CN110009293A - Finishing management system and method - Google Patents
Finishing management system and method Download PDFInfo
- Publication number
- CN110009293A CN110009293A CN201811423706.3A CN201811423706A CN110009293A CN 110009293 A CN110009293 A CN 110009293A CN 201811423706 A CN201811423706 A CN 201811423706A CN 110009293 A CN110009293 A CN 110009293A
- Authority
- CN
- China
- Prior art keywords
- construction
- task
- construction task
- engineering
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 448
- 239000000463 material Substances 0.000 claims abstract description 88
- 238000012790 confirmation Methods 0.000 claims abstract description 59
- 238000007726 management method Methods 0.000 claims description 22
- 238000013461 design Methods 0.000 claims description 20
- 238000012550 audit Methods 0.000 claims description 16
- 239000004035 construction material Substances 0.000 claims description 16
- 238000011112 process operation Methods 0.000 claims description 7
- 238000012216 screening Methods 0.000 claims description 7
- 230000005540 biological transmission Effects 0.000 claims description 3
- 230000008439 repair process Effects 0.000 claims description 2
- 238000009877 rendering Methods 0.000 claims 1
- 238000005034 decoration Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 235000012054 meals Nutrition 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The present invention discloses a kind of finishing management system and method, including finishing information receiving unit;Budget generation unit;Project Scheduling unit;Initialize engineering information unit;Task scheduling unit;Application of materials dispenses unit;Flow of task control unit;Statement of account generation unit, task based access control completes content and the initial labor cost of task after the completion of being used for construction task, and the rewards and punishments amount of money generated during practice of construction task, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;After tasks all in engineering and the clearing confirmation of used material, Engineering Settlement inventory is generated based on construction budget information, the practical variable cost generated of engineering;Financial settlement unit;Data supporter.The present invention can control construction quality, cost, financial risks, and construction cost is difficult to control, and construction team can be specified all to control construction team according to the actual situation.
Description
Technical field
The present invention relates to decoration technology fields, manage system and method more particularly, to finishing.
Background technique
The existing monitoring to fitment process mainly uses manual type, by the building carried out build data and enterprise and
Product information is collected filing using file, is organized into list data by artificial mode, simple in common system
It is single to receive, to realize monitoring.The prior art only will completely or partially have in project data return in a file or
It is used for reference in documentation form, but can not synchronize and determine design, cost, each details of buying, construction.This way
Not only spend time length, low efficiency, there is also following deficiencies: 1. construction qualities are difficult to control;2. construction cost is difficult to control;3.
Construction team is all difficult to control;4. financial risks are difficult to control.
For this reason, it may be desirable to seek a kind of technical solution, at least to mitigate the above problem.
Summary of the invention
To solve the above problems, the present invention uses following technical scheme.
A kind of finishing management system, comprising:
Fit up information receiving unit, be used to receive the construction task that parses of decorating scheme determined based on user and
Corresponding construction material, and receive the engineering based on design object corresponding on finishing drawing corresponding to the decorating scheme
Amount;
Budget generation unit is used to generate financial expenditures based on the received construction task of institute, construction material and project amount
The budget information of budget information, the budget information of materials'use amount and each construction task working hour;
Project Scheduling unit is used for budget information, geographical location and project warp based on each construction task working hour
Manage the project manager that can receive the finishing project that engineering information assigns the management user;
It initializes engineering information unit, is used for on-stream time based on assigned project manager, the construction task
Dependence graph, each construction task working hour, working day arranges and workaday working hour, calculates the estimated of each construction task and opens
Begin time and expected concluding time, and generates the construction speed Gantt chart of finishing project;
Task scheduling unit is used for estimated time of commencement, expected concluding time and construction class based on each construction task
The acceptable task quantity of group, acceptable task time, job site range assign the construction that can receive corresponding construction task
Teams and groups, or assign according to the acceptable task quantity of construction teams and groups, acceptable task time and can receive corresponding construction task
Construction teams and groups;When construct teams and groups receive corresponding construction task after, be also used to according at the beginning of the construction task,
The grade of skill of the construction teams and groups of budget working hour and the construction task recalculates the construction teams and groups and completes the construction task
Working hour recalculates the estimated time of commencement and expected concluding time of the construction task and its subsequent construction task, and wash with watercolours again
Contaminate the construction speed Gantt chart information of finishing project;
Application of materials dispenses unit, is used to count material and its number required for each construction trade when application of materials for the first time
Amount, perhaps the dispatching batch for the material according to configuration counts each material for dispensing batch and its quantity or for subsequent
Corresponding material is searched for according to different screening conditions when application of materials;
Flow of task control unit, the node for being used to specify by each construction task/process operations sequence receive construction class
The confirmation message of work is completed in group, audits this based on the received confirmation message of construction reference and institute that work is completed and is completed
Work, checked and accepted when completed work audit passes through and needs to check and accept by the acceptance criteria of the completed work;When
Construction task construction terminates, and records the physical end time and practice of construction working hour of the construction task, and according to construction task according to
Rely figure using the physical end time of the construction task as the estimated time of commencement of its subsequent first construction task, recalculates
The estimated beginning of subsequent all construction tasks and expected concluding time render the construction speed Gantt chart of finishing project again;
Statement of account generation unit, task based access control completes content and the initial labor cost of task after the completion of being used for construction task,
The rewards and punishments amount of money generated during practice of construction task, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;
After tasks all in engineering and the clearing confirmation of used material, based on construction budget information, the practical variation generated of engineering
Cost generates Engineering Settlement inventory;
Financial settlement unit is used for based on the Engineering Settlement inventory, has confirmed that errorless task statement of account, really
The material statement of account recognized, financial expenditures budget information carry out financial settlement;
Data supporter is used for basic data and relevant configuration data required for said units are stored in advance.
