CN109973970A - Steam generation facility and conditioner - Google Patents

Steam generation facility and conditioner Download PDF

Info

Publication number
CN109973970A
CN109973970A CN201910277426.4A CN201910277426A CN109973970A CN 109973970 A CN109973970 A CN 109973970A CN 201910277426 A CN201910277426 A CN 201910277426A CN 109973970 A CN109973970 A CN 109973970A
Authority
CN
China
Prior art keywords
water
water tank
generation facility
steam generation
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910277426.4A
Other languages
Chinese (zh)
Inventor
刘树清
阮涛
罗彬�
占磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201910277426.4A priority Critical patent/CN109973970A/en
Publication of CN109973970A publication Critical patent/CN109973970A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/28Methods of steam generation characterised by form of heating method in boilers heated electrically
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/0007Indoor units, e.g. fan coil units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Air Humidification (AREA)

Abstract

The invention discloses a kind of steam generation facility and conditioners, steam generation facility is suitable for generating vapor to be conditioner for vapor, and steam generation facility includes: operating water tank, replenishing water tank of water, heating component and water inlet normally closed solenoid valve.Operating water tank has steam (vapor) outlet;Replenishing water tank of water is equipped with water inlet;Heating component is set in operating water tank, and the vapor in operating water tank flows at conditioner under the driving of air pressure;Normally closed solenoid valve of intaking is set to water inlet;Level switch is set in operating water tank.Thus, pass through operating water tank, replenishing water tank of water, heating component and water inlet normally closed solenoid valve cooperation, it does not need to add water into steam generation facility manually, steam generation facility is more convenient to use, and, steam generation facility can be made to be arranged outside conditioner, the convenience of steam generation facility disassembly, installation can be promoted, so as to improve the disassembly efficiency of steam generation facility.

Description

Steam generation facility and conditioner
Technical field
The present invention relates to field of air conditioning, more particularly, to a kind of steam generation facility and with the steam generation facility Conditioner.
Background technique
In the related technology, it is humidified to, for steam, be needed to air conditioner using moisture film structure or is arranged in the air conditioner Steam generation facility.But farther out due to steam generation facility and water source, generally use water tank for steam generation facility water supply, every time Water will be added manually, use trouble.In addition it when to air outlet for vapor, needs that driving part is separately provided so as to steam Thus vapour needs to be separately provided air duct and drives the component of flow of water vapor according to scheduled duct flows, and then increase sky Adjust the complexity of device.In addition, steam generation facility is arranged in the inside of conditioner, filled when needing to dismantle steam generation When setting, the disassembly of steam generation facility is inconvenient, during repairing steam generation facility, will increase maintenance difficulty, thus meeting Influence maintenance efficiency.Also, when assembling steam generation facility, assembly is inconvenient, leads to the assembly efficiency of steam generation facility Decline.
Summary of the invention
The application provides a kind of steam generation facility, which is arranged outside conditioner, can be with Promote the convenience of steam generation facility disassembly, installation.
The present invention further proposes a kind of conditioner.
Steam generation facility according to the present invention, the steam generation facility are suitable for generating vapor to for air conditioning Device includes: operating water tank for vapor, the steam generation facility, and the operating water tank has heating chamber, the working water Case has steam (vapor) outlet, and the steam (vapor) outlet is set to the top of the operating water tank;Replenishing water tank of water, the replenishing water tank of water pass through company Siphunculus is connected to the operating water tank, and the replenishing water tank of water is equipped with water inlet, and the water inlet is located at the upper of the replenishing water tank of water Side;Heating component, the heating component are set in the operating water tank, and the heating component is set under the operating water tank Portion, the heating component add thermogenetic vapor to be suitable for being discharged from the steam (vapor) outlet, the vapor in the operating water tank It is flowed under the driving of air pressure at the conditioner;Water inlet normally closed solenoid valve, the water inlet normally closed solenoid valve are set to The water inlet, to control the on-off of the water inlet;Level switch, the level switch are set to the working water To detect the water level in the operating water tank in case.
Steam generation facility according to the present invention passes through operating water tank, replenishing water tank of water, heating component and the normally closed electromagnetism of water inlet Valve cooperation does not need to add water into steam generation facility manually, and steam generation facility is more convenient to use, further, it is possible to make to steam Vapour generating device is arranged outside conditioner, can promote the convenience of steam generation facility disassembly, installation, so as to To improve the disassembly efficiency of steam generation facility.
In some examples of the invention, the operating water tank also has discharge outlet, is equipped with drain valve at the discharge outlet, To control the on-off of the discharge outlet, the discharge outlet is set to the lower part of the operating water tank, and the discharge outlet adds with described Hot assemblies spaced apart.
In some examples of the invention, the heating component is electric heating part.
In some examples of the invention, the electric heating part is PTC.
In some examples of the invention, the electric heating part is multiple.
In some examples of the invention, the heating component is connect by screw thread with operating water tank.
In some examples of the invention, the communicating pipe is U-tube.
In some examples of the invention, the U-tube is equipped with check valve, so that fluid is only capable of from the replenishing water tank of water Flow to operating water tank.
In some examples of the invention, the operating water tank have air pressure adjustment mouth, the air pressure adjustment mouth with it is described Heating chamber connection.
In some examples of the invention, steam valve is equipped at the air pressure adjustment mouth.
In some examples of the invention, the operating water tank is multiple.
In some examples of the invention, the replenishing water tank of water is multiple, and each replenishing water tank of water is connected to water source, Each replenishing water tank of water is connected to operating water tank described at least one.
In some examples of the invention, the level switch is tongue tube float switch.
In some examples of the invention, the tongue tube float switch has alarm gear, and the alarm gear includes High water level shelves and low water level shelves.
In some examples of the invention, the tongue tube float switch also has early warning gear, the early warning gear packet Include time high water level shelves and time low water level shelves.
In some examples of the invention, the level switch is water level probe component.
In some examples of the invention, the water level probe component includes high-level probe, middle water level probe and low water Position probe, wherein the free end position of high-level probe is higher than the height of the free end of the middle water level probe again on vertical direction Degree, the height of the free end of the middle water level probe is higher than the height of low-level probe free end, wherein the low-level probe For common end, remaining probe is connected by water with the low-level probe.
In some examples of the invention, the level switch is pressure sensor, and the pressure sensor is set to institute State the inner bottom wall of operating water tank.
In some examples of the invention, the level switch is capacitance detecting component.
In some examples of the invention, the steam (vapor) outlet be spaced apart it is multiple.
In some examples of the invention, drip tray is equipped with below the operating water tank and the replenishing water tank of water.
Conditioner according to the present invention includes indoor unit, and the indoor unit has air outlet;Steam generation facility, The steam generation facility is above-mentioned steam generation facility;Steam conveying pipeline, one end of the steam conveying pipeline and institute Steam (vapor) outlet connection is stated, the steam generation facility flows and pass sequentially through the steam using the pressure driving steam of steam Mouth, the steam conveying pipeline flow to the indoor unit.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures Obviously and it is readily appreciated that, in which:
Fig. 1 is the conditioner implemented according to the present invention and the schematic diagram of steam generation facility;
Fig. 2 is the schematic diagram for the conditioner implemented according to the present invention;
Fig. 3 is the schematic diagram of the one embodiment for the steam generation facility implemented according to the present invention;
Fig. 4 is the signal that the operating water tank for the steam generation facility implemented according to the present invention is connected to replenishing water tank of water upper end Figure;
Fig. 5 be the steam generation facility implemented according to the present invention cistern assembly based on water tank schematic diagram;
Fig. 6 is the operating water tank for the steam generation facility implemented according to the present invention and replenishing water tank of water is that multiple connections is shown It is intended to;
Fig. 7 is that the main body water tank for the steam generation facility implemented according to the present invention is multiple connection schematic diagram;
Fig. 8 is the schematic diagram of the tongue tube float switch for the steam generation facility implemented according to the present invention;
Fig. 9 is that showing on replenishing water tank of water is arranged in the tongue tube float switch for the steam generation facility implemented according to the present invention It is intended to;
Figure 10 is that the tongue tube float switch for the steam generation facility implemented according to the present invention is arranged on main body water tank Schematic diagram;
Figure 11 is the schematic diagram of the water level probe component for the steam generation facility implemented according to the present invention;
Figure 12 is that showing on replenishing water tank of water is arranged in the water level probe component for the steam generation facility implemented according to the present invention It is intended to;
Figure 13 is that showing on main body water tank is arranged in the water level probe component for the steam generation facility implemented according to the present invention It is intended to.
Appended drawing reference:
Conditioner 700;
Steam generation facility 800;
Casing 810;
Cistern assembly 820;Steam (vapor) outlet 821;Water inlet 822;Discharge outlet 823;Drain valve 824;
Main body water tank 825;
Heating chamber 826;Operating water tank 827;Replenishing water tank of water 828;Communicating pipe 829;
Heating component 830;
Level switch 840;
Tongue tube float switch 841;Alarm gear 842;High water level shelves 843;Low water level shelves 844;
Early warning gear 845;Secondary high water level shelves 846;Secondary low water level shelves 847;
Water level probe component 848;High-level probe 849;Middle water level probe 8491;Low-level probe 8492;
Water inlet normally closed solenoid valve 850;Drip tray 860;Moisturizing water level line a;Stop moisturizing water level line b;
Air outlet 900;Indoor unit 901;First air inlet 902;Second air inlet 903;Heat exchanger 904;Outdoor unit 905.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
Steam generation facility 800 according to an embodiment of the present invention is described below with reference to Fig. 1-Figure 13.
As shown in Fig. 1-Figure 13, steam generation facility 800 according to an embodiment of the present invention, steam generation facility 800 is suitable for Vapor is generated to be conditioner 700 for vapor, steam generation facility 800 includes: casing 810, cistern assembly 820, heating component 830, water inlet normally closed solenoid valve 850 and level switch 840.Cistern assembly 820 is set in casing 810, water Box assembly 820 may include: operating water tank 827 and replenishing water tank of water 828.Work when operating water tank 827 and different replenishing water tank of water 828 Make.Operating water tank 827 can have heating chamber 826, and operating water tank 827 can have steam (vapor) outlet 821, and steam (vapor) outlet 821 can To be set to the top of replenishing water tank of water 828.Replenishing water tank of water 828 can be connected to by communicating pipe 829 with operating water tank 827, moisturizing Water tank 828 is equipped with water inlet 822, and water inlet 822 is located at the top of replenishing water tank of water 828, and water inlet 822 is connected to water source.Here " water source " can be tap water, or the tap water equipped with purification device.
It should be noted that water inlet 822 can be connected to by water inlet pipe with water source, the water in water source can pass through water inlet Mouth 822 flows into replenishing water tank of water 828.Heating component 830 is set in operating water tank 827, and heating component 830 is set to water operating water tank Water in operating water tank 827 can be thermally formed vapor by 827 lower part, heating component 830, and the heating of heating component 830 generates Vapor be suitable for being discharged from steam (vapor) outlet 821, the vapor in operating water tank 827 flows to air tune under the driving of air pressure At regulating device 700.Level switch 840 is set in operating water tank 827, and level switch 840 is to detect in operating water tank 827 Water level.
As shown in Fig. 3-Fig. 7, water inlet normally closed solenoid valve 850 be set to water inlet 822 at, water inlet normally closed solenoid valve 850 to Control the on-off of water inlet 822, wherein water inlet normally closed solenoid valve 850 can be connect with controller, and controller can control into water The opening and closing of normally closed solenoid valve 850.Specifically, when level switch 840 detects that the water level in operating water tank 827 is lower than When moisturizing water level line a, level switch 840 sends signal to controller, and then controller control water inlet normally closed solenoid valve 850 is beaten It opens, moves the water to flow into replenishing water tank of water 828, when the water level in operating water tank 827, which is raised to, stops moisturizing water level line b, water level detecting Device 840 sends signal to controller, and then controller control water inlet normally closed solenoid valve 850 is closed, and stops into replenishing water tank of water 828 Moisturizing.It is arranged such and can be realized the work purpose for automatically controlling the moisturizing into cistern assembly 820, it is ensured that cistern assembly Water is all stored in 820 at any time, thereby may be ensured that the functional reliability of steam generation facility 800.
Wherein, the steam (vapor) outlet 821 of steam generation facility 800 can pass through the outlet air of pipeline and conditioner 700 Mouth 900 is connected to.When needing to conditioner 700 for vapor, controller controls steam generation facility 800 and works, and adds Water in hot 830 heating water tank component 820 of component, water form vapor during heating, and vapor is located at cistern assembly 820 The top of the interior water surface, with increasing for vapor, the top air pressure of the water surface is become larger in cistern assembly 820, in the work of air pressure Under, vapor can flow into conditioner 700 from steam (vapor) outlet 821.Also, due in steam generation facility 800 Water gradually decreases in evaporation process, when level switch 840 detects that the water in cistern assembly 820 is reduced to predetermined value, Level switch 840 can send signal to controller, and controller can control the opening of water inlet 822, flow into the water in water source In cistern assembly 820.Setting can save the work step for adding water into steam generation facility 800 manually, steam generation in this way Device 800 is more convenient to use, can promote user satisfaction.
Also, steam generation facility 800 can also be arranged outside conditioner 700, when needing to dismantle steam When generating device 800, the convenient disassembly of steam generation facility 800 can reduce dimension during repairing steam generation facility 800 Difficulty is repaired, so as to improve maintenance efficiency.Meanwhile when assembling steam generation facility 800, more convenient, Ke Yiti is assembled The assembly efficiency of high steam generation facility 800.
Cooperated as a result, by casing 810, cistern assembly 820, heating component 830 and level switch 840, does not need hand Add water in trend steam generation facility 800, steam generation facility 800 is more convenient to use, further, it is possible to make steam generation facility 800 are arranged outside conditioner 700, can promote the convenience of the disassembly of steam generation facility 800, installation, so as to To improve the disassembly efficiency of steam generation facility 800.
In some embodiments of the invention, steam generation facility 800 can also include warning device, and warning device can be with It is electrically connected with the controller, when the water in operating water tank 827 is lower than predetermined value or dry combustion method, warning device can issue alarm signal Number, alarm signal can dodge for sound or lamp, so as to preferably prompt water shortage in user job water tank 827.
In some embodiments of the invention, as shown in Fig. 3-Fig. 7, operating water tank 827 can also have discharge outlet 823, Drain valve 824, on-off of the drain valve 824 to control discharge outlet 823 can be equipped at discharge outlet 823.Wherein, work as cistern assembly When water in 820 needs that cistern assembly 820 is discharged, the opening of drain valve 824 can control, then the water in cistern assembly 820 is just Cistern assembly 820 can be discharged from discharge outlet 823.When needing to store water in cistern assembly 820, control drain valve 824 is closed, can To prevent the water flow in water box assembly 820 to be discharged box assembly 820, so as to prevent the water flow water tank in cistern assembly 820 Component 820.Also, discharge outlet 823 is set to the lower part of operating water tank 827, and discharge outlet 823 and heating component 830 are arranged spaced apart, Setting can guarantee that the water in operating water tank 827 can be discharged in time in this way, also can be avoided discharge outlet 823 and heating component 830 generate mutually interference, it is ensured that the functional reliability of heating component 830.
In some embodiments of the invention, heating component 830 can be set to electric heating part, the work effect of electric heating part Rate height, good reliability, in this way setting can make the water in cistern assembly 820 be rapidly formed vapor, can promote steam hair The working efficiency of generating apparatus 800, also, also can further promote the functional reliability of steam generation facility 800.
In some embodiments of the invention, electric heating part can be set to PTC (Positive Temperature Coefficient- posive temperature coefficient thermistor), wherein the temperature of PTC rises fast, 800 course of work of steam generation facility In, the rate that the water in cistern assembly 820 forms vapor can be promoted, so as to further promote steam generation facility 800 working efficiency.Also, PTC can be used in water, and PTC is less likely to be damaged, and such setting can extend electric heating part Service life.
In some embodiments of the invention, electric heating part can be set to multiple, and multiple electric heating parts can be set simultaneously It sets in cistern assembly 820, the water that setting further promotes in cistern assembly 820 in this way forms the rate of vapor, so as to Further to promote the working efficiency of steam generation facility 800.Also, when one of them in multiple electric heating parts breaks down When, other electric heating parts can work normally, so as to be further ensured that the functional reliability of steam generation facility 800.
In some embodiments of the invention, heating component 830 can be connect by screw thread with operating water tank 827.So Setting can reliably assemble heating component 830 on operating water tank 827, can prevent heating component 830 and operating water tank 827 separation thereby may be ensured that the stability that heating component 830 is assembled.It, can be with also, when needing replacing heating component 830 Facilitate the replacement of heating component 830.
In some embodiments of the invention, as shown in figure 5, cistern assembly 820 may include: main body water tank 825, main body It can have heating chamber 826 in water tank 825, water inlet 822, steam (vapor) outlet 821 can be set to main body water tank 825, heating group Part 830 can be set in main body water tank 825.It is to be understood that cistern assembly 820 is integrated, steam (vapor) outlet 821 can With close to main body water tank 825 top layout, heating component 830 can close to main body water tank 825 bottom arrange, when need to In main body water tank 825 when moisturizing, controller control water inlet normally closed solenoid valve 850 is opened, and water can pass through water inlet pipe, water inlet 822 flow into heating chamber 826, and after the completion of 825 moisturizing of main body water tank, controller control water inlet normally closed solenoid valve 850 is closed.Work as needs When to conditioner 700 for vapor, controller controls heating component 830 and works, and heating component 830 will can add rapidly Water in hot chamber 826 is heated into vapor.
In some embodiments of the invention, as shown in figure 3, cistern assembly 820 may include: operating water tank 827 and mend Water tank 828.Operating water tank 827 and replenishing water tank of water 828 do not work at the same time.Operating water tank 827 can have heating chamber 826, steam Vapor outlet 821 can be set in operating water tank 827, and replenishing water tank of water 828 can be connected to by communicating pipe 829 with operating water tank 827, Water inlet 822 is set to replenishing water tank of water 828.Wherein, water can be flowed into replenishing water tank of water 828 by water inlet 822, and water can be with It is stored in replenishing water tank of water 828, when needing the moisturizing into operating water tank 827, the water in replenishing water tank of water 828 can pass through connection Pipe 829 flows into operating water tank 827, thereby may be ensured that the moment all stores water in operating water tank 827.Also, at water inlet 822 It is provided with into water normally closed solenoid valve 850, when the water in replenishing water tank of water 828 is lower than moisturizing water level line a, controller control water inlet is normal The opening of solenoid valve 850 is closed, water is made to flow into replenishing water tank of water 828 from water inlet 822, waterborne rise in replenishing water tank of water 828 stops mending When water water level line b, controller control water inlet normally closed solenoid valve 850 is closed, and is stopped the moisturizing into replenishing water tank of water 828, is arranged in this way Can guarantee to store water in replenishing water tank of water 828, can to avoid there is no the case where water in operating water tank 827, so as to 830 dry combustion method of heating component is avoided, and then the service life of heating component 830 can be extended.
In some embodiments of the invention, communicating pipe 829 can be set to U-tube.Wherein, operating water tank 827 and benefit After water tank 828 is connected to by U-tube, the structure of operating water tank 827 and replenishing water tank of water 828 can be made to form law of connected vessels, In 800 course of work of steam generation facility, the water in operating water tank 827 is gradually decreased, then the water surface in replenishing water tank of water 828 Height is higher than the water surface elevation in operating water tank 827, and under the action of pressure difference, the water in replenishing water tank of water 828 can be pressed into benefit Water tank 828, so as to realize the work purpose of the moisturizing into operating water tank 827.
As shown in figure 4, another specific embodiment according to the present invention, cistern assembly 820 may include: operating water tank 827 and replenishing water tank of water 828.Operating water tank 827 can have heating chamber 826, and steam (vapor) outlet 821 can be set in operating water tank 827, replenishing water tank of water 828 can be connected to by communicating pipe 829 with operating water tank 827, can make operating water tank 827 and replenishing water tank of water 828 structure forms law of connected vessels, and water inlet 822 is set to replenishing water tank of water 828.Wherein, the upper end of operating water tank 827 and moisturizing The upper end of water tank 828 is connected to, and being arranged can guarantee that operating water tank 827 is equal with the pressure in replenishing water tank of water 828 in this way, can be to prevent Only pressure is excessive in operating water tank 827 covers water tank 828 for hydraulic pressure.
In some embodiments of the invention, check valve can be equipped in U-tube, check valve can be such that fluid is only capable of from benefit Water tank 828 flows to the flowing of operating water tank 827, and the fluid that being arranged such can be avoided in operating water tank 827 flows to replenishing water tank of water 828, it can make to store enough fluids in operating water tank 827.
In some embodiments of the invention, operating water tank 827 can have air pressure adjustment mouth, and air pressure adjustment mouth can be with Heating chamber 826 is connected to.It should be noted that when needing to open air pressure adjustment mouth, heating chamber 826 to when 827 moisturizing of operating water tank Interior gas pressure quickly reduces, and the pressure in heating chamber 826 can be made rapidly close to atmospheric pressure, thereby may be ensured that moisturizing water Water in case 828 flows into rapidly operating water tank 827, and then can complete the work of 827 moisturizing of operating water tank.
In some embodiments of the invention, steam valve can be equipped at air pressure adjustment mouth, wherein steam valve can be with control Device processed connection, steam valve preferably control pressure can adjust the opening and closing of mouth, when needing to 827 moisturizing of operating water tank When, controller controls steam valve and opens, and makes the pressure in heating chamber 826 rapidly close to atmospheric pressure, so as to be further ensured that Water in replenishing water tank of water 828 flows into rapidly operating water tank 827.When not needing to when 827 moisturizing of operating water tank, controller control is steamed Steam valve is closed.
It should be noted that steam generation facility 800 is used in first time or after a period of operation, is needed to work When making moisturizing in water tank 827, replenishing water tank of water 828 can pass through the moisturizing into operating water tank 827 of communicating pipe 829.Work as replenishing water tank of water When being connected with U-tube between 828 and operating water tank 827, law of connected vessels can use, supplement the water in replenishing water tank of water 828 Into operating water tank 827, water level decreasing in replenishing water tank of water 828, and level switch 840 detects to need to replenishing water tank of water When 828 moisturizing, water inlet normally closed solenoid valve 850 is opened with the moisturizing into replenishing water tank of water 828, due to replenishing water tank of water 828 and working water Case 827 constructs linker, and the liquid level in two water tanks is concordant, when the water level in replenishing water tank of water 828 reach a certain height, water Bit detector 840 issues electric signal, and control water inlet normally closed solenoid valve 850 is closed, it is possible thereby to not have to again into replenishing water tank of water 828 Moisturizing.
When the water abundance in replenishing water tank of water 828 and operating water tank 827, when needing to generate vapor, heating can star Component 830 heats heating component 830 to the water in operating water tank 827 to generate vapor, and heating component 830 is adding In thermal process, the atmospheric pressure in operating water tank 827 is gradually increased, and since communicating pipe 829 is equipped with check valve, fluid can not be from Operating water tank 827 flows to replenishing water tank of water 828, and under the action of air pressure in operating water tank 827 at this time, replenishing water tank of water 828 does not exist For 827 moisturizing of operating water tank, i.e., pressure and work caused by the liquid-column height difference in replenishing water tank of water 828 and operating water tank 827 Pressure in water tank 827 is equal, and replenishing water tank of water 828 is not 827 moisturizing of operating water tank at this time.
After heating component 830 heats a period of time, and when water shortage around heating component 830, in operating water tank 827 Portion has a small amount of vapor to generate or do not having vapor generation, continues to generate vapor at this time if necessary, need to work Moisturizing in water tank 827, namely when needing the air pressure in equal operating water tanks 827 equal with the air pressure in replenishing water tank of water 828, moisturizing water Case 828 just can be to 827 moisturizing of operating water tank.For the air pressure in balancing work water tank 827 and replenishing water tank of water 828, Ke Yitong Cross following two mode to carry out: 1) since heating component 830 is not heating, the temperature in operating water tank 827 is gradually reduced, work Remaining vapor in water tank 827 gradually condenses, so that the air pressure in operating water tank 827 is gradually reduced, when operating water tank 827 When interior air pressure is declined to a certain extent, using law of connected vessels, the water in replenishing water tank of water 828 can be flowed into operating water tank In 827;It 2), can be on operating water tank 827 in order to the pressure in Fast-Balance operating water tank 827 and replenishing water tank of water 828 Air pressure adjustment mouth is set, steam valve can be set at air pressure adjustment mouth, when needing balancing work water tank 827 and replenishing water tank of water 828 When interior pressure, steam valve is opened, so that the pressure in operating water tank 827 is quickly recovered to atmospheric pressure, and then can be with moisturizing water Pressure in case 828 reaches balance.
In some embodiments of the invention, as shown in fig. 6, operating water tank 827 can be set to it is multiple, in the unit time Interior, multiple operating water tanks 827 work together, the amount that steam generation facility 800 forms vapor can be promoted, so as to be promoted The working efficiency of steam generation facility 800.
In some embodiments of the invention, as shown in fig. 6, replenishing water tank of water 828 can be set to multiple, each moisturizing water Case 828 is connected to water source, and each replenishing water tank of water 828 is connected to at least one operating water tank 827.It is to be understood that each Replenishing water tank of water 828 can be connected to an operating water tank 827, can also be connected to multiple operating water tanks 827.When each moisturizing water When case 828 can be connected to an operating water tank 827, replenishing water tank of water 828 and operating water tank 827 are corresponded, that is to say, that one A replenishing water tank of water 828 is only connected to an operating water tank 827, it is understood that is that one replenishing water tank of water 828 are a job 827 moisturizing of water tank.
It can be with it should be noted that steam generation facility 800 can be connected to by water inlet manifold with water source, on water inlet manifold Multiple water inlet pipes are provided with, multiple water inlet pipes and replenishing water tank of water 828 correspond.Wherein, replenishing water tank of water 828 and operating water tank 827 are connected to by the principle of linker, and the upper end of replenishing water tank of water 828 is connected to the upper end of operating water tank 827, is arranged in this way It can guarantee that replenishing water tank of water 828 is equal with the pressure in operating water tank 827, it, can be to prevent when the pressure of operating water tank 827 is excessive The hydraulic pressure in operating water tank 827 is only entered into replenishing water tank of water 828.Also, it can be at the water inlet 822 of each replenishing water tank of water 828 It is provided with into water normally closed solenoid valve 850, level switch 840 is provided in each replenishing water tank of water 828, when replenishing water tank of water 828 When interior water level is lower than moisturizing water level line a, water inlet normally closed solenoid valve 850 is opened, and water can pass sequentially through water inlet manifold, water inlet Pipe, water inlet 822 flow into replenishing water tank of water 828, and when water level, which rises to, stops moisturizing water level line b, water inlet normally closed solenoid valve 850 is closed It closes, stops to 828 moisturizing of replenishing water tank of water.
In some embodiments of the invention, cistern assembly 820 includes main body water tank 825, has in main body water tank 825 and adds Hot chamber 826, water inlet 822, steam (vapor) outlet 821 are set to main body water tank 825, and heating component 830 is set in main body water tank 825. That is, water tank 825 supplies water based on water inlet 822 is direct, heating component 830 is for adding the water in main body water tank 825 Heat, vapor are flowed out from main body water tank 825.
In some embodiments of the invention, it as shown in fig. 7, main body water tank 825 can be set to multiple, needs to illustrate It is that steam generation facility 800 can be connected to by water inlet manifold with water source, multiple water inlet pipes has can be set on water inlet manifold, Multiple water inlet pipes and main body water tank 825 correspond.Wherein, it can be set at the water inlet 822 of each main body water tank 825 It intakes normally closed solenoid valve 850, is provided with level switch 840 in each main body water tank 825, the water in main body water tank 825 When position is lower than moisturizing water level line a, water inlet normally closed solenoid valve 850 is opened, and water can pass sequentially through water inlet manifold, water inlet pipe, water inlet Mouthfuls 822 flow into main body water tanks 825, and when water level, which rises to, stops moisturizing water level line b, water inlet normally closed solenoid valve 850 is closed, stop to 825 moisturizing of main body water tank.
In some embodiments of the invention, as Figure 8-Figure 10, it is floating to can be set to tongue tube for level switch 840 The functional reliability of ball switch 841, tongue tube float switch 841 is good, and such setting can preferably detect replenishing water tank of water 828, the water level in main body water tank 825, can promote the accuracy of water level detecting.
In some embodiments of the invention, as shown in figure 8, tongue tube float switch 841 can have alarm gear 842, alarm gear 842 may include high water level shelves 843 and low water level shelves 844, and the position of high water level shelves 843 is higher than low water level shelves 844 position.Wherein, in the moisturizing into replenishing water tank of water 828, main body water tank 825, when replenishing water tank of water 828, main body water tank 825 When interior water level is located at high water level shelves 843, tongue tube float switch 841 to controller send alarm signal, controller control into Water normally closed solenoid valve 850 is closed, and moisturizing is stopped.When the water level in replenishing water tank of water 828, main body water tank 825 is located at low water level shelves 844 When, tongue tube float switch 841 sends alarm signal to controller, and controller control water inlet normally closed solenoid valve 850 is opened, started Moisturizing.Setting can be realized the function from moisturizing in trend replenishing water tank of water 828, main body water tank 825 in this way, can promote moisturizing Accuracy.
In some embodiments of the invention, as shown in figure 8, tongue tube float switch 841 can also have early warning gear 845, early warning gear 845 may include time high water level shelves 846 and time low water level shelves 847, and the position of secondary high water level shelves 846 is higher than secondary The position of low water level shelves 847, and the position shelves of secondary high water level are lower than the position of high water level shelves 843, the position of secondary low water level shelves 847 Set the position higher than low water level shelves 844.Wherein, in the moisturizing into replenishing water tank of water 828, main body water tank 825, work as replenishing water tank of water 828, when the water level in main body water tank 825 is located at time low water level shelves 847, secondary high water level shelves 846, tongue tube float switch 841 to Controller sends alarm signal, and family can be used and understand replenishing water tank of water 828, the water level conditions in main body water tank 825.Operating water tank 827 during the work time, when the water level in replenishing water tank of water 828 is located at high water level shelves 843, low water level shelves 844, tongue tube floating ball Switch 841 sends alarm signal to controller, and family also can be used and understand replenishing water tank of water 828, the water level feelings in main body water tank 825 Condition.
In some embodiments of the invention, as shown in figure 9, tongue tube floating ball can be set in replenishing water tank of water 828, Into replenishing water tank of water 828 when moisturizing, when water level successively reach low water level shelves 844, secondary low water level shelves 847, secondary high water level shelves 846, When high water level shelves 843, tongue tube float switch 841 can send alarm signal to controller, and user is made accurately to understand moisturizing Moisturizing situation in water tank 828, after the water level in replenishing water tank of water 828 reaches high water level shelves 843, tongue tube float switch 841 Alarm signal is sent, controller control water inlet normally closed solenoid valve 850 is closed, and the moisturizing into replenishing water tank of water 828 is stopped.Operating water tank 827 during the work time, when the water level in replenishing water tank of water 828 successively reaches high water level shelves 843, secondary high water level shelves 846, secondary low water When the shelves 847, low water level shelves 844 of position, tongue tube float switch 841 can send alarm signal to controller, keep user accurate Understand the water level conditions in replenishing water tank of water 828, after the water level in replenishing water tank of water 828 reaches low water level shelves 844, operating water tank 827 stop working, and controller control water inlet normally closed solenoid valve 850 is opened, and start the moisturizing into replenishing water tank of water 828.
In some embodiments of the invention, as shown in Figure 10, tongue tube floating ball can be set in main body water tank 825, In the moisturizing into main body water tank 825, when water level successively reaches low water level shelves 844, secondary low water level shelves 847, secondary high water level shelves 846, when high water level shelves 843, tongue tube float switch 841 can send alarm signal, and user is made accurately to understand replenishing water tank of water Moisturizing situation in 828, after the water level in main body water tank 825 reaches high water level shelves 843, tongue tube float switch 841 is sent Alarm signal, controller control water inlet normally closed solenoid valve 850 are closed, and the moisturizing into main body water tank 825 is stopped.Main body water tank 825 During the work time, when the water level in main body water tank 825 successively reaches high water level shelves 843, secondary high water level shelves 846, secondary low water level When 847, low water level shelves 844 of shelves, tongue tube float switch 841 can send alarm signal, and user is made accurately to understand main body water Water level conditions in case 825, after the water level in main body water tank 825 reaches low water level shelves 844, main body water tank 825 stops working, Controller control water inlet normally closed solenoid valve 850 is opened, and the moisturizing into main body water tank 825 is started.
In some embodiments of the invention, as shown in figures 11-13, level switch 840 can be set to water level spy The work of needle assemblies 848, water level probe component 848 is more accurate, and setting in this way can accurately detect main body water tank 825, mend Water level in water tank 828 can promote the work accuracy of level switch 840.Also, the water level probe component 848 Functional reliability is good, it is not easy to damage, the service life that can extend level switch 840 is arranged such.
In some embodiments of the invention, as shown in figure 11, water level probe component 848 may include high-level probe 849, middle water level probe 8491 and low-level probe 8492, in the vertical direction, the free end position of high-level probe 849 are higher than The height of the free end of middle water level probe 8491, the height of the free end of middle water level probe 8491 are higher than low-level probe 8492 certainly By the height held.Wherein, low-level probe 8492 is common end, remaining probe is connected by water and low-level probe 8492.Tool Body, water level probe component 848 can be set in replenishing water tank of water 828, main body water tank 825, when replenishing water tank of water 828, main body water When the height for the free end that the height of water level in case 825 is equal to middle water level probe 8491, middle water level probe 8491 and low water level are visited Needle 8492 is connected, and water level probe component 848 detects that replenishing water tank of water 828, the water level in main body water tank 825 are located at middle water level, when When the height for the free end that the height of water level in replenishing water tank of water 828, main body water tank 825 is equal to high-level probe 849, high water level is visited Needle 849 and low-level probe 8492 are connected, and water level probe component 848 detects replenishing water tank of water 828, the water in main body water tank 825 Position is located at high water level, at this time replenishing water tank of water 828, do not need moisturizing in main body water tank 825, when replenishing water tank of water 828, main body water tank When the height for the free end that the height of water level in 825 is lower than low-level probe 8492, water level probe component 848 detects moisturizing water Water level in case 828, main body water tank 825 is located at low water level.
In some embodiments of the invention, as shown in figure 12, water level probe component 848 can be set in replenishing water tank of water In 828, in the moisturizing into replenishing water tank of water 828, when the height of water level in replenishing water tank of water 828 is equal to oneself of high-level probe 849 By hold height when, high-level probe 849 and low-level probe 8492 are connected, and controller control water inlet normally closed solenoid valve 850 closes It closes, stops the moisturizing into replenishing water tank of water 828.During the work time, the water level in replenishing water tank of water 828 is lower than height for operating water tank 827 The height of the free end of water level probe 849, and it is located at the height and middle water level probe 8491 of the free end of high-level probe 849 Free end height between when, middle water level probe 8491 and low-level probe 8492 are connected, and user is made to connect replenishing water tank of water 828 Interior water level is located at middle water level.During the work time, the water level in replenishing water tank of water 828 is lower than middle water level probe to operating water tank 827 When the height of 8491 free end, controller control water inlet normally closed solenoid valve 850 is opened, the moisturizing into replenishing water tank of water 828.
In some embodiments of the invention, as shown in figure 13, water level probe component 848 can be set in main body water tank In 825, in the moisturizing into main body water tank 825, when the height of water level in main body water tank 825 is equal to oneself of high-level probe 849 By hold height when, high-level probe 849 and low-level probe 8492 are connected, and controller control water inlet normally closed solenoid valve 850 closes It closes, stops the moisturizing into main body water tank 825.During the work time, the water level in main body water tank 825 is lower than height for main body water tank 825 The height of the free end of water level probe 849, and it is located at the height and middle water level probe 8491 of the free end of high-level probe 849 Free end height between when, middle water level probe 8491 and low-level probe 8492 are connected, and user is made to connect main body water tank 825 Interior water level is located at middle water level.During the work time, the water level in main body water tank 825 is lower than middle water level probe to main body water tank 825 When the height of 8491 free end, controller control water inlet normally closed solenoid valve 850 is opened, the moisturizing into main body water tank 825.
In some embodiments of the invention, level switch 840 can be pressure sensor, and pressure sensor is set to work Make the inner bottom wall of water tank 827.Wherein, since the height of water more High Voltage is bigger, when steam generation facility 800 works, working water Liquid level in case 827 gradually decreases, and the pressure of water is gradually reduced, and pressure sensor can detecte out in operating water tank 827 The pressure change of water whereby it can be detected that the height of water in operating water tank 827, when the pressure of water in operating water tank 827 reduces When to predetermined value, pressure sensor sends signal to controller, opens controller control water inlet normally closed solenoid valve 850, thus Realize the purpose for adding water into replenishing water tank of water 828.Also, during the moisturizing into operating water tank 827, work as pressure sensor When detecting that the pressure of water in operating water tank 827 increases to predetermined value, pressure sensor sends signal to controller, makes controller Control water inlet normally closed solenoid valve 850 is closed, and the moisturizing into operating water tank 827 is stopped.
In some embodiments of the invention, level switch 840 can be capacitance detecting component, and capacitance detecting component can To include: electrostatic pole piece and moving electrode piece, moving electrode piece changes position with SEA LEVEL VARIATION, and then can detecte two electrode slices Between water amount.
In some embodiments of the invention, steam (vapor) outlet 821 can be set to spaced apart multiple, and setting can in this way Make multiple steam (vapor) outlets 821 simultaneously to conditioner 700 for vapor, the blowout of conditioner 700 can be promoted Gas humidity.
In some embodiments of the invention, it can be equipped with drip tray 860 below operating water tank 827 and replenishing water tank of water 828, Wherein, it when 828 leak of operating water tank 827 and replenishing water tank of water, or needs main body water tank 825, operating water tank 827 and moisturizing When water in water tank 828 is discharged, water be can store in drip tray 860, so as to prevent steam generation facility 800 to outside Leak.
In some embodiments of the invention, partition has been can be set in casing 810, partition can will be in casing 810 It is separated out the first chamber and the second chamber, cistern assembly 820 can be set in the first chamber, and the electric-controlled box of steam generation facility 800 can be with It is intracavitary to be set to second.Cistern assembly 820, electric-controlled box can be arranged in two cavitys by such setting, can be to avoid Cistern assembly 820 and electric-controlled box generate interference, thereby may be ensured that the functional reliability of cistern assembly 820 and electric-controlled box.
In some embodiments of the invention, electric-controlled box is removably joined together with partition, in maintenance process, this Sample setting can promote maintenance efficiency convenient for removing electric-controlled box.
In some embodiments of the invention, casing 810 can be mounted on the rooftop position in room by way of furred ceiling. Further, casing 810 includes top plate, coaming plate and bottom plate, and wherein top plate, coaming plate and bottom plate limit installation space, water tank group Part 820 is located in installation space, and top plate is connect with roof, and cistern assembly 820 and partition can be connect with top plate, coaming plate and top plate Connection, drip tray 860 are connect with cistern assembly 820, and bottom plate can be connect with coaming plate.It is needing to steam generation facility 800 When electric-controlled box repairs, bottom plate, which is disassembled, to repair electric-controlled box.Further, when needing to cistern assembly 820 when being repaired or replaced, and can first disassemble bottom plate, then drip tray 860 is disassembled, thus cistern assembly 820 can expose, and thus can be repaired or replaced, can simplify in this way to steam generation facility 800 to drip tray 860 Maintenance process.
As depicted in figs. 1 and 2, conditioner 700 according to an embodiment of the present invention includes outdoor unit 905, indoor unit 901, steam generation facility 800 and steam conveying pipeline.Outdoor unit 905 is connected to indoor unit 901, and indoor unit 901 can have Air outlet 900, steam generation facility 800 are the steam generation facility 800 of above-described embodiment, one end of steam conveying pipeline and steaming Vapor outlet 821 is connected to, and the other end of steam conveying pipeline can be connected to indoor unit 901, and steam generation facility 800 utilizes steam Pressure driving steam flowing and pass sequentially through steam (vapor) outlet 821, steam conveying pipeline flows to indoor unit 901.It is arranged such Steam generation facility 800 can be arranged outside machine 901 indoors, not need to add water into steam generation facility 800 manually, steam Vapour generating device 800 is more convenient to use, also, can also promote the convenience of the disassembly of steam generation facility 800, installation, from And the disassembly efficiency of steam generation facility 800 can be improved.
In some embodiments of the invention, indoor unit 901 can have the first air inlet hole 902,903 and of the second air inlet hole Heat exchanger 904, heat exchanger 904 are located in indoor unit 901, as shown in Fig. 2, the first air inlet hole 902 can be located at heat exchanger 904 Left side, the second air inlet hole 903 can be located at the right side of heat exchanger 904, and steam generation facility 800 can be with the of indoor unit 901 The connection of one air inlet hole 902, in this way setting can guarantee that steam generation facility 800 has enough installation spaces, it is ensured that steam The installation strength of vapour generating device 800.In addition, steam generation facility 800 can connect with the second air inlet hole 903 of indoor unit 901 It is logical, the wind that indoor unit 901 can be made to blow out is arranged such and more moistens, the humidity of air can be promoted, so as to promote sky The outlet air quality of gas control device 700.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, knot Structure, material or feature are included at least one embodiment or example of the invention.In the present specification, to above-mentioned term Schematic representation may not refer to the same embodiment or example.Moreover, specific features, structure, material or the spy of description Point can be combined in any suitable manner in any one or more of the embodiments or examples.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (22)

1. a kind of steam generation facility, which is characterized in that the steam generation facility is suitable for generating vapor to for air tune Regulating device includes: for vapor, the steam generation facility
Operating water tank, the operating water tank have heating chamber, and the operating water tank has steam (vapor) outlet, and the steam (vapor) outlet is set to The top of the operating water tank;
Replenishing water tank of water, for the replenishing water tank of water by being connected to the operating water tank communicating pipe, the replenishing water tank of water is equipped with water inlet, The water inlet is located at the top of the replenishing water tank of water;
Heating component, the heating component are set in the operating water tank, and the heating component is set under the operating water tank Portion, the heating component add thermogenetic vapor to be suitable for being discharged from the steam (vapor) outlet, the vapor in the operating water tank It is flowed under the driving of air pressure at the conditioner;
Water inlet normally closed solenoid valve, the water inlet normally closed solenoid valve are set to the water inlet, to control the logical of the water inlet It is disconnected;
Level switch, the level switch are set in the operating water tank to detect the water level in the operating water tank.
2. steam generation facility according to claim 1, which is characterized in that the operating water tank also has discharge outlet, institute It states and is equipped with drain valve at discharge outlet, to control the on-off of the discharge outlet, the discharge outlet is set under the operating water tank Portion, the discharge outlet are spaced apart with the heating component.
3. steam generation facility according to claim 1, which is characterized in that the heating component is electric heating part.
4. steam generation facility according to claim 3, which is characterized in that the electric heating part is PTC.
5. steam generation facility according to claim 3, which is characterized in that the electric heating part is multiple.
6. steam generation facility according to claim 1, which is characterized in that the heating component passes through screw thread and working water Case connection.
7. steam generation facility according to claim 1, which is characterized in that the communicating pipe is U-tube.
8. steam generation facility according to claim 7, which is characterized in that the U-tube is equipped with check valve, so that stream Body is only capable of flowing to operating water tank from the replenishing water tank of water.
9. steam generation facility according to claim 1, which is characterized in that the operating water tank has air pressure adjustment mouth, The air pressure adjustment mouth is connected to the heating chamber.
10. conditioner according to claim 9, which is characterized in that be equipped with steam valve at the air pressure adjustment mouth.
11. steam generation facility according to claim 1, which is characterized in that the operating water tank is multiple.
12. steam generation facility according to claim 1, which is characterized in that the replenishing water tank of water be it is multiple, it is each described Replenishing water tank of water is connected to water source, and each replenishing water tank of water is connected to operating water tank described at least one.
13. steam generation facility according to claim 1, which is characterized in that the level switch is tongue tube floating ball Switch.
14. steam generation facility according to claim 13, which is characterized in that the tongue tube float switch has alarm Gear, the alarm gear includes high water level shelves and low water level shelves.
15. steam generation facility according to claim 13, which is characterized in that the tongue tube float switch also has pre- Alert gear, the early warning gear include time high water level shelves and time low water level shelves.
16. steam generation facility according to claim 1, which is characterized in that the level switch is water level probe group Part.
17. steam generation facility according to claim 16, which is characterized in that the water level probe component includes high water level Probe, middle water level probe and low-level probe, wherein the free end position of high-level probe is higher than in described again on vertical direction The height of the free end of water level probe, the height of the free end of the middle water level probe are higher than the height of low-level probe free end Degree,
Wherein the low-level probe is common end, remaining probe is connected by water with the low-level probe.
18. steam generation facility according to claim 1, which is characterized in that the level switch is pressure sensor, The pressure sensor is set to the inner bottom wall of the operating water tank.
19. steam generation facility according to claim 1, which is characterized in that the level switch is capacitance detecting group Part.
20. steam generation facility according to claim 1, which is characterized in that the steam (vapor) outlet be spaced apart it is multiple.
21. steam generation facility according to claim 1, which is characterized in that the operating water tank and the replenishing water tank of water Lower section is equipped with drip tray.
22. a kind of conditioner, which is characterized in that including
Indoor unit, the indoor unit have air outlet;
Steam generation facility, the steam generation facility are the dress of the steam generation according to any one of claim 1-21 It sets;
Steam conveying pipeline, one end of the steam conveying pipeline are connected to the steam (vapor) outlet, the steam generation facility benefit It is flowed with the pressure driving steam of steam and passes sequentially through the steam (vapor) outlet, the steam conveying pipeline flows to the interior Machine.
CN201910277426.4A 2019-04-08 2019-04-08 Steam generation facility and conditioner Pending CN109973970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910277426.4A CN109973970A (en) 2019-04-08 2019-04-08 Steam generation facility and conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910277426.4A CN109973970A (en) 2019-04-08 2019-04-08 Steam generation facility and conditioner

Publications (1)

Publication Number Publication Date
CN109973970A true CN109973970A (en) 2019-07-05

Family

ID=67083412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910277426.4A Pending CN109973970A (en) 2019-04-08 2019-04-08 Steam generation facility and conditioner

Country Status (1)

Country Link
CN (1) CN109973970A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006292205A (en) * 2005-04-07 2006-10-26 Shinnosuke Nomura Small-size steam generator
CN201215358Y (en) * 2008-04-09 2009-04-01 珠海格力电器股份有限公司 Air conditioner indoor unit with humidifying function
CN203731615U (en) * 2014-02-25 2014-07-23 广东美的暖通设备有限公司 Air conditioner humidifier and air conditioner
CN105135579A (en) * 2014-06-09 2015-12-09 广东美的暖通设备有限公司 Base station air conditioner, humidifying system thereof and humidifying system control method
CN210891596U (en) * 2019-04-08 2020-06-30 广东美的暖通设备有限公司 Steam generating device and air conditioning device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006292205A (en) * 2005-04-07 2006-10-26 Shinnosuke Nomura Small-size steam generator
CN201215358Y (en) * 2008-04-09 2009-04-01 珠海格力电器股份有限公司 Air conditioner indoor unit with humidifying function
CN203731615U (en) * 2014-02-25 2014-07-23 广东美的暖通设备有限公司 Air conditioner humidifier and air conditioner
CN105135579A (en) * 2014-06-09 2015-12-09 广东美的暖通设备有限公司 Base station air conditioner, humidifying system thereof and humidifying system control method
CN210891596U (en) * 2019-04-08 2020-06-30 广东美的暖通设备有限公司 Steam generating device and air conditioning device

Similar Documents

Publication Publication Date Title
CN109973972A (en) Steam generation facility, control method and conditioner
US11105533B2 (en) Hot water heating systems and related methods
CN109973969A (en) Steam generation facility and conditioner
CN109973966A (en) Steam generation facility and conditioner
CN105588336B (en) Water heater and its control method
CN109973967A (en) Steam generation facility and conditioner
CN209857210U (en) Air conditioning apparatus
CN106183701A (en) The air-conditioning device of vehicle
WO2020207283A1 (en) Steam generation device and air conditioning device
CN109973973A (en) Steam generation facility and conditioner
CN109973968A (en) Steam generation facility and conditioner
CN109973970A (en) Steam generation facility and conditioner
CN109973971A (en) Steam generation facility and conditioner
CN209819725U (en) Multi-connected air conditioning system
CN210485665U (en) Steam generating device and air conditioning device
CN210891596U (en) Steam generating device and air conditioning device
CN109974113A (en) Conditioner
CN210485664U (en) Steam generating device and air conditioning device
CN210485666U (en) Steam generating device and air conditioning device
CN210118935U (en) Steam generating device and air conditioning device
CN210485663U (en) Steam generating device and air conditioning device
CN210485667U (en) Steam generating device and air conditioning device
CN210123153U (en) Steam generating device and air conditioning device
CN109915979A (en) Humidification device and air conditioner with same
CN105157229B (en) Hot water machine water tank and hot water machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination