CN110004940A
CN110004940A CN201910347657.8A CN201910347657A CN110004940A CN 110004940 A CN110004940 A CN 110004940A CN 201910347657 A CN201910347657 A CN 201910347657A CN 110004940 A CN110004940 A CN 110004940A
Authority
CN
China
Prior art keywords
support pile
connector
supporting construction
support
holding section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910347657.8A
Other languages
Chinese (zh)
Inventor
秦力
刘志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Design Institute
Original Assignee
Guangzhou Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Design Institute filed Critical Guangzhou Design Institute
Priority to CN201910347657.8A priority Critical patent/CN110004940A/en
Publication of CN110004940A publication Critical patent/CN110004940A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of supporting construction and its construction methods.Wherein supporting construction includes the first support pile and the second support pile, and the first support pile is provided with the first connector, and the second support pile is provided with the second connector.First connector is equipped with the first holding section, and the second connector is equipped with the second holding section, and the first holding section is with the second snap fit so that the first connector is connected and fixed with the second connector.Above-mentioned supporting construction has better shearing resistance, anti-pressure ability, and then avoids and need to construct multiple tracks inner support or multiple anchor cable structures in supporting construction to increase supporting construction strength problem, reduces difficulty of construction and cost.

Description

Supporting construction and its construction method
Technical field
The present invention relates to technical field of civil engineering, more particularly to a kind of supporting construction and its construction method.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.Although foundation pit is most Belong to temporary work, but many places are in house or lifeline close quarters.In order to guarantee underground construction personnel and foundation pit peripheral ring The safety in border needs to take the safeguard measures such as supporting and retaining system, reinforcing to foundation pit side-wall and surrounding enviroment.
Larsen steel sheet pile has the features such as high durable, high-environmental, therefore Larsen steel sheet pile is widely used in foundation pit protection In structure.But Larsen steel sheet pile rigidity is small, need to construct multilayer inner support or multiple anchor cable structures in deep basal pit application to carry out It reinforces, leads to that difficulty of construction is big, increased costs.
Summary of the invention
Based on this, it is necessary to for the strength problem for how improving foundation pit supporting construction, provide a kind of supporting construction and its Construction method.
A kind of supporting construction, which is characterized in that including the first support pile and the second support pile, first support pile is set It is equipped with the first connector, second support pile is provided with the second connector, and first connector is equipped with the first holding section, institute The second connector is stated equipped with the second holding section, first holding section and second snap fit are so that first connector It is connected and fixed with second connector.
Above-mentioned supporting construction on the first support pile and the second support pile by being respectively set the first connector or the second company Fitting, and connect and fix the first connector with the second connector, so that the first support pile and the second support pile support pile Be interconnected to form can earth-retaining sealing continuous wall construction, the steel plate poor compared to surface rigidity pass through the first support pile and the Two support piles connect and fix composition supporting construction can by pressure dissipation to the first support pile and the second support pile, and first Support pile and the second support pile have higher rigidity and flexing resistance, so that supporting construction has better shearing resistance, resistance to compression Ability, and then avoid and need to construct multiple tracks inner support in supporting construction or multiple anchor cable structures are asked to increase supporting construction intensity Topic, reduces difficulty of construction and cost, meanwhile, pass through the supporting construction connected and fixed by the first connector and the second connector It is easily installed and dismantles, further reduced difficulty of construction and cost.
First holding section is groove in one of the embodiments, and second holding section is and the groove phase Matched protrusion;Alternatively, first holding section is protrusion, second holding section is the groove to match with the protrusion, The protrusion is arranged in the groove.
First holding section extends along the short transverse of first support pile in one of the embodiments, and The other end of first support pile is extended to from one end of first support pile, second holding section is along described second The short transverse of fender pile extends, and the other end of second support pile is extended to from one end of second support pile.
First connector there are two the first support pile settings in one of the embodiments, and two institutes The first connector is stated with the setting substantially symmetrical about its central axis of first support pile, there are two described second for the second support pile setting Connector, two second connectors are with the setting substantially symmetrical about its central axis of second support pile.
The two sides of first support pile and the two sides of second support pile are distinguished in one of the embodiments, It is provided with first connector and second connector.
In one of the embodiments, the supporting construction further include it is vertical with the short transverse of first support pile or The attachment beam of near normal setting, the attachment beam connect first support pile and second support pile.
The supporting construction further includes supporting element in one of the embodiments, and the supporting element is set to the foundation pit It is interior and abutted with the attachment beam.
The supporting element is provided with extensible member in one of the embodiments, and the supporting construction further includes extensible member, institute Stating supporting element includes the first part and the second part, and described first connect with one end of the extensible member, described second and institute The other end connection of extensible member is stated, the extensible member is for driving described first and described second to do close to or far from institute State the movement of attachment beam.
The supporting construction further includes anchor cable in one of the embodiments, and one end of the anchor cable connects the connection The other end of beam, the anchor cable is set in soil layer.
The quantity of first support pile is at least two in one of the embodiments, the number of second support pile Amount is at least two, and first support pile is arranged alternately with second support pile.
A kind of construction method of supporting construction, comprising the following steps:
It is embedded with the second card in the second support pile in embedded the first connector with the first holding section of the first support pile Second connector in conjunction portion;
First support pile and second support pile are squeezed into soil layer, and make first connector with it is described Second connector connects and fixes.
The construction method of above-mentioned supporting construction in the first support pile with burying first on the second support pile respectively by connecting Part or the second connector, and connect and fix the first connector with the second connector, so that the first support pile and second Fender pile support pile is interconnected to form the continuous wall construction of energy earth-retaining sealing, and the steel plate poor compared to surface rigidity passes through first The supporting construction that support pile and the second support pile connect and fix composition can be by pressure dissipation to the first support pile and the second support pile On, and the first support pile and the second support pile have higher rigidity and flexing resistance, so that supporting construction has more preferably Shearing resistance, anti-pressure ability, and then avoid and need to construct multiple tracks inner support or multiple anchor cable structures in supporting construction to increase branch Protection structure strength problem reduces difficulty of construction and cost, meanwhile, it is solid by being clamped by the first connector and the second connector Fixed supporting construction is easily installed and dismantles, and further reduced difficulty of construction and cost.
In one of the embodiments, the following steps are included:
Prefabricated at least two first support pile is simultaneously buried in each first support pile with the first holding section First connector, prefabricated at least two second support pile are simultaneously embedded with the second holding section in each second support pile The second connector;
At least two first support piles are squeezed at interval in soil layer;
Squeeze into second support pile between two adjacent first support piles, and make first connector with Second connector connects and fixes.
It is further comprising the steps of in one of the embodiments:
Along vertical or short transverse direction construction attachment beam approximately perpendicular to the support pile, and connect the attachment beam Connect first support pile and second support pile;
Earth excavation forms foundation pit, and supporting element is arranged in the foundation pit, supports the supporting element with the attachment beam It connects.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the supporting construction of an embodiment;
Fig. 2 is the front view of supporting construction shown in Fig. 1;
Fig. 3 is the structural schematic diagram of the supporting construction of another real embodiment;
Fig. 4 is the cross-sectional view of the supporting construction of an embodiment;
Fig. 5 is the flow chart of the construction method of the supporting construction of an embodiment;
Fig. 6 is the flow chart of the construction method of the supporting construction of another embodiment.
Description of symbols:
100, supporting construction;111, the first support pile;112, the second support pile;120, the first connector;121, the first card Conjunction portion;130, the second connector;131, the second holding section;140, attachment beam;150, supporting element;151, the first supporting element;152, Second supporting element;153, first;154, second;161, extensible member;162, fixing piece;210, foundation pit;220, soil layer.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing to the present invention Specific embodiment be described in detail.Many details are explained in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case where violating intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.Term as used herein "vertical", "horizontal", "left" and "right" "upper" "lower" and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
Referring to Fig. 1 and Fig. 2, the embodiment of the present application provides a kind of supporting construction 100, right when being used for excavation pit 210 Foundation pit 210 carries out going along with sb. to guard him the protection such as earth-retaining and water seepage prevention.Specifically, the supporting construction 100 of an embodiment includes first Fender pile 111 and the second support pile 112, the first support pile 111 and the second support pile 112, the first support pile 111 are provided with A connection piece 120, the second support pile 112 are provided with the second connector 130, and the first connector 120 and the second connector 130 are close Connection.Further, the first connector 120 is taken with 130 phase mutual connection of the second connector, and the first connector 120 is equipped with first Holding section 121, the second connector 130 are provided with the second holding section 131, the first holding section 121 and 131 phase interworking of the second holding section It closes so that the first connector 120 is connected and fixed with the second connector 130.
Specifically, the first support pile 111 and the second support pile 112 are prestressing concrete pipe pile, the first connector 120 with Second connector 130 can be steel member, by the first connector 120 and/or the second connector before prestressed concrete pipe solidification 130 bury into prestressed concrete pipe to form the first support pile 111 or the second support pile 112.
Above-mentioned supporting construction 100 is respectively provided with the first connector on the first support pile 111 and the second support pile 112 120 or second connector 130, and connect and fix the first connector 120 mutually with the second connector 130, so that first Support pile 111 and the second support pile 112 are interconnected to form the supporting construction 100 of energy earth-retaining sealing, poor compared to surface rigidity Steel plate, can be by pressure dissipation by the supporting construction 100 that the first support pile 111 and the second support pile 112 connect and fix composition Onto the first support pile 111 and the second support pile 112, and the first support pile 111 and the second support pile 112 have it is higher Rigidity and flexing resistance, so that supporting construction 100 has better shearing resistance, anti-pressure ability, so as to avoid need to be in supporting knot Multiple tracks inner support or multiple anchor cable structures are constructed on structure 100 to increase strength problem, reduce difficulty of construction and cost.In addition, It is easily installed and dismantles by the supporting construction 100 that the first connector 120 is connected together with the second connector 130, so as to reach To recycle, energy-saving and environment-friendly purpose.
With continued reference to Fig. 1 and Fig. 2, the quantity of the first support pile 111 is at least two, the quantity of the second support pile 112 Also be at least two, and the first support pile 111 is arranged alternately with the second support pile 112 so that the first support pile 111 and Second support pile 112 is interconnected to form the continuous wall construction of energy earth-retaining sealing.
Referring to fig. 2, in the present embodiment, the first holding section 121 extends along the short transverse of the first support pile 111, and The other end of the first support pile 111 is extended to from one end of the first support pile 111, the second holding section 131 is along the second support pile 112 Short transverse extend, and extend to from one end of the second support pile 112 other end of second support pile 112.I.e. first card Conjunction portion 121 is consistent with the length of the first support pile 111, the length one of the length of the second holding section 131 and the second support pile 112 It causes, to guarantee the bonding strength of the first connector 120 and the second connector 130.
With continued reference to Fig. 1, the first holding section 121 is groove in one of the embodiments, the second holding section 131 be with The protrusion that groove matches, protrusion is arranged in the groove so that the first connector 120 is connected and fixed with the second connector 130.Into One step, bulge-structure is integrally formed in the second connector 130.And 130 inside hollow out of the second connector, to reduce material damage Consumption.Alternatively, in another embodiment, the first holding section 121 is protrusion, the second holding section 131 is recessed to match with protrusion Slot, protrusion is arranged in the groove so that the first connector 120 is connected and fixed with the second connector 130.
Further, as shown in Figure 1, the setting of the first support pile 111 is there are two the first connector 120, and two first Connector 120 is with the setting substantially symmetrical about its central axis of support pile 110.Accordingly, there are two the second connections for the setting of the second support pile 112 Part 130, two the second connectors 130 are with the setting substantially symmetrical about its central axis of support pile 110.First connector 120 is connect with second Part 130 is set on different support piles 110, in construction supporting structure 100, is first set two the first support pile 111 intervals It sets, then squeezes into the second support pile 112 between two the first support piles 111, so as to make the first support pile 111 to Two support piles 112 generate squeezing action, so that the connection of the first connector 120 and the second connector 130 is more closely, Increase the bonding strength of the first connector 120 and the second connector 130.
Referring to Fig. 3, in another embodiment, the first holding section 121 or the first latch hook, the second holding section 131 For the second latch hook to match with the first latch hook.It is mutually clamped by the first latch hook and the second latch hook so that the first connector 120 connect and fix with the second connector 130.
Further, as shown in figure 3, it is equal in the two sides of the first support pile 111 and the two sides difference of the second support pile 112 It is provided with the first connector 120 and the second connector 130, and the first connector 120 and second on the first support pile 111 Connector 130 is with the setting substantially symmetrical about its central axis of the first support pile 111.The first connector 120 and second on second support pile 112 Connector 130 is with the setting substantially symmetrical about its central axis of the second support pile 112.By by the first connector 120 and the second connector 130 The two sides of the first support pile 111 or the two sides of the second support pile 112 are set to simultaneously, so as to avoid man-hour requirement is applied to first Support pile 111 is distinguished with the second support pile 112, improves construction efficiency.
Specifically, referring to fig. 2, supporting construction 100 further includes and the first support pile 111 in one of the embodiments, Short transverse is vertically or the attachment beam 140 of near normal setting, first support pile of the connection of attachment beam 140 111 and second connect Stake 112.Further, attachment beam 140 further includes the stake top for being set to the first support pile 111 in one of the embodiments, Crown beam and be set to the first support pile 111 waist waist rail (not shown).Crown beam is sequentially connected the stake of multiple support piles 110 Top, waist rail are sequentially connected the waist of multiple support piles 110.Attachment beam 140 is to the first connector 120 and the second connector 130 Connection is enhanced, and the support action of supporting construction 100 is further enhanced.
Referring to fig. 4, supporting construction 100 further includes supporting element 150, supporting element 150 be set in foundation pit 210 and with connection Beam 140 abuts.Supporting element 150 is used to support support pile 110, prevents support pile 110 under the effect of 220 extruding force of soil layer to foundation pit 210 is tilted or collapse, to further enhance the intensity of supporting construction 100.Further, according to the depth of foundation pit 210 Degree, the quantity of supporting element 150 can be no less than one.Specifically, supporting element 150 includes and hat in one of the embodiments, The first supporting element 151 that beam abuts and the second supporting element 152 abutted with waist rail.
Further, supporting construction 100 further includes extensible member 161, and supporting element 150 includes first 153 and second 154, first 153 connect with one end of extensible member 161, and second 154 connect with the other end of extensible member 161.
Extensible member 161 is done for first 153 and second 154 of driving support member 150 close to or far from attachment beam 140 Movement.Specifically, and extensible member 161 can carry out stretching motion along the length direction of supporting element 150, thus driving support member First 153 of 150 abuts or separates with second 154 with attachment beam 140, and then convenient for the installation of attachment beam 140 and tears open It unloads.Further, extensible member 161 can be hydraulic-driven part, and the internal pressure by changing hydraulic-driven part makes supporting element First 153 of 150 and second 154 movement done close to or far from attachment beam 140.Further, when supporting element 150 is many When Yu Yigen, every supporting element 150 is provided with extensible member 161, and passes through fixing piece between two adjacent extensible members 161 162 connections, and fixing piece 162 protrudes into 210 bottom of foundation pit, to fix extensible member 161.
In another embodiment, supporting construction 100 further includes anchor cable (not shown), enhances supporting construction by anchor cable 100 supporting effect.Specifically, one end of anchor cable connects attachment beam 140, and the other end of the anchor cable is set in soil layer 220. Anchor cable can be provided for supporting construction 100 along the tractive force far from 210 direction of foundation pit, to enhance the load of supporting construction 100 Ability.The quantity of anchor cable can be more, and more anchor cables are uniformly arranged along attachment beam 140.
Referring to Fig. 5, the application also provides a kind of construction method of supporting construction 100, the construction method the following steps are included:
S110: in embedded the first connector with the first holding section of the first support pile, burying in the second support pile has Second connection of the second holding section;
Specifically, referring to Fig. 1, using prefabricated first connector 120 of Steel material and the second connector 130.So that first Connector 120 forms the first holding section 121, and the second connector 130 forms the second holding section 131.Using " centrifugal process " prefabricated One support pile 111 and the second support pile 112, make its vibration compacting.Meanwhile in the first support pile 111 and the second support pile Before 112 solidifications, the first connector 120 is buried in the first support pile 111, buries the second connector 130 in the second support pile 112.
S120: squeezing into the first support pile and the second support pile in soil layer, and connects the first connector and described second Fitting connects and fixes.
Specifically, place is flattened first, and surveying setting-out is arranged according to foundation pit 210, then uses and squeezes into method along layout design The sideline of foundation pit 210 squeeze into the first support pile 111 and the second support pile 112 so that the first holding section 121 engages with second Portion 131 is mutually clamped, so that the first support pile 111 and the second support pile 112 connect and fix to form energy earth-retaining sealing Supporting construction 100.
Referring to Fig. 6, in another embodiment, the construction method of supporting construction 100 the following steps are included:
S210: prefabricated at least two first support pile simultaneously buries first with the first holding section in each first support pile Connector, prefabricated at least two second support pile are simultaneously connected in embedded second with the second holding section of each second support pile Part;
S220: at least two first support piles are squeezed at interval in soil layer;
S230: the second support pile is squeezed between two neighboring first support pile, and connect the first connector with second Part connects and fixes.
Further, with continued reference to Fig. 6, the construction method of supporting construction 100 is further comprising the steps of:
S240: along vertical or short transverse construction attachment beam approximately perpendicular to the first support pile, and connect attachment beam First support pile and the second support pile;
S250: earth excavation forms foundation pit, and supporting element is arranged in foundation pit, abuts supporting element with attachment beam.
Specifically, the earthwork can stage excavation, one layer of one of supporting element 150 of then constructing of every digging, repetitive operation, until be excavated to 210 bottom of foundation pit.
Further, after the completion of supporting construction 100 is constructed, can construct basis in foundation pit 210.Foundation construction is completed Afterwards, backfilling of earthwork is carried out.The first support pile 111 and the second support pile 112 are finally extracted using vibratory drilling method, so that the first supporting Stake 111 and the second support pile 112 can be carried out recycling.
Above-mentioned supporting construction 100 is respectively provided with the first connector on the first support pile 111 and the second support pile 112 120 or second connector 130, and make with the second connector 130 mutually to connect and fix the first adjacent connector 120, thus So that the first support pile 111 and the second support pile 112 are interconnected to form the supporting construction 100 of energy earth-retaining sealing, compared to table The steel plate of face poor rigidity can be incited somebody to action by the supporting construction 100 that the first support pile 111 and the second support pile 112 connect and fix composition On pressure dissipation to the first support pile 111 and the second support pile 112, and the first support pile 111 has with the second support pile 112 Higher rigidity and flexing resistance, so that supporting construction 100 has better shearing resistance, anti-pressure ability, and then avoiding need to be Multiple tracks inner support or multiple anchor cable structures are constructed in supporting construction 100 to increase strength problem, reduce difficulty of construction and cost. In addition, be easily installed and dismantle by the supporting construction 100 that the first connector 120 is connected together with the second connector 130, from And it can reach and recycle, energy-saving and environment-friendly purpose.Simultaneously by two the first support piles 111 of first interval setting, then two The second support pile 112 is squeezed between a first support pile 111.So as to produce between the first support pile 111 and the second support pile 112 Raw squeezing action, so that the connection of the first connector 120 and the second connector 130 more closely further improves, supporting knot The intensity of structure 100.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (13)

1. a kind of supporting construction, which is characterized in that including the first support pile and the second support pile, the first support pile setting There is the first connector, second support pile is provided with the second connector, and first connector is equipped with the first holding section, described Second connector is equipped with the second holding section, first holding section and second snap fit so that first connector with Second connector connects and fixes.
2. supporting construction according to claim 1, which is characterized in that first holding section is groove, second card Conjunction portion is the protrusion to match with the groove, and the protrusion is arranged in the groove;Alternatively, first holding section is convex It rises, second holding section is the groove to match with the protrusion, and the protrusion is arranged in the groove.
3. supporting construction according to claim 1, which is characterized in that first holding section is along first support pile Short transverse extends, and the other end of first support pile is extended to from one end of first support pile, and described second Holding section extends along the short transverse of second support pile, and extends to described second from one end of second support pile The other end of support pile.
4. supporting construction according to claim 1, which is characterized in that there are two described first for the first support pile setting Connector, and two first connectors are with the setting substantially symmetrical about its central axis of first support pile, second support pile There are two second connectors for setting, and two second connectors are with the setting substantially symmetrical about its central axis of second support pile.
5. supporting construction according to claim 1, which is characterized in that the two sides of first support pile and described second The two sides of support pile are respectively arranged with first connector and second connector.
6. supporting construction according to claim 1, which is characterized in that the supporting construction further includes and first supporting The short transverse of stake is vertical or the attachment beam of near normal setting, and the attachment beam connects first support pile and described the Two support piles.
7. supporting construction according to claim 6, which is characterized in that the supporting construction further includes supporting element, the branch Support member is set in foundation pit and abuts with the attachment beam.
8. supporting construction according to claim 7, which is characterized in that the supporting construction further includes extensible member, the branch Support member includes the first part and the second part, and described first connect with one end of the extensible member, and described second is stretched with described The other end of contracting part connects, and the extensible member is for driving described first and described second to do close to or far from the company Connect the movement of beam.
9. supporting construction according to claim 6, which is characterized in that the supporting construction further includes anchor cable, the anchor cable One end connect the attachment beam, the other end of the anchor cable is set in soil layer.
10. supporting construction described in any one of -9 according to claim 1, which is characterized in that the quantity of first support pile is At least two, the quantity of second support pile is at least two, and first support pile replaces with second support pile to be set It sets.
11. a kind of construction method of supporting construction, which comprises the following steps:
It is embedded with the second holding section in the second support pile in embedded the first connector with the first holding section of the first support pile The second connector;
First support pile and second support pile are squeezed into soil layer, and make first connector and described second Connector connects and fixes.
12. the construction method of supporting construction according to claim 11, which comprises the following steps:
Prefabricated at least two first support pile simultaneously buries first with the first holding section in each first support pile Connector, prefabricated at least two second support pile and in embedded the with the second holding section of each second support pile Two connectors;
At least two first support piles are squeezed at interval in soil layer;
Squeeze into second support pile between two adjacent first support piles, and make first connector with it is described Second connector connects and fixes.
13. the construction method of supporting construction according to claim 11, which is characterized in that further comprising the steps of:
Along vertical or short transverse construction attachment beam approximately perpendicular to first support pile, and make attachment beam connection institute State the first support pile and second support pile;
Earth excavation forms foundation pit, and supporting element is arranged in the foundation pit, abuts the supporting element with the attachment beam.
CN201910347657.8A 2019-04-28 2019-04-28 Supporting construction and its construction method Pending CN110004940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910347657.8A CN110004940A (en) 2019-04-28 2019-04-28 Supporting construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910347657.8A CN110004940A (en) 2019-04-28 2019-04-28 Supporting construction and its construction method

Publications (1)

Publication Number Publication Date
CN110004940A true CN110004940A (en) 2019-07-12

Family

ID=67174716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910347657.8A Pending CN110004940A (en) 2019-04-28 2019-04-28 Supporting construction and its construction method

Country Status (1)

Country Link
CN (1) CN110004940A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4096916A (en) * 1974-03-13 1978-06-27 Delmag-Maschinenfabrik Reinhold Dornfeld Diesel pile driver
CA1159268A (en) * 1981-07-03 1983-12-27 Juei-Tse Lin Method of and apparatus for reinforcing piling structure and improved precast concrete pile suitable for use in said method
CN86108374A (en) * 1986-06-20 1987-12-30 有限会社丸共工务所 Pillar assembly of protecting walls
US5002435A (en) * 1989-02-09 1991-03-26 Sondages Injections Forages "S.I.F." Entreprise Bachy Device for making cast-in-situ piles using a continuous hollow auger
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
CN202117049U (en) * 2011-05-31 2012-01-18 中铁十九局集团第二工程有限公司 Latch type steel pipe pile
CN105019401A (en) * 2015-07-14 2015-11-04 周兆弟 Fender pile structure
CN105735249A (en) * 2016-03-31 2016-07-06 宝山钢铁股份有限公司 Two steel plate combined buckle steel pipe centrifugal concrete pile free of longitudinal welding line and prefabrication method
CN107859034A (en) * 2017-11-14 2018-03-30 中铁十局集团第工程有限公司 Large diameter pile foundation spillage immediate processing method
CN207260084U (en) * 2017-06-27 2018-04-20 吴健 The stress stake in shore protection is combined for ecoscape
CN208152010U (en) * 2017-12-07 2018-11-27 天津市佰世恒建筑工程有限公司 A kind of combined type steel pipe diaphragm wall
CN109403342A (en) * 2018-10-31 2019-03-01 中建局集团建设发展有限公司 A kind of foundation pit mixing support construction and its construction method
CN109440782A (en) * 2018-12-17 2019-03-08 福州大学 The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam
CN210177514U (en) * 2019-04-28 2020-03-24 广州市设计院 Supporting structure

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4096916A (en) * 1974-03-13 1978-06-27 Delmag-Maschinenfabrik Reinhold Dornfeld Diesel pile driver
CA1159268A (en) * 1981-07-03 1983-12-27 Juei-Tse Lin Method of and apparatus for reinforcing piling structure and improved precast concrete pile suitable for use in said method
CN86108374A (en) * 1986-06-20 1987-12-30 有限会社丸共工务所 Pillar assembly of protecting walls
US5002435A (en) * 1989-02-09 1991-03-26 Sondages Injections Forages "S.I.F." Entreprise Bachy Device for making cast-in-situ piles using a continuous hollow auger
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
CN202117049U (en) * 2011-05-31 2012-01-18 中铁十九局集团第二工程有限公司 Latch type steel pipe pile
CN105019401A (en) * 2015-07-14 2015-11-04 周兆弟 Fender pile structure
CN105735249A (en) * 2016-03-31 2016-07-06 宝山钢铁股份有限公司 Two steel plate combined buckle steel pipe centrifugal concrete pile free of longitudinal welding line and prefabrication method
CN207260084U (en) * 2017-06-27 2018-04-20 吴健 The stress stake in shore protection is combined for ecoscape
CN107859034A (en) * 2017-11-14 2018-03-30 中铁十局集团第工程有限公司 Large diameter pile foundation spillage immediate processing method
CN208152010U (en) * 2017-12-07 2018-11-27 天津市佰世恒建筑工程有限公司 A kind of combined type steel pipe diaphragm wall
CN109403342A (en) * 2018-10-31 2019-03-01 中建局集团建设发展有限公司 A kind of foundation pit mixing support construction and its construction method
CN109440782A (en) * 2018-12-17 2019-03-08 福州大学 The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam
CN210177514U (en) * 2019-04-28 2020-03-24 广州市设计院 Supporting structure

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
KR102337785B1 (en) Wire structure for staggered lapping in slurry wall and construction method using the same
CN207092107U (en) A kind of anti-subsidence structure using diaphram wall
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN105113514B (en) Foundation pit enclosure system with underground continuous wall as vertical cantilever fulcrum and construction method
CN210712863U (en) Foundation pit support structure
CN109183848A (en) A kind of Tunnel Design and building method
CN106759378B (en) Level is to the construction method for drawing anchor cable
CN105986621A (en) Prefabricated building concrete beam column profile steel connection node structure and method
CN206693242U (en) A kind of vertical bearing structure of suspension support beam in base pit engineering
CN100443673C (en) Method of construction
CN110004940A (en) Supporting construction and its construction method
JP2011246910A (en) Construction method of underground structure
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN109024668B (en) Construction method of multilayer subway station
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN110004942A (en) A kind of large span integral supporting structure and its construction method
CN207392240U (en) For the full bag water proof structure structure of contrary sequence method building
CN110485461A (en) A kind of drop board construction method of underground structure
CN210177514U (en) Supporting structure
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN105926635B (en) A kind of vertical rectangular prefabricated components construction equipment, assembly and construction method
CN102561393B (en) Assembly type underground structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province

Applicant after: Guangzhou Design Institute Group Co.,Ltd.

Address before: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU DESIGN INSTITUTE