It further include follow-up marking unit, which is used for based on the received confirmation message of institute, institute
The estimated time of commencement of the construction task and its subsequent construction task for recalculating and expected concluding time and appointment management institute
The construction speed information retrieval for stating project manager's submission of the finishing project of user goes out unfinished construction task/engineering and marks
Note.
It is described based on received confirmation message, the construction task that is recalculated and its subsequent construction task it is estimated
Time started and expected concluding time and the construction speed letter for assigning the project manager for the finishing project for managing the user to submit
Unfinished construction task/the engineering of breath retrieval and correspondence markings specifically:
Based on received confirmation message and the estimated of the construction task that is recalculated and its subsequent construction task open
Begin the time, retrieve the construction task started not in time and make respective markers, the construction task that should start in retrieval configuration range is simultaneously
Make respective markers, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the construction task terminated not in time and makees respective markers, and the construction task that should terminate in retrieval configuration range is simultaneously
Make respective markers, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the engineering terminated not in time and makees respective markers, and the engineering that should terminate in retrieval configuration range simultaneously makees corresponding mark
Note, retrieval configure the engineering being not over yet in range and make respective markers.
Further include notice transmission unit, which is used for:
Based on the respective markers, construction task/engineering information corresponding to the respective markers is sent to and the phase
The corresponding relevant personnel of construction task/engineering should be marked;And/or for the operation information of each task and engineering is crucial
The start information in stage is sent to the relevant personnel of corresponding construction task/engineering.
A kind of finishing management method, comprising the following steps:
The construction task and corresponding construction material that the decorating scheme determined based on user is parsed are received, and is received
Project amount based on corresponding design object on finishing drawing corresponding to the decorating scheme;
Financial expenditures budget information, materials'use amount are generated based on the received construction task of institute, construction material and project amount
Budget information and the budget information in each construction task working hour;
Budget information, geographical location and project manager based on each construction task working hour can receive engineering information and assign
Manage the project manager of the finishing project of the user;
The dependence graph of on-stream time, the construction task based on assigned project manager, each construction task working hour,
Working day arranges and workaday working hour, calculates estimated time of commencement and the expected concluding time of each construction task, and raw
At the construction speed Gantt chart of finishing project;
Estimated time of commencement, expected concluding time based on each construction task and construction teams and groups are subjected to task quantity, can
Time, the job site range of receiving an assignment assign and can receive the construction teams and groups of corresponding construction task, or according to construction class
The acceptable task quantity of group, acceptable task time assign the construction teams and groups that can receive corresponding construction task;When construction class
After group receives corresponding construction task, also according to the construction task at the beginning of, budget working hour and the construction task
Construction teams and groups grade of skill recalculate the working hour that the construction teams and groups complete the construction task, recalculate the construction task and
The estimated time of commencement of its subsequent construction task and expected concluding time, and the construction speed Gantt chart of finishing project is rendered again
Information;
Material and its quantity required for each construction trade when application of materials for the first time are counted, or for the material according to configuration
The dispatching batch of material counts the material and its quantity of each dispatching batch, or according to different screenings when for subsequent material application
The corresponding material of conditional search;
The node specified by each construction task/process operations sequence receives the confirmation message that work is completed in construction teams and groups,
The completed work is audited based on the received confirmation message of construction reference and institute that work is completed, when the completed work
It is checked and accepted when audit passes through and needs to check and accept by the acceptance criteria of the completed work;When construction task construction terminates, record should
The physical end time and practice of construction working hour of construction task, and according to construction task dependency graph by the practical knot of the construction task
Estimated time of commencement of the beam time as its subsequent first construction task recalculates the estimated of subsequent all construction tasks and opens
Beginning and expected concluding time render the construction speed Gantt chart of finishing project again;
Task based access control completes content and the initial labor cost of task after the completion of construction task, generates during practice of construction task
The rewards and punishments amount of money, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;When tasks all in engineering and used
Material clearing confirmation after, Engineering Settlement inventory is generated based on the practical variable cost generated of construction budget information, engineering;
Based on the Engineering Settlement inventory, the material statement of account, the wealth that have confirmed that errorless task statement of account, have confirmed that
Appropriation budget information of being engaged in carries out financial settlement;
Basic data required for said units and relevant configuration data is stored in advance.
Further include based on received confirmation message, the construction task that is recalculated and its subsequent construction task it is pre-
The construction speed counted time started and expected concluding time and the project manager for the finishing project for managing the user is assigned to submit
Information retrieval goes out unfinished construction task/engineering and marks.
It is described based on received confirmation message, the construction task that is recalculated and its subsequent construction task it is estimated
Time started and expected concluding time and the construction speed letter for assigning the project manager for the finishing project for managing the user to submit
Unfinished construction task/the engineering of breath retrieval and correspondence markings specifically:
Based on received confirmation message and the estimated of the construction task that is recalculated and its subsequent construction task open
Begin the time, retrieve the construction task started not in time and make respective markers, the construction task that should start in retrieval configuration range is simultaneously
Make respective markers, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the construction task terminated not in time and makees respective markers, and the construction task that should terminate in retrieval configuration range is simultaneously
Make respective markers, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the engineering terminated not in time and makees respective markers, and the engineering that should terminate in retrieval configuration range simultaneously makees corresponding mark
Note, retrieval configure the engineering being not over yet in range and make respective markers.
Also packet be based on the respective markers, by construction task/engineering information corresponding to the respective markers be sent to
The relevant personnel of construction task/engineering corresponding to the respective markers;And/or for by the operation information and engineering of each task
The start information of critical stage is sent to the relevant personnel of corresponding construction task/engineering.
The present invention has following advantageous effects.
The present invention is based on the received construction task of institute, construction material and project amounts to generate financial expenditures budget information, material
The budget information of usage amount and the budget information in each construction task working hour are then based on the budget in each construction task working hour
Information and project manager can receive engineering information and assign the project manager for managing the finishing project of the user, then by assigned item
The on-stream time of mesh manager is set as construction speed Ganluo source of graph, according to the setting of the dependence graph of the construction task
At the beginning of the finishing project, daily working time and section, calculate the estimated of the direct follow-up work of each construction task
Time started and expected concluding time, estimated time of commencement, expected concluding time and construction teams and groups based on each construction task can
Quantity, acceptable task time, the job site range of receiving an assignment assign the construction teams and groups that can receive corresponding construction task,
Or the construction that can receive corresponding construction task is assigned according to the acceptable task quantity of construction teams and groups, acceptable task time
Teams and groups;When construct teams and groups receive corresponding construction task after, according to the construction task at the beginning of and the construction task
The grade of skill of construction teams and groups recalculate the working hour that the construction teams and groups complete the construction task, recalculate the construction task
Subsequent construction task estimated time of commencement and the expected concluding time;It counts when application of materials for the first time required for each construction task
Material and its quantity, or count for the dispatching batch according to the material of configuration the material and its quantity of each dispatching batch,
Or corresponding material is searched for according to different screening conditions when for subsequent material application;By specified node/process operations
Sequence receives the confirmation message that work is completed in construction teams and groups, based on the received confirmation letter of construction reference and institute that work is completed
Breath audits the completed work, the testing by the completed work when the completed work audit passes through and needs to check and accept
Receipts standard is checked and accepted;Task based access control completes content after the completion of construction task and the initial labor cost of task generates task statement of account and pushes
The confirmation of the end people APP is completed to task;After tasks all in engineering and the clearing confirmation of used material, believed based on construction budget
The practical variable cost generated of breath, engineering generates Engineering Settlement inventory;Based on the Engineering Settlement inventory, have confirmed that errorless appoint
Statement of account, the material statement of account having confirmed that, the financial expenditures budget information of being engaged in carry out financial settlement.The present invention can be to construction matter
Amount, cost, financial risks are controlled, and construction cost is difficult to control, and construction team can be specified to construction according to the actual situation
Team is all controlled.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of present invention finishing management system.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
It is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.?
In the case where not conflicting, the feature in embodiment and embodiment in the present invention can mutual any combination.Although also, flowing
Logical order is shown in journey figure, but in some cases, it can be to be different from shown or described by sequence execution herein
The step of.
Participate in Fig. 1, a kind of finishing management system of the invention, including finishing information receiving unit 1, budget generation unit 2,
Project Scheduling unit 3, initialization engineering information unit 4, task scheduling unit 5, application of materials dispatching unit 6, task flow are program-controlled
Unit 7 processed, statement of account generation unit 8, financial settlement unit 9, data supporter 10.
When finishing, first collect user's Decoration Design scheme information, then according to design object configuration construction task and apply
User's scheme is parsed into specific construction task and corresponding construction material by work material.Finishing information receiving unit 1 is for connecing
The construction task and corresponding construction material that the decorating scheme determined based on user is parsed are received, and receives and is based on the dress
Repair the project amount of corresponding design object on finishing drawing corresponding to scheme.Fit up the project amount packet of corresponding design object on drawing
Include the duration project amount of construction task, the labor cost project amount of construction task, materials'use amount project amount and calculating task node
Working hour, labor cost, materials'use amount and material in amount.
Data supporter 10 is for being stored in advance basic data and relevant configuration data.Store up basic data and relevant
Configuration data includes: (1) Decoration Design project information, primary fields: and design object title, number, detail parameters, price,
Design object type, suitable modules };(2) the design object information that design scheme set meal includes, primary fields: { set meal name
Claim, price, the Decoration Design project for including (3) construction task information, primary fields: construction task title, task encoding,
Parent task, task work post, task level, if need to audit, if need to check and accept, auditing standards, acceptance criteria, standard work
Valence, standard work force, standard subsidy };Three layers of construction task point: task, node, process, node, which needs to check and accept, then needs maintenance to check and accept
Whether standard includes Accreditation Tool (and be arranged and inspect by random samples);Each process has construction reference, includes construction tool;(4) construction work
Journey constructs dependence sequentially, primary fields: { mission number, previous task, postposition task };(5) construction material information, it is main
Field: { title material, number, specifications and models, brand, delivery batch, price };(6) applying for Decoration Design project needs is completed
Work task and material, primary fields: { Decoration Design project number, [construction task node serial number, standard construction labor cost, standard
It constructs working hour, standard construction subsidy, standard checks and accepts subsidy (when node needs to check and accept), and { construction material number, standardized amount are single
Valence }] };(7) construction and the configuration of task received quantity, primary fields: { human roles can receive quantity };(8) other configurations;
Etc..
Budget generation unit 2 is used to generate financial expenditures based on the received construction task of institute, construction material and project amount pre-
Calculate information, the budget information of materials'use amount and the budget information in each construction task working hour.The budget includes for financial expenditures: (1)
Material assembly sheet counts the cost money of all material;(2) artificial totle drilling cost counts the labor cost amount of money of all task nodes;
(3) scheme module material cost counts all material in amount used of the module according to design object said module;(4) scheme
Module cost of labor counts the cost of labor of all construction nodes used of the module according to design object said module.Material
Using the budget includes: (1) total amount of material counts all material and its usage amount;(2) scheme module materials'use amount, according to setting
Meter project said module counts all materials used of the module and its dosage;(3) materials'use amount of construction node, merges
The material of all nodes simultaneously counts its usage amount.The budget includes for construction speed: (1) the parent construction according to belonging to construction node is appointed
Business merges all construction nodes and its relevant information under all tasks;(2) if containing examination in need in construction task
Node, then the task needs to check and accept and judges sampling observation task ratio;(3) it according to the task order of configuration, repaints engineering and appoints
Business dependence graph;(4) according to the node duration of subordinate, add up to the operating time of the task;(5) it is relied on and is closed according to engineering duty
System's figure calculates the estimated construction length of engineering according to parallel and serial rule.
Project Scheduling unit 3 can connect for budget information, geographical location and project manager based on each construction task working hour
It receives engineering information and assigns the project manager for managing the finishing project of the user.Assign includes that automatic assign is assigned with artificial.From
It is dynamic to assign, according to job location, the receivable engineering quantity of project manager, it can receive engineering time started, job site and model
Enclose, automatically select most go into operation fastly, the project manager of the finishing project for the receivable user that distance is nearest.It is artificial to assign, according to item
Mesh, which is handled, can receive engineering quantity, can receive the engineering time started, directly assign.
Initialize engineering information unit 4 for based on assigned project manager on-stream time, the construction task according to
Rely relational graph, each construction task working hour, working day arrangement and workaday working hour, calculates the estimated beginning of each construction task
Time and expected concluding time, and generate the construction speed Gantt chart of finishing project.Gantt chart can according to time dimension (day, it is small
When) check.Initialization engineering information unit 4 is also used to activate all construction tasks and according to task assignment Policy Updates correlation
Task is to be designated.
Task scheduling unit 5 is for estimated time of commencement, expected concluding time and construction teams and groups based on each construction task
Acceptable task quantity, acceptable task time, job site range assign the construction class that can receive corresponding construction task
Group, or assign according to the acceptable task quantity of construction teams and groups, acceptable task time and can receive corresponding construction task
Construct teams and groups;After the teams and groups that construct receive corresponding construction task, be also used to according at the beginning of the construction task, it is pre-
The grade of skill for calculating working hour and the construction teams and groups of the construction task recalculates the work that the construction teams and groups complete the construction task
When, the estimated time of commencement and expected concluding time of the construction task and its subsequent construction task are recalculated, and render again
The construction speed Gantt chart information of finishing project.
Application of materials material and its number required for each construction trade when dispensing unit 6 for counting application of materials for the first time
Amount, perhaps the dispatching batch for the material according to configuration counts each material for dispensing batch and its quantity or for subsequent
Corresponding material is searched for according to different screening conditions when application of materials.
The node that flow of task control unit 7 is used to specify by each construction task/process operations sequence receives construction teams and groups
The confirmation message of work is completed, it is completed to audit this based on the received confirmation message of construction reference and institute that work is completed
Work is checked and accepted when the completed work audit passes through and needs to check and accept by the acceptance criteria of the completed work;When applying
The construction of work task terminates, and records the physical end time and practice of construction working hour of the construction task, and rely on according to construction task
Figure is using the physical end time of the construction task as the estimated time of commencement of its subsequent first construction task, after recalculating
Continue estimated beginning and the expected concluding time of all construction tasks, renders the construction speed Gantt chart of finishing project again.It is aforementioned
Constructing when construction task terminates, and refers to that the audit for being not required to check and accept is completed, the examination for needing to check and accept is completed.Flow of task control
Unit 7 includes: that (1) goes into operation control, and previous task must be completed;(2) Submission control, it is necessary to be grasped according to specified node/process
Work sequence is submitted;(3) audit control, node are submitted, and are audited according to the construction reference of process in each node;(4) it checks and accepts
Node audit needs to check and accept by it to be checked and accepted according to the acceptance criteria of each node.Aforementioned each nodal operation time will
Construction speed Ganluo figure is caused to recalculate once.
Task based access control completes content and the initial labor cost generation of task after the completion of statement of account generation unit 8 is used for construction task
Task statement of account is simultaneously pushed to the task completion end people APP confirmation;When tasks all in engineering and the clearing of used material are true
After recognizing, Engineering Settlement inventory is generated based on construction budget information, the practical variable cost generated of engineering.Construction task is audited/is tested
It receives by being that construction task is completed.For example, task, which completes the end people APP, can be installed on communicating terminal 13, communicating terminal 13 with
This finishing management system passes through wired or wireless connection.Communicating terminal 13 can be the communicating terminals such as existing mobile phone, computer.
Task based access control completes content and the initial labor cost of task after the completion of financial settlement unit 9 is used for construction task, actually applies
The rewards and punishments amount of money generated during work task, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;Work as engineering
In after all tasks and the clearing confirmation of used material, it is raw based on the practical variable cost generated of construction budget information, engineering
At Engineering Settlement inventory.
In some embodiments, the invention also includes follow-up marking unit 11, which is used
In based on received confirmation message, the construction task and its subsequent construction task for being recalculated estimated time of commencement and
Expected concluding time and the construction speed information retrieval for assigning the project manager for the finishing project for managing the user to submit go out not
Construction task/engineering of completion simultaneously marks
It is aforementioned based on received confirmation message, the construction task that is recalculated and its subsequent construction task it is estimated
Time started and expected concluding time and the construction speed letter for assigning the project manager for the finishing project for managing the user to submit
Unfinished construction task/the engineering of breath retrieval and correspondence markings specifically:
Based on received confirmation message and the estimated of the construction task that is recalculated and its subsequent construction task open
Begin the time, retrieve the construction task started not in time and make respective markers, the construction task that should start in retrieval configuration range is simultaneously
Make respective markers, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the construction task terminated not in time and makees respective markers, and the construction task that should terminate in retrieval configuration range is simultaneously
Make respective markers, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the engineering terminated not in time and makees respective markers, and the engineering that should terminate in retrieval configuration range simultaneously makees corresponding mark
Note, retrieval configure the engineering being not over yet in range and make respective markers.
In some embodiments, the invention also includes notice transmission unit 12, which is used for:
Based on the respective markers, construction task/engineering information corresponding to the respective markers is sent to and the phase
The corresponding relevant personnel of construction task/engineering should be marked;And/or for the operation information of each task and engineering is crucial
The start information in stage is sent to the relevant personnel of corresponding construction task/engineering.Engineering critical stage is such as construction task
Audit/examination is by being that construction task is completed.
The data that data supporter 10 is used to need said units carry out data support.For example, above-mentioned each unit from
Data needed for being called respectively in data supporter 10.
A kind of finishing management method of the invention, comprising the following steps:
Step 1 receives construction task and corresponding construction material that the decorating scheme determined based on user is parsed,
And receive the project amount based on design object corresponding on finishing drawing corresponding to the decorating scheme;
Step 2 generates financial expenditures budget information, material based on the received construction task of institute, construction material and project amount
The budget information of usage amount and the budget information in each construction task working hour;
Step 3, budget information, geographical location and project manager based on each construction task working hour can receive engineering
Information assigns the project manager for managing the finishing project of the user;
Step 4, by the on-stream time of assigned project manager, the dependence graph of the construction task, each construction task
Working hour, working day arranges and workaday working hour, calculates estimated time of commencement and the expected concluding time of each construction task,
And generate the construction speed Gantt chart of finishing project;
Step 5, estimated time of commencement, expected concluding time and construction teams and groups based on each construction task are subjected to task
Quantity, acceptable task time, job site range assign the construction teams and groups that can receive corresponding construction task, or according to
Construction teams and groups are subjected to task quantity, acceptable task time assigns the construction teams and groups that can receive corresponding construction task;When
Construct after teams and groups receive corresponding construction task, also according to the construction task at the beginning of, budget working hour and the construction
The grade of skill of the construction teams and groups of task recalculates the working hour that the construction teams and groups complete the construction task, recalculates the construction
The estimated time of commencement and expected concluding time of task and its subsequent construction task, and the construction speed of finishing project is rendered again
Gantt chart information;
Step 6 counts material and its quantity required for each construction trade when application of materials for the first time, or is used for basis
The dispatching batch of the material of configuration count it is each dispatching batch material and its quantity, or be used for subsequent material application when according to not
Same screening conditions search for corresponding material;
Step 7, the node specified by each construction task/process operations sequence receive construction teams and groups and work are completed really
Recognize information, which is audited based on the received confirmation message of construction reference and institute that work is completed, when this is complete
At work audit pass through and need to check and accept when by the completed work acceptance criteria check and accept;It constructs and ties when construction task
Beam records the physical end time and practice of construction working hour of the construction task, and is appointed the construction according to construction task dependency graph
Estimated time of commencement of the physical end time of business as its subsequent first construction task recalculates subsequent all constructions and appoints
The estimated beginning of business and expected concluding time render the construction speed Gantt chart of finishing project again;
Step 8, task based access control completes content and the initial labor cost of task, practice of construction task process after the completion of construction task
The rewards and punishments amount of money of middle generation, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;When tasks all in engineering
After the clearing confirmation of used material, Engineering Settlement is generated based on construction budget information, the practical variable cost generated of engineering
Inventory;
Step 9 is settled accounts based on the Engineering Settlement inventory, the material for having confirmed that errorless task statement of account, having confirmed that
Inventory, financial expenditures budget information carry out financial settlement;
Basic data required for above-mentioned steps and relevant configuration data is stored in advance in step 10.
In some embodiments, method of the invention further include based on received confirmation message, recalculated should
The estimated time of commencement and expected concluding time of construction task and its subsequent construction task and the finishing for assigning the management user
The step of construction speed information retrieval that the project manager of project submits goes out unfinished construction task/engineering and marks.
It is above-mentioned based on received confirmation message, the construction task that is recalculated and its subsequent construction task it is estimated
Time started and expected concluding time and the construction speed letter for assigning the project manager for the finishing project for managing the user to submit
Unfinished construction task/the engineering of breath retrieval and correspondence markings specifically:
Based on received confirmation message and the estimated of the construction task that is recalculated and its subsequent construction task open
Begin the time, retrieve the construction task started not in time and make respective markers, the construction task that should start in retrieval configuration range is simultaneously
Make respective markers, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the construction task terminated not in time and makees respective markers, and the construction task that should terminate in retrieval configuration range is simultaneously
Make respective markers, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated knot
The beam time retrieves the engineering terminated not in time and makees respective markers, and the engineering that should terminate in retrieval configuration range simultaneously makees corresponding mark
Note, retrieval configure the engineering being not over yet in range and make respective markers.
In some embodiments, method of the invention further includes that also packet is based on the respective markers, by the respective markers institute
The information of corresponding construction task/engineering is sent to personnel relevant to construction task/engineering corresponding to the respective markers;
And/or for the start information of the operation information of each task and engineering critical stage to be sent to corresponding construction task/engineering
The step of relevant personnel.
In embodiment provided by the present invention, it should be understood that disclosed device and method can pass through others
Mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another device, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of device or unit
It connects, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, it can be located at
One place, or may be distributed over multiple network units.Can select according to the actual needs part therein or
Whole units achieve the purpose of the solution of this embodiment.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
It is each that equipment (can be personal computer, server or the network equipment etc.) or processor (processor) execute the present invention
The all or part of the steps of embodiment the method.And storage medium/unit above-mentioned includes: general serial bus USB
(Universal Serial Bus flash disk), mobile hard disk, read-only memory (Read-Only Memory, ROM),
Random access memory (Random Access Memory, RAM), magnetic or disk etc. be various to can store program code
Medium.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (8)
1. a kind of finishing management system characterized by comprising
Information receiving unit is fitted up, is used to receive construction task and correspondence that the decorating scheme determined based on user is parsed
Construction material, and receive the project amount based on corresponding design object on finishing drawing corresponding to the decorating scheme;
Budget generation unit is used to generate financial expenditures budget based on the received construction task of institute, construction material and project amount
The budget information of information, the budget information of materials'use amount and each construction task working hour;
Project Scheduling unit, being used for budget information, geographical location and project manager based on each construction task working hour can
It receives engineering information and assigns the project manager for managing the finishing project of the user;
Engineering information unit is initialized, the dependence of on-stream time, the construction task based on assigned project manager are used for
Relational graph, each construction task working hour, working day arranges and workaday working hour, when calculating the estimated beginning of each construction task
Between and the expected concluding time, and generate the construction speed Gantt chart of finishing project;
Task scheduling unit, being used for estimated time of commencement, expected concluding time and construction teams and groups based on each construction task can
Quantity, acceptable task time, the job site range of receiving an assignment assign the construction teams and groups that can receive corresponding construction task,
Or the construction that can receive corresponding construction task is assigned according to the acceptable task quantity of construction teams and groups, acceptable task time
Teams and groups;When construct teams and groups receive corresponding construction task after, be also used to according at the beginning of the construction task, budget work
When and the grade of skill of construction teams and groups of the construction task recalculate the working hour that the construction teams and groups complete the construction task, weight
The estimated time of commencement and expected concluding time of the construction task and its subsequent construction task are newly calculated, and rendering finishing item again
Purpose construction speed Gantt chart information;
Application of materials dispenses unit, is used to count material and its quantity required for each construction trade when application of materials for the first time,
Perhaps the dispatching batch for the material according to configuration counts each material for dispensing batch and its quantity or for subsequent material
Corresponding material is searched for according to different screening conditions when application;
Flow of task control unit, the node for being used to specify by each construction task/process operations sequence have received construction teams and groups
The confirmation message for completing work audits the completed work based on the received confirmation message of construction reference and institute that work is completed
Make, is checked and accepted when the completed work audit passes through and needs to check and accept by the acceptance criteria of the completed work;Work as construction
Task construction terminates, and records the physical end time and practice of construction working hour of the construction task, and according to construction task dependency graph
Using the physical end time of the construction task as the estimated time of commencement of its subsequent first construction task, recalculate subsequent
The estimated beginning of all construction tasks and expected concluding time render the construction speed Gantt chart of finishing project again;
Statement of account generation unit, task based access control completes content and the initial labor cost of task after the completion of being used for construction task, practical
The rewards and punishments amount of money generated during construction task, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;Work as work
After all tasks and the clearing of used material confirm in journey, based on construction budget information, the practical variable cost generated of engineering
Generate Engineering Settlement inventory;
Financial settlement unit is used for based on the Engineering Settlement inventory, has confirmed that errorless task statement of account, has confirmed that
Material statement of account, financial expenditures budget information carry out financial settlement;
Data supporter is used for basic data and relevant configuration data required for said units are stored in advance.
2. finishing management system according to claim 1, which is characterized in that it further include follow-up marking unit, it should be into
Degree check mark unit be used for based on received confirmation message, the construction task and its subsequent construction task for being recalculated
Estimated time of commencement and the expected concluding time and assign the finishing project for managing the user project manager's submission construction
Progress msg retrieves unfinished construction task/engineering and marks.
3. finishing management system according to claim 2, which is characterized in that described based on a received confirmation message, institute
The estimated time of commencement of the construction task and its subsequent construction task for recalculating and expected concluding time and appointment management institute
State the unfinished construction task/engineering of construction speed information retrieval that the project manager of the finishing project of user submits and corresponding mark
Note specifically:
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated beginning when
Between, it retrieves the construction task started not in time and makees respective markers, the construction task that should start in retrieval configuration range simultaneously makees phase
It should mark, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task that is recalculated and its subsequent construction task it is estimated at the end of
Between, it retrieves the construction task terminated not in time and makees respective markers, the construction task that should terminate in retrieval configuration range simultaneously makees phase
It should mark, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task that is recalculated and its subsequent construction task it is estimated at the end of
Between, it retrieves the engineering terminated not in time and makees respective markers, the engineering that should terminate in retrieval configuration range simultaneously makees respective markers, examines
Rope configures the engineering being not over yet in range and makees respective markers.
4. finishing management system according to claim 2, which is characterized in that further include notice transmission unit, notice hair
Unit is sent to be used for:
Based on the respective markers, construction task/engineering information corresponding to the respective markers is sent to mark corresponding to this
The corresponding relevant personnel of construction task/engineering of note;And/or for by the operation information of each task and engineering critical stage
Start information be sent to the relevant personnel of corresponding construction task/engineering.
5. a kind of finishing management method, which comprises the following steps:
The construction task and corresponding construction material that the decorating scheme determined based on user is parsed are received, and receives and is based on
The project amount of corresponding design object on finishing drawing corresponding to the decorating scheme;
Based on received construction task, construction material and project amount generate financial expenditures budget information, materials'use amount it is pre-
Calculate information and the budget information in each construction task working hour;
Calculation information, geographical location and project manager based on each construction task working hour can receive engineering information and assigns management institute
State the project manager of the finishing project of user;
The dependence graph of on-stream time, the construction task based on assigned project manager, each construction task working hour, work
Day arranges and workaday working hour, calculates estimated time of commencement and the expected concluding time of each construction task, and generate dress
Repair the construction speed Gantt chart of project;
Estimated time of commencement, expected concluding time and construction teams and groups based on each construction task are subjected to task quantity, are subjected to
Task time, job site range assign the construction teams and groups that can receive corresponding construction task, or can according to construction teams and groups
Receive an assignment quantity, acceptable task time assigns the construction teams and groups that can receive corresponding construction task;When construction, teams and groups are connect
After receiving corresponding construction task, also according to the construction task at the beginning of, the construction of budget working hour and the construction task
The grade of skill of teams and groups recalculates the working hour that the construction teams and groups complete the construction task, recalculates the construction task and thereafter
The estimated time of commencement of continuous construction task and expected concluding time, and the construction speed Gantt chart letter of finishing project is rendered again
Breath;
Statistics for the first time application of materials when each construction trade required for material and its quantity, or for according to the material of configuration
Dispatching batch counts the material and its quantity of each dispatching batch, or according to different screening conditions when for subsequent material application
Search for corresponding material;
The node specified by each construction task/process operations sequence receives the confirmation message that work is completed in construction teams and groups, is based on
The received confirmation message of construction reference and institute that work is completed audits the completed work, when the completed work is audited
By and checked and accepted by the acceptance criteria of the completed work when needing to check and accept;Constructing when construction task terminates, and records the construction
The physical end time and practice of construction working hour of task, and when according to construction task dependency graph by the physical end of the construction task
Between estimated time of commencement as its subsequent first construction task, recalculate subsequent all construction tasks estimated beginning and
Expected concluding time renders the construction speed Gantt chart of finishing project again;
Task based access control completes content and the initial labor cost of task, the rewards and punishments generated during practice of construction task after the completion of construction task
The amount of money, which generates task statement of account and is pushed to task, completes the confirmation of the end people APP;When tasks all in engineering and used material
After material clearing confirmation, Engineering Settlement inventory is generated based on construction budget information, the practical variable cost generated of engineering;
Based on the Engineering Settlement inventory, the material statement of account for having confirmed that errorless task statement of account, having confirmed that, finance branch
Budget information carries out financial settlement out;
Basic data required for said units and relevant configuration data is stored in advance.
6. finishing management method according to claim 5, which is characterized in that further include based on the received confirmation message of institute,
The estimated time of commencement of the construction task and its subsequent construction task for being recalculated and expected concluding time and appointment management
The construction speed information retrieval that the project manager of the finishing project of the user submits goes out unfinished construction task/engineering and marks
Note.
7. finishing management method according to claim 6, which is characterized in that described based on a received confirmation message, institute
The estimated time of commencement of the construction task and its subsequent construction task for recalculating and expected concluding time and appointment management institute
State the unfinished construction task/engineering of construction speed information retrieval that the project manager of the finishing project of user submits and corresponding mark
Note specifically:
Based on received confirmation message and the construction task and its subsequent construction task for being recalculated estimated beginning when
Between, it retrieves the construction task started not in time and makees respective markers, the construction task that should start in retrieval configuration range simultaneously makees phase
It should mark, the construction task not started yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task that is recalculated and its subsequent construction task it is estimated at the end of
Between, it retrieves the construction task terminated not in time and makees respective markers, the construction task that should terminate in retrieval configuration range simultaneously makees phase
It should mark, the construction task being not over yet in retrieval configuration range simultaneously makees respective markers;
Based on received confirmation message and the construction task that is recalculated and its subsequent construction task it is estimated at the end of
Between, it retrieves the engineering terminated not in time and makees respective markers, the engineering that should terminate in retrieval configuration range simultaneously makees respective markers, examines
Rope configures the engineering being not over yet in range and makees respective markers.
8. finishing management method according to claim 6, which is characterized in that also packet is based on the respective markers, by the phase
Corresponding construction task/engineering information should be marked to be sent to related to construction task/engineering corresponding to the respective markers
Personnel;And/or appoint for the start information of the operation information of each task and engineering critical stage to be sent to corresponding construction
The relevant personnel of business/engineering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811423706.3A CN110009293A (en) | 2018-11-27 | 2018-11-27 | Finishing management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811423706.3A CN110009293A (en) | 2018-11-27 | 2018-11-27 | Finishing management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110009293A true CN110009293A (en) | 2019-07-12 |
Family
ID=67164991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811423706.3A Pending CN110009293A (en) | 2018-11-27 | 2018-11-27 | Finishing management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110009293A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110782124A (en) * | 2019-09-20 | 2020-02-11 | 中铁二十一局集团电务电化工程有限公司 | BIM-based task processing method and device, server and storage medium |
CN111476533A (en) * | 2020-03-05 | 2020-07-31 | 武汉和悦数字科技有限公司 | Internet management platform based on information interaction |
CN113344324A (en) * | 2021-04-30 | 2021-09-03 | 深圳市顺易通信息科技有限公司 | Parking lot material management method and device |
CN113743765A (en) * | 2021-08-27 | 2021-12-03 | 深圳市炎唐装饰有限公司 | Decoration project construction process management method and system based on Internet of things technology |
CN117592949A (en) * | 2024-01-18 | 2024-02-23 | 一智科技(成都)有限公司 | Construction task management method, system and storage medium |
CN117893170A (en) * | 2024-01-18 | 2024-04-16 | 一智科技(成都)有限公司 | Construction progress management method, system, device and storage medium |
-
2018
- 2018-11-27 CN CN201811423706.3A patent/CN110009293A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110782124A (en) * | 2019-09-20 | 2020-02-11 | 中铁二十一局集团电务电化工程有限公司 | BIM-based task processing method and device, server and storage medium |
CN111476533A (en) * | 2020-03-05 | 2020-07-31 | 武汉和悦数字科技有限公司 | Internet management platform based on information interaction |
CN113344324A (en) * | 2021-04-30 | 2021-09-03 | 深圳市顺易通信息科技有限公司 | Parking lot material management method and device |
CN113743765A (en) * | 2021-08-27 | 2021-12-03 | 深圳市炎唐装饰有限公司 | Decoration project construction process management method and system based on Internet of things technology |
CN117592949A (en) * | 2024-01-18 | 2024-02-23 | 一智科技(成都)有限公司 | Construction task management method, system and storage medium |
CN117893170A (en) * | 2024-01-18 | 2024-04-16 | 一智科技(成都)有限公司 | Construction progress management method, system, device and storage medium |
CN117592949B (en) * | 2024-01-18 | 2024-06-11 | 一智科技(成都)有限公司 | Construction task management method, system and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110009293A (en) | Finishing management system and method | |
Dissanayaka et al. | Comparing contributors to time and cost performance in building projects | |
Boehm et al. | Value-based software engineering: A case study | |
CN107358340A (en) | A kind of project management system based on list of engineering | |
US20110213631A1 (en) | System and method for performing project management attendant to any of various types of projects | |
CN103562942A (en) | Method and system for allocation of resources in a project portfolio | |
CN106649500A (en) | Data verification method and system | |
JP2006503352A (en) | Systems and methods for improving planning, scheduling and supply chain management | |
JP2009534736A (en) | Network-based information technology solution development management system and method | |
CN106970953B (en) | Network construction management-control method and its platform based on big data analysis | |
CN109740849A (en) | Structure design work management method, platform and the system quickly delivered | |
KR102342027B1 (en) | Cloud based automatic schedule system to produce a variety of varieties in small quantities | |
CN109460962A (en) | Design objective crowdsourcing management system and method based on full Photographing On-line platform | |
CN110460640A (en) | A kind of Photographing On-line data sharing method and system | |
CN110222996A (en) | Method for allocating tasks and device | |
CN110276666A (en) | A kind of real time service method of commerce based on supply and demand both sides | |
CN107122386A (en) | The screening technique and device of data | |
CN107450975A (en) | A kind of task executing method and device based on layering | |
CN108108950A (en) | Data processing method and device | |
CN116630082A (en) | Method and device for allocating production resources, electronic equipment and storage medium | |
Oke | Effect of bond administration on construction project delivery | |
Aljuhani et al. | Incorporating a decision support approach within the agile mobile application development process | |
CN109685328A (en) | A kind of project under construction turns the risk score method and system of fixed assets | |
CN115358852A (en) | Bond data processing method and device | |
CN109003048A (en) | Engineering design project process management system and its method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190712 |