CN109972649A - Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress - Google Patents

Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress Download PDF

Info

Publication number
CN109972649A
CN109972649A CN201910380277.4A CN201910380277A CN109972649A CN 109972649 A CN109972649 A CN 109972649A CN 201910380277 A CN201910380277 A CN 201910380277A CN 109972649 A CN109972649 A CN 109972649A
Authority
CN
China
Prior art keywords
bridge pier
reinforcing bar
cushion cap
bridge
geological process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910380277.4A
Other languages
Chinese (zh)
Inventor
周建
邓治国
李建中
解卫江
肖耀辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Shanxi Road and Bridge Construction Group Co Ltd
Original Assignee
Tongji University
Shanxi Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University, Shanxi Road and Bridge Construction Group Co Ltd filed Critical Tongji University
Priority to CN201910380277.4A priority Critical patent/CN109972649A/en
Publication of CN109972649A publication Critical patent/CN109972649A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

It is suitable for reducing bridge pier under geological process the present invention relates to one kind, half hinge of cushion cap and basic stress constructs, it can be simultaneously in bridge direction across bridge and vertical bridge to playing a role, including sleeve, reinforcing bar is truncated, connect reinforcing bar and mortar bed, the bridge pier is placed on cushion cap, the truncation Bar Anchorage is in bridge pier, the connection reinforcing bar lower end is protruded into and is anchored in cushion cap, upper end is protruded into and is anchored in bridge pier, bridge pier is connect by the connection reinforcing bar with cushion cap, in the junction of the bridge pier and cushion cap, mortar bed is poured on the outside of the connection reinforcing bar, the sleeve wraps connection reinforcing bar in bridge pier and cushion cap junction, contact of the isolation connection reinforcing bar with concrete, it is concentrated to avoid connection reinforcement stresses.Compared with prior art, the present invention can reduce bridge pier under geological process, cushion cap, basis internal force, have many advantages, such as to reduce foundation engineering amount, reduce bridge pier arrangement of reinforcement, reduce cushion cap and basis seismic Damage, is easy for construction, reliable performance, low in cost.

Description

Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress
Technical field
The present invention relates to sciences of bridge building, earthquake engineering field, are suitable for reducing under geological process more particularly, to one kind is suitable Half hinge of bridge pier, cushion cap and basic stress constructs.
Background technique
Under geological process, girder, pile foundation, cushion cap are often used as capacity protection component, are set by capacity protection principle Meter, and bridge pier is often designed as ductile reinforced member, and pier stud is made to form whole ductile mechanism.But when the sectional dimension of bridge pier is larger (such as Railway Bridges And Piers), bridge pier is difficult to enter ductility under geological process, bears biggish earthquake so as to cause bridge foundation and cushion cap Power is shown in that Fig. 3, Fig. 4, Fig. 3, Fig. 4 are the destruction picture of Japan Kobe earthquake pile foundation.Therefore, by using reasonable construction, lead to The yield moment for reducing bridge pier is crossed, so that reducing seismic force suffered by bridge foundation and cushion cap is big section bridge pier tensility shock-resistant The key point of design.
In order to protect basis, there is researcher to propose to see Fig. 5 using lift-off formula pile foundation.Its structural form is to hold Platform and pile foundation junction set seam, to have the function that discharge pulling force and moment of flexure between pile foundation and cushion cap for only compression spring.But It is such construct under geological process, cushion cap and pile crown often generate collision, cause the destruction of pile crown;Cushion cap and basis are without reliable Connection, structure is more soft, and geological process flowering structure displacement response is larger;In addition when bridge pier is higher, such bridge pier under severe earthquake action There is also the problem of toppling, it is not suitable for high pier, and the construction is complicated, cost is high, and as concealed work, checks and repair after shake It has difficulties again.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to be suitable for reducing ground Half hinge that shake acts on lower bridge pier, cushion cap and basic stress constructs, which can reduce the yield moment of large scale section bridge pier, To reduce cushion cap and basic stress, under the premise of not influencing bridge normal use, the bridge under geological process can be effectively controlled The yield moment of pier reduces the seismic force that bridge pier reaches cushion cap, basis.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of half hinge construction suitable for reducing bridge pier under geological process, cushion cap and basic stress, can be simultaneously in bridge cross Bridge to playing a role, including sleeve, truncation reinforcing bar, connection reinforcing bar and mortar bed, the bridge pier are placed on cushion cap with vertical bridge, The truncation Bar Anchorage is in bridge pier, and the connection reinforcing bar lower end is protruded into and is anchored in cushion cap, and upper end is protruded into and is anchored in In bridge pier, bridge pier is connect by the connection reinforcing bar with cushion cap, in the junction of the bridge pier and cushion cap, in the connection reinforcing bar Outside pours mortar bed, and the sleeve wraps connection reinforcing bar, isolation connection reinforcing bar and coagulation in bridge pier and cushion cap junction The contact of soil is concentrated to avoid connection reinforcement stresses.
Further, the connection reinforcing bar is arranged in the inside of truncation reinforcing bar, the truncation reinforcing bar on bridge pier cross section It is laid around bridge pier in bridge pier, the truncation reinforcing bar apart from bridge pier indulges bridge, and to the end with direction across bridge, there are a spacing.
Connect between reinforcing bar and truncation reinforcing bar there are interior receipts distance, the interior receipts distance according to normal use load case with And frequently occurred earthquake load case determines, pier bottom section bending strength should meet under normal use load and frequently occurred earthquake reinforcing bar in bullet The requirement of property range.It is received under rarely occurred earthquake effect due to connecting in reinforcing bar designing, the surrender that can effectively reduce pier bottom is curved Square is to reduce the stress of cushion cap and pile foundation.
Further, the interior receipts distance for connecting reinforcing bar is true according to normal use load case and frequently occurred earthquake load case Fixed, pier bottom section bending strength should meet under normal use load and frequently occurred earthquake reinforcing bar in the requirement of elastic range.Generally connect It connects reinforcing bar and the 20-30% that interior receipts distance of the reinforcing bar between bridge pier length direction is bridge pier length is truncated, connect reinforcing bar and cut Interior receipts distance of the disconnected reinforcing bar between bridge pier width direction is the 20-30% of bridge pier width, and corresponding bridge pier bottom section is anti- Curved intensity should meet under normal use load and frequently occurred earthquake reinforcing bar in the requirement of elastic range, generally higher than 240MPa.
It is described connection reinforcing bar interior receipts, can make bridge pier bottom yield moment reduce 40-50%, thus reduce bridge pier, The internal force of cushion cap and pile foundation, plays antihunt action.
Further, there are a spacing for upper surface of the lower end of the truncation reinforcing bar apart from cushion cap.That is truncation reinforcing bar is being held Suitable distance truncation above platform.
Further, the length that the connection reinforcing bar protrudes into bridge pier is the 90- of bridge pier vertically and horizontally cross-sectional maximum dimension 120%, it is bridge pier diameter for circular pier, protruding into cushion cap length is specification regulation anchorage length, for connection bar diameter 30-35 times, to connect cushion cap and bridge pier.
Further, the length of the sleeve is 5-10 times of connection bar diameter, and does not influence connection reinforcing bar and holding Anchoring in platform and bridge pier.
Further, the bush material includes the one or more of plastics, rubber or cork.
Further, truncation reinforcing bar 15-20cm above cushion cap is truncated.
Further, the outside bending in lower end of the connection reinforcing bar, to be sufficiently anchored in cushion cap.
Further, the mortar bed is located in the bridge pier above cushion cap, the mortar bed pour area according to The target capabilities of bridge pier determine, are the 40-50% of pier section area, with a thickness of 5-10cm.
Under rarely occurred earthquake effect, mortar bed is destroyed on the outside of pier bottom section, and effective cross-section is enclosed by connection reinforcing bar Area is constituted, and area of section reduces, Stiffness, therefore, can effectively reduce the moment of flexure that rarely occurred earthquake acts on lower bridge pier bottom, To reduce the internal force of cushion cap, pile foundation.
The components such as the cushion cap and pile foundation are as capacity protection component.
Under normal use load and frequently occurred earthquake effect operating condition, which meets normal power transmission demand.Cushion cap and bridge pier Connect the quantity of reinforcing bar, anchorage length, mortar bed area account for the section gross area ratio should all meet normal use load with Frequently occurred earthquake acts on operating condition, and pier bottom section bending strength will meet normal use load and frequently occurred earthquake acts on lower reinforcing bar in bullet The requirement of property range.
In the case where being designed at rarely occurred earthquake load action, half hinge construction enters yield situation, achievees the purpose that reduce seismic force, To protect other capacity protection components.
The invention discloses a kind of simple structure, easy for construction, installation and maintenance cost are cheap, are suitable for China's bridge pier Half hinge construction of the biggish freely-supported beam bridge of sectional dimension or rigid frame bridge.The device can be before not influencing bridge normal use It puts, the yield moment at bridge pier bottom or pier top under effective and reasonable Earthquake occurrence control effect reduces cushion cap, basis and other abilities and protects The seismic force demand of component is protected, while reducing the displacement of geological process flowering structure, compared with lift-off formula pile foundation, which is more suitable for height Pier bridge.
Compared with prior art, the invention has the following advantages that
(1) it is designed at bridge pier under rarely occurred earthquake acts on and enters yield situation, be effectively reduced the ground of lower part cushion cap and basis Shake demand protects other capacity protection components;
(2) simple structure, low in cost, strong operability facilitate inspection to repair after shake;
(3) after the half hinge construction forms plastic hinge at half hinge, bridge pier can provide reliable and stable hysteretic energy ability, can The performance for making full use of material is effectively reduced the seismic response of structure, while can reduce displacement structure, makes it in permissible range It is interior.
Detailed description of the invention
Fig. 1 is the half hinge construction schematic view of the front view suitable for reducing bridge pier under geological process, cushion cap and basic stress;
Fig. 2 is the face A-A schematic cross-sectional view in Fig. 1;
It is identified in figure are as follows: reinforcing bar 2 is truncated in sleeve 1, connects reinforcing bar 3, mortar bed 4
Fig. 3 is the destruction schematic diagram one of Japan Kobe earthquake pile foundation;
Fig. 4 is the destruction schematic diagram two of Japan Kobe earthquake pile foundation;
Fig. 5 is lift-off pile foundation schematic diagram.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
As illustrated in fig. 1 and 2, a kind of half hinge construction suitable for reducing bridge pier under geological process, cushion cap and basic stress, can Simultaneously in bridge direction across bridge and vertical bridge to playing a role, including sleeve 1, truncation reinforcing bar 2, connection reinforcing bar 3 and mortar bed 4, institute It states bridge pier 5 to be placed on cushion cap 6, the truncation reinforcing bar 2 is anchored in bridge pier 5, and 3 lower end of connection reinforcing bar, which is protruded into and is anchored in, holds In platform 6, upper end is protruded into and is anchored in bridge pier 5, and bridge pier 5 is connect by the connection reinforcing bar 3 with cushion cap 6, the bridge pier 5 with hold The junction of platform 6 pours mortar bed 4 in the outside of the connection reinforcing bar 3, and the sleeve 1 is in bridge pier 5 and 6 junction of cushion cap Connection reinforcing bar 3 is wrapped, contact of the isolation connection reinforcing bar 3 with concrete is concentrated to avoid connection 3 stress of reinforcing bar.
In the present embodiment, the connection reinforcing bar 3 is arranged in the inside of truncation reinforcing bar 2, the truncation on 5 cross section of bridge pier Reinforcing bar 2 is laid around bridge pier 5 in bridge pier 5, and the truncation reinforcing bar 2 is indulged bridge apart from bridge pier 5 and stayed to the end with direction across bridge There is a spacing.
I.e. there are interior receipts distances between connection reinforcing bar 3 and truncation reinforcing bar 2, and the interior receipts distance is according to normal use load case And frequently occurred earthquake load case determines, pier bottom section bending strength should meet reinforcing bar under normal use load and frequently occurred earthquake and exist The requirement of elastic range.It is designing and, due to receiving in connection reinforcing bar, the surrender of pier bottom can effectively reduced under rarely occurred earthquake effect Moment of flexure is to reduce the stress of cushion cap and pile foundation.
In the present embodiment, the interior receipts distance is determined according to normal use load case and frequently occurred earthquake load case, The interior receipts distance of general connection reinforcing bar 3 and truncation reinforcing bar 2 between bridge pier length direction is the 20-30% of bridge pier length, connection The interior receipts distance of reinforcing bar 3 and truncation reinforcing bar 2 between bridge pier width direction is the 20-30% of bridge pier width, and corresponding bridge pier Bottom section bending strength should meet reinforcing bar under normal use load and frequently occurred earthquake in the requirement of elastic range, generally higher than 240MPa。
It is described connection reinforcing bar interior receipts, can make bridge pier bottom yield moment reduce 40-50%, thus reduce bridge pier, The internal force of cushion cap and pile foundation, plays antihunt action.
In the present embodiment, there are a spacing for upper surface of the lower end of the truncation reinforcing bar 2 apart from cushion cap 6.Reinforcing bar 2 is truncated Suitable distance is truncated above cushion cap 6.
In the present embodiment, the truncation reinforcing bar 2 15-20cm above cushion cap is truncated.
In the present embodiment, the length that the connection reinforcing bar 3 protrudes into bridge pier 5 is the 90- of the vertically and horizontally cross-sectional maximum dimension of bridge pier 5 120%, it is bridge pier diameter for circular pier, protruding into 6 length of cushion cap is specification regulation anchorage length, to connect 3 diameter of reinforcing bar 30-35 times, to connect cushion cap 5 and bridge pier 6.
In the present embodiment, the length of the sleeve 1 is 5-10 times of connection 3 diameter of reinforcing bar, and does not influence to connect reinforcing bar 3 Anchoring in cushion cap and bridge pier.
In the present embodiment, 1 material of sleeve includes the one or more of plastics, rubber or cork.
In the present embodiment, the outside bending in lower end of the connection reinforcing bar 3, to be sufficiently anchored in cushion cap.
In the present embodiment, the mortar bed 4 is located in the bridge pier 5 of 6 top of cushion cap, and the mortar bed 4 pours face Product is determined according to the target capabilities of bridge pier, is the 40-50% of pier section area, with a thickness of 5-10cm.
Under rarely occurred earthquake effect, mortar bed is destroyed on the outside of pier bottom section, and effective cross-section is enclosed by connection reinforcing bar Area is constituted, and area of section reduces, Stiffness, therefore, can effectively reduce the moment of flexure that rarely occurred earthquake acts on lower bridge pier bottom, To reduce the internal force of cushion cap, pile foundation.
The components such as the cushion cap and pile foundation are as capacity protection component.
Under normal use load and frequently occurred earthquake effect operating condition, which meets normal power transmission demand.Cushion cap and bridge pier Connect the quantity of reinforcing bar, anchorage length, mortar bed area account for the section gross area ratio should all meet normal use load with Frequently occurred earthquake acts on operating condition, and pier bottom section bending strength will meet normal use load and frequently occurred earthquake acts on lower reinforcing bar in bullet The requirement of property range.
In the case where being designed at rarely occurred earthquake load action, half hinge construction enters yield situation, achievees the purpose that reduce seismic force, To protect other capacity protection components.
The invention discloses a kind of simple structure, easy for construction, installation and maintenance cost are cheap, are suitable for China's bridge pier Half hinge construction measure of the biggish freely-supported beam bridge of sectional dimension or rigid frame bridge.The device can not influence bridge normal use Under the premise of, the yield moment at bridge pier bottom or pier top under effective and reasonable Earthquake occurrence control effect reduces cushion cap, basis and other energy It tries hard to keep and protects the seismic force demand of component, while reducing the displacement of geological process flowering structure, compared with lift-off formula pile foundation, the construction is more applicable In high pier bridge.
This hair can be understood and applied the above description of the embodiments is intended to facilitate those skilled in the art It is bright.Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein General Principle is applied in other embodiments without having to go through creative labor.Therefore, the present invention is not limited to implementations here Example, those skilled in the art's announcement according to the present invention, the improvement made for the present invention and modification all should be of the invention Within protection scope.

Claims (9)

1. a kind of half hinge construction suitable for reducing bridge pier under geological process, cushion cap and basic stress, which is characterized in that including set Cylinder (1), truncation reinforcing bar (2), connection reinforcing bar (3) and mortar bed (4), the bridge pier (5) are placed on cushion cap (6), the truncation Reinforcing bar (2) is anchored in bridge pier (5), and connection reinforcing bar (3) lower end is protruded into and is anchored in cushion cap (6), and upper end is protruded into and anchor It is fixed in bridge pier (5), bridge pier (5) is connect by the connection reinforcing bar (3) with cushion cap (6), in the bridge pier (5) and cushion cap (6) Junction pours mortar bed (4) on the outside of the connection reinforcing bar (3), and the sleeve (1) is handed in bridge pier (5) and cushion cap (6) The place of connecing wraps connection reinforcing bar (3), contact of isolation connection reinforcing bar (3) with concrete.
2. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that the inside for connecting reinforcing bar (3) and being arranged in truncation reinforcing bar (2) on bridge pier (5) cross section, described section Disconnected reinforcing bar (2) are laid around bridge pier (5) in bridge pier (5), the truncation reinforcing bar (2) apart from bridge pier (5) vertical bridge to cross Bridge to there are a spacing for end.
3. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that there are a spacing for upper surface of the lower end of truncation reinforcing bar (2) apart from cushion cap (6).
4. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 Make, it is characterised in that connection reinforcing bar (3) protrude into bridge pier (5) length be bridge pier (5) vertically and horizontally cross-sectional maximum dimension 90- 120%, protruding into cushion cap (6) length is 30-35 times for connecting reinforcing bar (3) diameter, to connect cushion cap (5) and bridge pier (6).
5. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that the length of the sleeve (1) is 5-10 times of connection reinforcing bar (3) diameter, and does not influence to connect reinforcing bar (3) anchoring in cushion cap and bridge pier.
6. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that sleeve (1) material includes the one or more of plastics, rubber or cork.
7. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that the truncation reinforcing bar (2) 15-20cm above cushion cap is truncated.
8. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that the outside bending in lower end of connection reinforcing bar (3).
9. a kind of half hinge structure suitable for reducing bridge pier under geological process, cushion cap and basic stress according to claim 1 It makes, which is characterized in that the mortar bed (4) is located at the bridge pier (5) above cushion cap (6) Nei, and mortar bed (4) pour Area is the 40-50% of pier section area, with a thickness of 5-10cm.
CN201910380277.4A 2019-05-08 2019-05-08 Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress Pending CN109972649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910380277.4A CN109972649A (en) 2019-05-08 2019-05-08 Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910380277.4A CN109972649A (en) 2019-05-08 2019-05-08 Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress

Publications (1)

Publication Number Publication Date
CN109972649A true CN109972649A (en) 2019-07-05

Family

ID=67073204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910380277.4A Pending CN109972649A (en) 2019-05-08 2019-05-08 Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress

Country Status (1)

Country Link
CN (1) CN109972649A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254816A (en) * 2020-03-26 2020-06-09 中铁二院工程集团有限责任公司 Recoverable ductile structure pier for railway bridge
CN111636466A (en) * 2020-05-29 2020-09-08 叶长青 Wooden earthquake-resistant building
CN113373800A (en) * 2021-06-24 2021-09-10 上海应用技术大学 Hollow prefabricated assembled pier adopting grouting sleeve and connecting method thereof
CN113481831A (en) * 2021-06-10 2021-10-08 浙江工业大学 Seamless pier structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN104562923A (en) * 2015-01-17 2015-04-29 福州大学 Semi-rigid-joint integral type abutment bridge supported by concrete pile and construction method
CN107059599A (en) * 2017-04-27 2017-08-18 北京市市政工程设计研究总院有限公司 Antidetonation without bearing Self-resetting, damping cast-in-situ bridge
CN107190634A (en) * 2017-06-08 2017-09-22 上海应用技术大学 A kind of method of rapid construction bridge pier after macroseism shifted based on plastic hinge
CN108570923A (en) * 2018-05-06 2018-09-25 北京工业大学 The reinforced concrete bridge pier construction that can be quickly repaired after shake
CN108978450A (en) * 2018-08-31 2018-12-11 浙江工业大学 A kind of semi-integral bridge abutment connection structure and its construction method
CN210140843U (en) * 2019-05-08 2020-03-13 山西路桥建设集团有限公司 Half hinge structure suitable for reducing stress of pier, cushion cap and foundation under earthquake action

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN104562923A (en) * 2015-01-17 2015-04-29 福州大学 Semi-rigid-joint integral type abutment bridge supported by concrete pile and construction method
CN107059599A (en) * 2017-04-27 2017-08-18 北京市市政工程设计研究总院有限公司 Antidetonation without bearing Self-resetting, damping cast-in-situ bridge
CN107190634A (en) * 2017-06-08 2017-09-22 上海应用技术大学 A kind of method of rapid construction bridge pier after macroseism shifted based on plastic hinge
CN108570923A (en) * 2018-05-06 2018-09-25 北京工业大学 The reinforced concrete bridge pier construction that can be quickly repaired after shake
CN108978450A (en) * 2018-08-31 2018-12-11 浙江工业大学 A kind of semi-integral bridge abutment connection structure and its construction method
CN210140843U (en) * 2019-05-08 2020-03-13 山西路桥建设集团有限公司 Half hinge structure suitable for reducing stress of pier, cushion cap and foundation under earthquake action

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254816A (en) * 2020-03-26 2020-06-09 中铁二院工程集团有限责任公司 Recoverable ductile structure pier for railway bridge
CN111636466A (en) * 2020-05-29 2020-09-08 叶长青 Wooden earthquake-resistant building
CN113481831A (en) * 2021-06-10 2021-10-08 浙江工业大学 Seamless pier structure and construction method thereof
CN113373800A (en) * 2021-06-24 2021-09-10 上海应用技术大学 Hollow prefabricated assembled pier adopting grouting sleeve and connecting method thereof

Similar Documents

Publication Publication Date Title
CN109972649A (en) Suitable for reducing half hinge construction of bridge pier under geological process, cushion cap and basic stress
CN107059599B (en) Antidetonation, damping cast-in-situ bridge without support Self-resetting
WO2019149270A1 (en) Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar
US7254921B2 (en) Rocking hinge bearing system for isolating structures from dynamic/seismic loads
CN104153287A (en) Segmental assembled concrete frame pier system with self-reset function and method
CN208563346U (en) A kind of large span band angle brace prestressing force Double-row Piles Support system
KR102226697B1 (en) Fixing and seismic strengthening method of steel bar trusses to improve seismic performance of masonry buildings
CN105484152A (en) Connection mode of pier and bearing platform through additional mild steel dampers
CN108678227A (en) A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar
CN110080388A (en) A kind of connection structure and its construction method improving PC frame joint anti-seismic performance
CN107338864A (en) Prefabricated reinforced concrete frame structure node
WO2016181669A1 (en) Rigid connection structure for bottom end of pillar and concrete pile
CN210622421U (en) Building shock insulation support
CN215482258U (en) Multi-damping system for segment-assembled single-column pier separated UHPC swinging bearing platform
CN108316130A (en) A kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement
CN212611921U (en) Prefabricated assembled concrete-filled steel tube self-resetting pier with box-type earthquake damage replaceable components
CN110409647B (en) Easily-repaired assembled concrete frame ductility energy dissipation node with single-side yield
CN202416163U (en) Multi-stage lead core rubber shock insulation support
CN210140843U (en) Half hinge structure suitable for reducing stress of pier, cushion cap and foundation under earthquake action
CN208415517U (en) A kind of Fabricated Beam-Slab connection structure
CN208379837U (en) A kind of band diagonal brace steel pipe concrete frame shear wall of built-in prestressed steel bar
CN208455456U (en) A kind of three straddle type environmental type bridges with Horizontal Seismic support construction
CN106337512A (en) The bottom reinforced concrete-filled steel tubular frame high-strength concrete composite shear wall and manufacturing method
CN103790230B (en) Novel post-earthquake self-reset concrete framework structural system
CN217174354U (en) Double-column type prefabricated swing pier multiple damping structure system with replaceable prestressed tendons

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination