically input connection management end, automatically select module electrically input connection database Monitoring running state module, electrically output connects Optimized model generation module to scheme base.
Preferably, the optimization method of the overall architecture optimization system of a kind of intergrated workbench:
The operating condition of S1, database monitoring running state module monitors database, and automatically analyzing, and by the number of analysis According to reaching in prioritization scheme selecting module, prioritization scheme selecting module is automatic according to the data of database monitoring running state module Prioritization scheme, the operating status of distribution adjustment module analysis hard disk and server are selected, and it is raw to send data to Optimized model At in module, while database monitoring running state module also transmits data in word Optimized model generation module, Optimized model Generation module adjusts the data of module and database monitoring running state module, the side with prioritization scheme selecting module according to distribution Case automatically generates Optimized model;
Model generated in S2, Optimized model distribution module analysis optimization model generation module, and algorithm tune will be passed through Mould preparation block carry out near-end adjustment, then by distribution adjustment module and database monitoring running state module data to model into Row optimization, the result of analysis is transmitted in database monitoring running state module by Optimized model distribution module, convenient for people's Check, when it is seen that analysis as a result, and after determine using analytical plan, issue control life by adjusting order confirmation module It enables;
S3, distribution adjustment module distribute the memory space of hard disk according to the model adjustment in Optimized model generation module, and Regulating command is transmitted in process optimization module, process optimization module carries out identification to useless operation program and actively ties Beam accelerates the speed of service of server, to optimize the performance of database.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention is by the operating condition of database monitoring running state module monitors database, and after data are analyzed It is transmitted in management end and prioritization scheme selecting module, there are many prioritization scheme is available in prioritization scheme selecting module, energy It is enough that different prioritization schemes is selected according to the specific operating scheme of database monitoring running state module, it is the operation of database Efficiently, energy saving;
2, by Optimized model generation module, electrically input join algorithm adjusts module and distribution adjustment module to the present invention, and And Optimized model distribution module can adjust in real time the scheme in Optimized model generation module, pass through the simulation energy of model Enough precognition effect of optimization in advance, adjust separately hard disk and server by distribution adjustment module and process optimization module, energy So that the operation of database is reached peak efficiency, promotes the value of data.
Detailed description of the invention
Fig. 1 is principle of the invention figure;
Fig. 2 is that present invention distribution adjusts module principle block diagram;
Fig. 3 is Optimized model generation module functional block diagram of the present invention;
Fig. 4 is prioritization scheme selecting module functional block diagram of the present invention;
Fig. 5 is process optimization module functional block diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5 is please referred to, the present invention provides a kind of technical solution: a kind of overall architecture optimization system of intergrated workbench System, including database 1, electrically output connects database monitoring running state module 2, the operation feelings of monitor database 1 to database 1 Condition, database monitoring running state module 2 electrically export connection management end 3 and prioritization scheme selecting module 4, and manager passes through pipe Monitoring information is checked at reason end 3, is carried out in prioritization scheme selecting module 4 to the data of database monitoring running state module 2 automatic Judgement automatically selects prioritization scheme, and electrically output connection prioritization scheme selecting module 4, manager can also pass through management to management end 3 End 3 manually selects scheme, and electrically output connects Optimized model generation module 5 to prioritization scheme selecting module 4, generates Optimized model, Electrically output Optimized model distribution module 6, the model of generation are calculated Optimized model generation module 5, and analysis optimization efficiency is excellent Changing model distribution module 6, electrically output join algorithm adjusts module 7, adjusts the algorithm of database, algorithm adjusts the two-way electricity of module 7 Property connection Optimized model generation module 5, the two-way electrically output connection hard disk 8 of database 1 and server 9 analyze hard disk 8 and service The operating condition of device 9, and hard disk 8 is adjusted, hard disk 8 and the two-way electric connection distribution adjustment module 10 of server 9, point The two-way electric connection Optimized model generation module 5 of auxiliary tone mould preparation block 10, according to the data of distribution adjustment module 10 to Optimized model Generation module 5 optimizes, and electrically input connection adjustment order confirmation module 11, adjustment order are true for Optimized model generation module 5 Recognize the electrically input connection management end 3 of module 11, electrically output 12 process of the connection process optimization module optimization of distribution adjustment module 10 Electrically food output connects server 9 to module 12.
Wherein, distribution adjustment module 10 includes server monitoring module 101 and hard disk monitoring module 102, server monitoring Module 101 electrically supervise by output linking parsing module 103, the two-way electric connection hard disk monitoring module 102 of analysis module 103, hard disk Electrically output connection hard disk distribution module 104 is monitored server and hard disk to control module 102, and is adjusted to hard disk 8;
Electrically input connection hard disk 8, hard disk monitoring module 102 electrically input connection server 9 to hard disk monitoring module 102, The electrical input connection Optimized model generation module 5 of hard disk monitoring module 102, server monitoring module 101 electrically output connect into Journey optimization module 12, electrically output connects hard disk 8 to hard disk distribution module 104, adjusts convenient for the distribution condition directly to hard disk 8 It is whole;
Optimized model generation module 5 includes that model adjusts module 51, and model adjusts module 51, and electrically output link model is raw At module 52, model adjusts module 51, and electrically output connection distribution adjustment module 10 and algorithm adjust module 7, model generation module 52 electrically go out connection Optimized model distribution module 6, generate prediction model, and adjusted in real time to model, make optimization efficiency most Bigization;
Process optimization module 12 includes process analysis module 121, and electrically output connection process terminates process analysis module 121 Module 122, electrically input connection distribution adjusts module 10, the electrically output connection of process ending module 122 to process analysis module 121 Server 9 monitors process to analyzing for server 9, and useless process pressure is terminated;
Prioritization scheme selecting module 4 includes Manual selection modules 41 and automatically selects module 42,41 He of Manual selection modules It automatically selects module 42 and electrically exports connection scheme library 43, automatically select module 42 and according to circumstances automatically select scheme, it can also To be manually selected by Manual selection modules 41;
Manual selection modules 41 electrically input connection management end 3, convenient for manually selecting scheme, automatically select module 42 electrically Input connects database monitoring running state module 2, automatically selects under default situations, and electrically output connects optimization mould to scheme base 43 Type generation module 5;
A kind of optimization method of the overall architecture optimization system of intergrated workbench:
The operating condition of S1,2 monitor database 1 of database monitoring running state module, and automatically analyzing, and by analysis Data reach in prioritization scheme selecting module 4, and prioritization scheme selecting module 4 is according to the number of database monitoring running state module 2 According to prioritization scheme is automatically selected, distribution adjustment module 10 analyzes the operating status of hard disk 8 and server 9, and sends data to In Optimized model generation module 5, while data are also transmitted word Optimized model generation module by database monitoring running state module 2 In 5, Optimized model generation module 5 adjusts the data of module 10 and database monitoring running state module 2 according to distribution, with optimization The scheme of Scheme Choice module 4 automatically generates Optimized model;
Model generated in S2,6 analysis optimization model generation module 5 of Optimized model distribution module, and algorithm will be passed through Adjust the adjustment that module 7 carries out near-end, then the data pair by distribution adjustment module 10 and database monitoring running state module 2 Model optimizes, and the result of analysis is transmitted in database monitoring running state module 2 by Optimized model distribution module 6, just In checking for people, when it is seen that analysis as a result, and after determine using analytical plan, by adjusting the hair of order confirmation module 11 Control command out;
S3, distribution adjustment module 10 are empty according to the storage of the model adjustment distribution hard disk 8 in Optimized model generation module 5 Between, and regulating command is transmitted in process optimization module 12, process optimization module 12 identifies useless operation program Actively terminate, accelerates the speed of service of server 9, to optimize the performance of database 1.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of overall architecture optimization system of intergrated workbench, including database (1), it is characterised in that: database (1) Electrically output connection database monitoring running state module (2), database monitoring running state module (2) electrically export connecting tube Manage end (3) and prioritization scheme selecting module (4), management end (3) electrically output connection prioritization scheme selecting module (4), optimization side Case selecting module (4) electrically output connection Optimized model generation module (5), Optimized model generation module (5) electrically output optimization Model distribution module (6), Optimized model distribution module (6) electrically output join algorithm adjustment module (7), algorithm adjust module (7) two-way electric connection Optimized model generation module (5), database (1) two-way electrically output connection hard disk (8) and server (9), hard disk (8) and two-way electric connection distribution adjustment module (10) of server (9), distribution adjustment module (10) two-way electrical property It connects Optimized model generation module (5), Optimized model generation module (5) electrically input connection adjustment order confirmation module (11), Order confirmation module (11) electrically input connection management end (3) is adjusted, electrically output connection process is excellent for distribution adjustment module (10) Change module (12) process optimization module (12) electrically food output connection server (9).
2. a kind of overall architecture optimization system of intergrated workbench according to claim 1, it is characterised in that: distribution adjustment Module (10) includes server monitoring module (101) and hard disk monitoring module (102), and server monitoring module (101) is electrically defeated Linking parsing module (103) out, the two-way electric connection hard disk monitoring module (102) of analysis module (103), hard disk monitoring module (102) electrically output connection hard disk distribution module (104).
3. a kind of overall architecture optimization system of intergrated workbench according to claim 2, it is characterised in that: hard disk monitoring Module (102) electrically input connection hard disk (8), hard disk monitoring module (102) electrically input connection server (9), hard disk monitoring Module (102) electrically input connection Optimized model generation module (5), server monitoring module (101) electrically export connection process Optimization module (12), hard disk distribution module (104) electrically output connection hard disk (8).
4. a kind of overall architecture optimization system of intergrated workbench according to claim 1, it is characterised in that: Optimized model Generation module (5) includes model adjustment module (51), and model adjusts module (51) electrically output link model generation module (52), Model adjusts module (51) electrically output connection distribution adjustment module (10) and algorithm adjustment module (7), model generation module (52) electrically go out connection Optimized model distribution module (6).
5. a kind of overall architecture optimization system of intergrated workbench according to claim 1, it is characterised in that: process optimization Module (12) includes process analysis module (121), and process analysis module (121) electrically exports connection process ending module (122), Electrically input connection distributes adjustment module (10) to process analysis module (121), and electrically output connection takes process ending module (122) It is engaged in device (9).
6. a kind of overall architecture optimization system of intergrated workbench according to claim 1, it is characterised in that: prioritization scheme Selecting module (4) includes Manual selection modules (41) and automatically selects module (42), Manual selection modules (41) and is automatically selected Module (42) electrically output connection scheme library (43).
7. a kind of overall architecture optimization system of intergrated workbench according to claim 6, it is characterised in that: manually select Module (41) electrically input connection management end (3) automatically selects module (42) electrically input connection database monitoring running state Module (2), scheme base (43) electrically output connection Optimized model generation module (5).
8. a kind of optimization method of the overall architecture optimization system of intergrated workbench, it is characterised in that:
The operating condition of S1, database monitoring running state module (2) monitor database (1), and automatically analyzing, and by analysis Data reach in prioritization scheme selecting module (4), and prioritization scheme selecting module (4) is according to database monitoring running state module (2) data automatically select prioritization scheme, and the operating status of hard disk (8) and server (9) is analyzed in distribution adjustment module (10), and It sends data in Optimized model generation module (5), while data are also transmitted word by database monitoring running state module (2) In Optimized model generation module (5), Optimized model generation module (5) is according to distribution adjustment module (10) and database operating status The data of monitoring modular (2) automatically generate Optimized model with the scheme of prioritization scheme selecting module (4);
Model generated in S2, Optimized model distribution module (6) analysis optimization model generation module (5), and algorithm will be passed through Adjustment module (7) carries out the adjustment of near-end, then passes through distribution adjustment module (10) and database monitoring running state module (2) Data optimize model, and the result of analysis is transmitted to database monitoring running state mould by Optimized model distribution module (6) In block (2), convenient for checking for people, when it is seen that analysis as a result, and after determine using analytical plan, it is true by adjusting order Recognize module (11) and issues control command;
S3, distribution adjustment module (10) are empty according to the storage of model adjustment distribution hard disk (8) in Optimized model generation module (5) Between, and regulating command is transmitted in process optimization module (12), process optimization module (12) carries out useless operation program Identification and active terminate, and accelerate the speed of service of server (9), to optimize the performance of database (1).
CN201910160776.2A 2019-03-04 2019-03-04 Integrated architecture optimization system and optimization method of integrated data platform Active CN110046143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910160776.2A CN110046143B (en) 2019-03-04 2019-03-04 Integrated architecture optimization system and optimization method of integrated data platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910160776.2A CN110046143B (en) 2019-03-04 2019-03-04 Integrated architecture optimization system and optimization method of integrated data platform

Publications (2)

Publication Number Publication Date
CN110046143A true CN110046143A (en) 2019-07-23
CN110046143B CN110046143B (en) 2023-03-28

Family

ID=67274465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910160776.2A Active CN110046143B (en) 2019-03-04 2019-03-04 Integrated architecture optimization system and optimization method of integrated data platform

Country Status (1)

Country Link
CN (1) CN110046143B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114677069A (en) * 2022-05-30 2022-06-28 深圳市房帮帮互联网科技有限公司 Energy internet scheduling method based on big data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120215838A1 (en) * 2011-02-22 2012-08-23 Siemens Aktiengesellschaft Optimization of a software application implemented on a client-server system
CN103401260A (en) * 2013-08-19 2013-11-20 山东大学 Advanced optimization progressive control method for composite energy storage
CN104657215A (en) * 2013-11-19 2015-05-27 南京鼎盟科技有限公司 Virtualization energy-saving system in Cloud computing
CN104767834A (en) * 2006-04-12 2015-07-08 思杰***有限公司 Systems and methods for providing levels of access and action control via an ssl vpn appliance
CN106934426A (en) * 2015-12-29 2017-07-07 三星电子株式会社 The method and apparatus of the neutral net based on picture signal treatment
CN108829925A (en) * 2018-05-07 2018-11-16 上海电力学院 A kind of offshore wind farm collector system optimum design method considering electromagnetic environment constraint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104767834A (en) * 2006-04-12 2015-07-08 思杰***有限公司 Systems and methods for providing levels of access and action control via an ssl vpn appliance
US20120215838A1 (en) * 2011-02-22 2012-08-23 Siemens Aktiengesellschaft Optimization of a software application implemented on a client-server system
CN103401260A (en) * 2013-08-19 2013-11-20 山东大学 Advanced optimization progressive control method for composite energy storage
CN104657215A (en) * 2013-11-19 2015-05-27 南京鼎盟科技有限公司 Virtualization energy-saving system in Cloud computing
CN106934426A (en) * 2015-12-29 2017-07-07 三星电子株式会社 The method and apparatus of the neutral net based on picture signal treatment
CN108829925A (en) * 2018-05-07 2018-11-16 上海电力学院 A kind of offshore wind farm collector system optimum design method considering electromagnetic environment constraint

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114677069A (en) * 2022-05-30 2022-06-28 深圳市房帮帮互联网科技有限公司 Energy internet scheduling method based on big data

Also Published As

Publication number Publication date
CN110046143B (en) 2023-03-28

Similar Documents

Publication Publication Date Title
CN112053041B (en) Province-region integrated source network load storage real-time control system and control method
CN114444739B (en) Digital smart power grid region management system and method
CN108462175A (en) A kind of electric heating equipment demand response interactive approach, system and device
CN114254912A (en) Load control system and method for electric vehicle charging station
CN115833402B (en) Artificial intelligent network command management and issuing system based on power dispatching
CN113346558A (en) Virtual power plant operation control system and control method
CN110046143A (en) A kind of the overall architecture optimization system and optimization method of intergrated workbench
CN116739360A (en) Distributed wind-solar intelligent energy storage management system based on block chain
CN117644794B (en) Intelligent period control system based on charging pile
CN114707761A (en) Electric power intelligent scheduling management system
CN110365114A (en) The energy-accumulating power station total management system and information interacting method integrated based on multimode
CN117636868A (en) Intelligent voice scheduling system for power grid regulation and control service
CN107168210B (en) Monitoring system and monitoring method of distributed photovoltaic power station
CN111242492A (en) WebService-based resource aggregator regulation and control information interaction system and method
CN112686501B (en) Method and device for analyzing production line, storage medium and processor
CN110190593A (en) A kind of multimode and machine control method and system
CN115271249A (en) Intelligent power grid maintenance operation arrangement and operation order generation system based on fault prediction
CN116128223A (en) Intelligent energy system taking electric power system as core
CN111537256B (en) Method and system for analyzing reason for unqualified AGC (automatic gain control) performance of thermal generator set
CN115438958A (en) Intelligent energy efficiency management system based on Internet and management method thereof
CN113904378A (en) Virtual power plant resource regulation and control method, system and resource regulation and control terminal
CN109038830A (en) High frequency rate acquisition control system and method in a kind of wind power plant
CN117154747B (en) Virtual power plant demand response system and method based on multi-tenant technology
CN205263633U (en) Level of factory load optimal control device
CN217276512U (en) Multi-station shared spectrometer system for optical device power test

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant